SlideShare a Scribd company logo
1 of 3
Information of Industrial Engineering Department
 SMV
Standard minute value is the standard time, to complete any given task by
using best possible methods at standard level of performance.
 Plan Layout
Plan is the special arrangement & configuration of departments. Work
stations & equipment used in the conversion process.
 TPT (Throughput time)
Throughput time is the time taken by particular volume of work to
complete.
 Method improved
 Select
 Record
 Examine
 Develop
 Evaluate
 Define
 Install
 Maintain
 Work study
Work study is the systematic examination of the method of caring on
activities
 Time study
To determine the time is should take for a qualified worker to perform a
specific task using a specified method by directly observing on operator.
 Step of the time study
 -break the work into element
 -How element are selected
 Observed Time
Time recorded by observing on operator while he she is doing a task.
 Loss time
Loss time is the ineffective or useless time that spends on any activity which
is not a specified part of a job.
 Performance
This is a figure which we calculate after reducing the lost time out of the
total available time.
 WIP
WIP is the number of garments under production at a given time.
 Time measurement:
Time measurement is the application of techniques designed to establish the time for a
qualified worker to carry out a task at a defined level of performance.
 Method study
Method study is the systematic recoding & critical examination of ways of
doing thing in order to make improvements.
 Important consideration of the method study
 Minimum motion of the human body
 Arrangement of work place
 Working condition
 Process of manufacturing
 Rating :
Rating is the assessment of the workers rate of working relative to the
observer’s concept of the rate corresponding to standard rate.
 Rating errors:
 Loose rating
 Tight rating
 Flat rating
 Steep rating
 Inconsistent rating.
 Target
Target is the amount of production which should be produced by an
operator or a line that a management desires.
 Bottleneck
Which are holding up production operations or a lengthy operation that
consumes a great deal of time.
 Plan layout :
Plan layout is the special arrangement & configuration of departments, work stations, &
equipment used in the conversion process.
 7M:
 Manpower
 Material
 Money
 Methods
 Machine
 Moral
 Management of time
 Need of apparel engineer:
 Standardization of methods, equipment & conditions.
 Production scheduling to work accurately help to understand how long it
takes to complete the work.
 Fair payment to employee.
• Historical data:
This is the technique of work measurement in this way we carry out an experiment &
determine that time required for a certain operation.
• Different types of allowances:
 Relaxation allowance
 M/C delay allowance
 Contingency allowance
• Operation breakdown:
In the clothing industry operation breakdown is the separation of the making operations
so that garments can be made up quickly & cheaply using available labor & machinery.
• Production line balancing:
Production line balancing is the allocation of the work to be done to the people available
to do it production line balancing is used.
 To ensure a steady flow of work
 To make the best use of the available time &
 To keep work in progress of a minimum.
• Quality of Work study Executive:
 Sincerity & Honesty
 Enthusiasm
 Tactful
 Good appearance
 Self confidence
 Sympathy with people
• Work place engineering:
 Minimum working area:
It indicates that place from where the operator can take his/her raw materials or cut
panel without any movement of their task.
 Maximum working area:
It indicates that place from where the operator cannot take his/her raw materials or cut
panel without any movement of their task.
• Standard worker:
The standard worker is that worker who has the consistency a qualified worker is one
who has acquired the skill, knowledge & other attributes to carry out the work in hand to
satisfactory standard of quality quantity & safety.
• GSD:
General sewing data is a technique for method analysis & setting of time standards for
sewing products of industry.
• Capacity:
To check how many an operator can produce in one hour.
• Effectiveness Means:
Doing the right thing.
• Effectiveness Means:
Doing the thing right.
• The Equipment used for time study:
 Stop watch
 Clip board
 Time study format
 Pencil
 Eraser
 Calculator
• 5 s :
 SEIRE (SORT)
 SEITON (SET IN ORDER)
 SEISO (SHINE)
 SEIKETSU (STANDARDIZE) &
 SHITSUKT (SUSTAIN).
• Who are responsible for the implementation of 5S
 Management commitment
 Management envelopment
 Participation by all
 Supported by all
 Self sustaining
• Responsibilities of IE Executive:
 Establish a correct method
 Establish a correct standards
 Achieve operator’s performance.
• 7 Wastage:
 Delay / Waiting
 Transportation
 Excess motion
 Over production
 Inventory
 Over processing
 Defective parts / Alter
• Movement’s motions of human body’s:
 Finger
 Wrist
 Forearm
 Upper arm
 Shoulder
• Work content:
 Effective content
o Basic work content
 Ineffective work
o Poor design
o Incorrect quality
o Poor layout
o Poor planning
o Absenteeism
o Inefficiency
