Objective of site visit
To observe the different activities and techniques carried out on site.
To explore the various types of building materials and machinery used on site.
Aware of the items measurable for sub-structure and reinforced concrete frame works.
To have a feel of how the condition of the site really is and how safety is a priority.
To have an up-close view of the entire building structure as opposed to seeing it in the
drawings.
4
Details of the project
-25 storeys
-2 basement floors of carpark, levels 1-2 will be the shopping areas, levels 3-6 will be
another carpark area, levels 7-24 will be the apartments.
-Approximate cost of RM100million for the entire project
-AIKBEE TIMBERS (employer), LT LEONG SEKUTU (architect), PERUNDING MAJUJAYA
(civil & structural engineer), KEW & ASSOCIATES (mechanical & electrical engineer), PCM
COST PERUDING (quantity surveyor), ENCORP CONSTRUCT (main contractor).
5
Observations
Ground floor
The overall view of construction
Construction netting & scaffolding can be seen on the exterior of the building
6
Mesh fabric reinforcement bars & timber stored on site
Security room right in front of the entrance
7
The safety & health officer, in charge of the safety and well-being of those on site
Parts of scaffolding & cement stored on site
8
Scaffolding in the centre of the building possibly used for installing the formworks and
pouring the concrete
Pipes, timber and other resources stored on site
9
Basement
The basement level where the workers temporarily stay for the night
Basement carpark
10
More scaffolding used for various tasks namely the piping
Air conditioning ducts stored waiting to be installed
11
Wall piles to support the base of the building and for extra anchorage
Ground floor-basement staircase
12
Ramp to the first floor carpark
The old building on site waiting to be demolished or continued upon
13
Reinforcement bars & stirrups for the ramps
Floors above ground level
The frame of the lifts
14
Scaffolding in the middle of the building from the ground floor
Starter bars for the continuation of the next section of concrete works
15
Workers positioning the reinforcement bars in place
Aerial view of part of the site
16
Back to ground floor
Scaffolding on the exterior of the building to gain easy excess to the upper floors
Wires to be installed along the inside of the orange pipe
17
Formwork for sides and soffits of staircase
Production of spacers used to determine concrete cover
18
Site office from the outside
Site office for the consultants to hold meetings and various other functions
19
The drawings for the whole project
Tower crane at the front of the building used to carry heavy loads onto the upper floors
20
Fresh fabric reinforcement bars just being delivered to the site
21
Conclusion
From this site visit, I have experienced for the first time what it feels like to be in a
construction site and I can say it is pretty exciting. Apart from the experience, this site
visit also helps me to visualise the items that needs to be measured and how it is
properly placed in real time. I also see that safety is very important in the site especially
for us newbies. It also seems like a good place to talk to some of the people involved to
get more insight on this field. Teamwork is also important at a site that’s where
different professions come together to work on the project. For it to work, the team
must rely on each other and must constantly interact with one another.

More Related Content

What's hot

Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
Esmael Aragaw
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
Anis Rahman Khokan
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
Ir. Abdul Aziz Abas
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
Aglaia Connect
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
Rising Sher
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
Zahid Khan
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
XinYee Khoo
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
Prabhat chhirolya
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
Self-employed
 
Site visit report
Site visit reportSite visit report
Site visit report
foongmei yap
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
Sameer Thaiyam
 
ppt on training civil report on shuttering
ppt on training civil report on shutteringppt on training civil report on shuttering
ppt on training civil report on shuttering
Surat Construction PVT LTD
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
Ahmed Ezz-eldin
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
Farah Sham
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
Ved Jangid
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
mukul srivastava
 

What's hot (20)

Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
ppt on training civil report on shuttering
ppt on training civil report on shutteringppt on training civil report on shuttering
ppt on training civil report on shuttering
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Stairs
StairsStairs
Stairs
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 

Similar to Objective of site visit

Measurement 1 site report
Measurement 1 site reportMeasurement 1 site report
Measurement 1 site report
Jessyca Than
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Introduction
IntroductionIntroduction
Introduction
Lam Yu
 
Site report
Site reportSite report
Site reportYunshi94
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
Yee Len Wan
 
Report
ReportReport
Report
Yong Sy
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
I'mMiss Lily
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
Site report
Site reportSite report
Site report
vaylu
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
Joyce HweeMin
 
Report
ReportReport
Report
jefrineo96
 
Ez
EzEz
bqs Site report
bqs Site reportbqs Site report
bqs Site report
Felix Vong
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
Yung Kai
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Kai Yun Pang
 
Training Report
Training ReportTraining Report
Training Report
Ritika Vyas
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
Zi Shan
 

Similar to Objective of site visit (20)

Measurement 1 site report
Measurement 1 site reportMeasurement 1 site report
Measurement 1 site report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Introduction
IntroductionIntroduction
Introduction
 
Site report
Site reportSite report
Site report
 
Integrated Assignment - Site Visit Report
Integrated Assignment - Site Visit ReportIntegrated Assignment - Site Visit Report
Integrated Assignment - Site Visit Report
 
Report
ReportReport
Report
 
Final Report
Final Report Final Report
Final Report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Site report algel
Site report algelSite report algel
Site report algel
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Site visit-report-nov2015
Site visit-report-nov2015Site visit-report-nov2015
Site visit-report-nov2015
 
Report
ReportReport
Report
 
Ez
EzEz
Ez
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
 
Training Report
Training ReportTraining Report
Training Report
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 

