Toronto Pearson Airport
Terminal Expansion Project
Presented by:
Ahmed Mahmoud
Toronto Pearson Airport - Terminal Expansion Project
Topics
 Introduction
 Procurement Strategy
 Change and Conflict Management
 Recommendations & Conclusion
Introduction
Toronto Pearson Airport - Terminal Expansion Project
Introduction
GTAA needs to address the following challenges:
1. Rapid increase in passenger volumes and cargo movement;
2. Overcrowding; and
3. Overall efficiency of the airport
Toronto Pearson Airport - Terminal Expansion Project
Introduction
Best approach to solving these challenges:
A TERMINAL EXPANSION PROJECT!
Toronto Pearson Airport - Terminal Expansion Project
Introduction
Aviation Activity & Forecast
Actual Forecast
Year 1990 1995 2000 2005 2010 2015 2020 2025 2030
Passengers 22 22.4 28.9 29.9 36 42.9 50.3 58.1 66
In 2010, approximately 36 million passengers passed through Toronto Pearson
Forecast of 58 million passengers by 2025
Toronto Pearson Airport - Terminal Expansion Project
Introduction
Terminal Expansion Project Components
 Terminal 1 Expansion of 400,000m²;
 Three piers G, H & I to be built: Pier G will provide 18 gates; Pier H will provide 31
gates and Pier I will provide 14 gates;
 New pedestrian tunnel connection to GO train platform;
 New parking facility will provide 4,000 parking spaces;
 New pedestrian tunnel connection between new parking facility and Terminal; and
 New baggage claim areas.
Toronto Pearson Airport - Terminal Expansion Project
Introduction
Procurement Strategy
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Project delivery method
The recommended project delivery method is Construction
Management at Fee
Why Construction Management
 The effective use of available funds
 Enhanced control of the scope of the work
 Optimum project scheduling options
 flexibility in procurement options
 Strategies to avoid delays, changes and claims
 Assist in Design Consultant selection
 Enhanced design and construction quality
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Project delivery method
As a best practice major airport owners selected construction management
project delivery over other methods, for example the following International
Airports:
 Toronto Pearson
 London Heathrow
 Seattle-Tacoma
 Philadelphia
 San Francisco
 Los Angeles
 Cairo
 Jeddah
 Dubai
 Abu Dhabi
 Muscat
 Doha
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Procurement Model
The recommended procurement model is the
Traditional Model (Design-Bid-Build)
Why traditional procurement model
 This model is widely applicable, well understood, and
clearly defined roles for the parties involved.
 This model is the most common approach for public
owners having to comply with regional, provincial or
federal procurement statutes.
 The owner has a significant amount of control over the
end product.
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Scheduling Approach
The recommended scheduling approach is the
Sequential Approach
Sequential versus Fast-Track
 In sequential construction, construction does not begin until design is complete.
 In Fast-Track construction, design and construction activities overlap, with the goal
of reducing the overall time required to complete a project.
 Phased construction also introduces more complexity into the design process and
increases the potential for costly design errors.
 project estimated duration is not required to be fast-tracked.
 it’s required to be simple with minimum risk allocation.
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Forms of Agreement
Legal relations
Owner + Construction Manager = Management Services Contract;
Owner + Design Consultant = Design Services Contract;
Owner + General Contractor = Construction Services Contract.
Owner Issuing Organization
Construction Manager CCDC 5A Canadian Construction Documents Committee
Design Consultant RAIC Document 6 Royal Architectural Institute of Canada
General Contactor CCDC 2 Canadian Construction Documents Committee
CCDC 5A 2010 Construction Management Contract – For Services
RAIC Document 6 2006 Canadian Standard Form of Contract for Architectural Services
CCDC 2 2008 Stipulated Price Contract
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Project Organization
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Procurement Strategy Benefits
Using hybrid procurement strategy of construction management as a project
delivery method with traditional procurement model and sequential construction
approach will maximize the advantage of each method and minimize the concerns
of each one if used separately; which will lead to minimum risk allocation and best
value for construction dollar as briefly listed as follows:
 Development teams selection based upon qualifications.
 Owner can select sub-contractors/sub-consultants.
 Can be fast-tracked; if requested by the owner.
 CM responsible to deliver the project on budget and on schedule.
 Defined roles/responsibilities for the development teams.
 Initially presents the lowest potential cost for the project.
 Design change claims during construction are the minimum compared to other
strategies.
Toronto Pearson Airport - Terminal Expansion Project
Procurement Strategy
Procurement Strategy Benefits
Why P3 is not recommended
There has been increasing discussion recently of P3 financing for airport projects as
a response to the tightening of availability of financial resources for airports.
 P3 is not recommend for the terminal expansion project because it has conflict of
interest between the private investor and the public entity serving the taxpayers
interest;
 plus the partial risk and control to an outside entity for such a strategic facility;
 It is suitable for services & maintenance facilities where owner control is
non‐critical, through a limited and controlled scope.
Recommendations &
Conclusion
No procurement strategy is faultless
Toronto Pearson Airport - Terminal Expansion Project
Recommendations
 Effectively communicate to the various development project team members, It is
important that all parties understand and commit to the owner’s expectations.
 Ensure that the terms and conditions of the various contracts reflect the goals,
objectives, issues, and expectations for the project owner;
 Consider legal assistance experienced in construction matters for crafting the
contract language;
 Commit to the appropriate level of owner involvement;
 Assess potential risks and plan how to manage the overall project via a
professional construction management consultant.
 Consider using alternate dispute resolution (ADR) approaches such as, dispute
review boards, or similar alternatives.
 Finally, Define how such disputes will be handled so that disruption and
cost/schedule impact are minimized.
Toronto Pearson Airport - Terminal Expansion Project
Conclusion
No procurement strategy is faultless. But, choosing the system that
best works for this specific project and actively ensuring that it is
properly implemented, can mean the difference between the success
and failure of your project.
If the terminal expansion project is undertaken it will address the
demand and be designed to provide a better flow of passengers,
baggage and new commercial retail offerings all designed to enhance
the customer travel and service experience and solidify Toronto
Pearson as a truly global hub, attracting passengers from around the
globe.
Thank You!

