The document explains the concepts of Standard Minute Value (SMV) and Standard Allowed Minute (SAM), highlighting their differences and calculation methods. SMV is the time a qualified operator takes to perform a task under standard conditions, while SAM includes additional allowances. The document provides guidance on how to calculate both SMV and SAM using synthetic data and allowances.