Quality control
Quality
• Quality refers to the sum of the attributes or
properties that describe a product
• These are generally expressed in terms of
specific product characteristics such as length,
width, colour, specific gravity and the like.
– Performance
• Conformity to performance standards
Definition
• ASQC – Quality means the totality of features
and characteristics of a product or service
that bear on its ability to satisfy given needs
• From customer’s perspective, quality of a
good or service is fitness for use of it
• Customer satisfaction for the price of the
product
• Quality is a blend of:
–Fitness of purpose, adequacy of functioning
and reliability, for the price paid
–Design and manufacturing characteristics
tailored to meet customer’s requirements
during service
–Availability when required
Quality control
• Quality control is a management system for
initiating and co ordinating:
– Quality development, quality maintenance and
quality improvement in the various departments
of design and manufacturing, for achieving the
twin objectives of:
Economical production and customer satisfaction
Objectives of Q C
• It is to provide products which are
dependable, satisfactory and economical
• To ensure economic production of
products of uniform quality acceptable to
the customer
• Aims at preventing the defects rather
than detecting the defects
Need for quality
• Increased productivity
• Reduced cost of repairs
• Increases loyal customer base
• Better profits
Quality creation
• Those activities involved in the selection of
the specific characteristics required to achieve
the desired quality and the processing or
fabrication of materials to conform to the
specific characteristics selected.
• Quality creation involves almost all
organisational elements of the enterprise and
is the basic objective towards which most
activity is directed
Quality control through Production systems
• Inputs – Raw materials – acceptance tests-
quality of inputs
• Conversion – production processes-control
charts- monitoring quality of partially
completed products
• Outputs- goods & services – acceptance tests-
quality of outputs
Quality control Techniques
• JIT
• Quality at source
• Inspection
• SQC
• QC
• TQM
JIT
• JIT helps achieve quality because it is a
philosophy that seeks to constantly improve
production processes and methods.
• JIT contributes to high product quality in the
following ways
– Production is highly standardised. Workers
perform standard tasks every day. They are
familiar with their tasks. Familiarity ensures high
quality
– In process inventories are drastically reduced by
cutting lot sizes. Any interruption, therefore
causes production to stop until the problem has
been solved. In this way, JIT has been called a
system of enforced problem solving. Now, this
stoppage in production forces everybody to solve
the quality problem so that the defect will not
repeat. Hence high product quality is ensured.
– Suppliers of materials, under JIT system, supply
materials of perfect quality. Many companies do
not even inspect suppliers’ deliveries of materials;
rather, the emphasis is on working with suppliers
to produce perfect parts and materials.
– JIT system envisages the use of automated
equipment and robots in production processes.
Use of such sophisticated machines will ensure
high product quality.
– JIT system also envisages the use of intensive
preventive maintenance programmes in order to
prevent any machine breakdown. This results in
machines producing parts of perfect quality.
– Workers are responsible for producing parts of
perfect quality or with zero defects before they are
passed on to the next production operation.
Quality at the source
• The worker is put in the driver’s seat in
controlling product quality. The principles
underlying quality at the source are:
– Every worker’s job becomes a quality control station.
The worker is responsible for inspecting his own
work, identifying any defects and reworking them in
to non-defectives, and correcting any causes of
defect.
– Statistical quality control techniques are used to
monitor the quality of parts produced at each work
station/ and easy-to-understand charts and graphs
are used to communicate progress to workers and
managers .
– Each worker is given the right to stop the
production line to avoid producing defective parts
– Workers and managers are organised into quality
circles- groupes of people who analyse quality
problems, work to solve the problems, and
implement programmes to improve product
quality.
Inspection
• The act of determining conformance or non-
conformance of the expected performance is
the function of inspection. By inspection, a
manager seeks to determine the acceptability
or non- acceptability of the parts, products or
services. The basis for inspection is usually a
specification which is called inspection
standard. Inspection is made by comparing
the quality of the product to the standard.
Frequency of inspection
• The challenge is to keep inspection costs
minimum, yet realise expected quality. In
certain cases every part is inspected, in which
case, it is called 100 percent inspection. When
it is less than 100 percent , it is called partial
or sampling inspection. Parts with high value
and those having tendency to run in to large
number of rejects are normally subject to
100% inspection.
When to inspect
• Inspection is desired at
– Finished products and parts to know that correct
parts are to be assembled or products are right
when shipped,
– Before an expensive processing,
– The out put of automatic machine periodically so
that possible errors are confined to small
quantities, and
– Before an operation that can’t be undone, for
example, in mixing paint.
Where to inspect
• Crib inspection
• On line inspection
Quality Circle
• It is a participative management concept
• Though it is in Japan that this was concretised
and demonstrated its potential, its
rudimentary origin is traced to USA, where
problem solving groups have existed since the
1930s.
• QC – Japan -1960s – Edward Deming & Joseph
Juran
