BIM Management, Made Simple.
the right bim,
at the right time,
by the right people
- for the right reasons
SmartLeanBIM™
We believe in
Top 5 BIM Uses
1. Benefits of BIM
2. Choosing the right BIM Use(s)
3. Top 5 BIM Uses - Demos + Templates
4. What’s next
Agenda:
BIM: get it right...
50% design saving 33% construction saving 20% operations saving
BIM: get it wrong...
Conflicts Blame Handover
So, how do
we get it
Right?
BIM
is used for:
Marketing
Facilities
Management
Analysis
QuantitiesClash
Simulation
VR/AR/MR
Design
(Building Information Modeling)
bim.psu.edu/uses
BIM / Model Use: Penn State University
BIM / Model Use: Harvard
Dr. Amarnath: https://www.bimthinkspace.com/2016/09/global-trends-in-bim-research.html
BIM / Model Use Research:
BIM / Model Use: BIM Dictionary
According to the BIM Dictionary,
Model Uses are the “intended or
expected project deliverables
from generating, collaborating-
on and linking 3D models to
external databases”. Each Model
Use represents a set of defined
requirements, specialised
activities and specific project
outcomes, grouped together
under a single heading so they
can be more easily specified,
measured and learned.
So, how do we
select the right
model uses?
The top uses of BIM in the US AEC
industry (Becerik-Geber, 2010)
“Determining the Frequency and Benefit of Applying
BIM for Different Purposes on Building Project”
(Kreider, Messner and Dubler).
First, the team must agree on WHY
this project needs a 3D Model.
Previous Webinar: Agree on why
Your project…
❏ Complex design?
❏ Constrained Site Plan?
❏ Cost Concerns?
❏ Schedule Constraints?
❏ External Party Review/Approvals?
❏ Environmental impacts?
❏ Tolerances?
❏ Asset Information?
❏ Maintenance Challenges?
Who can deliver?
BIM Capability Assessment and BIM Buy-in
How do owners ask for BIM?
BUT...
How do we actually
do this?
A goal without a plan is a dream
Let’s create our BIM Uses
Which ones?
Design Review
Quantities + Cost
Coordination
4D Planning
As-Built Handover
Design Reviews (the cool type)1
Quantities / Cost Estimation2
Coordination3D
Reference: http://www.designfirms.org/portfolios/view/29065/autocad-drafting-india/mep-bim-services/20068/
Phase Planning4D
As-built / Handover5
http://ashrae-ireland.org/2016/10/upcoming-event-facility-management-operational-energy-efficiency-and-bim-integration/
PLAN
SCOPE
TRACK
1
2
3
Solution - BIM Management, Made Simple.
PLAN
Project Execution Plans
that don’t gather dust.
● Industry templates & online contract
● Reduced admin and gain agreement
1
SCOPE
2
Visual project scopes that
everyone can understand.
● The who, what, when and why
● Visual scope agreement
The project timeline that
teams manage together.
● Auto-generated Tasks
● Live Gantt scheduling & Kanban board
TRACK
3
https://www.lodplanner.com/demo
www.lodplanner.com
@lodplanner
/lodplanner
/lodplanner
Product Demos
BIM Management, Made Simple.
Thank you!
SmartLeanBIM™

Top 5 BIM Uses

Editor's Notes

  • #7 Hello Everyone! Thanks for joining! Today’s webinar we be speaking about the boring part of BIM Not to worry - we at LOD Planner made BIM Planning fun!
  • #8 There are man BIM uses through out a projects life cycle. No matter the project type there is someone needing a BIM Model for Designing Purposes, Analysis, Clash Detection and Coordination, 4D Simulations in Construction and for Information purposes for Facities Management.
  • #13 Hello Everyone! Thanks for joining! Today’s webinar we be speaking about the boring part of BIM Not to worry - we at LOD Planner made BIM Planning fun!
  • #15 Hello Everyone! Thanks for joining! Today’s webinar we be speaking about the boring part of BIM Not to worry - we at LOD Planner made BIM Planning fun!
  • #26 A contract-to-validation workflow between all parties