Kendall Pinder Work Profile
Overview:
An active leader, learner, and mentor in the field of Electrical
Engineering, Substation Operation & Maintenance, Commissioning ,
and Non Destructive Testing (NDT) of Substation Apparatus.
Career High Lights/Committees:
 Attended Numerous IEEE Meetings at Hardly Rd Facility NJ
promoted by Mr. Ron Quade
 Attended Numerous Doble Conferences and Classes
 Sat on numerous Substation Committees:
 Strategic Maintenance 69kV and above
 Substation NERC Maintenance and adherence
 Critical Equipment /asset and ID and planning
 5&10 Year Load impact transformer ID and Change out
 Substation Testing Procedures and Protocols
Major Projects:
 Storm Sandy with PSEG in NJ
 138 to 230KV Upgrades from PA to NY (22 plus Substations)
 Critical load plan via transformer re-allocation
 LTC- Maintenance and change out Program
 Manage the largest NDT Testing group in USA 20 plus employees
Safety First-Safety Always
1
Power Transformer Testing
Acceptance test 230-34.5kV Transformer
Pre-Acceptance test:
• Dew Point < 0.5%
• Insulation resistance
• Physical Inspection
• Impact Recorder
• Bushings C1 &C2
Safety First-Safety Always
2
Power Transformer Testing Hands on
Experience using various test sets
Doble, Leakage Reactance, SFRA, Winding Resistance, Meggar
Safety First-Safety Always
3
YY∆ 3Ø 230kV SMITH Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
Safety First-Safety Always
4
Single Ø 500kV SIEMENS Auto Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
Safety First-Safety Always
5
3Ø Single Tank 230kV HYUNDI Auto Power
Transformer Test and Commissioned
Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage,
Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals
6
Safety First-Safety Always
Testing of an water Cooled Arc
Furnace Transformer
Water cooled arc furnace transformer; coolant water used must be
pure and ionized or CL will be high
7
Safety First-Safety Always
Testing of an water Cooled Arc
Furnace Transformer
Commissioning Test: TTR, Double PF, SFRA, Leakage, Winding
Resistance, Insulation Resistance, Excitation, Alarms
8
Safety First-Safety Always
Worked on many different types of LTCs
Rebuilt/Maintenance/Changing of
reversing and contact finger on the
TLH-21 Allis Chalmers LTC….Planed
Outage, ID parts, scheduled crews,
Maintained, Commissioned and test
9
Safety First-Safety Always
Profile
Maintenance/Changing reversing and
contact finger on the UZD LTC
10
Safety First-Safety Always
Profile
Emergency Corrective
Maintenance on a Waukesha
UZD load tap changer,
replacing reversing switch and
contacts very common with
this type of LTC….Fault was
identified by loss of one phase
on the distribution line…I ID
the problem and made
corrective action to the
installation process of the
reversing switch.
11
Safety First-Safety Always
Worked on many Transformer LTC
Problems
Investigating and correcting
problems on a GE LR65 LTC
Broken Support Rod on a GE LR65
LTC as a result bad mechanism
timing and coordination
12
Safety First-Safety Always
Transformer Commissioning and Processing
Always check CT wells/
cabinet to ensure that correct
torque and to address and
correcting oil leaks (230-
34.5kV 150MVA TX)
Safety First-Safety Always 13
Transformer Lock Out Relay Test
Critical Testing of the lock-out (68) relay on a Vacuum Type LTC…..Before
filling of the LTC
Safety First-Safety Always 14
Emergency Transformer Change out
Emergency Removal, replacement, and commissioning of
10 MVA bank
15
Safety First-Safety Always
Profile
Emergency Removal, replacement, and commissioning of
10 MVA bank
Safety First-Safety Always 16
Bushing Change out U-Type and degrading
program
U-Type Bushing replacement project
Safety First-Safety Always 17
Transformer High side bushing
Bottom connected
Prep for 24hrs standing in rack to ensure paper is
immersed in oil before testing
18
Safety First-Safety Always
Profile
Draw Lead Bushing replacement project
Safety First-Safety Always 19