o Occupational hazards
• PDCA:
 Plan
 Do
 Check
 Action
• What is marker
Drawing the pattern on the paper as per style.
• Objective of marker
 To arrange for cutting
 To share fabric
 To make minimum wastage
 To help for your cutting.
• Marker Efficiency
Additional of total area of all patterns in a marker (square inch) * 100 / total area of
marker (square inch)
• If the efficiency is high then wastage will be less.
• Marker Efficiency
Marker Efficiency = (Total area of marker / Total area of lay) * 100
• What factor are increasing marker efficiency
 Size of garments
 Marker length
 Pattern engineering
 Type of fabric
 Symmetrical
 Asymmetrical
 Process of marker making
 Width of marker
 Types of garments
• Fabric wastage outside of marker
 Ends of ply losses (2+2=4)
 Losses of fabric at the ends of roll
 Selvedge losses : 2 % not more than 7 %
 Purchase loss
• Spreading
To spread cloth as determined by needed quantity as per marking.
• Grain line
Parallel to grain line.
• Button ligne
Ligne = 1 inch / 40 “One inch ar 40 vager ak vag ke ligne bole”.
1 ligne = 0.625 mm
If, 20 ligne = 20 * 0.625 mm = 12.5 mm
So, the size of the button will be written as 20 L
Converted:
Ligne to mm
16 L so, 16 / 1.6 = 10 mm
&
Mm to ligne
10mm so, 10 * 1.6 = 16 L
• What is marking
It is the process by which all necessary patterns of all size are drawn on a marking paper
by utilizing minimum area of the paper.
• Marker width
It is the width of marker, which is, determine by omitting the bode fabric from edge of the
roll.
Example: Width = 48” & 1” is bode fabric, so, marker width : 48 – 1 = 47”
• GSM Calculation
1” = 2.54 cm
36” = 1 yards = 36 * 2.54 = 91.44 cm
2 yards = 91.44 * 2 = 182.88 cm / 100 = 1.8288 mm
4 yards = 91.44 * 4 = 365.76 cm / 100 = 3.6576 mm
Area = 4 yards * 2 yards = 1.8288 * 3.6676 = 6.68901888 m2
Now, 2 kg = 2 * 1000 gm = 2000 gm
So, 6.68901888 m2 = 2000 gm
; ‘GSM = 2000 / 6.68901888 = 298.997 ~ 299
• Team Development model
 Forming
 Storming
 Norming
 Performing
 Adjourning
• Seam types
 Supper imposed seam
 Lapped seam
 Bound seam
 Flat seam
 Decorative seam
 Edge neatening seam
 Seam class – 7
 Seam class – 8
• Poly bag is made of two type of chemicals
 Poly propylene
 Poly ethylene
Poly ethylene is costly then poly propylene.
• Classification of stitch
 Chine stitch (Hem, Button)
 Hand stitch (Jacket edge )
 Lock stitch (pocket, Caller, Cuff T/S)
 Multithread chain stitch ( F/L less, Bread, Elastic )
 Over edge stitch (O/L)
 Cover chain stitch ( F/L , Kansie )
• Care label code
Normal Wash
Chlorine blasé
Iron code
Dry Clean code
Drying condition
• The sub holding of Workstudy department
 Planning
 Discipline
 Motivation
 Follow up
 Productivity
 Quality
 Training
• GSD
GSD = (Man power * Work hour) / Target
• SMV
SMV = Basic time + (Basic time * Allowance)
• Basic time
Basic time = Observed time * Rating
4 yards
Wait = 2 kg
2 yards
• Observed time
Observed time = Total Cycle time / No of cycle
• Rating
Rating = (Observed Rating * Standard rating) / Standard rating
• Efficiency
Efficiency = (Earn minute * Available minute) * 100
• Earn minute
Earn minute = No of Pc’s (Production) * Garments SMV
• Available minute
Available minute = Work hour * Manpower
• Organization Efficiency
Organization Efficiency = (Basic pis time / Bottle neck time) * 100
• Basic pis time (BPT)
Basic pis time = Total Gmt SMV / Total Manpower
• UCL
UCL = Basic pis time / Organization Efficiency
• LCL
LCL = 2 * Basic pis time – UCL
• Improvement
Improvement = 1 – (Production / Capacity)
• Performance
Performance = {Earn minute * (Available minute – Off standard time)} * 100
• Balancing loss
Balancing loss = {AML – (TML/AML)} * 100
• TML
TML = Operational SMV / BPT
• Balancing Efficiency
Balancing Efficiency = 1 - Balancing loss
• Capacity
Capacity = 60 / Capacity time in minute
• Cycle Time
Cycle Time = 60 / Team target
• Team target
Team target = (Work hour/SMV) * Present operator * Organizational efficiency
• Capacity Achievable
Capacity Achievable = Capacity * Balance
• Balance
Balance = BPT / Bottle neck time (BNT)
• Standard time
Standard time = Net operation time * (1 + Ratio of loss time)
• Daily output
Daily output = Work hour / SMV
• Factory capacity
Factory capacity = (Work hour / SMV) * Total worker * Working day * Efficiency
• CPM
CPM = (Total over head cost of the month / No of SMV earners * Work minutes)
*Efficiency
• Required no of operator
Required no of operator = Target daily output / Daily output per operator
• CM of garments
CM of garments = Total production / (No of worker * Work hour)
• Marker Efficiency
Marker Efficiency = (Total area of marker / Total area of lay) * 100
• CPD (Consumption per dozen)
CPD = Marker length * Marker width * GSM * 12 / (1000 * 100 * 100 * Total marker
pc’s)
• Stitch Consumption
Single Needle:
 S/N 1 inch = 2.75 inch
 D/N 1 inch = 6 inch
Over Lock:
 O/L 3TH
1 inch = 14 inch
 O/L 4TH
1 inch = 17.75 inch
 O/L 5TH
1 inch = 20 inch
Flat Lock:
 F/L 2TH
1 inch = 10.25 inch
 F/L 3TH
1 inch = 14 inch
 F/L 4TH
1 inch = 17.75 inch
 F/L 5TH
1 inch = 22.75 inch
FOA:
 1TH
1 inch = 14 inch
Button Stitch:
 1 Button = 4~6 inch
Button Attach:
 1 Hole = 5 inch
Bar tack:
 1 Bar tack = 9 inch
Lopper:
 1 inch = 9 inch
Latus:
 1 inch = 30 inch

