This document discusses ISO 19650 and outlines a process for project mobilization and collaborative production of information according to its guidelines. It emphasizes the importance of proper planning, preparation and training during mobilization to setup the project team and technology for success. It also stresses the need for communication, trust and transparency during collaborative production to avoid issues like delays, rework and confusion. Key aspects covered include mobilizing resources and IT, testing procedures, generating and reviewing information, quality assurance checks and using technology like Plannerly to simplify the workflow.
Agenda:
1. Preparing For Better BIM Contracting
2. Level of Information Need Explained
3. BIM Contracting With E-Signature
Don't just ask for "BIM" as this will unlikely get you the BIM you need. More owners are now requesting "Building Information Modeling in accordance with ISO 19650" especially for the vitally important Appointment steps in the BIM contracting workflow.
Helping you communicate who is responsible for what BIM and at what point in time!
Introduction
ISO 19650 Templates Team
ISO 19650 Templates Results So Far
Using Structured Data
How To Get Involved
OIR, PIR, AIR, EIR, BEP - etc required
Outlines the concepts and principles for information management
Provides recommendations for a framework to manage information
Applied to all types of assets and by all types and sizes of organizations, regardless of the chosen procurement strategy
A unified approach
✓ What is ISO 19650
✓ ISO 19650 Templates
✓ ISO 19650 Appointment Workflow
✓ ISO 19650 Project Planning Workflow
✓ ISO 19650 Project Management Workflow
WATCH THE WEBINAR HERE: https://www.plannerly.com/what-is-iso-19650
Watch to learn how to:
- Read and understand YOUR Level of Information Needs
- Define the most efficient submittal and checking workflow
- Keep QA records of task reviews and approvals
- Use structured Plannerly data with Dynamo, Revit, Archicad, Power BI and more!
FULL WEBINAR RECORDINGS HERE: https://www.plannerly.com/iso-19650-webinar
Summary:
1. Understand ISO 19650 Requirements for Information Model Delivery
2. Define a Submittal Workflow
3. Check Your Work Before Submitting
4. Define a Checking Workflow
5. Use Structured Data
6. Allocate Time For Checking
7. Know What To Check Against
8. Document QA Records Properly
9. Combine Tools And Process
Hi Semua, Saya Denis dari CAED rakan Plannerly-Malaysia anda.
Today we are introducing the ISO 19650 Template of which it is the Standards for execution of Building Information Modeling (BIM).
Hari ini kami akan memperkenalkan Templat ISO 19650 yang merupakan Piawaian untuk Perlaksanaan BIM.
This session will be conducted in Bahasa Malaysia.
Perbentangan ini akan mengambil masa sekitar 25 minute, dan jikalau ada apa-apa persoalan, anda boleh menaipkan soal anda di dalam bahasa Malaysia atau English mengunakan CHAT BAR. Saya akan menjawab persoalan anda mengunakan rakaman untuk Q&A yang akan dimasukkan ke dalam rakaman video ini.
So, Let’s Start!
How The ISO 19650 Appointment Process Works
Agenda:
1. Preparing For Better BIM Contracting
2. Level of Information Need In Practice
3. BIM Contracting With E-Signature
Agenda:
1. Preparing For Better BIM Contracting
2. Level of Information Need Explained
3. BIM Contracting With E-Signature
Don't just ask for "BIM" as this will unlikely get you the BIM you need. More owners are now requesting "Building Information Modeling in accordance with ISO 19650" especially for the vitally important Appointment steps in the BIM contracting workflow.
Helping you communicate who is responsible for what BIM and at what point in time!
Introduction
ISO 19650 Templates Team
ISO 19650 Templates Results So Far
Using Structured Data
How To Get Involved
OIR, PIR, AIR, EIR, BEP - etc required
Outlines the concepts and principles for information management
Provides recommendations for a framework to manage information
Applied to all types of assets and by all types and sizes of organizations, regardless of the chosen procurement strategy
A unified approach
✓ What is ISO 19650
✓ ISO 19650 Templates
✓ ISO 19650 Appointment Workflow
✓ ISO 19650 Project Planning Workflow
✓ ISO 19650 Project Management Workflow
WATCH THE WEBINAR HERE: https://www.plannerly.com/what-is-iso-19650
Watch to learn how to:
- Read and understand YOUR Level of Information Needs
- Define the most efficient submittal and checking workflow
- Keep QA records of task reviews and approvals
- Use structured Plannerly data with Dynamo, Revit, Archicad, Power BI and more!
