SlideShare a Scribd company logo
Standard Minute Value:
SMV in Garments,
Calculation and
Importance
PREPARED BY
Name : Md.Mazharul Islam
ID : 171-009-041
Batch : 61 Batch
Department : Textile Engineering
Email:mazharulislam8881@gmail.com
Facebook Id:
https://www.facebook.com/people/MazharulIslam/100
014796875584
Linkedin: https://www.linkedin.com/in/mazharul-
islam-
419698160/
FB Group : Textile all questions & ans for job
PRIMEASIA UNIVERSITY
Department of Textile Engineering
The Main objective of industrial engineering
is:
• To Increase Productivity
• To eliminate waste and non-value added activities
• To come up with the optimum use of scarce resources that would bring out
the best results.
Importance of SMV in the Apparel
Industry
• SMV is calculated for doing a costing of garments
• It is used for calculation of target and set the right target
• For Calculating the Efficiency of workers
• SMV is calculated for making a plan and take effective factory production
decision.
Formulas of SMV Calculation
Calculation of SMV in Garments
• SMV = (Basic Time + Allocated Allowance)
• The formula of Basic Time = Observe Time x Rating Factor
• Basic Time: Basic time is the most likely time required to make garments
considering observe time and applicable rating factors.
• Observe Time: Time taken to do a work when an observer is observing
closely and record the worker’s work speed.
• Calculation of Observe Time = Total Cycle Time is divided by Number of
Cycle
• Cycle Time: Cycle Time is the time between starting a garments manufacturing
and finishing of those garments.
• Rating Factor: Rating factor is assigned based on an evaluation of worker
performance which is conducted through eye judgment. A worker can be fast,
slow and rating is on a scale of 100% to lower.
• Costing SMV is calculated for sending SMV information to buyers. Normally 5%
additional time is added with the actual SMV.
• Costing SMV = Actual SMV + (Actual SMV x 5%)
Thanks

More Related Content

What's hot

Quality control
Quality controlQuality control
Quality control
zaman parvez
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
Rabiul Hasan
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
Mahibur Rahman
 
Internship presentation in knit composite garments
Internship presentation in knit composite garmentsInternship presentation in knit composite garments
Internship presentation in knit composite garments
Noorul Islam Saiful
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
Md. Mazadul Hasan Shishir
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
Mizan Rahman
 
Sampling Department
Sampling DepartmentSampling Department
Sampling Department
Luke Chanditha Perera
 
Garment production and productivity
Garment production and productivityGarment production and productivity
Garment production and productivity
Md Shamsuzzaman Rasel
 
Garments Inspection
Garments InspectionGarments Inspection
Garments Inspection
Takbir Ahmed
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
zaman parvez
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industry
SherminAkter1
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
Mazharul Islam
 

What's hot (20)

Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Quality control
Quality controlQuality control
Quality control
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
Internship presentation in knit composite garments
Internship presentation in knit composite garmentsInternship presentation in knit composite garments
Internship presentation in knit composite garments
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMV
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
Fully-Fashion-Knitwear
Fully-Fashion-KnitwearFully-Fashion-Knitwear
Fully-Fashion-Knitwear
 
Sampling Department
Sampling DepartmentSampling Department
Sampling Department
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Garment production and productivity
Garment production and productivityGarment production and productivity
Garment production and productivity
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Garments Inspection
Garments InspectionGarments Inspection
Garments Inspection
 
Study on knit garments merchandising
Study on knit garments merchandisingStudy on knit garments merchandising
Study on knit garments merchandising
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
Inspection in garment industry
Inspection in garment industryInspection in garment industry
Inspection in garment industry
 
Garment washing
Garment washingGarment washing
Garment washing
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
 

Similar to Standard minute value( SMV) in garments, calculation and importance

A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
Sourav Kumar
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
Present scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industryPresent scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industry
Hindustan University
 
Effect of work study & time study on production and quality
 Effect of work study & time study on production and quality Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL  TOTAL QUALITY CONTROL.pptxQUALITY CONTROL  TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
SamitBisal
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
AryaRukmana1
 