More Related Content

What's hot

Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel productionNiloy Rahman
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department ShivamSagar13
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedureMazharul Islam
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments productionMd.Abdur Rahim Al Bahar
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementRajeev Sharan
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMVThreadSol
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentK.K.T Madhusanka
 
Garment Industries Industrial Engineering
Garment Industries Industrial  EngineeringGarment Industries Industrial  Engineering
Garment Industries Industrial EngineeringsanjeevSingla10
 

What's hot (20)

Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
SMV & Benefits
SMV & BenefitsSMV & Benefits
SMV & Benefits
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Industrial engineering for apparel production
Industrial engineering for apparel productionIndustrial engineering for apparel production
Industrial engineering for apparel production
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
 
Work study presentation
Work study presentationWork study presentation
Work study presentation
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 
Smv
SmvSmv
Smv
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
Industrial engineering
Industrial engineeringIndustrial engineering
Industrial engineering
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMV
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
 
Garment Industries Industrial Engineering
Garment Industries Industrial  EngineeringGarment Industries Industrial  Engineering
Garment Industries Industrial Engineering
 

Viewers also liked

Industrial engineering presentation
Industrial engineering presentation Industrial engineering presentation
Industrial engineering presentation Işıl Tabağ
 
Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secretgsdlife
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsArpan Mahato
 
6 things you should know about industrial engineering
6 things you should know about industrial engineering6 things you should know about industrial engineering
6 things you should know about industrial engineeringIE Saeed Shurrab
 
Industrial Engineering At A glance.
Industrial Engineering At A glance.Industrial Engineering At A glance.
Industrial Engineering At A glance.Greejesh Prakash
 
What Is Industrial Engineering
What Is Industrial EngineeringWhat Is Industrial Engineering
What Is Industrial Engineeringahmad bassiouny
 
