• Describe objectives as related to on-call procurement
• Appropriateness of various on-call procurement strategies that
reduce district management resource allocation needs
• Understanding of allowable state procurement rules and
statutes
• Ability to weigh the benefits and cons of the procurement
method based on your needs
Learning Objectives
Rule R7-2-1001 defines:
• “Specified professional services” means services of an architect, engineer, land surveyor,
assayer, geologist and landscape architect.
Other pertinent definitions:
• “Procurement” means buying, purchasing, renting, leasing or otherwise acquiring any
materials, services or construction.
• “Cooperative purchasing” means procurement conducted by, or on behalf of, more than one
public procurement unit.
• “Contract” means all types of agreements, including purchase orders, regardless of what they
may be called, for the procurement of materials, services or construction or the disposal of
materials.
What is “Procurement of Specified
Professional Services”?
Professional services is awarded by qualifications based merit, rather than
competitive bid. Therefore competitively sealed proposals are used versus
competitively sealed bidding. A summary of the process is as follow:
1. Request for qualifications(RFQ) shall be issued at least 14 days before the time and date
set for bid opening. Invitations shall include, description of scope of services, type of
contract to be used, estimated budget and schedule closing date and time of receipt of
qualifications, evaluation criteria and their relative order of importance (Additional
requirements per R7-2-1042, R2-7-C301, A.R.S. 41-2534 or A.R.S. 41-2578)
2. Pre-Proposal Conference (optional but recommended / mandatory)
3. Conduct interviews with at least three and no more than five persons or firms
4. Negotiate contract with highest ranking firm based on evaluation criteria, notify those
not highest
5. Award contract, or if terms cannot be reached, negotiate contract with second highest
ranking firm based on evaluation criteria
What is the required procurement process?
• Per R7-2-1117, two methods of award of a contract for specified professional
services are the single negotiated fee method of award(R7-2-1122)
and multiple fee proposal method of award(R7-2-1123).
• Note, per A.R.S. 41-2578, C, 1, D, All construction-manager-at-risk construction
services or design-build construction services included in a procurement
under this section shall be limited to construction services to be performed
at a single location, a common location or, if the construction
services are all for a similar purpose, multiple locations. This
does not specifically apply to specified professional services, beyond that
precedence might be argued based on the above Statute.
Arizona Administrative Code
Chapter 2: State Board of Education, Title 7
• R7-2-1093 states
Unless otherwise provided by law, a contract for materials or services may be
entered into for a period of time up to five years, as deemed to be
advantageous to the school district, if the term of the contract and conditions of renewal or
extension, if any, are included in the solicitation and monies are available for the first fiscal
period at the time of contracting. Payment and performance obligations for succeeding
fiscal periods are subject to the availability and appropriation of monies.
This multi-term contract is allowed providing the governing board determines among other
things that “such a contract will serve the best interests of the school
district by encouraging effective competition or otherwise promoting
economies in school district procurement.”
**Upheld by Attorney General Opinion, Janet Napolitano (November 24, 1999)**
Arizona Administrative Code
Chapter 2: State Board of Education, Title 7
Specified Professional Services Procurement
Options
1. Traditional Procurement per R7-2-1122
single negotiated fee method of award(solicitation by district)
2. On-Call District Procurement per R7-2-1123
multiple fee proposal method of award(solicitation by district)
3. On-Call State Procurement per A.R.S 41-2581
single or multiple contracts, projects less than $250,000 for architectural services or $500,000
for Engineering services (solicitation by state)
4. Cooperative Purchasing Agreement Procurement (R7-2-1191)
single negotiated fee method of award(solicitation by cooperative)
Sample Master Contract & Work Order
• Set fee percentages
for different types of
projects
• Lists multiple
projects or project
types covered in the
RFP
• Incorporates overall
general conditions
and insurance
requirements
Sample Master Contract & Work Order
• Lists
other/supplementary
conditions
• Sets limits or types
of reimbursable
expenses
Master Contract & Work Orders
• Defines specific
project
• Sets Fee
• Further defines
reimbursable
expenses if needed
• Lists additional sub
consultants
• Defines deliverables
• Ties to master
agreement and
general conditions
On-Call Professional Services -
Recommendations
One or more design professionals selected to provide services for a period of up
to 5 years.
Recommended that the contract is awarded as a one year term with options to
extend up to four additional terms
Base fee as a percentage of Maximum Allowable Construction Cost (MACC) with
sliding scale for project complexity (Established for each year of service)
Hourly rates established for time and materials type projects and or additional
services / added scope (Established for each year of service)
Single project manager as point of contact throughout the term of the contact with
multiple project architects identified for specific project types, i.e. new facilities,
renovation and additions, tenant improvements, assessments etc.
Identification of consultants covering all disciplines, (local civil engineer
recommended)
On-Call Professional Services -
Recommendations
Sample Fee Schedule
Sample Fee Schedule
Benefits of District On-Call Procurement
One time solicitation to serve for a 5 year timeframe
• Time and cost savings, no repetitive procurement
• Ability to evaluate qualifications and personnel at the district level
• Set or negotiated price for each project
• Budget project design costs
Consistent representation
• Main point of contact / project manager
• Specialized expertise / project architects for different project types
• Knowledge of, or ability to establish, district standards
• Establish and test Owner Project Requirements (OPR) document
Benefits of District On-Call Procurement
Quickly contract new work through work orders
Resource available for assessments, planning and cost estimation
Advocacy and funding application support
Ability to run several project simultaneously and conserve district recourses
Advisor for maintenance and preventative maintenance planning (BIM)
Potential for reducing reimbursable expenses by combining project meetings
• Turnover – Might see turnover within architecture firm that changes the team
that you work with
• Expertise – Might not have an architect that has expertise in specific needs
• Capacity – Might overload your architect
• Complacency – Designs may not be innovative
• Perception – Best interest of the district….non-competitive
Potential Cons of District On-Call Procurement
Case Study
Gallup McKinley County School District
• One of three on-call architects
• Three four year on call-contracts
• 35 Projects
Not just design
• Planning
• Assessments
• Project budgeting
• 5 Year Master Planning support
• Funding application processing
• Community Facilitation & Bond campaign support
As needed summer renovations and repairs
Emergency repairs
Artesia Public Schools
• One on-call architect
• One year contract with possible 2 year extension
• 14 Projects in first year
Not just design
• Bond campaign support
• Assessments
• District wide utilization study
• Comprehensive operating cost comparisons
Flexibility to address a shift in district facility design priorities
Emergency structural and roofing repairs
Case Study
Summary
Objectives:
• Save time, money and District resources
• Creating a long term beneficial relationship
Application:
• Several under defined needs
• Limited district facility management and maintenance resources
Understanding of State on-call procurement rules:
• Procurement flexibility
• Promotes competition
Questions?
The Benefits of On-Call Procurement for Design Professional Services
The Benefits of On-Call Procurement for Design Professional Services

