Paper Study: A survey on modeling

guidelines for quantity takeoff-oriented
BIM-based design
Andre Monteiro, Joao Pocas Martins

1

Advisor: Professor Wei-Chi Wang
Student: Abdoul-Aziz GANSONRE
1/7/2014
 BIM: Building Information Modeling

 QTO: Quantity TakeOff

 SIGABIM: A research project for application and implementation of

BIM.
 CRMC: Curso Sobre Regras de Medição na Construção‖ (Course on

Measurement Rules in Construction)
 LOD: Level Of Development

1/7/2014

2
 Introduction
 Study outline
 Research findings
 Conclusion

1/7/2014

3
 Quantity TakeOff (QTO) is one of the potentially most important

applications of BIM.
 Traditionally, quantity takeoff is a manual process that involves

measuring the different design elements, namely, floor
plans, elevations, cross sections and other similar documents. (error
prone: e.g. a cross section of the connection of a beam, a column, a
wall and a slab).
 This type of survey also aims to highlight the potential benefits of

using BIM for QTO.
 The following presentation will be divided will show the applications of

BIM-based QTO, its problems and recommandations.
1/7/2014

4
STUDY OUTLINE

1/7/2014

5
 QTO is one of the key tasks in the construction process.

 QTO is the measurement of the building's schematics or of the

work done on site which is assembled in a Bill of Quantities.
 QTO should be accurate because the budget of the whole

construction process depends on it.

1/7/2014

6
QTO applications

•Early stage: it provides the
base for a preliminary cost
estimate for the project.
• Tendering stage: it is used
to assist in the estimation of
the project's cost and
duration of the construction
activities.
•Construction stage: it is
used for the economic
control of the project.

Relation of quantity takeoff with the other major tasks in the project life-cycle.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

1/7/2014

7
 BIM-based QTO provides simpler and yet more detailed and

accurate cost estimates of the project.
 Although capable of providing QTO tables, popular BIM tools

cannot manipulate that data.
 Information is usually exchanged between the BIM and cost

estimation software in one of two ways:
• Both systems use the same proprietary format for product data

definition and the exchange is done smoothly without loss of data.
• The systems use different proprietary formats and the exchange

is done by converting the data to a third, common format, usually
the Industry Foundation Classes (IFC).
1/7/2014

8
 ArchiCAD and Revit Architecture are the two most widely used

BIM tools for architectural design.
 Revit's QTO feature is simpler and not as powerful as

ArchiCAD's.
 ArchiCAD provides a larger choice of pre-defined

parameters, while Revit has fewer predefined measurement
parameters.

Autodesk Revit Architecture (left panel) and Graphisoft ArchiCAD (right panel) QTO parameterization interface.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

1/7/2014

9
 ArchiCAD allows the user to edit some of the fields through the

definition of new configurations directly on the takeoff sheet, with such
changes being then automatically processed in the building model.
 ArchiCAD can save the tables in various formats, including Excel, PDF

and DWF. Revit only exports tables in TXT format, which often requires
further processing in order to handle the data in subsequent phases.
 There is also a number of different applications that allow the user to

perform QTO on a BIM model Vico Office, Solibri Model
Checker, Autodesk Navisworks etc.

1/7/2014

10
 This study was conducted under the

SIGABIM project.

SIGABIM

ArchiCAD

CRMC

LOD 300

 ArchiCAD was adopted as the BIM

tool.
 The CRMC as the criteria to be

surveyed.
 As for modeling detail, the most used

level was the LOD 300.

1/7/2014

11
1/7/2014

BIM-based QTO according to the CRMC criteria survey — conceptual workflow.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

12
 Export to Vico Office was also taken into account in the modeling

process, meaning that no specific functions of ArchiCAD were used, thereby
preventing conflicts. The goal in SIGABIM is to use Vico Office as a tool to
extract quantities.
 Vico Office uses the same extracting engine as ArchiCAD's, which means it

will recognize the object's takeoff parameters.
 Certain CRMC criteria require greater detail in the modeling. An example of

this is would be the modeling of waterproofing finishes in roofs, where LOD
500.
 For the purpose of this article and for the sake of simplicity, the BIM design is

considered ―automatic‖ when the element ismodeled using the same
ArchiCAD element type.