FULL WEBINAR RECORDINGS HERE: https://www.plannerly.com/iso-19650-webinar
Summary:
1. Understand ISO 19650 Requirements for Information Model Delivery
2. Define a Submittal Workflow
3. Check Your Work Before Submitting
4. Define a Checking Workflow
5. Use Structured Data
6. Allocate Time For Checking
7. Know What To Check Against
8. Document QA Records Properly
9. Combine Tools And Process
Hi Semua, Saya Denis dari CAED rakan Plannerly-Malaysia anda.
Today we are introducing the ISO 19650 Template of which it is the Standards for execution of Building Information Modeling (BIM).
Hari ini kami akan memperkenalkan Templat ISO 19650 yang merupakan Piawaian untuk Perlaksanaan BIM.
This session will be conducted in Bahasa Malaysia.
Perbentangan ini akan mengambil masa sekitar 25 minute, dan jikalau ada apa-apa persoalan, anda boleh menaipkan soal anda di dalam bahasa Malaysia atau English mengunakan CHAT BAR. Saya akan menjawab persoalan anda mengunakan rakaman untuk Q&A yang akan dimasukkan ke dalam rakaman video ini.
So, Let’s Start!
How The ISO 19650 Appointment Process Works
Agenda:
1. Preparing For Better BIM Contracting
2. Level of Information Need In Practice
3. BIM Contracting With E-Signature
Agenda:
What’s in the ISO 19650 Templates and Why?
ISO 19650 Tender + Response Demystified
ISO 19650 Tools
ISO 19650-2 Clause 5 Parts:
- Assessment and Need
- Invitation to Tender
- Tender Response
CIC Building Information Modelling Standards Draft 5.0
This is the Draft BIM Standard presented at the HKIBIM & BuildingSmart CIC BIM Standards briefing on December 17th.
The following are links to the PDF versions of the documents presented at the HKIBIM & BuildingSmart CIC BIM Standards briefing on December 17th.
CIC BIM Standards Draft 5.0
https://www.dropbox.com/s/6baypn31ljqufd9/CIC%20BIM%20Standards%20Draft%205.pdf?dl=0
CICBIMS PXP Checklist
https://www.dropbox.com/s/u6mhhf7kr1acukn/CIC%20BIM%20PXP%20Check%20List.pdf?dl=0
BIM Uses Tables from New Zealand BIM Handbook
https://www.dropbox.com/s/87cfuf897z19kjp/NZ1-8710064-New%20Zealand%20BIM%20Handbook.pdf?dl=0
BIM Use Descriptions from BIM Planning Guide for Facility Managers by Penn State
https://www.dropbox.com/s/ksrf9xr3adzgxuj/BIM_Planning_Guide_for_Facility_Owners-Version_2.0.pdf?dl=0
BIM Forum Level of Development Specification
https://www.dropbox.com/s/ddcd0g10gj33rcl/2013-LOD-Specification.pdf?dl=0
China BIM Delivery Standard
https://www.dropbox.com/s/plxfslxj849082d/CHINA%20BIM%20Delivery%20Standard.pdf?dl=0
=================
Facebook Event page
https://www.facebook.com/events/1575415879358864/
CIC Building Information Modelling Standards Draft 6.2
Construction Industry Council (CIC) BIM Page:
https://www.hkcic.org/eng/news/BIM/BIMIndex.aspx?langType=1033
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
HKIPM-HKIBIM Joint Conference 2015 - BIM in Project Management
Date: 28 October 2015
Time: 2:00 - 5:00pm
Venue: Meeting Room 201C, AsiaWorld-Expo
Speakers:
Mr. Ivan KO, Senior Manager - Training & Development - Secretariat, Construction Industry Council
Topic: The role of CIC on BIM development
Sponsor: Construction Industry Council
https://www.hkcic.org/eng/news/BIM/BIMIndex.aspx?langType=1033
Conference details:
http://www.slideshare.net/HKIBIM/hkipmhkibim-joint-conference-2015-bim-in-project-management
1. ¿Qué contienen las plantillas ISO 19650 y por qué?
2. ISO 19650 Licitación + Respuesta desmitificada
3. Herramientas ISO 19650
Evaluación y necesidad | Licitación | Respuesta a la licitación
¿Qué contienen las plantillas ISO 19650?
