Standard Minute Value: SMV in Garments, Calculation,
Importance
The term Standard Minute Value – SMV is mostly used in the garments industry. It is a process of
time study and measure standard minute and then calculates the SMV. The calculation of SMV is
actually done by the Industrial Engineer. Generally, SMV indicates the time taken to make garments
by the workers using the right types of machinery. In the garments factory, you may find that many
people used to the SAM – Standard Allowed Minute which is the same as SMV. SMV varies
garments to garments, style to style, factory to factory. Management and buyers ask for SMV and it is
the responsibility of the IE department to calculate SMV and give it to the respective parties. Here in
this article, I will share details of Standard Minute Value: SMV in Garments, Calculation, Importance
with a practical example.
Standard Minute Value: SMV in Garments, Calculation, Importance
Industrial Engineering is concerned with the design, improvement, and installation of an integrated
system of men, machinery, and materials. SMV is one of the most important tools used by IE.
The Main Objective of Industrial Engineering
 To Increase Productivity
 To eliminate waste and non-value added activities
 To come up with the optimum use of scarce resources that would bring out the best results.
Importance of SMV in the Apparel Industry
The reason Why we use SMV in Garments Factory is given below
 SMV is calculated for doing costing of garments
 It is used for calculation of target and set the right target
 For Calculating the Efficiency of workers
 SMV is calculated for making a plan and take effective factory production decisions.
For Calculating SMV – Standard Minute Value in Garments you must have a proper idea of machine
operating procedure and working process of workers. Close observation of Industrial Engineer is
required to calculate the right SMV for a particular product or style in your factory.
Basically, SMV is the sum of the basic time requirement and allowance applicable to it. Normally
allowance is given at the rate of 10% based on efficiency.
Formulas of Calculating SMV
Calculation of SMV in Garments
SMV = (Basic Time + Allocated Allowance)
The formula of Basic Time = Observe Time x Rating Factor
Basic Time
Basic time is the most likely time required to make garments considering observe time and applicable
rating factors.
Observe Time
Time is taken to do work when an observer is observing closely and record the worker’s work speed.
Calculation of Observe Time = Total Cycle Time is divided by Number of Cycle
Cycle Time
Cycle Time is the time between starting a garment manufacturing and finishing of those garments.
Rating Factor
The rating factor is assigned based on an evaluation of worker performance which is conducted
through eye judgment. A worker can be fast, slow and rating is on a scale of 100% to lower.
Costing SMV is calculated for sending SMV information to buyers. Normally 5% additional time is
added with the actual SMV.
Costing SMV = Actual SMV + (Actual SMV x 5%)
Example of Calculation of SMV in Garments
Suppose for making a product the following assumption is there
 Observe Time = 25 Minutes
 Rating of Operator = 80%
 Considering Allowance = 10%
 Basic Time = 25minutes x 80% = 20 minutes
 Allowance = 20 x 10% = 2 Minute
So, SMV = 20 minutes + 2 minutes = 22 minutes for making a particular garments product
SMV Calculator
You can use the following calculator to quickly calculate the SMV of garments.
Input
Observe Time*
Rating Factor*
Allowance*
Output
Standard Minute Value (SMV)
Calculation of Capacity of Single Operator in Garments
 If an operator works for 10 hours a day
 30 minutes to make a product
Capacity = (1 operator x 10 hours x 60 minutes)/30 Minutes = 20 Pieces of Garments by an operator
If you assign 100 operators then your capacity will be = 100 operators x 20 pieces = 2000 pieces a
day
Calculation of Efficiency Percent
 SMV 22 Minutes
 Working Hours 10 a Day
 Number of Operators 100 person
 Actual Production 2000 pieces
Efficiency (%) = (2000 pieces x 22 minute)/(100 operators x 10 hours x 60 minutes) x 100 = 73.33%
whereas,
Target = (10 hours x 60 minutes x 100 operators)/smv 22 minutes = 2727 Pieces of garments

More Related Content

What's hot

Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
K.K.T Madhusanka
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
Mizan Rahman
 
Knitting calculation
Knitting calculationKnitting calculation
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Disha Pawar
 
Quality control
Quality controlQuality control
Quality control
zaman parvez
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality Assurance
SAMultimedia
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
 