Ch8 controlling class 12 business studies
Ch8  controlling class 12 business studiesCh8  controlling class 12 business studies
Ch8 controlling class 12 business studies
Priyanka Rao
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Disha Pawar
 
ACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWS
Kriace Ward
 
UNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptxUNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptx
KarthigaiSelviU
 
Presentation on Productivity Mesurement
Presentation on Productivity MesurementPresentation on Productivity Mesurement
Presentation on Productivity Mesurement
Ahmad Kawser Zohair
 
Total quality management
Total quality managementTotal quality management
Total quality management
Aanand Gajjar
 
Training on development of supervisor
Training on development of supervisorTraining on development of supervisor
Training on development of supervisor
MdIslamulHasan
 
OKTL BY SHIHAB
OKTL BY SHIHABOKTL BY SHIHAB
OKTL BY SHIHAB
Shihab Tex
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Negi
 

Similar to Standard minute value( SMV) in garments, calculation and importance (20)

A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
sudath
sudath sudath
sudath
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Present scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industryPresent scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industry
 
Effect of work study & time study on production and quality
 Effect of work study & time study on production and quality Effect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL  TOTAL QUALITY CONTROL.pptxQUALITY CONTROL  TOTAL QUALITY CONTROL.pptx
QUALITY CONTROL TOTAL QUALITY CONTROL.pptx
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
Ch8 controlling class 12 business studies
Ch8  controlling class 12 business studiesCh8  controlling class 12 business studies
Ch8 controlling class 12 business studies
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
ACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWS
 
Resume
ResumeResume
Resume
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
UNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptxUNIT 4 LABOUR.pptx
UNIT 4 LABOUR.pptx
 
Presentation on Productivity Mesurement
Presentation on Productivity MesurementPresentation on Productivity Mesurement
Presentation on Productivity Mesurement
 
Rajesh P
Rajesh PRajesh P
Rajesh P
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Training on development of supervisor
Training on development of supervisorTraining on development of supervisor
Training on development of supervisor
 
OKTL BY SHIHAB
OKTL BY SHIHABOKTL BY SHIHAB
OKTL BY SHIHAB
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 

More from Mazharul Islam

T-Shirt business Final Plan
T-Shirt business Final PlanT-Shirt business Final Plan
T-Shirt business Final Plan
Mazharul Islam
 
Details about textile washing
Details about textile washingDetails about textile washing
Details about textile washing
Mazharul Islam
 
All textile abbreviations
All textile abbreviationsAll textile abbreviations
All textile abbreviations
Mazharul Islam
 
Challenges of apparel industry of bangladesh
Challenges of apparel industry of bangladeshChallenges of apparel industry of bangladesh
Challenges of apparel industry of bangladesh
Mazharul Islam
 
Al muslim company question and ans 2019
Al muslim company question and ans 2019Al muslim company question and ans 2019
Al muslim company question and ans 2019
Mazharul Islam
 
Presentation on Card-Spinning System
Presentation on Card-Spinning SystemPresentation on Card-Spinning System
Presentation on Card-Spinning System
Mazharul Islam
 
Presentation on Financial statement of Aman Group
Presentation  on  Financial statement  of  Aman GroupPresentation  on  Financial statement  of  Aman Group
Presentation on Financial statement of Aman Group
Mazharul Islam
 
Pw annie high grading TECH PACK
Pw annie high grading TECH PACKPw annie high grading TECH PACK
Pw annie high grading TECH PACK
Mazharul Islam
 
Seminar Banner Pattern
Seminar Banner PatternSeminar Banner Pattern
Seminar Banner Pattern
Mazharul Islam
 
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES   PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
Mazharul Islam
 
T-shirt business final plan
T-shirt business final planT-shirt business final plan
T-shirt business final plan
Mazharul Islam
 
The 3 mistakes of my life
The 3 mistakes of my lifeThe 3 mistakes of my life
The 3 mistakes of my life
Mazharul Islam
 