Cómo iniciar su proyecto BIM con ISO 19650
Building Information Modeling (BIM) is a powerful tool for visualizing and virtually constructing in 3D. It is also a database where the information and process for adding data is equally powerful, giving owners and operators the ability to integrate BIM into Facility Management (FM) software and use the model to manage the facility over the building's lifecycle. Learn about Building Information Models and how BIM reinforces collaboration and helps project teams deliver better products and services.
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
WATCH THE RECORDED WEBINAR HERE: http://bit.ly/Intro-To-BEPs
Agenda:
1. Why Do We Need A BIM Execution Plan?
2. What To Include In Your BEP
3. How To Engage Your Team
4. How To Get Agreement
5. How To Continuously Improve Your BEP
Find out what to include in your BIM Execution Plan and how to create one that will actually get your team working on the right things at the right time!
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?Sylvain Kubicki
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ? Présentation de Sylvain Kubicki pour la conférence "BIM, outil de cohésion des acteurs" du Energivie Summit, à Strabsourg, France, le 04 novembre 2014.
Agenda:
What’s in the ISO 19650 Templates and Why?
ISO 19650 Tender + Response Demystified
ISO 19650 Tools
ISO 19650-2 Clause 5 Parts:
- Assessment and Need
- Invitation to Tender
- Tender Response
CIC Building Information Modelling Standards Draft 5.0
This is the Draft BIM Standard presented at the HKIBIM & BuildingSmart CIC BIM Standards briefing on December 17th.
The following are links to the PDF versions of the documents presented at the HKIBIM & BuildingSmart CIC BIM Standards briefing on December 17th.
CIC BIM Standards Draft 5.0
https://www.dropbox.com/s/6baypn31ljqufd9/CIC%20BIM%20Standards%20Draft%205.pdf?dl=0
CICBIMS PXP Checklist
https://www.dropbox.com/s/u6mhhf7kr1acukn/CIC%20BIM%20PXP%20Check%20List.pdf?dl=0
BIM Uses Tables from New Zealand BIM Handbook
https://www.dropbox.com/s/87cfuf897z19kjp/NZ1-8710064-New%20Zealand%20BIM%20Handbook.pdf?dl=0
BIM Use Descriptions from BIM Planning Guide for Facility Managers by Penn State
https://www.dropbox.com/s/ksrf9xr3adzgxuj/BIM_Planning_Guide_for_Facility_Owners-Version_2.0.pdf?dl=0
BIM Forum Level of Development Specification
https://www.dropbox.com/s/ddcd0g10gj33rcl/2013-LOD-Specification.pdf?dl=0
China BIM Delivery Standard
https://www.dropbox.com/s/plxfslxj849082d/CHINA%20BIM%20Delivery%20Standard.pdf?dl=0
=================
Facebook Event page
https://www.facebook.com/events/1575415879358864/
CIC Building Information Modelling Standards Draft 6.2
Construction Industry Council (CIC) BIM Page:
https://www.hkcic.org/eng/news/BIM/BIMIndex.aspx?langType=1033
Drafted a BIMEX plan based on the BIMEX Guide 2.0 (PSU).
Identified all the BIM goals & uses, contractors, communitcation protocol, collaboration procedures, deliverables and the infrastructure needed. Prepared BIM informaiton exchange sheet in CSI Uniformat II and described the LOD for each component.
Project / Delivery : Renovation / D-B-B
Owner : Jump Trading Simulation & Education Center (OSF Medical Center)
Contractor : P.J.Hoerr
Contract Value : $10.5 Million
Note : Certain details have been changed for privacy.
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
HKIPM-HKIBIM Joint Conference 2015 - BIM in Project Management
Date: 28 October 2015
Time: 2:00 - 5:00pm
Venue: Meeting Room 201C, AsiaWorld-Expo
Speakers:
Mr. Ivan KO, Senior Manager - Training & Development - Secretariat, Construction Industry Council
Topic: The role of CIC on BIM development
Sponsor: Construction Industry Council
https://www.hkcic.org/eng/news/BIM/BIMIndex.aspx?langType=1033
Conference details:
http://www.slideshare.net/HKIBIM/hkipmhkibim-joint-conference-2015-bim-in-project-management
1. ¿Qué contienen las plantillas ISO 19650 y por qué?
2. ISO 19650 Licitación + Respuesta desmitificada
3. Herramientas ISO 19650
Evaluación y necesidad | Licitación | Respuesta a la licitación
¿Qué contienen las plantillas ISO 19650?