• Dr. Ishikawa – Advisor with JUSE - 1962
Meaning & Nature
• QC is a voluntary group of people who meet
togethet on a regular basis to identify, analyse
and solve quality, productivity, cost reduction,
safety and other problems in their work area,
leading to improvement in their performance
and enrichment of their worklife.
• Ideal size of QC is around 10 memebers
• Employee problem solving groups
Objective or philosophy of QC
• Reduce errors and enhance quality and
productivity
• Inspire more effective teamwork
• Promote job involvement and participation
• Increase employee motivation
• Create problem solving capability
• Build an attitude of ‘problem prevention’
• Improve communication in the organisation
• Develop harmonious manager – worker
relationship
• Promote personla and leadership
development
• Develop a greater safety awareness
• Promote cost reduction
• Catalyse attitudinal changes for greater
cohesiveness and teamwork
Process of QC
• Identification of problem
• Problem selection
• Problem analysis
• Recommendation to the Top management
Deming’s 14 points
• Consistency of purpose is a must for continual
improvement of a product. Manager‘s have to
ensure that the company’s vision of quality is
understood by all the employees and that they
move continuously towards it.
• Continuous change and innovation is a must for
survival. In today’s complex business situations,
it is impossible for a small group of mangers to
identify and sort out quality problems. Thus all
the employees have to be involved in this
process.
• Quality cannot be achieved only by
inspection. Inspection wastes valuable time
and adds to the products cost without any
value addition. Inspections may not be
perfect, causing some defects to be passed on
to the customer. Defects are symptoms
removed by inspection, while the disease
(root cause) remains. Inspections create a gap
between the people and processes that
introduce defects and the people and
processes that detect defects
• Wastes should be eliminated in every
functional area, not just production. Even
processes in accounting, HRM, customer
service, and sales effect the quality of the
product and, thus, generate waste. Therefore,
the whole organisation should contribute
towards the enhancement of quality.
• The attitude of supervisors and managers
towards workers should be that of a facilitator.
Errors by workers should be treated by
supervisors as an opportunity to learn the
process and systems better. Teamwork should
be promoted and rewarded.
• The barriers between departments and
individuals should be removed. Problems
should not be handled within strict functional
limits and the concerns raised by related
functional areas should not be ignored.
• Posters and slogans should be eliminated.
These must not be used to tell the workers to
work harder. Instead, they should be provided
with tools and training so that they work
smarter leading to better quality.
• Remove obstacles in the good workmanship of
hourly workers to instill a sense of pride in
them.
• Vigorous programme of retraining and
education of employees are a must.
• Numerical targets and work standards may
affect quality. Reasonable numerical targets
make the workers complacent, while
excessively demanding ones may lead to a
compromise on quality in order to achieve the
targets. Such targets cannot be eliminated,
but can be set such that quality is not
compromised.
• Encourage workers to give quality
improvement ideas without fear. Workers
refrain from giving new ideas of change
because they may have to work with new and
unfamiliar methods in place of known and
comfortable, though inefficient, methods.
They also feel that if their ideas fail, it may
affect their performance appraisal, eventually
leading to job insecurity.
• Employees should be trained on the job.
Training on quality techniques should be
continual, as training never ends.
• The lowest price should not be the sole
criteria for selecting a supplier. Suppliers
asking for lowest prices often offer low quality
products, leading to an increase in the overall
cost to the buyer due to the increased
expenses of inspection, scrap, rework, and
inventory to replace defective items, etc. Thus,
the supplier offering the lowest total cost
should be selected.
• The top management’s commitment for ever
improving quality is a must.
ISO
• International Organisation for Standardisation
– Geneva
– 140 members
– 1979 – Genesis of ISO 9000
ISO 9000
• ISO 9000 standard represents an international
consensus on good management practices
with the aim of ensuring that the organisation
can time and again deliver the product or
services that meet the client’s quality
requirements. These good practices have been
distilled into a set of system, regardless of
what the organisation does, its size, or
whether it is private or public sector.
ISO
• Objective:
– To promote the development of standardiastion
and related activities in the world with a view to
facilitating international exchange of goods and
services, and to developing cooperation in the
spheres of intellectual, scientific, technological
and economic activity.
Principal concepts
• Demonstrate ability to consistently provide
product to meet customer and applicable
regulatory requirements
• Enhance customer satisfaction
• Improve the quality of its own operations
• Provide confidence to internal management
and interested parties that the requirements
of a quality management system are being
effectively implemented.
Benefits
• ISO 9000 certification has become the de facto
minimum requirement for entering into global
markets
• It provides an opportunity to increase value to
the activities of the organisation, by
streamlining quality management system.
• Improves the performance of processes/
activities continually thereby reducing the cost
of production
• It gives importance to customer satisfaction
• It helps to improve customer relations by
providing quality product or service
• It also acts as an incentive to develop
employee relations, employee empowerment
and organisational development