1/7/2014

13
RESEARCH FINDINGS

1/7/2014

14
1/7/2014

15
For QTO in BIM, the coating quantities can be obtained

in 2 ways:
It can be modeled to obtain the exact quantity.

(overloaded)
It can be taken from the structural elements with a

margin of error being assumed. (errors)

1/7/2014

16
Issues in extracting formwork quantities from a BIM model.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

 The formwork is not created directly from the model and there is not

even a tool for modeling formwork.
 In the IFC format, no entity is defined for formwork.
 In terms of QTO, it is not possible to obtain systematic, complete and

consistent results.
 The formwork can be measured based on the surface of the elements

involved, but this does not work where elements intersect.
 The only solution for a full and effective system is to explicitly model

the formwork, but this is extremely time consuming.

1/7/2014

17
 The solution found involved creating an add-on for ArchiCAD that

would automatically provide a formwork model based on the
structural model of the building.
 The add-on would use the standard ArchiCAD tools, Wall, Slab

and Roof, respectively for vertical, horizontal and sloping
formwork, to assemble the formwork model and the QTO process
would develop from there over the formwork model obtained.

1/7/2014
Formwork model.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

18
 ArchiCAD can be used to design a structural model

but it is not possible to represent the reinforced
concrete elements' rebars.
 Process: build building structure elements in a low

LOD and then export the model in a structural analysis
applicaton where the cross sections are designed and
the elements' connections detailed.

1/7/2014

19
 Measuring the volume of concrete is easy

because it is automatically extracted, but
grooves/recesses is difficult.

 All the grooves/recesses should be modeled

manually.

1/7/2014

20
 Footings, piles, beams or foundation walls, are different types of

Foundations.
 Foundations are an example of building elements which do not have a

specific modeling tool.

 Foundation elements have to be modeled using other types of elements

such as the Slab, Beam, Column, Wall.
 Each object is then associated with a specific Layer or ID in order to be

possible to isolate it from other building element types.

1/7/2014

21
 Stairs are rather problematic elements in that they are hard to

model and to measure.

 The ArchiCAD Stair object is quite limited in terms of QTO; their

measurement parameters are applied to the staircase object as a
whole, not to the sum of its component parts.

 The good point is that it is possible to automatically extract

quantities of the staircase.

1/7/2014

22
 To obtain an accurate QTO for the windows and doors, we use

the following steps:

.

1. Define and model the opening's
configurations manually, using
other ArchiCAD tools such as Wall or
Beam.

2. Model the opening using the
Window/Wall tool in ArchiCAD

1/7/2014

23
3.Calculate the values
manually and add them to
the element as a label.

4. Classify the openings in
accordance with their dimensions
and other configurations, then
model and provide each opening
with a specific ID in accordance to
its classification.

1/7/2014

24
 The measurement of MEP elements – pipes, ducts and cableways –

cannot be achieved directly by the assessed tools.
 The average length can be taken for straight elements but not for

curved ones. In these cases, their radius and the angle of curve should
be extracted and then applied in a formula to arrive at the average
length.
 IDs and Layers should be assigned to enable the identification and

separation of the elements belonging to each continuous structure.

1/7/2014

25
 The SIGABIM methods presented in this article were

applied, specifically, in three projects — a hospital, an office building
and a research center.

 The overall modeling LOD 300 used in most cases proved to be

enough to satisfy the modeling and QTO needs.
 The quantities taken from ArchiCAD directly generally meet the

measurement requirements according to the demands of traditional
processes.

1/7/2014

26
Using BIM compared to traditional approach gives the following

benefits:
Increased accuracy in most measurements.