Cómo iniciar su proyecto BIM con ISO 19650
Building Information Modeling (BIM) is a powerful tool for visualizing and virtually constructing in 3D. It is also a database where the information and process for adding data is equally powerful, giving owners and operators the ability to integrate BIM into Facility Management (FM) software and use the model to manage the facility over the building's lifecycle. Learn about Building Information Models and how BIM reinforces collaboration and helps project teams deliver better products and services.
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
WATCH THE RECORDED WEBINAR HERE: http://bit.ly/Intro-To-BEPs
Agenda:
1. Why Do We Need A BIM Execution Plan?
2. What To Include In Your BEP
3. How To Engage Your Team
4. How To Get Agreement
5. How To Continuously Improve Your BEP
Find out what to include in your BIM Execution Plan and how to create one that will actually get your team working on the right things at the right time!
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?Sylvain Kubicki
Quel rôle de la recherche et innovation dans le déploiement européen du BIM ? Présentation de Sylvain Kubicki pour la conférence "BIM, outil de cohésion des acteurs" du Energivie Summit, à Strabsourg, France, le 04 novembre 2014.
For projects like building a power plant or a train tunnel, tough project managers are needed. But when it comes to developing digital or physical products, the role of a project manager has an increasingly difficult standing. During agile or digital transformations, new roles emerge to take over project management tasks. So, are project managers needed in these areas in the future?
How to Better Manage Cognos Upgrades: Leveraging the New Release of MotioCISenturus
Users learn to plan, budget and manage the IBM Cognos upgrade process. View the webinar video recording and download this deck: http://www.senturus.com/resources/better-manage-cognos-upgrades/.
Motio demonstrated and discussed the following MotioCI functionalities: connect multiple versions of Cognos simultaneously; automate the manual processes of validating reports, namespaces, datasources; create comparisons of the data, performance and formatting of content in pre-upgrade and post upgrade environments; receive immediate alerts when any changes in the BI environment negatively impact performance or validation.
Senturus, a business analytics consulting firm, has a resource library with hundreds of free recorded webinars, trainings, demos and unbiased product reviews. Take a look and share them with your colleagues and friends: http://www.senturus.com/resources/.
ContentsTeam Work Schedule3Team Task Assignment3Project .docxbobbywlane695641
Contents
Team Work Schedule 3
Team Task Assignment 3
Project Plan 4
Step 1: Define the Problem 4
Step 2: Create a Plan 4
Step 3: Execute 4
Step 4: Check Work 6
Step 5: Learn and Generalize 6
House of Quality (HOQ) for Theia’s Smart Glasses 7
Step 1: Define the Problem 7
Step 2: Create a Plan 7
Step 3: Execute 8
Step 4: Check Work 14
Step 5: Learn and Generalize 14
Aggregate Project Plan 15
Step 1: Define the Problem 15
Step 2: Create a Plan 15
Step 3: Execute 16
Step 4: Check Work 22
Step 5: Learn and Generalize 22
I was able to use the APP skills from the midterm and apply it to our actual project. We learned that project #2 yields the highest EMV so that will be the industry we will be focusing on. 22
Theia’s Conceptual Design Process 23
Step 1: Define the Problem 23
Step 2: Create a Plan 23
Step 3: Execute 24
Concept 1 27
Concept 2 28
Concept 3 29
Concept 4 30
Concept 5 31
Concept 6 32
Step 4: Check Work 34
Step 5: Learn and Generalize 34
Phase Ⅱ Reportca 36
Step 1: Define the Problem 36
Step 2: Create a Plan 36
Step 3: Execute 36
Project Planning 36
House of Quality 37
Aggregate Project Plan 37
Reverse Engineering (includes FAST analysis + diagram) 38
Conceptual Design 38
Step 4: Check Work 38
Step 5: Learn and Generalize 39
Team Work Schedule
Date
Task
10/24
Homework assigned, touch bases with team to decide weekend plans.
10/25
Read handout and HOQ example. Everyone assigned to do individual research about AR Glasses.
10/26
Read handout and HOQ example. Everyone assigned to do individual research about AR Glasses.
10/27
Meet at a cafe downtown, due to the power outage. Meeting time is 1 hour.
10/28
Everyone working remotely. Also everyone is working on Phase I/II at the moment. HOQ problem is postponed for a while as we are working on Phase I/II.
10/29
Meet at TBD. Meeting time is 1 hour.
10/30
Revise our work.
10/31
Final revisions. Turn in homework.