More Related Content

What's hot

Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
ssuser553bbc
 
Airport planning
Airport planning Airport planning
Airport planning
Sonali99999
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
NISHCHAY SAXENA
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
srinivas2036
 
Standards of Cruise Terminal
Standards of Cruise Terminal Standards of Cruise Terminal
Standards of Cruise Terminal
Amr Samir Shaban
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building Design
Siniša Prvanov
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
Piyush KumAr
 
Airport Architecture
Airport ArchitectureAirport Architecture
Airport Architecture
Sourabh Prajapat
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
Nilanjana Pal
 
CHANGI AIRPORT
CHANGI AIRPORTCHANGI AIRPORT
CHANGI AIRPORT
Aashna Arora
 
Geometric design Taxiways
Geometric design TaxiwaysGeometric design Taxiways
Geometric design Taxiways
Zuhause México Corp,
 
Urban Design Studio PPT
Urban Design Studio PPTUrban Design Studio PPT
Urban Design Studio PPT
Angela Jaffuel
 
Strategies and Design of Airport City Stockholm
Strategies and Design of Airport City Stockholm Strategies and Design of Airport City Stockholm
Strategies and Design of Airport City Stockholm
Alexander Ståhle
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airport
Shubham Bathwal
 
Palm jumeirah
Palm jumeirah Palm jumeirah
Palm jumeirah
Divam Goyal
 
Risk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halsteadRisk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halstead
Association for Project Management
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
shrikrishna kesharwani
 
Process of planning and designing a new town
Process  of  planning and designing  a  new townProcess  of  planning and designing  a  new town
Process of planning and designing a new town
Noshad Ahmed Wahocho
 