Breaker Projects: Maintenance, Commissioning,
Emergency: GCB/VCB/OCB/ACB
Maintenance/Repair 230kV S&C
circuit switcher combo with a gang
operated disconnect.
20
Safety First-Safety Always
Profile
Maintenance on an ABB 230kV
Single pressure (SP) puffer type
circuit breaker with AHMA
hydraulic-spring mechanism
21Safety First-Safety Always
Profile
Corrective Maintenance on
ABB SF6 48PM.
Degasification, changing
interrupters, and bushings
22
Safety First-Safety Always
Profile
Corrective Maintenance on a GE FKA 339 (3000amp),
replacing bushings, bullets, and interrupters
Safety First-Safety Always 23
Profile
Corrective Maintenance on a GE
FKA 339 (3000amp), replacing
bushings, bullets, and interrupters
24
Safety First-Safety Always
Profile
Corrective Maintenance on a GE
FKA 339 (3000amp), replacing
bushings, bullets, and interrupters
25
Safety First-Safety Always
Profile
Corrective Maintenance on a GE FKA 339 (3000amp),
replacing bushings, bullets, and interrupters
Safety First-Safety Always 26
Profile
Doble Testing and timing of
S&C circuit switcher
Safety First-Safety Always 27
GIS-Substation
Timing and Doble testing of a
230kV SF6 encapsulated bus
system
Safety First-Safety Always
28
GCB Commissioning, Testing, Gas
Gassing, Timing, CTs, Doble
testing of a 340kV SF6 ABB
GCB
Safety First-Safety Always
29
GCB Commissioning, Testing, Gas
Gassing, mech placement, Timing, CTs,
Doble testing of a 230kV SF6 ABB GCB
Safety First-Safety Always
30
GCB Commissioning, Testing, Gas
Gassing, mech placement, Timing, CTs,
Doble testing of a 230kV SF6 ABB GCB
Safety First-Safety Always
31
Profile
Corrective Maintenance on 230KV gang
operated disconnect
Safety First-Safety Always 32
Mobile Substation Scheduling, Commissioning,
Testing, and Maintenance
230-34.5kV Mobile substation.
Test and commissioned
Safety First-Safety Always 33
Profile
Commission of 20MVA 34.5-
12/7.2kV mobile substation
Safety First-Safety Always 34
Profile
Commission of 20MVA 34.5-
12/7.2kV mobile substation
Safety First-Safety Always 35
Profile
Emergency Removal,
replacement, and
commissioning of
24MVA Mobile
Substation
Safety First-Safety Always 36
Profile
Commissioning of
New 24MVA Mobile
Substation
Safety First-Safety Always 37
“Protection and Control” and Relays
Commissioning and Testing
Functional Trip checks, Load angle checks, secondary
injection during commission of a new 34.5kv ABB breaker
Safety First-Safety Always
38
“Protection and Control” and Relays
Commissioning and Testing
Electromechanical Relays maintenance testing
Safety First-Safety Always
39
Commissioning of
SEL 251/351 and
487 SEL relays
Safety First-Safety Always
40
Profile
Kelman Portable DGA analysis
Safety First-Safety Always 41
Substation Battery Commission Routine
Maintenance and Testing
Impedance, Specific Gravity, 80% capacity Load Testing and
Commissioning
Safety First-Safety Always
42
Substation Battery Commission Routine
Maintenance and Testing
TORKEL840/860 - Battery Load
Tester - Megger
80% capacity Load Testing and
Commissioning
Safety First-Safety Always
43
Miscellaneous Projects
Replacement/Repairs 230kV Bus
work. No weep holes resulted Thermal
expansion that compromised “A”
structure
Safety First-Safety Always 44
Miscellaneous Projects
Commissioning and testing
230 Kv double grounded
WYE capacitor bank, GCB
45Safety First-Safety Always
Miscellaneous Projects
Testing,
Commissioning, and
phasing Cable
…Inspecting Ground
Sleeve cable and
back bone for new
subdivision
Safety First-Safety Always 46
Miscellaneous Projects
Installation of ground sleeve,
cables, Load Break Elbows
phasing
Safety First-Safety Always 47
Miscellaneous Projects
Repairing faulty 34.5kV 1000kcmil
cable, L.A.s, and insulators terminated
into MOD Sub
Safety First-Safety Always 48
Miscellaneous Projects
ABB Type ESVA 12kV vacuum type circuit breaker
Replace bushings, interrupters, and test
Safety First-Safety Always 49
Thank You
Safety First-Safety Always 50