Presentation on washing and garments
Presentation on washing and garmentsPresentation on washing and garments
Presentation on washing and garmentsNuruzzaman Shah
 
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Prasanta Sarkar
 
Made easy notes of Digital electronics Part-3
Made easy notes of Digital electronics Part-3Made easy notes of Digital electronics Part-3
Made easy notes of Digital electronics Part-3ranjeet kumar singh
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmSourav Kumar
 

Viewers also liked (18)

GSD Certificate
GSD CertificateGSD Certificate
GSD Certificate
 
Industrial engineering presentation
Industrial engineering presentation Industrial engineering presentation
Industrial engineering presentation
 
Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secret
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
 
6 things you should know about industrial engineering
6 things you should know about industrial engineering6 things you should know about industrial engineering
6 things you should know about industrial engineering
 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
 
Introduction to IE
Introduction to IEIntroduction to IE
Introduction to IE
 
Industrial Engineering At A glance.
Industrial Engineering At A glance.Industrial Engineering At A glance.
Industrial Engineering At A glance.
 
What Is Industrial Engineering
What Is Industrial EngineeringWhat Is Industrial Engineering
What Is Industrial Engineering
 
Presentation on washing and garments
Presentation on washing and garmentsPresentation on washing and garments
Presentation on washing and garments
 
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
 
Textile Calculations and Equations
Textile  Calculations and EquationsTextile  Calculations and Equations
Textile Calculations and Equations
 
Apparel manufacturing process
Apparel manufacturing processApparel manufacturing process
Apparel manufacturing process
 
Garment washing
Garment washingGarment washing
Garment washing
 
Textile calculations
Textile calculationsTextile calculations
Textile calculations
 
Made easy notes of Digital electronics Part-3
Made easy notes of Digital electronics Part-3Made easy notes of Digital electronics Part-3
Made easy notes of Digital electronics Part-3
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
 

Similar to All in 1 IE

Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuffMaududAhmmad
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdfRahbiMalek
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxRichardMagbatoc1
 
project-presentation
project-presentationproject-presentation
project-presentationronybste
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxRichardMagbatoc1
 
standardised-work-overview-and-documents
standardised-work-overview-and-documentsstandardised-work-overview-and-documents
standardised-work-overview-and-documentsAngelo Del Grosso
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungareeShamimaAkter41
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETMdRakibHasan27
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .pptAryaRukmana1
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainPrakhar Jain
 

Similar to All in 1 IE (20)

Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuff
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
project-presentation
project-presentationproject-presentation
project-presentation
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
standardised-work-overview-and-documents
standardised-work-overview-and-documentsstandardised-work-overview-and-documents
standardised-work-overview-and-documents
 
Line balancing
Line balancing Line balancing
Line balancing
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungaree
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar Jain
 

