SlideShare a Scribd company logo
Advanced Power Technologies, Inc.
www.aptinc.net
Standard Electrical Power System Device Function Numbers (from ANSI C37.2).
Dev. Function Dev. Function
1 Master Element 51 AC Time Overcurrent Relay
2 Time-Delay Starting or Closing Relay 52 AC Circuit Breaker
3 Checking or Interlocking Relay 53 Exciter or DC Generator Relay
4 Master Contactor 54 Reserved for future application
5 Stopping Device 55 Power Factor Relay
6 Starting Circuit Breaker 56 Field Application Relay
7 Anode Circuit Breaker 57 Short-Circuiting or Grounding Device
8 Control Power Disconnecting Device 58 Rectification Failure Relay
9 Reversing Device 59 Overvoltage Relay
10 Unit Sequence Switch 60 Voltage or Current Balance Relay
11 Reserved for future application 61 Reserved for future application
12 Over-speed Device 62 Time-Delay Stopping or Opening Relay
13 Synchronous-Speed Device 63 Pressure Switch
14 Under-Speed Device 64 Ground Protective Relay
15 Speed or Frequency Matching Device 65 Governor
16 Reserved for future applications 66 Notching or Jogging Device
17 Shunting or Discharge Switch 67 AC Directional Overcurrent Relay
18 Accelerating or Decelerating Device 68 Blocking Relay
19 Start-to-Run Transition Contactor 69 Permissive Control Device
20 Electrically Operated Valve 70 Rheostat
21 Distance Relay 71 Level Switch
22 Equalizer Circuit Breaker 72 DC Circuit Breaker
23 Temperature Control Device 73 Load-Resistor Contactor
24 Reserved for future application 74 Alarm Relay
25 Synchronism-Check Device 75 Position Changing Mechanism
26 Apparatus Thermal Device 76 DC Overcurrent Relay
27 Undervoltage Relay 77 Pulse Transmitter
28 Flame Detector 78 Phase-Angle Measuring or Out-of-Step
29 Isolating Contactor 79 AC Reclosing Relay
30 Annunciator Relay 80 Flow Switch
31 Separate Excitation Device 81 Frequency Relay
32 Directional Power Relay 82 DC Reclosing Relay
33 Position Switch/Cell Switch 83 Auto Selective Control/Transfer Relay
34 Master Sequence Device 84 Operating Mechanism
35 Slip-Ring Short-Circuiting 85 Carrier or Pilot-Wire Receiver Relay
36 Polarity or Polarizing Voltage Device 86 Locking-Out Relay
37 Undercurrent or Underpower Relay 87 Differential Protective Relay
38 Bearing Protective Device 88 Auxiliary Motor or Motor Generator
39 Mechanical Condition Monitor 89 Line Switch
40 Field Relay 90 Regulating Device
41 Field Circuit Breaker 91 Voltage Directional Relay
42 Running Circuit Breaker 92 Voltage and Power Directional Relay
43 Manual Transfer or Selector Device 93 Field-Changing Contactor
44 Unit Sequence Starting Relay 94 Tripping or Trip-Free Relay
45 Atmospheric Condition Monitor 95 Used only for specific applications
46 Phase-Balance Current Relay 96 in individual installations where
47 Phase-Sequence Voltage Relay 97 none of the assigned numbered
48 Incomplete Sequence Relay 98 functions from 1 to 94 are suitable
49 Machine or Transformer Thermal Relay 99
50 Instantaneous Overcurrent

More Related Content

What's hot

Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
Shyamkant Vasekar
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
Slides Hub
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
SMRITI KESHARWANI
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
SARAVANAN A
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
Siswoyo Edo
 
Switchyard
SwitchyardSwitchyard
Switchyard
I.E.T. lucknow
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
Roberto Costa
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
H. Kheir
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditions
SARAVANAN A
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
ManishKushwaha97
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
Shyamkant Vasekar
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Nadir Baloch
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
Ahmed Saada, (PRMG)
 