Physical planning in town planning
Physical planning in town planningPhysical planning in town planning
Physical planning in town planning
Abhi Vallabhaneni
 
FINAL CHSRP AND Megaproject Presentation
FINAL CHSRP AND Megaproject PresentationFINAL CHSRP AND Megaproject Presentation
FINAL CHSRP AND Megaproject Presentation
Arthur Bauer
 

What's hot (20)

Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
Airport planning
Airport planning Airport planning
Airport planning
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
 
Standards of Cruise Terminal
Standards of Cruise Terminal Standards of Cruise Terminal
Standards of Cruise Terminal
 
Airport Planning & Terminal Building Design
Airport Planning & Terminal Building DesignAirport Planning & Terminal Building Design
Airport Planning & Terminal Building Design
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
 
Airport Architecture
Airport ArchitectureAirport Architecture
Airport Architecture
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
 
CHANGI AIRPORT
CHANGI AIRPORTCHANGI AIRPORT
CHANGI AIRPORT
 
Geometric design Taxiways
Geometric design TaxiwaysGeometric design Taxiways
Geometric design Taxiways
 
Urban Design Studio PPT
Urban Design Studio PPTUrban Design Studio PPT
Urban Design Studio PPT
 
Strategies and Design of Airport City Stockholm
Strategies and Design of Airport City Stockholm Strategies and Design of Airport City Stockholm
Strategies and Design of Airport City Stockholm
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airport
 
Palm jumeirah
Palm jumeirah Palm jumeirah
Palm jumeirah
 
Risk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halsteadRisk and assurance on crossrail - rob halstead
Risk and assurance on crossrail - rob halstead
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
Process of planning and designing a new town
Process  of  planning and designing  a  new townProcess  of  planning and designing  a  new town
Process of planning and designing a new town
 
Physical planning in town planning
Physical planning in town planningPhysical planning in town planning
Physical planning in town planning
 
FINAL CHSRP AND Megaproject Presentation
FINAL CHSRP AND Megaproject PresentationFINAL CHSRP AND Megaproject Presentation
FINAL CHSRP AND Megaproject Presentation
 

Viewers also liked

Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
L'Institut Paris Region
 
The Connected Traveler - Eindhoven Airport Digital Strategy
The Connected Traveler - Eindhoven Airport Digital StrategyThe Connected Traveler - Eindhoven Airport Digital Strategy
The Connected Traveler - Eindhoven Airport Digital Strategy
elilejeune
 
Hongkong international airport
Hongkong international airportHongkong international airport
Hongkong international airport
Vedo Yudistira
 
Schiphol marketting strategies
Schiphol marketting strategiesSchiphol marketting strategies
Schiphol marketting strategies
Kivanc Ozuolmez
 
Airport IT Strategy
Airport IT Strategy Airport IT Strategy
Airport IT Strategy
Sarmad Ibrahim
 
The Case For Change: Rethinking Library Services, Staffing, and Spaces
The Case For Change: Rethinking Library Services, Staffing, and SpacesThe Case For Change: Rethinking Library Services, Staffing, and Spaces
The Case For Change: Rethinking Library Services, Staffing, and Spaces
brightspot
 
Key factors of attractiveness for Airport Areas and the special role of human...
Key factors of attractiveness for Airport Areas and the special role of human...Key factors of attractiveness for Airport Areas and the special role of human...
Key factors of attractiveness for Airport Areas and the special role of human...
L'Institut Paris Region
 
Case Study of Changi Airport,Singapore
Case Study of Changi Airport,SingaporeCase Study of Changi Airport,Singapore
Case Study of Changi Airport,Singapore
eileen_0692
 
Singapore changi airport (wh)
Singapore changi airport (wh)Singapore changi airport (wh)
Singapore changi airport (wh)
Mee Rul
 
Changi Airport Process Technology
Changi Airport Process TechnologyChangi Airport Process Technology
Changi Airport Process Technology
Yesa Ardiansyah Perdana
 