Team Task Assignment
Task
Phase 1 - Missing Info + Tech Strategy
Phase 1 - Missing Functional Maps
Project Planning
House of Quality for Product
Aggregate Project Plan
Reverse Engineering
Conceptual Design
Phase II ReportProject PlanStep 1: Define the Problem
We need to clearly determine the tasks required of this project and develop a systematic plan of action to tackle these tasks.Step 2: Create a Plan
Framework for Project Planning:
1. Clearly state the intent of the Project
2. Determine the Design/Development sub-tasks and activities Comment by Christopher Chiang: Develop OS
Develop Display technology
Develop glasses framework
Audio Output
Develop Bluetooth compatibility
Battery development
Charge development
Environment sensing capability
3. Create a design/development activity matrix
4. Create a schedule for each subtask using a GANTT Chart
5. Identify the Critical Path for the Project
6. Assign Clear Roles and Responsibilities & track progressStep 3: Execute
1. Clearly state the intent of the Project
a. Develop smart glasses wearable technology prototype within a 1 year timesp.
What Are The Best Practices When Building a Back-end App With Kotlin And Spri...Alex Fedorov
Are you tired of baby examples for Kotlin (or any programming language, platform, framework or library)?
In this talk, we’re going to explore how are real, and large applications are built.
These are the practices that worked well for countless product teams.
Productionalizing Machine Learning Models: The Good, The Bad and The UglyIrina Kukuyeva, Ph.D.
Data science teams tend to put a lot of thought into developing a predictive model to address a business need, tackling data processing, model development, training, and validation. After validation, the model then tends to get rolled out -- without much testing -- into production. While software engineering best practices have been around for a long time until recently, no formal guidelines existed for checking the quality of code of a machine learning pipeline.
The talk will cover tips and best practices for writing more robust production-ready predictive model pipelines. We know that code is never perfect; Irina will also share the pains and lessons learned from experience productionalizing and maintaining 4 customer-facing models at 4 different companies: in online advertising, consulting, finance, and fashion.
Implementing and Extending Oracle PLM Cloud for Gibson OverseasJade Global
Implementing and Extending Oracle PLM Cloud for Gibson Overseas, a Case Study of the PLM Cloud Implementation and Extension Project by Jade Global.
As presented during the OATUG (Oracle Applications and Technology Users Group) Collaborate19 Conference in San Antonio, Texas.
Application Migration: How to Start, Scale and SucceedVMware Tanzu
Undergoing the application migration journey can be cumbersome and challenging, especially when you have a complex application portfolio that consists of both legacy and newer apps on outdated systems. You are hindered by managing and operating manual processes to address security concerns, regulatory change and policy compliance.
You know embarking on the cloud journey is inevitable and deciding where to start is overwhelming. Let us show you how.
Join Matt Russell to hear how Pivotal helps large organizations plan and execute their application transformation initiatives by using a set of proven techniques and approaches that help you get started quickly and scale continuously.
We use simple tools and start small to redefine current systems, and achieve cloud-native speed and resiliency. Let us show you how Pivotal can help you navigate your journey while instilling confidence along the way.
Presenter : Matt Russell, Senior Director, Application Transformation at Pivotal
Technology-Driven Development: Using Automation and Development Techniques to...Hiroyuki Ito
This is the report presented at Agile2014 on "Experience Report" track.
「Agile2014」の「Experience Report」トラックで発表したスライドです。
Agile2014
http://agile2014.agilealliance.org/
Track information
http://agile2014.sched.org/event/356d50c44035cafe4c27c33da03c2b80#
Automation and development techniques such as Continuous Integration/Continuous Delivery, TDD (Test-Driven Development) and BDD (Behavior-Driven Development) are useful for not only efficiency but also learning and collaboration.
I explained these practices as "Technology-Driven Development".
CI/CD・TDD・BDD といった自動化技術・技術プラクティスは、業務効率化だけではなく、メンバーの成長およびコラボレーションの促進にも効果があります。
これらのプラクティスを "Technology-Driven Development" と命名・整理した資料になります。
Global trends in IT
- Process management
- Frameworks with maturity and continual improvements
- Frameworks used in IT for governance, operation and solution
Continuous Integration is a wonderful and popular practice in the software development universe. Yet, for whatever reason, it seems much less commonly utilized in the SharePoint community. SharePoint (naturally) throws a few wrinkles into the process, but no substantial roadblocks, and the benefits of CI can be realized just as well on SharePoint projects as anywhere else. In this session, you'll learn why you should implement a CI process and then see how to do it using TFS and Visual Studio.