More Related Content

What's hot

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2
Jason Lloyd
 

What's hot (20)

AGC Webinar
AGC WebinarAGC Webinar
AGC Webinar
 
Contract Management
Contract ManagementContract Management
Contract Management
 
NEC4 overview: key changes and impacts - Nottingham, September 2017
NEC4 overview: key changes and impacts - Nottingham, September 2017NEC4 overview: key changes and impacts - Nottingham, September 2017
NEC4 overview: key changes and impacts - Nottingham, September 2017
 
Guide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on ProcurementGuide to BS8534 British Standard on Procurement
Guide to BS8534 British Standard on Procurement
 
Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013Public Procurement and Contract - Theory and practice in Nepal_2013
Public Procurement and Contract - Theory and practice in Nepal_2013
 
Procurement plan
Procurement planProcurement plan
Procurement plan
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
Raffles International Institute_Procurement methods
Raffles International  Institute_Procurement methodsRaffles International  Institute_Procurement methods
Raffles International Institute_Procurement methods
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Contracts & procurement
Contracts & procurementContracts & procurement
Contracts & procurement
 
Construction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting StandardsConstruction contract_Existing and Proposed Accounting Standards
Construction contract_Existing and Proposed Accounting Standards
 
Architecture led procurement
Architecture led procurementArchitecture led procurement
Architecture led procurement
 
Procurement planning
Procurement planningProcurement planning
Procurement planning
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2
 
Contract management iritm aug2016
Contract management iritm aug2016Contract management iritm aug2016
Contract management iritm aug2016
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Skoda Minotti CPE Day - 2017 (Part 2)
Skoda Minotti CPE Day - 2017 (Part 2)Skoda Minotti CPE Day - 2017 (Part 2)
Skoda Minotti CPE Day - 2017 (Part 2)
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 
Construction contract
Construction contract Construction contract
Construction contract
 
Ias 11
Ias 11Ias 11
Ias 11
 

Viewers also liked

Viewers also liked (19)

Self-driving Cars: A Game Changer for Commercial Real Estate?
Self-driving Cars: A Game Changer for Commercial Real Estate?Self-driving Cars: A Game Changer for Commercial Real Estate?
Self-driving Cars: A Game Changer for Commercial Real Estate?
 