More Related Content

What's hot

Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substationsbhanu lucky
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Lakhan Vadher
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training ProgramArul Balan
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenancekarikalan123
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenancePradeep Avanigadda
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURHARISH KUMAR
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Niels Inderbiethen
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 

What's hot (20)

Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
 
220kv substation
220kv substation220kv substation
220kv substation
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
 
Sub Station Training Program
Sub Station Training ProgramSub Station Training Program
Sub Station Training Program
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenance
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPUR
 
220 66 kv nrs sub report
220 66 kv nrs sub report220 66 kv nrs sub report
220 66 kv nrs sub report
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
Transformer Failures and Case Studies
Transformer Failures and Case StudiesTransformer Failures and Case Studies
Transformer Failures and Case Studies
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 

Viewers also liked

Transformer protection commissioning tools
Transformer protection commissioning toolsTransformer protection commissioning tools
Transformer protection commissioning toolsmichaeljmack
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KVAbrar Ahamed
 
Pre commissioning checks &amp; periodic inspection on power transformers
Pre commissioning checks &amp; periodic inspection  on power transformersPre commissioning checks &amp; periodic inspection  on power transformers
Pre commissioning checks &amp; periodic inspection on power transformersayyadurai SHANMUGAM
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
Protection of transformer
Protection of transformerProtection of transformer
Protection of transformerSumeet Ratnawat
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformervikasgupta1965
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantGensol Engineering Limited
 

Viewers also liked (17)

Transformer protection commissioning tools
Transformer protection commissioning toolsTransformer protection commissioning tools
Transformer protection commissioning tools
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KV
 
final yr project-1
final yr project-1final yr project-1
final yr project-1
 
Pre commissioning checks &amp; periodic inspection on power transformers
Pre commissioning checks &amp; periodic inspection  on power transformersPre commissioning checks &amp; periodic inspection  on power transformers
Pre commissioning checks &amp; periodic inspection on power transformers
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Transformer 2
Transformer 2Transformer 2
Transformer 2
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Protection of transformer
Protection of transformerProtection of transformer
Protection of transformer
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power Plant
 

Similar to Kendall Pinder's Electrical Engineering Profile

REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Kyn28 metal clad switchgear
Kyn28 metal clad switchgearKyn28 metal clad switchgear
Kyn28 metal clad switchgearJoeChueng
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsNeil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsEnergyTech2015
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usameltric
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Vb4 series indoor vacuum circuit breaker
Vb4 series indoor vacuum circuit breakerVb4 series indoor vacuum circuit breaker
Vb4 series indoor vacuum circuit breakerJoeChueng
 
Level 3 ais-manual-12kv
Level 3 ais-manual-12kvLevel 3 ais-manual-12kv
Level 3 ais-manual-12kvHamZer
 

Similar to Kendall Pinder's Electrical Engineering Profile (20)

MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
electrician
electricianelectrician
electrician
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
Kyn28 metal clad switchgear
Kyn28 metal clad switchgearKyn28 metal clad switchgear
Kyn28 metal clad switchgear
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsNeil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
 
Product presentation usa
Product presentation  usaProduct presentation  usa
Product presentation usa
 
KYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgearKYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgear
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
Standing type GIS RMU
Standing type GIS RMUStanding type GIS RMU
Standing type GIS RMU
 
cv of pjnehru
cv of pjnehrucv of pjnehru
cv of pjnehru
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Vb4 series indoor vacuum circuit breaker
Vb4 series indoor vacuum circuit breakerVb4 series indoor vacuum circuit breaker
Vb4 series indoor vacuum circuit breaker
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric
 
Level 3 ais-manual-12kv
Level 3 ais-manual-12kvLevel 3 ais-manual-12kv
Level 3 ais-manual-12kv
 