IT Reference Architectures at Amsterdam Airport Schiphol
IT Reference Architectures at Amsterdam Airport SchipholIT Reference Architectures at Amsterdam Airport Schiphol
IT Reference Architectures at Amsterdam Airport Schiphol
Marc Chang Sing Pang
 
Dubai Airport 2012 Data Center Strategies
Dubai Airport  2012 Data Center Strategies Dubai Airport  2012 Data Center Strategies
Dubai Airport 2012 Data Center Strategies
Sarmad Ibrahim
 
Kansai airport ppt
Kansai airport pptKansai airport ppt
Kansai airport ppt
Pintu Badatiya
 
Business intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road mapBusiness intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road map
Omar Khan
 

Viewers also liked (14)

Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
Panoramique sur les paysages franciliens depuis la tour montparnasse pierre m...
 
The Connected Traveler - Eindhoven Airport Digital Strategy
The Connected Traveler - Eindhoven Airport Digital StrategyThe Connected Traveler - Eindhoven Airport Digital Strategy
The Connected Traveler - Eindhoven Airport Digital Strategy
 
Hongkong international airport
Hongkong international airportHongkong international airport
Hongkong international airport
 
Schiphol marketting strategies
Schiphol marketting strategiesSchiphol marketting strategies
Schiphol marketting strategies
 
Airport IT Strategy
Airport IT Strategy Airport IT Strategy
Airport IT Strategy
 
The Case For Change: Rethinking Library Services, Staffing, and Spaces
The Case For Change: Rethinking Library Services, Staffing, and SpacesThe Case For Change: Rethinking Library Services, Staffing, and Spaces
The Case For Change: Rethinking Library Services, Staffing, and Spaces
 
Key factors of attractiveness for Airport Areas and the special role of human...
Key factors of attractiveness for Airport Areas and the special role of human...Key factors of attractiveness for Airport Areas and the special role of human...
Key factors of attractiveness for Airport Areas and the special role of human...
 
Case Study of Changi Airport,Singapore
Case Study of Changi Airport,SingaporeCase Study of Changi Airport,Singapore
Case Study of Changi Airport,Singapore
 
Singapore changi airport (wh)
Singapore changi airport (wh)Singapore changi airport (wh)
Singapore changi airport (wh)
 
Changi Airport Process Technology
Changi Airport Process TechnologyChangi Airport Process Technology
Changi Airport Process Technology
 
IT Reference Architectures at Amsterdam Airport Schiphol
IT Reference Architectures at Amsterdam Airport SchipholIT Reference Architectures at Amsterdam Airport Schiphol
IT Reference Architectures at Amsterdam Airport Schiphol
 
Dubai Airport 2012 Data Center Strategies
Dubai Airport  2012 Data Center Strategies Dubai Airport  2012 Data Center Strategies
Dubai Airport 2012 Data Center Strategies
 
Kansai airport ppt
Kansai airport pptKansai airport ppt
Kansai airport ppt
 
Business intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road mapBusiness intelligence competency centre strategy and road map
Business intelligence competency centre strategy and road map
 

Similar to Toronto Pearson Airport - Terminal Expansion Project Presentation

Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
Ausrine Rakauskaite
 
ASCE T&DI Abstract 40 - Final Paper
ASCE T&DI Abstract 40 - Final PaperASCE T&DI Abstract 40 - Final Paper
ASCE T&DI Abstract 40 - Final Paper
Angela R. Newland, P.E., F. NSPE., A.A.E., I.A.P.
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
Haitham Mokhtar Abdelaty (CEng/MIMarEST) Project Manager
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
Giselle Duran
 
Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17 Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17
Association for Project Management
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
Catherine Bendell
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
Tim McManus
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
Gregoire Lesecq
 