DevOps provides the ability to increase time to market to an new level. The question is no longer if we need to speed up our delivery. The challenge is to find the right „pace“ for your product. Not every organization and every product needs to run at the speed of Netflix and Spotify, even if we’d like it to be like this. We need to adjust the organization, processes and tools appropriatly and to identify the real bottlenecks in the delivery pipeline continuously. And by the way, we need to justify our investment in the DevOps mission. Are we just automating the current processes or can we use this DevOps thing to really support our business? In this talk, I’d like to discuss with you how to find the right design for your delivery process and your organization to behave as a business enabler and how you can scale DevOps within your organization without loosing agility. Let’s explore how we can listen carefully to the unknown customer out there and to build software they really like in the speed of your business.
Similar to ISO 19650 - Mobilization + Collaborative Production of Information - SmartLeanBIM (Episode 4 of 6) (20)
Buenas prácticas BIM utilizando plantillas BIM de Plannerly Smart: ¿Por qué utilizar plantillas BIM en tu empresa?
Plantillas BIM Inteligentes para mejorar la Gestión Documental
Agenda:
- plantillas inteligentes
- documentos inteligentes
- Flujos de trabajo de aprobación
- Y 5 consejos para empezar
5 consejos para empezar:
1. Identificar las partes interesadas clave
2. Haz las preguntas correctas
3. Elija los documentos correctos
4. Formación e incorporación
5. Medición y seguimiento de la mejora continua
Algunas preguntas para hacer:
¿Cuál es nuestro proceso actual de redacción de documentos?
¿Cuál es nuestro flujo de trabajo actual y el proceso de aprobación de documentos, y el estado de nuestra gestión del ciclo de vida?
¿Cómo es nuestro proceso actual de firma de contratos?
¿Utilizamos firmas electrónicas?
¿Cuáles son los retos actuales a los que nos enfrentamos?
¿Qué contratos u otros documentos se utilizan con mayor frecuencia?
¿Es posible estimar el tiempo que lleva escribir cada uno de ellos?
¿Qué métricas tenemos?
Cuáles son nuestras políticas de uso de software y seguridad de datos
¿Mantenerse al día con BIM Management?:
- LinkedIn: https://www.linkedin.com/company/plan...
-Twitter: https://twitter.com/PlannerlyAEC
- Instagram: https://www.instagram.com/plannerlyAEC
-Facebook: https://www.facebook.com/plannerlyAEC
#BIM #ISO19650 #Information management #diseño #ingeniería #construcción #PEB #BEP #LOD #planificación #ingenieros #arquitectos #contratistas #smartleanbim #plannerly
Creación de alcances BIM:
Desafíos de los alcances BIM
Mejores prácticas en alcances BIM
Preguntas incómodas del BIM
Entendiendo la ISO-19650
Creando el Plan de Ejecución BIM perfecto
> Mejores prácticas en alcances colaborativos BIM
Gestionando tus plantillas BIM
Gestionando tus proyectos con Plannerly
Cómo verificar tus entregables BIM
Agenda:
1. Plantillas ISO 19650
2. Flujo de Trabajo ISO 19650
3. Cómo participar
¿Utiliza la norma ISO 19650 hoy en día?
Recién estoy empezando a aprender
Estamos aumentando nuestro conocimiento
Lo usamos en la mayoría de los proyectos
Soy el Jedi de la ISO 19650
Zyskaj więcej zleceń dzięki praktycznemu BIM’owi
Agenda:
Sprzedaż Hollywoodzkiego BIM’u
Sprzedaż praktycznego BIM’u
Szablony ISO 19650 dostępne w Plannerly
Agenda:
Γιατί χρειάζεται το συμβόλαιο BIM?
Πως ορίζονται τα πεδία εφαρμογής ΒΙΜ?
5 βήματα για την απλοποίηση των πεδίων εφαρμογής ΒΙΜ
Παράδοση συμβάσεων ΒΙΜ
Agenda:
Vendiendo Hollywood BIM
Vendiendo un BIM Práctico
¿Tiene un experto en ventas con enfoque BIM?
¿Ofrecen servicios BIM?
¿Tiene un experto en ventas con enfoque BIM?
¿Estas promesas BIM ganan proyectos?
¿Cómo piensas que reaccionaria el BIM Manager?
Entonces, ¿por qué está tan molesto y confundido el BIM Manager?
Entonces, que es lo que suele suceder?
¿Crees que el cliente querría BIM en su próximo proyecto?
Haga las preguntas correctas?
Definir ámbitos BIM claros y visuales?
Comparta actualizaciones de progreso continuo con su cliente?
¿Cuál cree que sería el nivel de satisfacción del cliente ahora?