Kendall Pinder's Electrical Engineering Profile

  • 1. Kendall Pinder Work Profile Overview: An active leader, learner, and mentor in the field of Electrical Engineering, Substation Operation & Maintenance, Commissioning , and Non Destructive Testing (NDT) of Substation Apparatus. Career High Lights/Committees:  Attended Numerous IEEE Meetings at Hardly Rd Facility NJ promoted by Mr. Ron Quade  Attended Numerous Doble Conferences and Classes  Sat on numerous Substation Committees:  Strategic Maintenance 69kV and above  Substation NERC Maintenance and adherence  Critical Equipment /asset and ID and planning  5&10 Year Load impact transformer ID and Change out  Substation Testing Procedures and Protocols Major Projects:  Storm Sandy with PSEG in NJ  138 to 230KV Upgrades from PA to NY (22 plus Substations)  Critical load plan via transformer re-allocation  LTC- Maintenance and change out Program  Manage the largest NDT Testing group in USA 20 plus employees Safety First-Safety Always 1
  • 2. Power Transformer Testing Acceptance test 230-34.5kV Transformer Pre-Acceptance test: • Dew Point < 0.5% • Insulation resistance • Physical Inspection • Impact Recorder • Bushings C1 &C2 Safety First-Safety Always 2
  • 3. Power Transformer Testing Hands on Experience using various test sets Doble, Leakage Reactance, SFRA, Winding Resistance, Meggar Safety First-Safety Always 3
  • 4. YY∆ 3Ø 230kV SMITH Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals Safety First-Safety Always 4
  • 5. Single Ø 500kV SIEMENS Auto Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals Safety First-Safety Always 5
  • 6. 3Ø Single Tank 230kV HYUNDI Auto Power Transformer Test and Commissioned Acceptance Test: Doble Power Factor, TTR, SFRA, Leakage, Excitation, LAs, Bushings C1 &C2, PRD, Alarms, Thermals 6 Safety First-Safety Always
  • 7. Testing of an water Cooled Arc Furnace Transformer Water cooled arc furnace transformer; coolant water used must be pure and ionized or CL will be high 7 Safety First-Safety Always
  • 8. Testing of an water Cooled Arc Furnace Transformer Commissioning Test: TTR, Double PF, SFRA, Leakage, Winding Resistance, Insulation Resistance, Excitation, Alarms 8 Safety First-Safety Always
  • 9. Worked on many different types of LTCs Rebuilt/Maintenance/Changing of reversing and contact finger on the TLH-21 Allis Chalmers LTC….Planed Outage, ID parts, scheduled crews, Maintained, Commissioned and test 9 Safety First-Safety Always
  • 10. Profile Maintenance/Changing reversing and contact finger on the UZD LTC 10 Safety First-Safety Always
  • 11. Profile Emergency Corrective Maintenance on a Waukesha UZD load tap changer, replacing reversing switch and contacts very common with this type of LTC….Fault was identified by loss of one phase on the distribution line…I ID the problem and made corrective action to the installation process of the reversing switch. 11 Safety First-Safety Always
  • 12. Worked on many Transformer LTC Problems Investigating and correcting problems on a GE LR65 LTC Broken Support Rod on a GE LR65 LTC as a result bad mechanism timing and coordination 12 Safety First-Safety Always
  • 13. Transformer Commissioning and Processing Always check CT wells/ cabinet to ensure that correct torque and to address and correcting oil leaks (230- 34.5kV 150MVA TX) Safety First-Safety Always 13
  • 14. Transformer Lock Out Relay Test Critical Testing of the lock-out (68) relay on a Vacuum Type LTC…..Before filling of the LTC Safety First-Safety Always 14
  • 15. Emergency Transformer Change out Emergency Removal, replacement, and commissioning of 10 MVA bank 15 Safety First-Safety Always
  • 16. Profile Emergency Removal, replacement, and commissioning of 10 MVA bank Safety First-Safety Always 16
  • 17. Bushing Change out U-Type and degrading program U-Type Bushing replacement project Safety First-Safety Always 17
  • 18. Transformer High side bushing Bottom connected Prep for 24hrs standing in rack to ensure paper is immersed in oil before testing 18 Safety First-Safety Always