Fabric inspections
Fabric inspectionsFabric inspections
Fabric inspections
Chamal Jayasinghe
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
 
Sewing Department
Sewing DepartmentSewing Department
Sewing Department
Mickey00Fahad
 
Garments & garment defects zubair lahore
Garments & garment defects zubair lahoreGarments & garment defects zubair lahore
Garments & garment defects zubair lahore
zubairtex90
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
Muhib Limon
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
Azmir Latif Beg
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished product
Prasanta Sarkar
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
Mahibur Rahman
 
Knitting technology
Knitting technologyKnitting technology
Marker Making - Marker Mode
Marker Making - Marker ModeMarker Making - Marker Mode
Marker Making - Marker Mode
Akansha Choudhary
 
A Complete Product Process of a Knitwear Garment
A Complete Product Process of a Knitwear GarmentA Complete Product Process of a Knitwear Garment
A Complete Product Process of a Knitwear GarmentSyed Mumtaz Ali
 

What's hot (20)

Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
 
Quality assurance department (sop)
Quality assurance department (sop)Quality assurance department (sop)
Quality assurance department (sop)
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Knitting calculation
Knitting calculationKnitting calculation
Knitting calculation
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Quality control
Quality controlQuality control
Quality control
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality Assurance
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Fabric inspections
Fabric inspectionsFabric inspections
Fabric inspections
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Sewing Department
Sewing DepartmentSewing Department
Sewing Department
 
Garments & garment defects zubair lahore
Garments & garment defects zubair lahoreGarments & garment defects zubair lahore
Garments & garment defects zubair lahore
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
 
Calculation of standard minute value of T shirt
Calculation of standard minute value of T shirtCalculation of standard minute value of T shirt
Calculation of standard minute value of T shirt
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished product
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
Knitting technology
Knitting technologyKnitting technology
Knitting technology
 
Marker Making - Marker Mode
Marker Making - Marker ModeMarker Making - Marker Mode
Marker Making - Marker Mode
 
A Complete Product Process of a Knitwear Garment
A Complete Product Process of a Knitwear GarmentA Complete Product Process of a Knitwear Garment
A Complete Product Process of a Knitwear Garment
 

Similar to Smv

Sewing line setting
Sewing line settingSewing line setting
Sewing line setting
SharifulHasan9
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
ShivamSagar13
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Work study
Work studyWork study
Work study
Saifur Rahman
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 
In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)
Ankur Shukla
 
Methodology
MethodologyMethodology
Methodology
mustafa hussain
 
Apparel Manufacturing Methodology
Apparel Manufacturing MethodologyApparel Manufacturing Methodology
Apparel Manufacturing Methodology
mustafa hussain
 
shipment management process
shipment management process shipment management process
shipment management process
Amiyo Roy
 
Production Management Lec-01.pptx
Production Management Lec-01.pptxProduction Management Lec-01.pptx
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments Industry
Shohag Ahammed
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
MdRakibHasan27
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
Ankur Shukla
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungaree
ShamimaAkter41
 
Presentation on Planning Calculations by Textile Jogot.
Presentation on Planning Calculations by Textile Jogot.Presentation on Planning Calculations by Textile Jogot.
Presentation on Planning Calculations by Textile Jogot.
RAKIB HOWLADER
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
dezyneecole
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
jamshaidAslam1
 

Similar to Smv (20)

Sewing line setting
Sewing line settingSewing line setting
Sewing line setting
 
Kpi
KpiKpi
Kpi
 
Line balancing
Line balancing Line balancing
Line balancing
 
industrial engineering in sewing department
industrial engineering in sewing department industrial engineering in sewing department
industrial engineering in sewing department
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Work study
Work studyWork study
Work study
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)In apparel manufacturing (2 files merged)
In apparel manufacturing (2 files merged)
 
Methodology
MethodologyMethodology
Methodology
 
Apparel Manufacturing Methodology
Apparel Manufacturing MethodologyApparel Manufacturing Methodology
Apparel Manufacturing Methodology
 
shipment management process
shipment management process shipment management process
shipment management process
 
Production Management Lec-01.pptx
Production Management Lec-01.pptxProduction Management Lec-01.pptx
Production Management Lec-01.pptx
 
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments Industry
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Operation bulletin of dungaree
Operation bulletin of dungareeOperation bulletin of dungaree
Operation bulletin of dungaree
 