Protection basic
Protection basicProtection basic
Protection basic
BHAGWAN PRASAD
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
Rakesh Joshi
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
CS V
 
EXCITATION SYSTEM.ppt
EXCITATION SYSTEM.pptEXCITATION SYSTEM.ppt
EXCITATION SYSTEM.ppt
vishal laddha
 

What's hot (20)

Understanding transformer vector group
Understanding transformer vector groupUnderstanding transformer vector group
Understanding transformer vector group
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditions
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Fault level calculations
Fault level calculationsFault level calculations
Fault level calculations
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Protection basic
Protection basicProtection basic
Protection basic
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
EXCITATION SYSTEM.ppt
EXCITATION SYSTEM.pptEXCITATION SYSTEM.ppt
EXCITATION SYSTEM.ppt
 

Similar to Protection Relays Numbering (ANSI)

Control Drawing for all motors used industiral
Control Drawing for all motors used industiralControl Drawing for all motors used industiral
Control Drawing for all motors used industiral
rajap2737
 
An si completa
An si completaAn si completa
An si completa
Cristian Burgos Rosales
 
R elays ansi
R elays ansiR elays ansi
R elays ansi
Ramesh Patel
 
ansi.pdf
ansi.pdfansi.pdf
ansi.pdf
asmasharab1
 
ansi.pdf
ansi.pdfansi.pdf
ansi.pdf
asmasharab1
 
938 g-electrical-systems
 938 g-electrical-systems 938 g-electrical-systems
938 g-electrical-systems
Silvio roman
 
116281132 938 g-electrical-systems
116281132 938 g-electrical-systems116281132 938 g-electrical-systems
116281132 938 g-electrical-systems
Silvio roman
 
lift ppt
lift pptlift ppt
lift ppt
smartraja1991
 
Switch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power stationSwitch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power station
neeraj prasad
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
CTY TNHH HẠO PHƯƠNG
 
P and i report
P and i reportP and i report
P and i report
osamazahid13
 
Air Damper Actuators siemens
Air Damper Actuators siemensAir Damper Actuators siemens
Air Damper Actuators siemens
CONTROLS & SYSTEMS
 
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
md muzahidul haque
 
MC3PHAC.pdf
MC3PHAC.pdfMC3PHAC.pdf
MC3PHAC.pdf
otmane BOUZARZAR
 
Kenr6200 01
Kenr6200 01Kenr6200 01
Kenr6200 01
Armando Aguilar
 
ABB Relay
ABB RelayABB Relay
ABB Relay
Amit Kumar
 
Off grid solar inverter 10-120 kva (3:3)
Off grid solar inverter 10-120 kva (3:3)Off grid solar inverter 10-120 kva (3:3)
Off grid solar inverter 10-120 kva (3:3)
Nasiru Bello
 
An-Overview-of-Protection-System-Analysis-3.pdf
An-Overview-of-Protection-System-Analysis-3.pdfAn-Overview-of-Protection-System-Analysis-3.pdf
An-Overview-of-Protection-System-Analysis-3.pdf
RamprasadSarkar1
 
Application overview
Application overviewApplication overview
Application overviewĐặng Hảo
 
Basic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdfBasic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdf
Thien Phan Bản
 

Similar to Protection Relays Numbering (ANSI) (20)

Control Drawing for all motors used industiral
Control Drawing for all motors used industiralControl Drawing for all motors used industiral
Control Drawing for all motors used industiral
 
An si completa
An si completaAn si completa
An si completa
 
R elays ansi
R elays ansiR elays ansi
R elays ansi
 
ansi.pdf
ansi.pdfansi.pdf
ansi.pdf
 
ansi.pdf
ansi.pdfansi.pdf
ansi.pdf
 
938 g-electrical-systems
 938 g-electrical-systems 938 g-electrical-systems
938 g-electrical-systems
 