All in 1 IE

  • 1. Information of Industrial Engineering Department  SMV Standard minute value is the standard time, to complete any given task by using best possible methods at standard level of performance.  Plan Layout Plan is the special arrangement & configuration of departments. Work stations & equipment used in the conversion process.  TPT (Throughput time) Throughput time is the time taken by particular volume of work to complete.  Method improved  Select  Record  Examine  Develop  Evaluate  Define  Install  Maintain  Work study Work study is the systematic examination of the method of caring on activities  Time study To determine the time is should take for a qualified worker to perform a specific task using a specified method by directly observing on operator.  Step of the time study  -break the work into element  -How element are selected  Observed Time Time recorded by observing on operator while he she is doing a task.  Loss time Loss time is the ineffective or useless time that spends on any activity which is not a specified part of a job.  Performance This is a figure which we calculate after reducing the lost time out of the total available time.  WIP WIP is the number of garments under production at a given time.  Time measurement: Time measurement is the application of techniques designed to establish the time for a qualified worker to carry out a task at a defined level of performance.  Method study Method study is the systematic recoding & critical examination of ways of doing thing in order to make improvements.  Important consideration of the method study  Minimum motion of the human body  Arrangement of work place  Working condition  Process of manufacturing  Rating : Rating is the assessment of the workers rate of working relative to the observer’s concept of the rate corresponding to standard rate.  Rating errors:  Loose rating  Tight rating  Flat rating  Steep rating  Inconsistent rating.  Target Target is the amount of production which should be produced by an operator or a line that a management desires.  Bottleneck Which are holding up production operations or a lengthy operation that consumes a great deal of time.  Plan layout : Plan layout is the special arrangement & configuration of departments, work stations, & equipment used in the conversion process.  7M:  Manpower  Material  Money  Methods  Machine  Moral  Management of time  Need of apparel engineer:  Standardization of methods, equipment & conditions.  Production scheduling to work accurately help to understand how long it takes to complete the work.  Fair payment to employee. • Historical data: This is the technique of work measurement in this way we carry out an experiment & determine that time required for a certain operation. • Different types of allowances:  Relaxation allowance  M/C delay allowance  Contingency allowance • Operation breakdown: In the clothing industry operation breakdown is the separation of the making operations so that garments can be made up quickly & cheaply using available labor & machinery. • Production line balancing: Production line balancing is the allocation of the work to be done to the people available to do it production line balancing is used.  To ensure a steady flow of work  To make the best use of the available time &  To keep work in progress of a minimum. • Quality of Work study Executive:  Sincerity & Honesty  Enthusiasm  Tactful  Good appearance  Self confidence  Sympathy with people • Work place engineering:  Minimum working area: It indicates that place from where the operator can take his/her raw materials or cut panel without any movement of their task.  Maximum working area: It indicates that place from where the operator cannot take his/her raw materials or cut panel without any movement of their task. • Standard worker: The standard worker is that worker who has the consistency a qualified worker is one who has acquired the skill, knowledge & other attributes to carry out the work in hand to satisfactory standard of quality quantity & safety. • GSD: General sewing data is a technique for method analysis & setting of time standards for sewing products of industry. • Capacity: To check how many an operator can produce in one hour. • Effectiveness Means: Doing the right thing. • Effectiveness Means: Doing the thing right. • The Equipment used for time study:  Stop watch  Clip board  Time study format  Pencil  Eraser  Calculator • 5 s :  SEIRE (SORT)  SEITON (SET IN ORDER)  SEISO (SHINE)  SEIKETSU (STANDARDIZE) &  SHITSUKT (SUSTAIN). • Who are responsible for the implementation of 5S  Management commitment  Management envelopment  Participation by all  Supported by all  Self sustaining