Does it Work? A post-occupancy evaluation focused on how facility design prom...
Does it Work? A post-occupancy evaluation focused on how facility design prom...Does it Work? A post-occupancy evaluation focused on how facility design prom...
Does it Work? A post-occupancy evaluation focused on how facility design prom...
 
Self driving car : Impact on real estate
Self driving car : Impact on real estateSelf driving car : Impact on real estate
Self driving car : Impact on real estate
 
Hoja de vida johanna[1]
Hoja de vida johanna[1]Hoja de vida johanna[1]
Hoja de vida johanna[1]
 
May 2016 Public Information Meeting
May 2016 Public Information MeetingMay 2016 Public Information Meeting
May 2016 Public Information Meeting
 
Créer sa communauté en partant de zéro - iAdvize
Créer sa communauté en partant de zéro - iAdvizeCréer sa communauté en partant de zéro - iAdvize
Créer sa communauté en partant de zéro - iAdvize
 
September Information Meetings
September Information MeetingsSeptember Information Meetings
September Information Meetings
 
Actividad 1
Actividad 1Actividad 1
Actividad 1
 
Act3
Act3Act3
Act3
 
The Future of Career and Vocational Education
The Future of Career and Vocational EducationThe Future of Career and Vocational Education
The Future of Career and Vocational Education
 
Alfresco Day Warsaw 2016: Identyfikacja i podpiselektroniczny - Safran
Alfresco Day Warsaw 2016: Identyfikacja i podpiselektroniczny - SafranAlfresco Day Warsaw 2016: Identyfikacja i podpiselektroniczny - Safran
Alfresco Day Warsaw 2016: Identyfikacja i podpiselektroniczny - Safran
 
How to evolve your BPM strategy using Office365 platform
How to evolve your BPM strategy using Office365 platformHow to evolve your BPM strategy using Office365 platform
How to evolve your BPM strategy using Office365 platform
 
Cbbuzz Uni Editions - OpinionWay - Eaagle : les addictions
Cbbuzz  Uni Editions - OpinionWay - Eaagle : les addictionsCbbuzz  Uni Editions - OpinionWay - Eaagle : les addictions
Cbbuzz Uni Editions - OpinionWay - Eaagle : les addictions
 
BioFab Europe 2016
BioFab Europe 2016BioFab Europe 2016
BioFab Europe 2016
 
Webinar - Activiti: il Business Process Management di Alfresco
Webinar - Activiti: il Business Process Management di AlfrescoWebinar - Activiti: il Business Process Management di Alfresco
Webinar - Activiti: il Business Process Management di Alfresco
 
Webinar: Le novità di Alfresco 5.1
Webinar: Le novità di Alfresco 5.1 Webinar: Le novità di Alfresco 5.1
Webinar: Le novità di Alfresco 5.1
 
Curso valoracion empresas i
Curso valoracion empresas iCurso valoracion empresas i
Curso valoracion empresas i
 
26 Disruptive & Technology Trends 2016 - 2018
26 Disruptive & Technology Trends 2016 - 201826 Disruptive & Technology Trends 2016 - 2018
26 Disruptive & Technology Trends 2016 - 2018
 
The Race to 2021: The State of Autonomous Vehicles and a "Who's Who" of Indus...
The Race to 2021: The State of Autonomous Vehicles and a "Who's Who" of Indus...The Race to 2021: The State of Autonomous Vehicles and a "Who's Who" of Indus...
The Race to 2021: The State of Autonomous Vehicles and a "Who's Who" of Indus...
 