¿Cree que a nuestros clientes les gustaría un BIM más práctico en su próximo proyecto?
Dos recursos para ayudar a su equipo con BIM
Agenda:
1. Akar permasalahan dari BIM yang buruk
2. Peluang yang diinginkan oleh Tim BIM
3. Bagaimana mendapatkan 53% lebih sedikit masalah dalam BIM
VIDEO: https://www.bit.ly/Manajemen-BIM
Fünf Schritte zu besserem BIM Management - Agenda:
BIM Abwicklungspläne (BAP)
BIM Umfang vereinbaren
Planung der Planung
BIM Aufgaben zusammen verwalten
BIM Konformität prüfen
Warum sind manche BIM Abwicklungspläne (BAPs) nicht erfolgreich?
Tipps für erfolgreiche BIM Abwicklungpläne
Assista e compartilhe a gravação do webinar!: http://bit.ly/Plano-De-Execução-BIM
Agenda:
1. Por Que Precisamos De Um BEP?
2. O Que Incluir No Seu BEP
3. Como Envolver Sua Equipe
4. Como Conseguir Entrar Em Acordo
5. Como Constantemente Aprimorar Seu BEP
Watch this BIM webinar recording here: http://bit.ly/Hollywood-BIM
Simple Webinar Agenda:
1. Selling Hollywood BIM
2. Selling Practical BIM
In this webinar we share some important BIM questions that you should ask so that you can eliminate the unrealistic expectations from your client.
Agenda:
1. Por qué definir un contrato BIM?
2. Cómo se definen los alcances BIM hoy
3. Cinco pasos para simplificar sus alcances BIM
4. Entrega de contratos BIM más claros
Agenda:
1. Cuando BIM sale mal...
2. La lista definitiva de requisitos del BIM
3. Cómo obtener un BIM glorioso
Es para destacar la importancia de tener un flujo de trabajo conforme.
Como entender que hacemos dentro de nuestro trabajo de BIM para que sea glorioso.
¿Para que usar el modelo?
Cantidades
Diseño
¿Documentación?
¿Coordinación?
¿Instalaciones?
¿RV?
Agenda:
1. Dos reuniones BIM muy diferentes
2. 10 cosas que arruinan las reuniones BIM
3. Cómo llevar a cabo una reunión GENIAL!
Vídeo: https://bit.ly/Gestion-BIM
5 Tahap menuju Manajemen BIM yang baik
Agenda:
1. Membuat BIM Execution Plan
2. Kesepakatan lingkup pekerjaan BIM
3. Delegasi penugasan kepada Tim
4. Manajemen Progress dalam BIM
5. Verifikasi persyaratan adaptasi BIM
Tonton dan Share Rekaman Webinar ini: https://bit.ly/Manajemen-BIM
¡Mira y comparte la grabación del seminario web!: https://bit.ly/AECO-BIM
Agenda:
1. Creando Plan de Ejecución BIM.
2. Acordar un claro alcance BIM.
3. Programar las tareas con tu Equipo.
4. Gestionar juntos las tareas BIM.
5. Comprobar los requisitos BIM.
Generating a custom Ruby SDK for your web service or Rails API using Smithyg2nightmarescribd
Have you ever wanted a Ruby client API to communicate with your web service? Smithy is a protocol-agnostic language for defining services and SDKs. Smithy Ruby is an implementation of Smithy that generates a Ruby SDK using a Smithy model. In this talk, we will explore Smithy and Smithy Ruby to learn how to generate custom feature-rich SDKs that can communicate with any web service, such as a Rails JSON API.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
Sidekick Solutions uses Bonterra Impact Management (fka Social Solutions Apricot) and automation solutions to integrate data for business workflows.
We believe integration and automation are essential to user experience and the promise of efficient work through technology. Automation is the critical ingredient to realizing that full vision. We develop integration products and services for Bonterra Case Management software to support the deployment of automations for a variety of use cases.
This video focuses on the notifications, alerts, and approval requests using Slack for Bonterra Impact Management. The solutions covered in this webinar can also be deployed for Microsoft Teams.
Interested in deploying notification automations for Bonterra Impact Management? Contact us at sales@sidekicksolutionsllc.com to discuss next steps.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
14. SCOPE
PLAN
Standards, processes and requirements FROM
TEMPLATES
Project Planning Project Controls
SCHEDU
LE
TRACK
Collaborative task management and INTEGRATED
VERIFICATION
VERIFY
CONTRA
CT
Plannerly Modules Are Designed To Support Workflow
17. 17
Planning and Preparation?
