The commissioning test report summarizes testing of a disconnector and earth switch at a substation for a customer. It lists the contractor and customer witnesses who were present for the testing. Measurement results are provided for resistance and insulation resistance tests between phases and of open contacts using a 5kV insulation tester. Operation checks showed the disconnector's electrical and manual operations and the earth switch 1's electrical and manual operations were okay, while earth switch 2 tests were not applicable.