Similar to The Benefits of On-Call Procurement for Design Professional Services

project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
Chris Nash
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
마 이환
 
Professional Resume_LeKeith Lee
Professional Resume_LeKeith LeeProfessional Resume_LeKeith Lee
Professional Resume_LeKeith Lee
Lekeith Lee
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
Giselle Duran
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
coryn
 

Similar to The Benefits of On-Call Procurement for Design Professional Services (20)

Health system ITO contract restructuring : A case study
Health system ITO contract restructuring :  A case studyHealth system ITO contract restructuring :  A case study
Health system ITO contract restructuring : A case study
 
IFMA Airports Council 2014.pptx
IFMA Airports Council 2014.pptxIFMA Airports Council 2014.pptx
IFMA Airports Council 2014.pptx
 
Brokerage Simplified
Brokerage SimplifiedBrokerage Simplified
Brokerage Simplified
 
Best value contracting
Best value contractingBest value contracting
Best value contracting
 
Raj new resume 2015
Raj new resume 2015Raj new resume 2015
Raj new resume 2015
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Chapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptxChapter_2-Procurement and Contract management.pptx
Chapter_2-Procurement and Contract management.pptx
 
Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types Government Contracts 101 - Understanding the Basics of Contract Types
Government Contracts 101 - Understanding the Basics of Contract Types
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
Procurement of services ppt
Procurement of services pptProcurement of services ppt
Procurement of services ppt
 
Resume
ResumeResume
Resume
 
NEC4 overview: key changes and impacts - Birmingham, September 2017
NEC4 overview: key changes and impacts - Birmingham, September 2017NEC4 overview: key changes and impacts - Birmingham, September 2017
NEC4 overview: key changes and impacts - Birmingham, September 2017
 
Section 2 of Philippine Institute of Civil Engineers Manual
Section 2 of Philippine Institute of Civil Engineers ManualSection 2 of Philippine Institute of Civil Engineers Manual
Section 2 of Philippine Institute of Civil Engineers Manual
 
Professional Resume_LeKeith Lee
Professional Resume_LeKeith LeeProfessional Resume_LeKeith Lee
Professional Resume_LeKeith Lee
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 
Contract administration week 7
Contract administration week 7Contract administration week 7
Contract administration week 7
 

More from Dekker/Perich/Sabatini

Ancient & Modern: Intersecting Traditional Health & Present-Day Healthcare
Ancient & Modern: Intersecting Traditional Health & Present-Day HealthcareAncient & Modern: Intersecting Traditional Health & Present-Day Healthcare
Ancient & Modern: Intersecting Traditional Health & Present-Day Healthcare
Dekker/Perich/Sabatini
 

More from Dekker/Perich/Sabatini (18)

BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
Improving Patient Care: The Intersection of Culture and Evidence-Based Design
Improving Patient Care: The Intersection of Culture and Evidence-Based DesignImproving Patient Care: The Intersection of Culture and Evidence-Based Design
Improving Patient Care: The Intersection of Culture and Evidence-Based Design
 
Navigating History: Balancing Educational Needs, Project Budgets, and Heritag...
Navigating History: Balancing Educational Needs, Project Budgets, and Heritag...Navigating History: Balancing Educational Needs, Project Budgets, and Heritag...
Navigating History: Balancing Educational Needs, Project Budgets, and Heritag...
 
What Can Public School Districts Learn About Facilities From For-Profit Provi...
What Can Public School Districts Learn About Facilities From For-Profit Provi...What Can Public School Districts Learn About Facilities From For-Profit Provi...
What Can Public School Districts Learn About Facilities From For-Profit Provi...
 
Extreme Makeovers: Dealing With the Realities of Existing Building Renovations
Extreme Makeovers: Dealing With the Realities of Existing Building RenovationsExtreme Makeovers: Dealing With the Realities of Existing Building Renovations
Extreme Makeovers: Dealing With the Realities of Existing Building Renovations
 
Ancient & Modern: Intersecting Traditional Health & Present-Day Healthcare
Ancient & Modern: Intersecting Traditional Health & Present-Day HealthcareAncient & Modern: Intersecting Traditional Health & Present-Day Healthcare
Ancient & Modern: Intersecting Traditional Health & Present-Day Healthcare
 
Lessons Learned: First Year in New Maker Spaces
Lessons Learned: First Year in New Maker SpacesLessons Learned: First Year in New Maker Spaces
Lessons Learned: First Year in New Maker Spaces
 
Moving On Up: How Travis 6th Grade Campus Prepares Learners for Secondary School
Moving On Up: How Travis 6th Grade Campus Prepares Learners for Secondary SchoolMoving On Up: How Travis 6th Grade Campus Prepares Learners for Secondary School
Moving On Up: How Travis 6th Grade Campus Prepares Learners for Secondary School
 
Looking Back to Look Forward
Looking Back to Look ForwardLooking Back to Look Forward
Looking Back to Look Forward
 
Establishing & Updating District Standards for Design & Construction
Establishing & Updating District Standards for Design & ConstructionEstablishing & Updating District Standards for Design & Construction
Establishing & Updating District Standards for Design & Construction
 