Direct linkage of the model extracted quantities to planning

Software.
Comparison of measurements for different phases of the

building.
Life-cycle becomes available.
Possibility of extracting partial or total quantities relating to a

given spatial area.
Margins of error often below 1%
Possibility of extracting information beyond typical

measurements, such as the number of openings or number of 27
1/7/2014
beams with a particular material characteristic, among others.
 The modeling is somewhat limited by the tools available. When it

comes to modeling — a staircase, for instance.

 As an alternative, users can configure a staircase according to their

requirements through the GDL programming function in ArchiCAD.
 Another solution would be to use elements other than the Stair tool

and assemble a staircase using Walls, Slabs and Beams.

1/7/2014

28
1/7/2014
Modeling elements for QTO purposes — conceptual workflow.
(A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)

29
PERSONAL
REFLEXIONS

1/7/2014

30
 The BIM based-estimation process is not completely automatic.
 There is not a specific standard of parameterization of objects.
 Because the case study focuses on ArchiCAD, it cannot be

regarded as representative for all BIM applications.
 A quick analysis of Revit's QTO parameters and mechanics

shows that the same problems experienced with ArchiCAD are
likely to occur with Revit.?
 ArchiCAD's specific or proprietary functions often lead to errors

both in the IFC translation and in the Vico Office QTO.

1/7/2014

31
 About coating in the BIM tools, it is difficult to perform QTO with exact

accuracy.
 One major disadvantage of the BIM tools that were evaluated is their

inability to work with formwork in the model.
 For simplicity in this research, the BIM design is considered

―automatic‖. For manual design, the results of the present research
may not be totally relevant.

1/7/2014

32
 Use ArchiCAD’ GDL Programming functions to configure better

modeling and QTO parameters. (Difficult)
 Perform a survey on BIM-based QTO using Revit and see if we

encounter the same problems. Then, compare with ArchiCAD and use
some ArchiCAD QTO positive aspects to improve the QTO on Revit.
 A study on how to improve the accuracy of quantities extracted

including:
• the standardization of QTO parameters,

• the adequate BIM software and cost estimation software to use

depending on the project.
• The best ways of obtaining perfect interoperability during the extracting
1/7/2014

process

33
 Monteiro, A., and Martins, J. P., (2013), “A survey on modeling guidelines for quantity takeoff-

oriented BIM-based design,” Automation in construction, Vol. 35, pp. 238-253.

 http://www.archicadwiki.com/MEP/FAQ
 http://www.abvent.com/softwares/archicad/
 http://fr.wikipedia.org/wiki/ArchiCAD

1/7/2014

34

More Related Content

What's hot

Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)Farid Ghori
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIMreem-yousef
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...Dalbir Dugal
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation Omar Selim
 
BEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceBEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceN.A. Tecnologia
 
BIM Presentation
BIM PresentationBIM Presentation
BIM PresentationOmer Syed
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Designnevena_psu
 

What's hot (20)

Bim
BimBim
Bim
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIM
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
BEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & MaintenanceBEXEL Manager - Facility & Maintenance
BEXEL Manager - Facility & Maintenance
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
BIM Presentation
BIM PresentationBIM Presentation
BIM Presentation
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
BIM & Sustainability
BIM & SustainabilityBIM & Sustainability
BIM & Sustainability
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
BIM
BIM BIM
BIM
 

Similar to A survey on modeling guidelines for quantity takeoff-oriented BIM-based design

Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Dr. Amarjeet Singh
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...IRJET Journal
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
Software Applications
Software ApplicationsSoftware Applications
Software ApplicationsXinYee Khoo
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”IRJET Journal
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...IRJET Journal
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxVandanaBrahmani1
 

Similar to A survey on modeling guidelines for quantity takeoff-oriented BIM-based design (20)

Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
 
Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
 
F1302033340
F1302033340F1302033340
F1302033340
 
BIM Report 3
BIM Report 3BIM Report 3
BIM Report 3
 

More from Abdoul-Aziz Gansonre

Introduction a la maquette numérique
Introduction a la maquette numériqueIntroduction a la maquette numérique
Introduction a la maquette numériqueAbdoul-Aziz Gansonre
 
Introduction to burkina faso construction industry
Introduction to burkina faso construction industryIntroduction to burkina faso construction industry
Introduction to burkina faso construction industryAbdoul-Aziz Gansonre
 
Burj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldBurj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldAbdoul-Aziz Gansonre
 
BURKINA FASO- General presentation
BURKINA FASO- General presentationBURKINA FASO- General presentation
BURKINA FASO- General presentationAbdoul-Aziz Gansonre
 

More from Abdoul-Aziz Gansonre (6)

Introduction a la maquette numérique
Introduction a la maquette numériqueIntroduction a la maquette numérique
Introduction a la maquette numérique
 
Introduction to burkina faso construction industry
Introduction to burkina faso construction industryIntroduction to burkina faso construction industry
Introduction to burkina faso construction industry
 
An introduction to MATLAB
An introduction to MATLABAn introduction to MATLAB
An introduction to MATLAB
 
Burj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldBurj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the world
 
Martin luther king BEST
Martin luther king BESTMartin luther king BEST
Martin luther king BEST
 
BURKINA FASO- General presentation
BURKINA FASO- General presentationBURKINA FASO- General presentation
BURKINA FASO- General presentation
 

Recently uploaded

Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightDelhi Call girls
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 

Recently uploaded (20)

Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 

A survey on modeling guidelines for quantity takeoff-oriented BIM-based design

  • 1. Paper Study: A survey on modeling guidelines for quantity takeoff-oriented BIM-based design Andre Monteiro, Joao Pocas Martins 1 Advisor: Professor Wei-Chi Wang Student: Abdoul-Aziz GANSONRE 1/7/2014
  • 2.  BIM: Building Information Modeling  QTO: Quantity TakeOff  SIGABIM: A research project for application and implementation of BIM.  CRMC: Curso Sobre Regras de Medição na Construção‖ (Course on Measurement Rules in Construction)  LOD: Level Of Development 1/7/2014 2
  • 3.  Introduction  Study outline  Research findings  Conclusion 1/7/2014 3
  • 4.  Quantity TakeOff (QTO) is one of the potentially most important applications of BIM.  Traditionally, quantity takeoff is a manual process that involves measuring the different design elements, namely, floor plans, elevations, cross sections and other similar documents. (error prone: e.g. a cross section of the connection of a beam, a column, a wall and a slab).  This type of survey also aims to highlight the potential benefits of using BIM for QTO.  The following presentation will be divided will show the applications of BIM-based QTO, its problems and recommandations. 1/7/2014 4
  • 6.  QTO is one of the key tasks in the construction process.  QTO is the measurement of the building's schematics or of the work done on site which is assembled in a Bill of Quantities.  QTO should be accurate because the budget of the whole construction process depends on it. 1/7/2014 6
  • 7. QTO applications •Early stage: it provides the base for a preliminary cost estimate for the project. • Tendering stage: it is used to assist in the estimation of the project's cost and duration of the construction activities. •Construction stage: it is used for the economic control of the project. Relation of quantity takeoff with the other major tasks in the project life-cycle. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253) 1/7/2014 7
  • 8.  BIM-based QTO provides simpler and yet more detailed and accurate cost estimates of the project.  Although capable of providing QTO tables, popular BIM tools cannot manipulate that data.  Information is usually exchanged between the BIM and cost estimation software in one of two ways: • Both systems use the same proprietary format for product data definition and the exchange is done smoothly without loss of data. • The systems use different proprietary formats and the exchange is done by converting the data to a third, common format, usually the Industry Foundation Classes (IFC). 1/7/2014 8
  • 9.  ArchiCAD and Revit Architecture are the two most widely used BIM tools for architectural design.  Revit's QTO feature is simpler and not as powerful as ArchiCAD's.  ArchiCAD provides a larger choice of pre-defined parameters, while Revit has fewer predefined measurement parameters. Autodesk Revit Architecture (left panel) and Graphisoft ArchiCAD (right panel) QTO parameterization interface. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253) 1/7/2014 9
  • 10.  ArchiCAD allows the user to edit some of the fields through the definition of new configurations directly on the takeoff sheet, with such changes being then automatically processed in the building model.  ArchiCAD can save the tables in various formats, including Excel, PDF and DWF. Revit only exports tables in TXT format, which often requires further processing in order to handle the data in subsequent phases.  There is also a number of different applications that allow the user to perform QTO on a BIM model Vico Office, Solibri Model Checker, Autodesk Navisworks etc. 1/7/2014 10
  • 11.  This study was conducted under the SIGABIM project. SIGABIM ArchiCAD CRMC LOD 300  ArchiCAD was adopted as the BIM tool.  The CRMC as the criteria to be surveyed.  As for modeling detail, the most used level was the LOD 300. 1/7/2014 11
  • 12. 1/7/2014 BIM-based QTO according to the CRMC criteria survey — conceptual workflow. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253) 12
  • 13.  Export to Vico Office was also taken into account in the modeling process, meaning that no specific functions of ArchiCAD were used, thereby preventing conflicts. The goal in SIGABIM is to use Vico Office as a tool to extract quantities.  Vico Office uses the same extracting engine as ArchiCAD's, which means it will recognize the object's takeoff parameters.  Certain CRMC criteria require greater detail in the modeling. An example of this is would be the modeling of waterproofing finishes in roofs, where LOD 500.  For the purpose of this article and for the sake of simplicity, the BIM design is considered ―automatic‖ when the element ismodeled using the same ArchiCAD element type. 1/7/2014 13
  • 16. For QTO in BIM, the coating quantities can be obtained in 2 ways: It can be modeled to obtain the exact quantity. (overloaded) It can be taken from the structural elements with a margin of error being assumed. (errors) 1/7/2014 16
  • 17. Issues in extracting formwork quantities from a BIM model. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253)  The formwork is not created directly from the model and there is not even a tool for modeling formwork.  In the IFC format, no entity is defined for formwork.  In terms of QTO, it is not possible to obtain systematic, complete and consistent results.  The formwork can be measured based on the surface of the elements involved, but this does not work where elements intersect.  The only solution for a full and effective system is to explicitly model the formwork, but this is extremely time consuming. 1/7/2014 17
  • 18.  The solution found involved creating an add-on for ArchiCAD that would automatically provide a formwork model based on the structural model of the building.  The add-on would use the standard ArchiCAD tools, Wall, Slab and Roof, respectively for vertical, horizontal and sloping formwork, to assemble the formwork model and the QTO process would develop from there over the formwork model obtained. 1/7/2014 Formwork model. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253) 18