More Related Content

Similar to QUALITY CONTROL TOTAL QUALITY CONTROL.pptx

Similar to QUALITY CONTROL TOTAL QUALITY CONTROL.pptx (20)

quality management
quality managementquality management
quality management
 
BBA008 -total quality management.pdf
BBA008  -total quality management.pdfBBA008  -total quality management.pdf
BBA008 -total quality management.pdf
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
TOTAL QUALITY MANAGEMENT (TQM).pptx
TOTAL QUALITY MANAGEMENT (TQM).pptxTOTAL QUALITY MANAGEMENT (TQM).pptx
TOTAL QUALITY MANAGEMENT (TQM).pptx
 
GE6757 UNIT-1.ppt
GE6757 UNIT-1.pptGE6757 UNIT-1.ppt
GE6757 UNIT-1.ppt
 
Tqm
TqmTqm
Tqm
 
Quality control-1223702290662347-9 (1)
Quality control-1223702290662347-9 (1)Quality control-1223702290662347-9 (1)
Quality control-1223702290662347-9 (1)
 
Introduction to Total Quality Management[TQM]
Introduction to Total Quality Management[TQM]Introduction to Total Quality Management[TQM]
Introduction to Total Quality Management[TQM]
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Quality management
Quality managementQuality management
Quality management
 
Quality management
Quality managementQuality management
Quality management
 
Quality control
Quality controlQuality control
Quality control
 
Pharmaceutical Quality Mangement.pptx
Pharmaceutical Quality Mangement.pptxPharmaceutical Quality Mangement.pptx
Pharmaceutical Quality Mangement.pptx
 
Qc
QcQc
Qc
 
Qc
QcQc
Qc
 
TQM
TQMTQM
TQM
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
Managing-QualitUpload a presentation to download Govt. Acctg Chp 13.pptxy-G6....
Managing-QualitUpload a presentation to download Govt. Acctg Chp 13.pptxy-G6....Managing-QualitUpload a presentation to download Govt. Acctg Chp 13.pptxy-G6....
Managing-QualitUpload a presentation to download Govt. Acctg Chp 13.pptxy-G6....
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPT
 
Quality Management
Quality Management Quality Management
Quality Management
 

More from SamitBisal

ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptx
ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptxENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptx
ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptxSamitBisal
 