50456_DBTR34_P_Info
50456_DBTR34_P_Info50456_DBTR34_P_Info
FPSO
FPSOFPSO
CCP Course - Introduction.pdf
CCP Course - Introduction.pdfCCP Course - Introduction.pdf
CCP Course - Introduction.pdf
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Standard forms lgtf
Standard forms lgtfStandard forms lgtf
Standard forms lgtf
Maheswari Karthikeyan
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
Pang Khai Shuen
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Construction
artba
 
4
44
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
Narendra Vasudeva
 
SDCV1116
SDCV1116SDCV1116
SDCV1116
Simon Drommel
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
Giselle Duran
 
AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
Association for Project Management
 

Similar to Toronto Pearson Airport - Terminal Expansion Project Presentation (20)

Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
ASCE T&DI Abstract 40 - Final Paper
ASCE T&DI Abstract 40 - Final PaperASCE T&DI Abstract 40 - Final Paper
ASCE T&DI Abstract 40 - Final Paper
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17 Contract and procuremet guide evening launch slides 05 10-17
Contract and procuremet guide evening launch slides 05 10-17
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
50456_DBTR34_P_Info
50456_DBTR34_P_Info50456_DBTR34_P_Info
50456_DBTR34_P_Info
 
FPSO
FPSOFPSO
FPSO
 
CCP Course - Introduction.pdf
CCP Course - Introduction.pdfCCP Course - Introduction.pdf
CCP Course - Introduction.pdf
 
Standard forms lgtf
Standard forms lgtfStandard forms lgtf
Standard forms lgtf
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Construction
 
4
44
4
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
SDCV1116
SDCV1116SDCV1116
SDCV1116
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016AVEVA ProCon FPSO Europe Congress 2016
AVEVA ProCon FPSO Europe Congress 2016
 
Project success through excellence in procurement and contract management
Project success through excellence in procurement and contract managementProject success through excellence in procurement and contract management
Project success through excellence in procurement and contract management
 

Recently uploaded

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 

Recently uploaded (20)

Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 

Toronto Pearson Airport - Terminal Expansion Project Presentation

  • 1. Toronto Pearson Airport Terminal Expansion Project Presented by: Ahmed Mahmoud
  • 2. Toronto Pearson Airport - Terminal Expansion Project Topics  Introduction  Procurement Strategy  Change and Conflict Management  Recommendations & Conclusion
  • 4. Toronto Pearson Airport - Terminal Expansion Project Introduction GTAA needs to address the following challenges: 1. Rapid increase in passenger volumes and cargo movement; 2. Overcrowding; and 3. Overall efficiency of the airport
  • 5. Toronto Pearson Airport - Terminal Expansion Project Introduction Best approach to solving these challenges: A TERMINAL EXPANSION PROJECT!
  • 6. Toronto Pearson Airport - Terminal Expansion Project Introduction Aviation Activity & Forecast Actual Forecast Year 1990 1995 2000 2005 2010 2015 2020 2025 2030 Passengers 22 22.4 28.9 29.9 36 42.9 50.3 58.1 66 In 2010, approximately 36 million passengers passed through Toronto Pearson Forecast of 58 million passengers by 2025
  • 7. Toronto Pearson Airport - Terminal Expansion Project Introduction Terminal Expansion Project Components  Terminal 1 Expansion of 400,000m²;  Three piers G, H & I to be built: Pier G will provide 18 gates; Pier H will provide 31 gates and Pier I will provide 14 gates;  New pedestrian tunnel connection to GO train platform;  New parking facility will provide 4,000 parking spaces;  New pedestrian tunnel connection between new parking facility and Terminal; and  New baggage claim areas.
  • 8. Toronto Pearson Airport - Terminal Expansion Project Introduction
  • 10. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Project delivery method The recommended project delivery method is Construction Management at Fee Why Construction Management  The effective use of available funds  Enhanced control of the scope of the work  Optimum project scheduling options  flexibility in procurement options  Strategies to avoid delays, changes and claims  Assist in Design Consultant selection  Enhanced design and construction quality
  • 11. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Project delivery method As a best practice major airport owners selected construction management project delivery over other methods, for example the following International Airports:  Toronto Pearson  London Heathrow  Seattle-Tacoma  Philadelphia  San Francisco  Los Angeles  Cairo  Jeddah  Dubai  Abu Dhabi  Muscat  Doha
  • 12. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Procurement Model The recommended procurement model is the Traditional Model (Design-Bid-Build) Why traditional procurement model  This model is widely applicable, well understood, and clearly defined roles for the parties involved.  This model is the most common approach for public owners having to comply with regional, provincial or federal procurement statutes.  The owner has a significant amount of control over the end product.
  • 13. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Scheduling Approach The recommended scheduling approach is the Sequential Approach Sequential versus Fast-Track  In sequential construction, construction does not begin until design is complete.  In Fast-Track construction, design and construction activities overlap, with the goal of reducing the overall time required to complete a project.  Phased construction also introduces more complexity into the design process and increases the potential for costly design errors.  project estimated duration is not required to be fast-tracked.  it’s required to be simple with minimum risk allocation.
  • 14. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Forms of Agreement Legal relations Owner + Construction Manager = Management Services Contract; Owner + Design Consultant = Design Services Contract; Owner + General Contractor = Construction Services Contract. Owner Issuing Organization Construction Manager CCDC 5A Canadian Construction Documents Committee Design Consultant RAIC Document 6 Royal Architectural Institute of Canada General Contactor CCDC 2 Canadian Construction Documents Committee CCDC 5A 2010 Construction Management Contract – For Services RAIC Document 6 2006 Canadian Standard Form of Contract for Architectural Services CCDC 2 2008 Stipulated Price Contract
  • 15. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Project Organization
  • 16. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Procurement Strategy Benefits Using hybrid procurement strategy of construction management as a project delivery method with traditional procurement model and sequential construction approach will maximize the advantage of each method and minimize the concerns of each one if used separately; which will lead to minimum risk allocation and best value for construction dollar as briefly listed as follows:  Development teams selection based upon qualifications.  Owner can select sub-contractors/sub-consultants.  Can be fast-tracked; if requested by the owner.  CM responsible to deliver the project on budget and on schedule.  Defined roles/responsibilities for the development teams.  Initially presents the lowest potential cost for the project.  Design change claims during construction are the minimum compared to other strategies.
  • 17. Toronto Pearson Airport - Terminal Expansion Project Procurement Strategy Procurement Strategy Benefits Why P3 is not recommended There has been increasing discussion recently of P3 financing for airport projects as a response to the tightening of availability of financial resources for airports.  P3 is not recommend for the terminal expansion project because it has conflict of interest between the private investor and the public entity serving the taxpayers interest;  plus the partial risk and control to an outside entity for such a strategic facility;  It is suitable for services & maintenance facilities where owner control is non‐critical, through a limited and controlled scope.
  • 19. Toronto Pearson Airport - Terminal Expansion Project Recommendations  Effectively communicate to the various development project team members, It is important that all parties understand and commit to the owner’s expectations.  Ensure that the terms and conditions of the various contracts reflect the goals, objectives, issues, and expectations for the project owner;  Consider legal assistance experienced in construction matters for crafting the contract language;  Commit to the appropriate level of owner involvement;  Assess potential risks and plan how to manage the overall project via a professional construction management consultant.  Consider using alternate dispute resolution (ADR) approaches such as, dispute review boards, or similar alternatives.  Finally, Define how such disputes will be handled so that disruption and cost/schedule impact are minimized.
  • 20. Toronto Pearson Airport - Terminal Expansion Project Conclusion No procurement strategy is faultless. But, choosing the system that best works for this specific project and actively ensuring that it is properly implemented, can mean the difference between the success and failure of your project. If the terminal expansion project is undertaken it will address the demand and be designed to provide a better flow of passengers, baggage and new commercial retail offerings all designed to enhance the customer travel and service experience and solidify Toronto Pearson as a truly global hub, attracting passengers from around the globe.

Editor's Notes

  1. 1