Understanding CPTED Principles + School Safety
Understanding CPTED Principles + School SafetyUnderstanding CPTED Principles + School Safety
Understanding CPTED Principles + School Safety
 
Inclusive Learning Environments: Designing for Diverse Learners
Inclusive Learning Environments: Designing for Diverse LearnersInclusive Learning Environments: Designing for Diverse Learners
Inclusive Learning Environments: Designing for Diverse Learners
 
The Future of Academic Incubators
The Future of Academic IncubatorsThe Future of Academic Incubators
The Future of Academic Incubators
 
Creating Healthier Environments for Teaching & Learning
Creating Healthier Environments for Teaching & LearningCreating Healthier Environments for Teaching & Learning
Creating Healthier Environments for Teaching & Learning
 
Technical Challenges of Indoor Natatorium Design
Technical Challenges of Indoor Natatorium DesignTechnical Challenges of Indoor Natatorium Design
Technical Challenges of Indoor Natatorium Design
 
Resilient Parks & Open Space in the Southwest
Resilient Parks & Open Space in the SouthwestResilient Parks & Open Space in the Southwest
Resilient Parks & Open Space in the Southwest
 
Park Design for Community Health & Wellbeing
Park Design for Community Health & WellbeingPark Design for Community Health & Wellbeing
Park Design for Community Health & Wellbeing
 
Native and Drought-Tolerant Plants for Southwestern Landscapes
Native and Drought-Tolerant Plants for Southwestern LandscapesNative and Drought-Tolerant Plants for Southwestern Landscapes
Native and Drought-Tolerant Plants for Southwestern Landscapes
 

Recently uploaded

Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 

Recently uploaded (20)

How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Keeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security ServicesKeeping Your Information Safe with Centralized Security Services
Keeping Your Information Safe with Centralized Security Services
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdfTelling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
 