  • 2. • Responsibilities of IE Executive:  Establish a correct method  Establish a correct standards  Achieve operator’s performance. • 7 Wastage:  Delay / Waiting  Transportation  Excess motion  Over production  Inventory  Over processing  Defective parts / Alter • Movement’s motions of human body’s:  Finger  Wrist  Forearm  Upper arm  Shoulder • Work content:  Effective content o Basic work content  Ineffective work o Poor design o Incorrect quality o Poor layout o Poor planning o Absenteeism o Inefficiency o Occupational hazards • PDCA:  Plan  Do  Check  Action • What is marker Drawing the pattern on the paper as per style. • Objective of marker  To arrange for cutting  To share fabric  To make minimum wastage  To help for your cutting. • Marker Efficiency Additional of total area of all patterns in a marker (square inch) * 100 / total area of marker (square inch) • If the efficiency is high then wastage will be less. • Marker Efficiency Marker Efficiency = (Total area of marker / Total area of lay) * 100 • What factor are increasing marker efficiency  Size of garments  Marker length  Pattern engineering  Type of fabric  Symmetrical  Asymmetrical  Process of marker making  Width of marker  Types of garments • Fabric wastage outside of marker  Ends of ply losses (2+2=4)  Losses of fabric at the ends of roll  Selvedge losses : 2 % not more than 7 %  Purchase loss • Spreading To spread cloth as determined by needed quantity as per marking. • Grain line Parallel to grain line. • Button ligne Ligne = 1 inch / 40 “One inch ar 40 vager ak vag ke ligne bole”. 1 ligne = 0.625 mm If, 20 ligne = 20 * 0.625 mm = 12.5 mm So, the size of the button will be written as 20 L Converted: Ligne to mm 16 L so, 16 / 1.6 = 10 mm & Mm to ligne 10mm so, 10 * 1.6 = 16 L • What is marking It is the process by which all necessary patterns of all size are drawn on a marking paper by utilizing minimum area of the paper. • Marker width It is the width of marker, which is, determine by omitting the bode fabric from edge of the roll. Example: Width = 48” & 1” is bode fabric, so, marker width : 48 – 1 = 47” • GSM Calculation 1” = 2.54 cm 36” = 1 yards = 36 * 2.54 = 91.44 cm 2 yards = 91.44 * 2 = 182.88 cm / 100 = 1.8288 mm 4 yards = 91.44 * 4 = 365.76 cm / 100 = 3.6576 mm Area = 4 yards * 2 yards = 1.8288 * 3.6676 = 6.68901888 m2 Now, 2 kg = 2 * 1000 gm = 2000 gm So, 6.68901888 m2 = 2000 gm ; ‘GSM = 2000 / 6.68901888 = 298.997 ~ 299 • Team Development model  Forming  Storming  Norming  Performing  Adjourning • Seam types  Supper imposed seam  Lapped seam  Bound seam  Flat seam  Decorative seam  Edge neatening seam  Seam class – 7  Seam class – 8 • Poly bag is made of two type of chemicals  Poly propylene  Poly ethylene Poly ethylene is costly then poly propylene. • Classification of stitch  Chine stitch (Hem, Button)  Hand stitch (Jacket edge )  Lock stitch (pocket, Caller, Cuff T/S)  Multithread chain stitch ( F/L less, Bread, Elastic )  Over edge stitch (O/L)  Cover chain stitch ( F/L , Kansie ) • Care label code Normal Wash Chlorine blasé Iron code Dry Clean code Drying condition • The sub holding of Workstudy department  Planning  Discipline  Motivation  Follow up  Productivity  Quality  Training • GSD GSD = (Man power * Work hour) / Target • SMV SMV = Basic time + (Basic time * Allowance) • Basic time Basic time = Observed time * Rating 4 yards Wait = 2 kg 2 yards
  • 3. • Observed time Observed time = Total Cycle time / No of cycle • Rating Rating = (Observed Rating * Standard rating) / Standard rating • Efficiency Efficiency = (Earn minute * Available minute) * 100 • Earn minute Earn minute = No of Pc’s (Production) * Garments SMV • Available minute Available minute = Work hour * Manpower • Organization Efficiency Organization Efficiency = (Basic pis time / Bottle neck time) * 100 • Basic pis time (BPT) Basic pis time = Total Gmt SMV / Total Manpower • UCL UCL = Basic pis time / Organization Efficiency • LCL LCL = 2 * Basic pis time – UCL • Improvement Improvement = 1 – (Production / Capacity) • Performance Performance = {Earn minute * (Available minute – Off standard time)} * 100 • Balancing loss Balancing loss = {AML – (TML/AML)} * 100 • TML TML = Operational SMV / BPT • Balancing Efficiency Balancing Efficiency = 1 - Balancing loss • Capacity Capacity = 60 / Capacity time in minute • Cycle Time Cycle Time = 60 / Team target • Team target Team target = (Work hour/SMV) * Present operator * Organizational efficiency • Capacity Achievable Capacity Achievable = Capacity * Balance • Balance Balance = BPT / Bottle neck time (BNT) • Standard time Standard time = Net operation time * (1 + Ratio of loss time) • Daily output Daily output = Work hour / SMV • Factory capacity Factory capacity = (Work hour / SMV) * Total worker * Working day * Efficiency • CPM CPM = (Total over head cost of the month / No of SMV earners * Work minutes) *Efficiency • Required no of operator Required no of operator = Target daily output / Daily output per operator • CM of garments CM of garments = Total production / (No of worker * Work hour) • Marker Efficiency Marker Efficiency = (Total area of marker / Total area of lay) * 100 • CPD (Consumption per dozen) CPD = Marker length * Marker width * GSM * 12 / (1000 * 100 * 100 * Total marker pc’s) • Stitch Consumption Single Needle:  S/N 1 inch = 2.75 inch  D/N 1 inch = 6 inch Over Lock:  O/L 3TH 1 inch = 14 inch  O/L 4TH 1 inch = 17.75 inch  O/L 5TH 1 inch = 20 inch Flat Lock:  F/L 2TH 1 inch = 10.25 inch  F/L 3TH 1 inch = 14 inch  F/L 4TH 1 inch = 17.75 inch  F/L 5TH 1 inch = 22.75 inch FOA:  1TH 1 inch = 14 inch Button Stitch:  1 Button = 4~6 inch Button Attach:  1 Hole = 5 inch Bar tack:  1 Bar tack = 9 inch Lopper:  1 inch = 9 inch Latus:  1 inch = 30 inch