  • 19. Profile Draw Lead Bushing replacement project Safety First-Safety Always 19
  • 20. Breaker Projects: Maintenance, Commissioning, Emergency: GCB/VCB/OCB/ACB Maintenance/Repair 230kV S&C circuit switcher combo with a gang operated disconnect. 20 Safety First-Safety Always
  • 21. Profile Maintenance on an ABB 230kV Single pressure (SP) puffer type circuit breaker with AHMA hydraulic-spring mechanism 21Safety First-Safety Always
  • 22. Profile Corrective Maintenance on ABB SF6 48PM. Degasification, changing interrupters, and bushings 22 Safety First-Safety Always
  • 23. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters Safety First-Safety Always 23
  • 24. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters 24 Safety First-Safety Always
  • 25. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters 25 Safety First-Safety Always
  • 26. Profile Corrective Maintenance on a GE FKA 339 (3000amp), replacing bushings, bullets, and interrupters Safety First-Safety Always 26
  • 27. Profile Doble Testing and timing of S&C circuit switcher Safety First-Safety Always 27
  • 28. GIS-Substation Timing and Doble testing of a 230kV SF6 encapsulated bus system Safety First-Safety Always 28
  • 29. GCB Commissioning, Testing, Gas Gassing, Timing, CTs, Doble testing of a 340kV SF6 ABB GCB Safety First-Safety Always 29
  • 30. GCB Commissioning, Testing, Gas Gassing, mech placement, Timing, CTs, Doble testing of a 230kV SF6 ABB GCB Safety First-Safety Always 30
  • 31. GCB Commissioning, Testing, Gas Gassing, mech placement, Timing, CTs, Doble testing of a 230kV SF6 ABB GCB Safety First-Safety Always 31
  • 32. Profile Corrective Maintenance on 230KV gang operated disconnect Safety First-Safety Always 32
  • 33. Mobile Substation Scheduling, Commissioning, Testing, and Maintenance 230-34.5kV Mobile substation. Test and commissioned Safety First-Safety Always 33
  • 34. Profile Commission of 20MVA 34.5- 12/7.2kV mobile substation Safety First-Safety Always 34
  • 35. Profile Commission of 20MVA 34.5- 12/7.2kV mobile substation Safety First-Safety Always 35
  • 36. Profile Emergency Removal, replacement, and commissioning of 24MVA Mobile Substation Safety First-Safety Always 36
  • 37. Profile Commissioning of New 24MVA Mobile Substation Safety First-Safety Always 37
  • 38. “Protection and Control” and Relays Commissioning and Testing Functional Trip checks, Load angle checks, secondary injection during commission of a new 34.5kv ABB breaker Safety First-Safety Always 38
  • 39. “Protection and Control” and Relays Commissioning and Testing Electromechanical Relays maintenance testing Safety First-Safety Always 39
  • 40. Commissioning of SEL 251/351 and 487 SEL relays Safety First-Safety Always 40
  • 41. Profile Kelman Portable DGA analysis Safety First-Safety Always 41
  • 42. Substation Battery Commission Routine Maintenance and Testing Impedance, Specific Gravity, 80% capacity Load Testing and Commissioning Safety First-Safety Always 42
  • 43. Substation Battery Commission Routine Maintenance and Testing TORKEL840/860 - Battery Load Tester - Megger 80% capacity Load Testing and Commissioning Safety First-Safety Always 43
  • 44. Miscellaneous Projects Replacement/Repairs 230kV Bus work. No weep holes resulted Thermal expansion that compromised “A” structure Safety First-Safety Always 44
  • 45. Miscellaneous Projects Commissioning and testing 230 Kv double grounded WYE capacitor bank, GCB 45Safety First-Safety Always
  • 46. Miscellaneous Projects Testing, Commissioning, and phasing Cable …Inspecting Ground Sleeve cable and back bone for new subdivision Safety First-Safety Always 46
  • 47. Miscellaneous Projects Installation of ground sleeve, cables, Load Break Elbows phasing Safety First-Safety Always 47
  • 48. Miscellaneous Projects Repairing faulty 34.5kV 1000kcmil cable, L.A.s, and insulators terminated into MOD Sub Safety First-Safety Always 48
  • 49. Miscellaneous Projects ABB Type ESVA 12kV vacuum type circuit breaker Replace bushings, interrupters, and test Safety First-Safety Always 49