NOT That Fun!
Usually An
Overhead Cost
Unplanned
Training
Tedious
Have Multiple
Starting Points
Uncoordinated
Unclear Process
Complex Tools
18. 18
Implications?
Untrained Teams
Learning On The
Job
Starting From
Scratch
Reinventing
Processes Every
Project
Difficult To Find
Information
Multiple To Do
Lists
Wasted Time
Searching
Unavailable Teams
Involve The Wrong
People/Team Teams Start
Without The Right
Knowledge
22. 22
5.1 Mobilize Resources
Include The Right Teams
Deliver
Education/On-
boarding
Skills and Training
Resource Availability
Team Permissions:
Viewer, Editor, Manager
23. 23
5.2 Mobilize Information Technology
Configure
Technology
Hardware and Software
Testing Plans
Procure + Consolidate Technology Resources
24. 24
5.3 Test Project Methods and Procedures
Test Production
Methods + Procedures
Breakdown Structure
Identification
Communicate Procedures
To All Task Teams
Templates For Information
Management Tasks
32. 32
6.1 Reference Information And Shared Resources
Check CDE for requirements
Check CDE for reference information
Report to the Lead Appointed
Party if any reference
information is missing
33. 33
6.2 Generate Information
Follow Production
Methods and
Procedures
Generate The Necessary
Level of Information Need
Export Structured Data For
Automation + Validation
Plan To Coordinate Geometric
Models With Other Models
Automated Tasks
From Contract
40. 40
Summary: ISO 19650 Mobilize + Collaborative Production Workflow
✓ Follow your Mobilization Plan
✓ Check Resources
✓ Deliver Training Early
✓ Test Software Before Live Project Work
✓ Walk Through Procedures
✓ Communicate Methods
✓ Communicate Missing Information Early
✓ Follow Quality Process
41. SCOPE
PLAN
Standards, processes and requirements FROM TEMPLATES
Project Planning Project Management
SCHEDULE TRACK
Collaborative task management and INTEGRATED VERIFICATION
VERIFY
This Process Is Simplified Using Plannerly:
CONTRACT
SELECT ONE OR MORE MODULES TO SIMPLIFY YOUR BIM MANAGEMENT
Traverse through the obstacles with flawless execution
With no changes or unforeseen conditions the project will be smooth for everyone!
With all goals with ease we will have plenty of time to have fun!
Will our project even get off of the ground?
The Mobilization and Collaborative Information Production guide teams to start projects with consistent collaboration
Plannerly supports the ISO 19650 workflow
Plan+Scope+Contracts simplify standards management and help streamline BIM Execution Planning (BEP)
Schedule+Track reduce the admin burden and simplify the management of BIM Tasks
Verify completes the BIM workflow by connecting your BIM requirements to the model for BIM compliance
Today we will cover testing procedures, how to use the same requirements from the scope (original contract). We will also cover collaborative sequencing and cover steps following ISO 19650 guidelines to review and progress tasks
Project Mobilization is the Planning and Preparation work for project execution
We understand that this responsibility isn’t something all team members want to take on.
However it’s important because of all the risk we take on. We then find ourselves making it up as we go - “It’s like fixing a plane in mid-flight”
The ISO 19650 standards
Don’t make up the process as you go - make sure the procedures will work out before sharing with the team
What are the most important BIM Uses for the project?
Why are teams creating 3D modeling in the first place?
What’s the PURPOSE for BIM?
Let’s start a BEP on the right foot by asking some questions that need to be clear
Sequencing story - two parallel projects running the same coordination process.
Automated Tasks
Each team should be responsible for updating their own tasks.
Do this as a team!
Sharing the right level of permission to each team so that they can update their own tasks - progress updates will be always up to date with the “herding cats”
Let’s start a BEP on the right foot by asking some questions that need to be clear
Plannerly supports the ISO 19650 workflow
Plan+Scope+Contracts simplify standards management and help streamline BIM Execution Planning (BEP)
Schedule+Track reduce the admin burden and simplify the management of BIM Tasks
Verify completes the BIM workflow by connecting your BIM requirements to the model for BIM compliance
watch the “Basics” videos and
let us know when you would like to schedule your SmartLeanBIM® Masterclass!
It is going to be cheaper this month
questions about pricing…
We would love to partner with you to help our industry!
Are you ready to work together?
Meet us?: https://www.plannerly.com/meeting
Partner?: https://www.plannerly.com/register