More from Jäkê Čhŷį Śêrñ

Meas 4-presentation
Meas 4-presentationMeas 4-presentation
Meas 4-presentation
Jäkê Čhŷį Śêrñ
 
Tender
TenderTender
Sustainable housing development assignment
Sustainable housing development assignmentSustainable housing development assignment
Sustainable housing development assignment
Jäkê Čhŷį Śêrñ
 
Site surveying
Site surveying Site surveying
Site surveying
Jäkê Čhŷį Śêrñ
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise building
Jäkê Čhŷį Śêrñ
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentation
Jäkê Čhŷį Śêrñ
 

More from Jäkê Čhŷį Śêrñ (20)

Meas 4-presentation
Meas 4-presentationMeas 4-presentation
Meas 4-presentation
 
Purpose
PurposePurpose
Purpose
 
Tender
TenderTender
Tender
 
Shd group-report
Shd group-reportShd group-report
Shd group-report
 
Sustainable housing development assignment
Sustainable housing development assignmentSustainable housing development assignment
Sustainable housing development assignment
 
Management science
Management scienceManagement science
Management science
 
Measurement 3 assignment
Measurement 3 assignmentMeasurement 3 assignment
Measurement 3 assignment
 
Site surveying
Site surveying Site surveying
Site surveying
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise building
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentation
 
Building materials report 2
Building materials report 2Building materials report 2
Building materials report 2
 
Dulux paints
Dulux paintsDulux paints
Dulux paints
 
Building material report
Building material reportBuilding material report
Building material report
 
Assignment 2 edited
Assignment 2 editedAssignment 2 edited
Assignment 2 edited
 
Business charity driveeee
Business charity driveeeeBusiness charity driveeee
Business charity driveeee
 
Journal2
Journal2Journal2
Journal2
 
Journal1
Journal1Journal1
Journal1
 
Assign 2
Assign 2Assign 2
Assign 2
 
The sponge
The spongeThe sponge
The sponge
 
Accounts project
Accounts projectAccounts project
Accounts project
 

Recently uploaded

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 

Recently uploaded (20)

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 

Objective of site visit

  • 1. 1 Site Report: Measurement 1 Building Materials Construction Technology Jake Sia Chyi Sern 0314396
  • 2. 2 Contents Objectives of site visit ................................................... 3 Details of the project ................................................... 4 Observations .................................................... 5 Conclusion .................................................... 21
  • 3. 3 Objective of site visit To observe the different activities and techniques carried out on site. To explore the various types of building materials and machinery used on site. Aware of the items measurable for sub-structure and reinforced concrete frame works. To have a feel of how the condition of the site really is and how safety is a priority. To have an up-close view of the entire building structure as opposed to seeing it in the drawings.
  • 4. 4 Details of the project -25 storeys -2 basement floors of carpark, levels 1-2 will be the shopping areas, levels 3-6 will be another carpark area, levels 7-24 will be the apartments. -Approximate cost of RM100million for the entire project -AIKBEE TIMBERS (employer), LT LEONG SEKUTU (architect), PERUNDING MAJUJAYA (civil & structural engineer), KEW & ASSOCIATES (mechanical & electrical engineer), PCM COST PERUDING (quantity surveyor), ENCORP CONSTRUCT (main contractor).
  • 5. 5 Observations Ground floor The overall view of construction Construction netting & scaffolding can be seen on the exterior of the building
  • 6. 6 Mesh fabric reinforcement bars & timber stored on site Security room right in front of the entrance
  • 7. 7 The safety & health officer, in charge of the safety and well-being of those on site Parts of scaffolding & cement stored on site
  • 8. 8 Scaffolding in the centre of the building possibly used for installing the formworks and pouring the concrete Pipes, timber and other resources stored on site
  • 9. 9 Basement The basement level where the workers temporarily stay for the night Basement carpark
  • 10. 10 More scaffolding used for various tasks namely the piping Air conditioning ducts stored waiting to be installed
  • 11. 11 Wall piles to support the base of the building and for extra anchorage Ground floor-basement staircase
  • 12. 12 Ramp to the first floor carpark The old building on site waiting to be demolished or continued upon
  • 13. 13 Reinforcement bars & stirrups for the ramps Floors above ground level The frame of the lifts
  • 14. 14 Scaffolding in the middle of the building from the ground floor Starter bars for the continuation of the next section of concrete works
  • 15. 15 Workers positioning the reinforcement bars in place Aerial view of part of the site
  • 16. 16 Back to ground floor Scaffolding on the exterior of the building to gain easy excess to the upper floors Wires to be installed along the inside of the orange pipe
  • 17. 17 Formwork for sides and soffits of staircase Production of spacers used to determine concrete cover
  • 18. 18 Site office from the outside Site office for the consultants to hold meetings and various other functions
  • 19. 19 The drawings for the whole project Tower crane at the front of the building used to carry heavy loads onto the upper floors
  • 20. 20 Fresh fabric reinforcement bars just being delivered to the site
  • 21. 21 Conclusion From this site visit, I have experienced for the first time what it feels like to be in a construction site and I can say it is pretty exciting. Apart from the experience, this site visit also helps me to visualise the items that needs to be measured and how it is properly placed in real time. I also see that safety is very important in the site especially for us newbies. It also seems like a good place to talk to some of the people involved to get more insight on this field. Teamwork is also important at a site that’s where different professions come together to work on the project. For it to work, the team must rely on each other and must constantly interact with one another.