POWER PLANT ENGINEERING WATER TUBE BOILER.pptx
POWER PLANT ENGINEERING WATER TUBE BOILER.pptxPOWER PLANT ENGINEERING WATER TUBE BOILER.pptx
POWER PLANT ENGINEERING WATER TUBE BOILER.pptxSamitBisal
 
HEAT TRANSFER automobile engineering.pptx
HEAT TRANSFER  automobile engineering.pptxHEAT TRANSFER  automobile engineering.pptx
HEAT TRANSFER automobile engineering.pptxSamitBisal
 
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdf
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdfRAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdf
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdfSamitBisal
 
friction-stir-welding2-130906104920- (1).pptx
friction-stir-welding2-130906104920- (1).pptxfriction-stir-welding2-130906104920- (1).pptx
friction-stir-welding2-130906104920- (1).pptxSamitBisal
 
Environmental science g (1).pptx
Environmental science g (1).pptxEnvironmental science g (1).pptx
Environmental science g (1).pptxSamitBisal
 

More from SamitBisal (6)

ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptx
ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptxENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptx
ENTREPRENEURSHIP DEVELOPMENT AND ECONOMICS GROWTH.pptx
 
POWER PLANT ENGINEERING WATER TUBE BOILER.pptx
POWER PLANT ENGINEERING WATER TUBE BOILER.pptxPOWER PLANT ENGINEERING WATER TUBE BOILER.pptx
POWER PLANT ENGINEERING WATER TUBE BOILER.pptx
 
HEAT TRANSFER automobile engineering.pptx
HEAT TRANSFER  automobile engineering.pptxHEAT TRANSFER  automobile engineering.pptx
HEAT TRANSFER automobile engineering.pptx
 
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdf
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdfRAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdf
RAKTIM PRAMANIK_6TH SEM_INTERNAL COMBUSTION ENGINES & GAS TURBINES.pdf
 
friction-stir-welding2-130906104920- (1).pptx
friction-stir-welding2-130906104920- (1).pptxfriction-stir-welding2-130906104920- (1).pptx
friction-stir-welding2-130906104920- (1).pptx
 
Environmental science g (1).pptx
Environmental science g (1).pptxEnvironmental science g (1).pptx
Environmental science g (1).pptx
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

