Prepared by : Mahmoud Mohamed Ali
Department : Electrical Maintenance
Email : Mahmoud.Mohamed@Siemens.com
Switchgear consist of :
• Circuit breaker.
• Busbar.
• Protection relay.
• Current transformer.
• Voltage transformer.
• Cables Connection
 Operating tools:
Current transformer :
APPLICATION:
 Current transformers (CT,s) are instrument transformers that are used to supply a reduced value of
current to protective relays , meters and other instruments.
 CT,s provide isolation from the high voltage primary , permit grounding of the secondary windings for
safety , and step down the magnitude of the measured current to a value that can be safely handled
by the instruments
RATIO:
 The most common CT secondary full load current is 1A or 5A.
 CT ratio are expressed as a ratio of rated primary current to the rated
secondary current .
 Example
a 1000/1 A CT will produce 1A of secondary current when 1000 A flows through
the primary .
As the primary current changes the secondary current will vary accordingly.
 Specification for CT:
1. Rated Burden (2.5 , 5.0, 7.5 , 10, 15, 30 VA)
2. Continuous Rated Current
3. Short circuit current and duration time
4. Rated secondry current
5- Turns ratio
6- Classes(5P, 10P, X): 5P use with Instantaneous oc Relay
- 10P use with IDMT oc Relay
- X no need high accuracy
 CT component :
 Effect of secondary windings for CT and VT:
CT POLARITY
P1
S1
Magnetization curve for CT :
Specification of voltage transformer:
1- Rated Voltage (11KV)
2- Level Voltage( 100 or 110 v)
3-Breakdown - Pulse Voltage
4-Turns Ratio
Accuracy Class (.1,.2,.3,.4,.5 …..for measuring )
For protection (3p and 5p
Classification of Circuit Breakers
Circuit Breakers
1. Based on
Voltage
•Low
•Medium
•High/Extra
High
•Ultra High
3. Based
on
External
Design
•Dead Tank
•Live Tank
4. Based on
Interrupting
Media
•Air Blast
•Oil
•SF6
•Vacuum
2. Based on
Location
•Indoor
•Outdoor
 Specification of Circuit Breakers
 Rated Voltage:
 Rated Normal Current:
630 – 800 – 1000 – 1250 – 1600 – 2000 – 2500 – 3150 – 4000 A
 Rated Short Circuit Breaking Current(Isc )
Ibreaking =10* Rated Normal Current
 Components of C.B :
1-Anti Pumping Relay (KN): 2- Shunt Closing
(YF):
 3- Shunt Opening(YO1 + YO2):
 General inspection on C.B
1- Ensure of the upper and down contacts for good
connection
2- Ensure of the opening and closing mechanical for
circuit breaker
3- inspection of Charging Limit Switch
4- easy in entire and outage the C.B
5-the heater in the cell is work
6- Ensure of the earthing
 General inspection on C.B
1- Ensure of the upper and down contacts for good
connection
2- Ensure of the opening and closing mechanical for
circuit breaker
3- inspection of Charging Limit Switch
4- easy in entire and outage the C.B
5-the heater in the cell is work
6- Ensure of the earthing
 insulation test for C.B:
 Contact Resistance for C.B
 Use Micrometer device:
 Measure each phase resistance only
 Connection points Resistance for C.B at voltage (11
kv) is 12 - 60 μΩ
 For (33kv) is (25-100) μΩ
 Pressure Switch for air – insulated switchgear:
Distribute type of problem on switchgear
Switchgear trouble shooting and repair work
Trouble 1: Breaker not closing
Switchgear trouble shooting and repair work
Motor not charging spring
(see in fig 1)
Reasons Remedial Action
supply voltage less than 85% Ensure supply voltage above 85% of
the rated voltage.
improper wiring Check motor circuit wiring as per
schematic drawing. If loose
connections are found, tighten them
Damage of gear box
(see in fig 2 )
Replace gear-box
motor shaft being broken or motor
key being broken (see in fig 3 )
Replace motor
Trouble 1: Breaker not closing
Switchgear trouble shooting and repair work
Trouble Reasons Remedial Action
Closing coil burnt
(see fig 4 )
plunger stuck in closing coil Replace closing coil
Problem inside Closing coil Closing coil not developing sufficient
force
Check the resistance of coil at
respective voltage, if not adequate,
then replace the coil
Auxiliary switch continuity missing contamination of contacts
( see fig 5 )
Problem in electrical circuit
Problem in electrical circuit Failure of control voltage Check the circuitry and replace the
faulty components
fig 1
Switchgear trouble shooting and repair work
Trouble 2: Breaker not opening :
Switchgear trouble shooting and repair work
Trouble Reasons Remedial Action
Problem inside Tripping coil Tripping coil not developing
sufficient force
Check the resistance of coil at
respective voltage, if not adequate,
then replace the coil
Tripping coil burnt plunger stuck in tripping coil. Replace tripping coil
Problem in tripping circuit. Fault in interlocking circuit Check the circuitry and replace the
faulty components
Switchgear trouble shooting and repair work
Trouble Reasons Remedial Action
No voltage on control circuit
although voltage on cables
VT fuses disconnected or failure Check the fuses
C.B disconnected after the incoming
directly
- Transformer inrush current
- Over and under voltage relay
- adjustable setting of O.C relay
- adjustable setting of (OV, UV) relay
C.B is operating period then
disconnected
Problem in setting relay Adjusted setting values in relay until
proportional with rated current and
CT values
Hearing high sound inside the cell -Dust on insulator surface
- high moisture inside the cell
- Clean the insulator surface
- Ensure of operate the heater
High temperature inside the cell Loose in connection points on main
Busbar
Tighten on connection points
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx
Meduim Voltage Switchgear.pptx