The Benefits of On-Call Procurement for Design Professional Services

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. • Bonnie Gonzalez CPPO at H2 Group • Former Arizona Attorney General Janet Napolitano • Arizona State Administrative Code, Chapter 23, Procurement Code • Arizona State Administrative Code, Title 7. Education, Chapter 2. State Board of Education • AZ School Facilities Board Sources
  • 6. • Describe objectives as related to on-call procurement • Appropriateness of various on-call procurement strategies that reduce district management resource allocation needs • Understanding of allowable state procurement rules and statutes • Ability to weigh the benefits and cons of the procurement method based on your needs Learning Objectives
  • 7. Rule R7-2-1001 defines: • “Specified professional services” means services of an architect, engineer, land surveyor, assayer, geologist and landscape architect. Other pertinent definitions: • “Procurement” means buying, purchasing, renting, leasing or otherwise acquiring any materials, services or construction. • “Cooperative purchasing” means procurement conducted by, or on behalf of, more than one public procurement unit. • “Contract” means all types of agreements, including purchase orders, regardless of what they may be called, for the procurement of materials, services or construction or the disposal of materials. What is “Procurement of Specified Professional Services”?
  • 8. Professional services is awarded by qualifications based merit, rather than competitive bid. Therefore competitively sealed proposals are used versus competitively sealed bidding. A summary of the process is as follow: 1. Request for qualifications(RFQ) shall be issued at least 14 days before the time and date set for bid opening. Invitations shall include, description of scope of services, type of contract to be used, estimated budget and schedule closing date and time of receipt of qualifications, evaluation criteria and their relative order of importance (Additional requirements per R7-2-1042, R2-7-C301, A.R.S. 41-2534 or A.R.S. 41-2578) 2. Pre-Proposal Conference (optional but recommended / mandatory) 3. Conduct interviews with at least three and no more than five persons or firms 4. Negotiate contract with highest ranking firm based on evaluation criteria, notify those not highest 5. Award contract, or if terms cannot be reached, negotiate contract with second highest ranking firm based on evaluation criteria What is the required procurement process?
  • 9. • Per R7-2-1117, two methods of award of a contract for specified professional services are the single negotiated fee method of award(R7-2-1122) and multiple fee proposal method of award(R7-2-1123). • Note, per A.R.S. 41-2578, C, 1, D, All construction-manager-at-risk construction services or design-build construction services included in a procurement under this section shall be limited to construction services to be performed at a single location, a common location or, if the construction services are all for a similar purpose, multiple locations. This does not specifically apply to specified professional services, beyond that precedence might be argued based on the above Statute. Arizona Administrative Code Chapter 2: State Board of Education, Title 7
  • 10. • R7-2-1093 states Unless otherwise provided by law, a contract for materials or services may be entered into for a period of time up to five years, as deemed to be advantageous to the school district, if the term of the contract and conditions of renewal or extension, if any, are included in the solicitation and monies are available for the first fiscal period at the time of contracting. Payment and performance obligations for succeeding fiscal periods are subject to the availability and appropriation of monies. This multi-term contract is allowed providing the governing board determines among other things that “such a contract will serve the best interests of the school district by encouraging effective competition or otherwise promoting economies in school district procurement.” **Upheld by Attorney General Opinion, Janet Napolitano (November 24, 1999)** Arizona Administrative Code Chapter 2: State Board of Education, Title 7
  • 11. Specified Professional Services Procurement Options 1. Traditional Procurement per R7-2-1122 single negotiated fee method of award(solicitation by district) 2. On-Call District Procurement per R7-2-1123 multiple fee proposal method of award(solicitation by district) 3. On-Call State Procurement per A.R.S 41-2581 single or multiple contracts, projects less than $250,000 for architectural services or $500,000 for Engineering services (solicitation by state) 4. Cooperative Purchasing Agreement Procurement (R7-2-1191) single negotiated fee method of award(solicitation by cooperative)
  • 12. Sample Master Contract & Work Order • Set fee percentages for different types of projects • Lists multiple projects or project types covered in the RFP • Incorporates overall general conditions and insurance requirements
  • 13. Sample Master Contract & Work Order • Lists other/supplementary conditions • Sets limits or types of reimbursable expenses
  • 14. Master Contract & Work Orders • Defines specific project • Sets Fee • Further defines reimbursable expenses if needed • Lists additional sub consultants • Defines deliverables • Ties to master agreement and general conditions
  • 15. On-Call Professional Services - Recommendations One or more design professionals selected to provide services for a period of up to 5 years. Recommended that the contract is awarded as a one year term with options to extend up to four additional terms Base fee as a percentage of Maximum Allowable Construction Cost (MACC) with sliding scale for project complexity (Established for each year of service) Hourly rates established for time and materials type projects and or additional services / added scope (Established for each year of service)
  • 16. Single project manager as point of contact throughout the term of the contact with multiple project architects identified for specific project types, i.e. new facilities, renovation and additions, tenant improvements, assessments etc. Identification of consultants covering all disciplines, (local civil engineer recommended) On-Call Professional Services - Recommendations
  • 19. Benefits of District On-Call Procurement One time solicitation to serve for a 5 year timeframe • Time and cost savings, no repetitive procurement • Ability to evaluate qualifications and personnel at the district level • Set or negotiated price for each project • Budget project design costs Consistent representation • Main point of contact / project manager • Specialized expertise / project architects for different project types • Knowledge of, or ability to establish, district standards • Establish and test Owner Project Requirements (OPR) document
  • 20. Benefits of District On-Call Procurement Quickly contract new work through work orders Resource available for assessments, planning and cost estimation Advocacy and funding application support Ability to run several project simultaneously and conserve district recourses Advisor for maintenance and preventative maintenance planning (BIM) Potential for reducing reimbursable expenses by combining project meetings
  • 21. • Turnover – Might see turnover within architecture firm that changes the team that you work with • Expertise – Might not have an architect that has expertise in specific needs • Capacity – Might overload your architect • Complacency – Designs may not be innovative • Perception – Best interest of the district….non-competitive Potential Cons of District On-Call Procurement
  • 22. Case Study Gallup McKinley County School District • One of three on-call architects • Three four year on call-contracts • 35 Projects Not just design • Planning • Assessments • Project budgeting • 5 Year Master Planning support • Funding application processing • Community Facilitation & Bond campaign support As needed summer renovations and repairs Emergency repairs
  • 23. Artesia Public Schools • One on-call architect • One year contract with possible 2 year extension • 14 Projects in first year Not just design • Bond campaign support • Assessments • District wide utilization study • Comprehensive operating cost comparisons Flexibility to address a shift in district facility design priorities Emergency structural and roofing repairs Case Study
  • 24. Summary Objectives: • Save time, money and District resources • Creating a long term beneficial relationship Application: • Several under defined needs • Limited district facility management and maintenance resources Understanding of State on-call procurement rules: • Procurement flexibility • Promotes competition