QUALITY CONTROL TOTAL QUALITY CONTROL.pptx

  • 1. CALCUTTA INSTITUTE OF TECHNOLOGY DEPARTMENT:-MECHANICAL ENGINEERING SUBJECT NAME:- DESIGN OF MACHINE ELEMENTS TOPIC: - QUALITY CONTROL YEAR:-3RD SEMESTER:-6TH ROLL NO:-17700721032
  • 3. Quality • Quality refers to the sum of the attributes or properties that describe a product • These are generally expressed in terms of specific product characteristics such as length, width, colour, specific gravity and the like. – Performance • Conformity to performance standards
  • 4. Definition • ASQC – Quality means the totality of features and characteristics of a product or service that bear on its ability to satisfy given needs • From customer’s perspective, quality of a good or service is fitness for use of it • Customer satisfaction for the price of the product
  • 5. • Quality is a blend of: –Fitness of purpose, adequacy of functioning and reliability, for the price paid –Design and manufacturing characteristics tailored to meet customer’s requirements during service –Availability when required
  • 6. Quality control • Quality control is a management system for initiating and co ordinating: – Quality development, quality maintenance and quality improvement in the various departments of design and manufacturing, for achieving the twin objectives of: Economical production and customer satisfaction
  • 7. Objectives of Q C • It is to provide products which are dependable, satisfactory and economical • To ensure economic production of products of uniform quality acceptable to the customer • Aims at preventing the defects rather than detecting the defects
  • 8. Need for quality • Increased productivity • Reduced cost of repairs • Increases loyal customer base • Better profits
  • 9. Quality creation • Those activities involved in the selection of the specific characteristics required to achieve the desired quality and the processing or fabrication of materials to conform to the specific characteristics selected. • Quality creation involves almost all organisational elements of the enterprise and is the basic objective towards which most activity is directed
  • 10.
  • 11. Quality control through Production systems • Inputs – Raw materials – acceptance tests- quality of inputs • Conversion – production processes-control charts- monitoring quality of partially completed products • Outputs- goods & services – acceptance tests- quality of outputs
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Quality control Techniques • JIT • Quality at source • Inspection • SQC • QC • TQM
  • 20. JIT • JIT helps achieve quality because it is a philosophy that seeks to constantly improve production processes and methods. • JIT contributes to high product quality in the following ways – Production is highly standardised. Workers perform standard tasks every day. They are familiar with their tasks. Familiarity ensures high quality
  • 21. – In process inventories are drastically reduced by cutting lot sizes. Any interruption, therefore causes production to stop until the problem has been solved. In this way, JIT has been called a system of enforced problem solving. Now, this stoppage in production forces everybody to solve the quality problem so that the defect will not repeat. Hence high product quality is ensured. – Suppliers of materials, under JIT system, supply materials of perfect quality. Many companies do not even inspect suppliers’ deliveries of materials; rather, the emphasis is on working with suppliers to produce perfect parts and materials.
  • 22. – JIT system envisages the use of automated equipment and robots in production processes. Use of such sophisticated machines will ensure high product quality. – JIT system also envisages the use of intensive preventive maintenance programmes in order to prevent any machine breakdown. This results in machines producing parts of perfect quality. – Workers are responsible for producing parts of perfect quality or with zero defects before they are passed on to the next production operation.
  • 23. Quality at the source • The worker is put in the driver’s seat in controlling product quality. The principles underlying quality at the source are: – Every worker’s job becomes a quality control station. The worker is responsible for inspecting his own work, identifying any defects and reworking them in to non-defectives, and correcting any causes of defect. – Statistical quality control techniques are used to monitor the quality of parts produced at each work station/ and easy-to-understand charts and graphs are used to communicate progress to workers and managers .
  • 24. – Each worker is given the right to stop the production line to avoid producing defective parts – Workers and managers are organised into quality circles- groupes of people who analyse quality problems, work to solve the problems, and implement programmes to improve product quality.
  • 25. Inspection • The act of determining conformance or non- conformance of the expected performance is the function of inspection. By inspection, a manager seeks to determine the acceptability or non- acceptability of the parts, products or services. The basis for inspection is usually a specification which is called inspection standard. Inspection is made by comparing the quality of the product to the standard.
  • 26. Frequency of inspection • The challenge is to keep inspection costs minimum, yet realise expected quality. In certain cases every part is inspected, in which case, it is called 100 percent inspection. When it is less than 100 percent , it is called partial or sampling inspection. Parts with high value and those having tendency to run in to large number of rejects are normally subject to 100% inspection.
  • 27. When to inspect • Inspection is desired at – Finished products and parts to know that correct parts are to be assembled or products are right when shipped, – Before an expensive processing, – The out put of automatic machine periodically so that possible errors are confined to small quantities, and – Before an operation that can’t be undone, for example, in mixing paint.
  • 28. Where to inspect • Crib inspection • On line inspection
  • 29. Quality Circle • It is a participative management concept • Though it is in Japan that this was concretised and demonstrated its potential, its rudimentary origin is traced to USA, where problem solving groups have existed since the 1930s. • QC – Japan -1960s – Edward Deming & Joseph Juran • Dr. Ishikawa – Advisor with JUSE - 1962