More Related Content

Similar to Meduim Voltage Switchgear.pptx

Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2koperundeviG
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 
power house training seminar
power house training seminarpower house training seminar
power house training seminarParas kumar
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier pptvikas kumar
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................hiiarindam
 
Power Electronics 2 mark Questions
Power Electronics 2 mark Questions Power Electronics 2 mark Questions
Power Electronics 2 mark Questions BALACHANDRAN D
 
Power electronics
Power electronicsPower electronics
Power electronicspsksiva13
 
Microsoft PowerPoint - Unit II.pdf
Microsoft PowerPoint - Unit II.pdfMicrosoft PowerPoint - Unit II.pdf
Microsoft PowerPoint - Unit II.pdfsrevathiap
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBMANOJ964697
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaKumarChaturvedula
 

Similar to Meduim Voltage Switchgear.pptx (20)

Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2
 
Transformer Rated Metering Site Verification
Transformer Rated Metering Site VerificationTransformer Rated Metering Site Verification
Transformer Rated Metering Site Verification
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier ppt
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
ct pt testing...........................................
ct pt testing...........................................ct pt testing...........................................
ct pt testing...........................................
 
Power Electronics 2 mark Questions
Power Electronics 2 mark Questions Power Electronics 2 mark Questions
Power Electronics 2 mark Questions
 
Lecture (11.11.22).pptx
Lecture (11.11.22).pptxLecture (11.11.22).pptx
Lecture (11.11.22).pptx
 
Untitled document.PDF
Untitled document.PDFUntitled document.PDF
Untitled document.PDF
 
Power electronics
Power electronicsPower electronics
Power electronics
 
Testing of cb
Testing of cbTesting of cb
Testing of cb
 
Microsoft PowerPoint - Unit II.pdf
Microsoft PowerPoint - Unit II.pdfMicrosoft PowerPoint - Unit II.pdf
Microsoft PowerPoint - Unit II.pdf
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
 
Power converter lab manual by chaturvedula
Power converter lab manual by chaturvedulaPower converter lab manual by chaturvedula
Power converter lab manual by chaturvedula
 