Special trigonometric integrals
Special trigonometric integralsSpecial trigonometric integrals
Special trigonometric integrals
Mazharul Islam
 
Array in c programming
Array in c programmingArray in c programming
Array in c programming
Mazharul Islam
 

More from Mazharul Islam (14)

T-Shirt business Final Plan
T-Shirt business Final PlanT-Shirt business Final Plan
T-Shirt business Final Plan
 
Details about textile washing
Details about textile washingDetails about textile washing
Details about textile washing
 
All textile abbreviations
All textile abbreviationsAll textile abbreviations
All textile abbreviations
 
Challenges of apparel industry of bangladesh
Challenges of apparel industry of bangladeshChallenges of apparel industry of bangladesh
Challenges of apparel industry of bangladesh
 
Al muslim company question and ans 2019
Al muslim company question and ans 2019Al muslim company question and ans 2019
Al muslim company question and ans 2019
 
Presentation on Card-Spinning System
Presentation on Card-Spinning SystemPresentation on Card-Spinning System
Presentation on Card-Spinning System
 
Presentation on Financial statement of Aman Group
Presentation  on  Financial statement  of  Aman GroupPresentation  on  Financial statement  of  Aman Group
Presentation on Financial statement of Aman Group
 
Pw annie high grading TECH PACK
Pw annie high grading TECH PACKPw annie high grading TECH PACK
Pw annie high grading TECH PACK
 
Seminar Banner Pattern
Seminar Banner PatternSeminar Banner Pattern
Seminar Banner Pattern
 
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES   PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
PRESENTATION ON INTRODUCTION TO SEVERAL VARIABLES AND PARTIAL DERIVATIVES
 
T-shirt business final plan
T-shirt business final planT-shirt business final plan
T-shirt business final plan
 
The 3 mistakes of my life
The 3 mistakes of my lifeThe 3 mistakes of my life
The 3 mistakes of my life
 
Special trigonometric integrals
Special trigonometric integralsSpecial trigonometric integrals
Special trigonometric integrals
 
Array in c programming
Array in c programmingArray in c programming
Array in c programming
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 

Standard minute value( SMV) in garments, calculation and importance

  • 1. Standard Minute Value: SMV in Garments, Calculation and Importance
  • 2. PREPARED BY Name : Md.Mazharul Islam ID : 171-009-041 Batch : 61 Batch Department : Textile Engineering Email:mazharulislam8881@gmail.com Facebook Id: https://www.facebook.com/people/MazharulIslam/100 014796875584 Linkedin: https://www.linkedin.com/in/mazharul- islam- 419698160/ FB Group : Textile all questions & ans for job PRIMEASIA UNIVERSITY Department of Textile Engineering
  • 3. The Main objective of industrial engineering is: • To Increase Productivity • To eliminate waste and non-value added activities • To come up with the optimum use of scarce resources that would bring out the best results.
  • 4. Importance of SMV in the Apparel Industry • SMV is calculated for doing a costing of garments • It is used for calculation of target and set the right target • For Calculating the Efficiency of workers • SMV is calculated for making a plan and take effective factory production decision.
  • 5. Formulas of SMV Calculation
  • 6. Calculation of SMV in Garments • SMV = (Basic Time + Allocated Allowance) • The formula of Basic Time = Observe Time x Rating Factor • Basic Time: Basic time is the most likely time required to make garments considering observe time and applicable rating factors. • Observe Time: Time taken to do a work when an observer is observing closely and record the worker’s work speed. • Calculation of Observe Time = Total Cycle Time is divided by Number of Cycle
  • 7. • Cycle Time: Cycle Time is the time between starting a garments manufacturing and finishing of those garments. • Rating Factor: Rating factor is assigned based on an evaluation of worker performance which is conducted through eye judgment. A worker can be fast, slow and rating is on a scale of 100% to lower. • Costing SMV is calculated for sending SMV information to buyers. Normally 5% additional time is added with the actual SMV. • Costing SMV = Actual SMV + (Actual SMV x 5%)