  • 30. Meaning & Nature • QC is a voluntary group of people who meet togethet on a regular basis to identify, analyse and solve quality, productivity, cost reduction, safety and other problems in their work area, leading to improvement in their performance and enrichment of their worklife. • Ideal size of QC is around 10 memebers • Employee problem solving groups
  • 31.
  • 32. Objective or philosophy of QC • Reduce errors and enhance quality and productivity • Inspire more effective teamwork • Promote job involvement and participation • Increase employee motivation • Create problem solving capability • Build an attitude of ‘problem prevention’ • Improve communication in the organisation
  • 33. • Develop harmonious manager – worker relationship • Promote personla and leadership development • Develop a greater safety awareness • Promote cost reduction • Catalyse attitudinal changes for greater cohesiveness and teamwork
  • 34. Process of QC • Identification of problem • Problem selection • Problem analysis • Recommendation to the Top management
  • 35. Deming’s 14 points • Consistency of purpose is a must for continual improvement of a product. Manager‘s have to ensure that the company’s vision of quality is understood by all the employees and that they move continuously towards it. • Continuous change and innovation is a must for survival. In today’s complex business situations, it is impossible for a small group of mangers to identify and sort out quality problems. Thus all the employees have to be involved in this process.
  • 36. • Quality cannot be achieved only by inspection. Inspection wastes valuable time and adds to the products cost without any value addition. Inspections may not be perfect, causing some defects to be passed on to the customer. Defects are symptoms removed by inspection, while the disease (root cause) remains. Inspections create a gap between the people and processes that introduce defects and the people and processes that detect defects
  • 37. • Wastes should be eliminated in every functional area, not just production. Even processes in accounting, HRM, customer service, and sales effect the quality of the product and, thus, generate waste. Therefore, the whole organisation should contribute towards the enhancement of quality.
  • 38. • The attitude of supervisors and managers towards workers should be that of a facilitator. Errors by workers should be treated by supervisors as an opportunity to learn the process and systems better. Teamwork should be promoted and rewarded.
  • 39. • The barriers between departments and individuals should be removed. Problems should not be handled within strict functional limits and the concerns raised by related functional areas should not be ignored.
  • 40. • Posters and slogans should be eliminated. These must not be used to tell the workers to work harder. Instead, they should be provided with tools and training so that they work smarter leading to better quality.
  • 41. • Remove obstacles in the good workmanship of hourly workers to instill a sense of pride in them.
  • 42. • Vigorous programme of retraining and education of employees are a must. • Numerical targets and work standards may affect quality. Reasonable numerical targets make the workers complacent, while excessively demanding ones may lead to a compromise on quality in order to achieve the targets. Such targets cannot be eliminated, but can be set such that quality is not compromised.
  • 43. • Encourage workers to give quality improvement ideas without fear. Workers refrain from giving new ideas of change because they may have to work with new and unfamiliar methods in place of known and comfortable, though inefficient, methods. They also feel that if their ideas fail, it may affect their performance appraisal, eventually leading to job insecurity.
  • 44. • Employees should be trained on the job. Training on quality techniques should be continual, as training never ends.
  • 45. • The lowest price should not be the sole criteria for selecting a supplier. Suppliers asking for lowest prices often offer low quality products, leading to an increase in the overall cost to the buyer due to the increased expenses of inspection, scrap, rework, and inventory to replace defective items, etc. Thus, the supplier offering the lowest total cost should be selected.
  • 46. • The top management’s commitment for ever improving quality is a must.
  • 47. ISO • International Organisation for Standardisation – Geneva – 140 members – 1979 – Genesis of ISO 9000
  • 48. ISO 9000 • ISO 9000 standard represents an international consensus on good management practices with the aim of ensuring that the organisation can time and again deliver the product or services that meet the client’s quality requirements. These good practices have been distilled into a set of system, regardless of what the organisation does, its size, or whether it is private or public sector.
  • 49. ISO • Objective: – To promote the development of standardiastion and related activities in the world with a view to facilitating international exchange of goods and services, and to developing cooperation in the spheres of intellectual, scientific, technological and economic activity.
  • 50. Principal concepts • Demonstrate ability to consistently provide product to meet customer and applicable regulatory requirements • Enhance customer satisfaction • Improve the quality of its own operations • Provide confidence to internal management and interested parties that the requirements of a quality management system are being effectively implemented.
  • 51. Benefits • ISO 9000 certification has become the de facto minimum requirement for entering into global markets • It provides an opportunity to increase value to the activities of the organisation, by streamlining quality management system. • Improves the performance of processes/ activities continually thereby reducing the cost of production
  • 52. • It gives importance to customer satisfaction • It helps to improve customer relations by providing quality product or service • It also acts as an incentive to develop employee relations, employee empowerment and organisational development