More from MAHMOUDMOHAMED431205

OC Relay, types,constrcution,maintenance.pptx
OC Relay, types,constrcution,maintenance.pptxOC Relay, types,constrcution,maintenance.pptx
OC Relay, types,constrcution,maintenance.pptxMAHMOUDMOHAMED431205
 
protection functions.types.maintenance,alarms.pptx
protection functions.types.maintenance,alarms.pptxprotection functions.types.maintenance,alarms.pptx
protection functions.types.maintenance,alarms.pptxMAHMOUDMOHAMED431205
 
cathodic protection and maintenance requred 3.pptx
cathodic protection and maintenance requred 3.pptxcathodic protection and maintenance requred 3.pptx
cathodic protection and maintenance requred 3.pptxMAHMOUDMOHAMED431205
 
plan for electrical technicianTraining .pptx
plan for electrical technicianTraining .pptxplan for electrical technicianTraining .pptx
plan for electrical technicianTraining .pptxMAHMOUDMOHAMED431205
 
09-2 Machine Prot. Exercises en Synchro.ppt
09-2 Machine Prot. Exercises en Synchro.ppt09-2 Machine Prot. Exercises en Synchro.ppt
09-2 Machine Prot. Exercises en Synchro.pptMAHMOUDMOHAMED431205
 
15_C_3_Numerical paralleling device_7VE6.ppt
15_C_3_Numerical paralleling device_7VE6.ppt15_C_3_Numerical paralleling device_7VE6.ppt
15_C_3_Numerical paralleling device_7VE6.pptMAHMOUDMOHAMED431205
 
09_C_3_100 percent - Stator Earth Fault Protection.ppt
09_C_3_100 percent - Stator Earth Fault Protection.ppt09_C_3_100 percent - Stator Earth Fault Protection.ppt
09_C_3_100 percent - Stator Earth Fault Protection.pptMAHMOUDMOHAMED431205
 
08_C_3_Basis Stator Earth Fault Protection.ppt
08_C_3_Basis Stator Earth Fault Protection.ppt08_C_3_Basis Stator Earth Fault Protection.ppt
08_C_3_Basis Stator Earth Fault Protection.pptMAHMOUDMOHAMED431205
 
07_C_3_Underexcitation Protection.ppt
07_C_3_Underexcitation Protection.ppt07_C_3_Underexcitation Protection.ppt
07_C_3_Underexcitation Protection.pptMAHMOUDMOHAMED431205
 
06_C_3_Rotor_Earth_Fault_Protection.ppt
06_C_3_Rotor_Earth_Fault_Protection.ppt06_C_3_Rotor_Earth_Fault_Protection.ppt
06_C_3_Rotor_Earth_Fault_Protection.pptMAHMOUDMOHAMED431205
 

More from MAHMOUDMOHAMED431205 (20)

OC Relay, types,constrcution,maintenance.pptx
OC Relay, types,constrcution,maintenance.pptxOC Relay, types,constrcution,maintenance.pptx
OC Relay, types,constrcution,maintenance.pptx
 
protection functions.types.maintenance,alarms.pptx
protection functions.types.maintenance,alarms.pptxprotection functions.types.maintenance,alarms.pptx
protection functions.types.maintenance,alarms.pptx
 
cathodic protection and maintenance requred 3.pptx
cathodic protection and maintenance requred 3.pptxcathodic protection and maintenance requred 3.pptx
cathodic protection and maintenance requred 3.pptx
 
plan for electrical technicianTraining .pptx
plan for electrical technicianTraining .pptxplan for electrical technicianTraining .pptx
plan for electrical technicianTraining .pptx
 
power Tr 2 course.ppt
power Tr 2 course.pptpower Tr 2 course.ppt
power Tr 2 course.ppt
 
power Tr 1 course.ppt
power Tr 1 course.pptpower Tr 1 course.ppt
power Tr 1 course.ppt
 
MOTOR PROTECTION.pptx
MOTOR PROTECTION.pptxMOTOR PROTECTION.pptx
MOTOR PROTECTION.pptx
 