  • 19.  ArchiCAD can be used to design a structural model but it is not possible to represent the reinforced concrete elements' rebars.  Process: build building structure elements in a low LOD and then export the model in a structural analysis applicaton where the cross sections are designed and the elements' connections detailed. 1/7/2014 19
  • 20.  Measuring the volume of concrete is easy because it is automatically extracted, but grooves/recesses is difficult.  All the grooves/recesses should be modeled manually. 1/7/2014 20
  • 21.  Footings, piles, beams or foundation walls, are different types of Foundations.  Foundations are an example of building elements which do not have a specific modeling tool.  Foundation elements have to be modeled using other types of elements such as the Slab, Beam, Column, Wall.  Each object is then associated with a specific Layer or ID in order to be possible to isolate it from other building element types. 1/7/2014 21
  • 22.  Stairs are rather problematic elements in that they are hard to model and to measure.  The ArchiCAD Stair object is quite limited in terms of QTO; their measurement parameters are applied to the staircase object as a whole, not to the sum of its component parts.  The good point is that it is possible to automatically extract quantities of the staircase. 1/7/2014 22
  • 23.  To obtain an accurate QTO for the windows and doors, we use the following steps: . 1. Define and model the opening's configurations manually, using other ArchiCAD tools such as Wall or Beam. 2. Model the opening using the Window/Wall tool in ArchiCAD 1/7/2014 23
  • 24. 3.Calculate the values manually and add them to the element as a label. 4. Classify the openings in accordance with their dimensions and other configurations, then model and provide each opening with a specific ID in accordance to its classification. 1/7/2014 24
  • 25.  The measurement of MEP elements – pipes, ducts and cableways – cannot be achieved directly by the assessed tools.  The average length can be taken for straight elements but not for curved ones. In these cases, their radius and the angle of curve should be extracted and then applied in a formula to arrive at the average length.  IDs and Layers should be assigned to enable the identification and separation of the elements belonging to each continuous structure. 1/7/2014 25
  • 26.  The SIGABIM methods presented in this article were applied, specifically, in three projects — a hospital, an office building and a research center.  The overall modeling LOD 300 used in most cases proved to be enough to satisfy the modeling and QTO needs.  The quantities taken from ArchiCAD directly generally meet the measurement requirements according to the demands of traditional processes. 1/7/2014 26
  • 27. Using BIM compared to traditional approach gives the following benefits: Increased accuracy in most measurements. Direct linkage of the model extracted quantities to planning Software. Comparison of measurements for different phases of the building. Life-cycle becomes available. Possibility of extracting partial or total quantities relating to a given spatial area. Margins of error often below 1% Possibility of extracting information beyond typical measurements, such as the number of openings or number of 27 1/7/2014 beams with a particular material characteristic, among others.
  • 28.  The modeling is somewhat limited by the tools available. When it comes to modeling — a staircase, for instance.  As an alternative, users can configure a staircase according to their requirements through the GDL programming function in ArchiCAD.  Another solution would be to use elements other than the Stair tool and assemble a staircase using Walls, Slabs and Beams. 1/7/2014 28
  • 29. 1/7/2014 Modeling elements for QTO purposes — conceptual workflow. (A. Monteiro, J. Poças Martins / Automation in Construction 35 (2013) 238–253) 29
  • 31.  The BIM based-estimation process is not completely automatic.  There is not a specific standard of parameterization of objects.  Because the case study focuses on ArchiCAD, it cannot be regarded as representative for all BIM applications.  A quick analysis of Revit's QTO parameters and mechanics shows that the same problems experienced with ArchiCAD are likely to occur with Revit.?  ArchiCAD's specific or proprietary functions often lead to errors both in the IFC translation and in the Vico Office QTO. 1/7/2014 31
  • 32.  About coating in the BIM tools, it is difficult to perform QTO with exact accuracy.  One major disadvantage of the BIM tools that were evaluated is their inability to work with formwork in the model.  For simplicity in this research, the BIM design is considered ―automatic‖. For manual design, the results of the present research may not be totally relevant. 1/7/2014 32
  • 33.  Use ArchiCAD’ GDL Programming functions to configure better modeling and QTO parameters. (Difficult)  Perform a survey on BIM-based QTO using Revit and see if we encounter the same problems. Then, compare with ArchiCAD and use some ArchiCAD QTO positive aspects to improve the QTO on Revit.  A study on how to improve the accuracy of quantities extracted including: • the standardization of QTO parameters, • the adequate BIM software and cost estimation software to use depending on the project. • The best ways of obtaining perfect interoperability during the extracting 1/7/2014 process 33
  • 34.  Monteiro, A., and Martins, J. P., (2013), “A survey on modeling guidelines for quantity takeoff- oriented BIM-based design,” Automation in construction, Vol. 35, pp. 238-253.  http://www.archicadwiki.com/MEP/FAQ  http://www.abvent.com/softwares/archicad/  http://fr.wikipedia.org/wiki/ArchiCAD 1/7/2014 34