ABCD.pptx
ABCD.pptxABCD.pptx
ABCD.pptx
 
Presentation on Planning Calculations by Textile Jogot.
Presentation on Planning Calculations by Textile Jogot.Presentation on Planning Calculations by Textile Jogot.
Presentation on Planning Calculations by Textile Jogot.
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
 
Introduction to SAM
Introduction to SAMIntroduction to SAM
Introduction to SAM
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Smv

  • 1. Standard Minute Value: SMV in Garments, Calculation, Importance The term Standard Minute Value – SMV is mostly used in the garments industry. It is a process of time study and measure standard minute and then calculates the SMV. The calculation of SMV is actually done by the Industrial Engineer. Generally, SMV indicates the time taken to make garments by the workers using the right types of machinery. In the garments factory, you may find that many people used to the SAM – Standard Allowed Minute which is the same as SMV. SMV varies garments to garments, style to style, factory to factory. Management and buyers ask for SMV and it is the responsibility of the IE department to calculate SMV and give it to the respective parties. Here in this article, I will share details of Standard Minute Value: SMV in Garments, Calculation, Importance with a practical example. Standard Minute Value: SMV in Garments, Calculation, Importance Industrial Engineering is concerned with the design, improvement, and installation of an integrated system of men, machinery, and materials. SMV is one of the most important tools used by IE. The Main Objective of Industrial Engineering  To Increase Productivity  To eliminate waste and non-value added activities  To come up with the optimum use of scarce resources that would bring out the best results. Importance of SMV in the Apparel Industry The reason Why we use SMV in Garments Factory is given below  SMV is calculated for doing costing of garments  It is used for calculation of target and set the right target  For Calculating the Efficiency of workers  SMV is calculated for making a plan and take effective factory production decisions.
  • 2. For Calculating SMV – Standard Minute Value in Garments you must have a proper idea of machine operating procedure and working process of workers. Close observation of Industrial Engineer is required to calculate the right SMV for a particular product or style in your factory. Basically, SMV is the sum of the basic time requirement and allowance applicable to it. Normally allowance is given at the rate of 10% based on efficiency. Formulas of Calculating SMV Calculation of SMV in Garments SMV = (Basic Time + Allocated Allowance) The formula of Basic Time = Observe Time x Rating Factor Basic Time Basic time is the most likely time required to make garments considering observe time and applicable rating factors. Observe Time Time is taken to do work when an observer is observing closely and record the worker’s work speed. Calculation of Observe Time = Total Cycle Time is divided by Number of Cycle Cycle Time Cycle Time is the time between starting a garment manufacturing and finishing of those garments. Rating Factor
  • 3. The rating factor is assigned based on an evaluation of worker performance which is conducted through eye judgment. A worker can be fast, slow and rating is on a scale of 100% to lower. Costing SMV is calculated for sending SMV information to buyers. Normally 5% additional time is added with the actual SMV. Costing SMV = Actual SMV + (Actual SMV x 5%) Example of Calculation of SMV in Garments Suppose for making a product the following assumption is there  Observe Time = 25 Minutes  Rating of Operator = 80%  Considering Allowance = 10%  Basic Time = 25minutes x 80% = 20 minutes  Allowance = 20 x 10% = 2 Minute So, SMV = 20 minutes + 2 minutes = 22 minutes for making a particular garments product SMV Calculator You can use the following calculator to quickly calculate the SMV of garments. Input Observe Time* Rating Factor* Allowance* Output Standard Minute Value (SMV) Calculation of Capacity of Single Operator in Garments  If an operator works for 10 hours a day  30 minutes to make a product Capacity = (1 operator x 10 hours x 60 minutes)/30 Minutes = 20 Pieces of Garments by an operator If you assign 100 operators then your capacity will be = 100 operators x 20 pieces = 2000 pieces a day Calculation of Efficiency Percent  SMV 22 Minutes  Working Hours 10 a Day  Number of Operators 100 person
  • 4.  Actual Production 2000 pieces Efficiency (%) = (2000 pieces x 22 minute)/(100 operators x 10 hours x 60 minutes) x 100 = 73.33% whereas, Target = (10 hours x 60 minutes x 100 operators)/smv 22 minutes = 2727 Pieces of garments