Single Line Diagram.pptx
Single Line Diagram.pptxSingle Line Diagram.pptx
Single Line Diagram.pptx
 
power cable 3.pptx
power cable 3.pptxpower cable 3.pptx
power cable 3.pptx
 
power cable 2.pptx
power cable 2.pptxpower cable 2.pptx
power cable 2.pptx
 
power cable1.ppt
power cable1.pptpower cable1.ppt
power cable1.ppt
 
MOTOR PROTECTION.pptx
MOTOR PROTECTION.pptxMOTOR PROTECTION.pptx
MOTOR PROTECTION.pptx
 
starting current of motor.pptx
starting current of motor.pptxstarting current of motor.pptx
starting current of motor.pptx
 
protection Training.pptx
protection Training.pptxprotection Training.pptx
protection Training.pptx
 
09-2 Machine Prot. Exercises en Synchro.ppt
09-2 Machine Prot. Exercises en Synchro.ppt09-2 Machine Prot. Exercises en Synchro.ppt
09-2 Machine Prot. Exercises en Synchro.ppt
 
15_C_3_Numerical paralleling device_7VE6.ppt
15_C_3_Numerical paralleling device_7VE6.ppt15_C_3_Numerical paralleling device_7VE6.ppt
15_C_3_Numerical paralleling device_7VE6.ppt
 
09_C_3_100 percent - Stator Earth Fault Protection.ppt
09_C_3_100 percent - Stator Earth Fault Protection.ppt09_C_3_100 percent - Stator Earth Fault Protection.ppt
09_C_3_100 percent - Stator Earth Fault Protection.ppt
 
08_C_3_Basis Stator Earth Fault Protection.ppt
08_C_3_Basis Stator Earth Fault Protection.ppt08_C_3_Basis Stator Earth Fault Protection.ppt
08_C_3_Basis Stator Earth Fault Protection.ppt
 
07_C_3_Underexcitation Protection.ppt
07_C_3_Underexcitation Protection.ppt07_C_3_Underexcitation Protection.ppt
07_C_3_Underexcitation Protection.ppt
 
06_C_3_Rotor_Earth_Fault_Protection.ppt
06_C_3_Rotor_Earth_Fault_Protection.ppt06_C_3_Rotor_Earth_Fault_Protection.ppt
06_C_3_Rotor_Earth_Fault_Protection.ppt
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Meduim Voltage Switchgear.pptx

  • 1. Prepared by : Mahmoud Mohamed Ali Department : Electrical Maintenance Email : Mahmoud.Mohamed@Siemens.com
  • 2.
  • 3. Switchgear consist of : • Circuit breaker. • Busbar. • Protection relay. • Current transformer. • Voltage transformer. • Cables Connection
  • 4.
  • 5.
  • 7.
  • 8. Current transformer : APPLICATION:  Current transformers (CT,s) are instrument transformers that are used to supply a reduced value of current to protective relays , meters and other instruments.  CT,s provide isolation from the high voltage primary , permit grounding of the secondary windings for safety , and step down the magnitude of the measured current to a value that can be safely handled by the instruments
  • 9. RATIO:  The most common CT secondary full load current is 1A or 5A.  CT ratio are expressed as a ratio of rated primary current to the rated secondary current .  Example a 1000/1 A CT will produce 1A of secondary current when 1000 A flows through the primary . As the primary current changes the secondary current will vary accordingly.
  • 10.  Specification for CT: 1. Rated Burden (2.5 , 5.0, 7.5 , 10, 15, 30 VA) 2. Continuous Rated Current 3. Short circuit current and duration time 4. Rated secondry current 5- Turns ratio 6- Classes(5P, 10P, X): 5P use with Instantaneous oc Relay - 10P use with IDMT oc Relay - X no need high accuracy
  • 12.  Effect of secondary windings for CT and VT:
  • 15. Specification of voltage transformer: 1- Rated Voltage (11KV) 2- Level Voltage( 100 or 110 v) 3-Breakdown - Pulse Voltage 4-Turns Ratio Accuracy Class (.1,.2,.3,.4,.5 …..for measuring ) For protection (3p and 5p
  • 16.
  • 17.
  • 18. Classification of Circuit Breakers Circuit Breakers 1. Based on Voltage •Low •Medium •High/Extra High •Ultra High 3. Based on External Design •Dead Tank •Live Tank 4. Based on Interrupting Media •Air Blast •Oil •SF6 •Vacuum 2. Based on Location •Indoor •Outdoor
  • 19.  Specification of Circuit Breakers  Rated Voltage:  Rated Normal Current: 630 – 800 – 1000 – 1250 – 1600 – 2000 – 2500 – 3150 – 4000 A  Rated Short Circuit Breaking Current(Isc ) Ibreaking =10* Rated Normal Current
  • 20.
  • 21.
  • 22.
  • 23.  Components of C.B : 1-Anti Pumping Relay (KN): 2- Shunt Closing (YF):
  • 24.  3- Shunt Opening(YO1 + YO2):
  • 25.  General inspection on C.B 1- Ensure of the upper and down contacts for good connection 2- Ensure of the opening and closing mechanical for circuit breaker 3- inspection of Charging Limit Switch 4- easy in entire and outage the C.B 5-the heater in the cell is work 6- Ensure of the earthing
  • 26.  General inspection on C.B 1- Ensure of the upper and down contacts for good connection 2- Ensure of the opening and closing mechanical for circuit breaker 3- inspection of Charging Limit Switch 4- easy in entire and outage the C.B 5-the heater in the cell is work 6- Ensure of the earthing
  • 28.
  • 29.  Contact Resistance for C.B  Use Micrometer device:  Measure each phase resistance only  Connection points Resistance for C.B at voltage (11 kv) is 12 - 60 μΩ  For (33kv) is (25-100) μΩ
  • 30.
  • 31.  Pressure Switch for air – insulated switchgear:
  • 32.
  • 33. Distribute type of problem on switchgear Switchgear trouble shooting and repair work
  • 34. Trouble 1: Breaker not closing Switchgear trouble shooting and repair work Motor not charging spring (see in fig 1) Reasons Remedial Action supply voltage less than 85% Ensure supply voltage above 85% of the rated voltage. improper wiring Check motor circuit wiring as per schematic drawing. If loose connections are found, tighten them Damage of gear box (see in fig 2 ) Replace gear-box motor shaft being broken or motor key being broken (see in fig 3 ) Replace motor
  • 35. Trouble 1: Breaker not closing Switchgear trouble shooting and repair work Trouble Reasons Remedial Action Closing coil burnt (see fig 4 ) plunger stuck in closing coil Replace closing coil Problem inside Closing coil Closing coil not developing sufficient force Check the resistance of coil at respective voltage, if not adequate, then replace the coil Auxiliary switch continuity missing contamination of contacts ( see fig 5 ) Problem in electrical circuit Problem in electrical circuit Failure of control voltage Check the circuitry and replace the faulty components
  • 36. fig 1 Switchgear trouble shooting and repair work
  • 37. Trouble 2: Breaker not opening : Switchgear trouble shooting and repair work Trouble Reasons Remedial Action Problem inside Tripping coil Tripping coil not developing sufficient force Check the resistance of coil at respective voltage, if not adequate, then replace the coil Tripping coil burnt plunger stuck in tripping coil. Replace tripping coil Problem in tripping circuit. Fault in interlocking circuit Check the circuitry and replace the faulty components
  • 38. Switchgear trouble shooting and repair work Trouble Reasons Remedial Action No voltage on control circuit although voltage on cables VT fuses disconnected or failure Check the fuses C.B disconnected after the incoming directly - Transformer inrush current - Over and under voltage relay - adjustable setting of O.C relay - adjustable setting of (OV, UV) relay C.B is operating period then disconnected Problem in setting relay Adjusted setting values in relay until proportional with rated current and CT values Hearing high sound inside the cell -Dust on insulator surface - high moisture inside the cell - Clean the insulator surface - Ensure of operate the heater High temperature inside the cell Loose in connection points on main Busbar Tighten on connection points