116281132 938 g-electrical-systems
116281132 938 g-electrical-systems116281132 938 g-electrical-systems
116281132 938 g-electrical-systems
 
lift ppt
lift pptlift ppt
lift ppt
 
Switch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power stationSwitch yard pp 2 kanti thermal power station
Switch yard pp 2 kanti thermal power station
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
 
P and i report
P and i reportP and i report
P and i report
 
Air Damper Actuators siemens
Air Damper Actuators siemensAir Damper Actuators siemens
Air Damper Actuators siemens
 
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
 
MC3PHAC.pdf
MC3PHAC.pdfMC3PHAC.pdf
MC3PHAC.pdf
 
Kenr6200 01
Kenr6200 01Kenr6200 01
Kenr6200 01
 
ABB Relay
ABB RelayABB Relay
ABB Relay
 
Off grid solar inverter 10-120 kva (3:3)
Off grid solar inverter 10-120 kva (3:3)Off grid solar inverter 10-120 kva (3:3)
Off grid solar inverter 10-120 kva (3:3)
 
An-Overview-of-Protection-System-Analysis-3.pdf
An-Overview-of-Protection-System-Analysis-3.pdfAn-Overview-of-Protection-System-Analysis-3.pdf
An-Overview-of-Protection-System-Analysis-3.pdf
 
Application overview
Application overviewApplication overview
Application overview
 
Basic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdfBasic_Protection_Theory_2013_BW.pdf
Basic_Protection_Theory_2013_BW.pdf
 

More from AHMED MOHAMED HEGAB

Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 14: Glossary)
NEETRAC (Chapter 14: Glossary)NEETRAC (Chapter 14: Glossary)
NEETRAC (Chapter 14: Glossary)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 13: Benefits of Diagnostics)
NEETRAC (Chapter 13: Benefits of Diagnostics)NEETRAC (Chapter 13: Benefits of Diagnostics)
NEETRAC (Chapter 13: Benefits of Diagnostics)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 12: Other Diagnostic Techniques)
NEETRAC (Chapter 12: Other Diagnostic Techniques)NEETRAC (Chapter 12: Other Diagnostic Techniques)
NEETRAC (Chapter 12: Other Diagnostic Techniques)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 11: Metallic Shield Assessment)
NEETRAC (Chapter 11: Metallic Shield Assessment)NEETRAC (Chapter 11: Metallic Shield Assessment)
NEETRAC (Chapter 11: Metallic Shield Assessment)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 10: Monitored Withstand Techniques)
NEETRAC (Chapter 10: Monitored Withstand Techniques)NEETRAC (Chapter 10: Monitored Withstand Techniques)
NEETRAC (Chapter 10: Monitored Withstand Techniques)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 9: Simple Dielectric Withstand)
NEETRAC (Chapter 9: Simple Dielectric Withstand)NEETRAC (Chapter 9: Simple Dielectric Withstand)
NEETRAC (Chapter 9: Simple Dielectric Withstand)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 6: Dissipation Factor)
NEETRAC (Chapter 6: Dissipation Factor)NEETRAC (Chapter 6: Dissipation Factor)
NEETRAC (Chapter 6: Dissipation Factor)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 5: Time Domain Reflectomertry)
NEETRAC (Chapter 5: Time Domain Reflectomertry)NEETRAC (Chapter 5: Time Domain Reflectomertry)
NEETRAC (Chapter 5: Time Domain Reflectomertry)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 4: How to Start)
NEETRAC (Chapter 4: How to Start)NEETRAC (Chapter 4: How to Start)
NEETRAC (Chapter 4: How to Start)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 2: MV Cable System Issues)
NEETRAC (Chapter 2: MV Cable System Issues)NEETRAC (Chapter 2: MV Cable System Issues)
NEETRAC (Chapter 2: MV Cable System Issues)
AHMED MOHAMED HEGAB
 
NEETRAC (Chapter 1: introduction)
NEETRAC (Chapter 1: introduction)NEETRAC (Chapter 1: introduction)
NEETRAC (Chapter 1: introduction)
AHMED MOHAMED HEGAB
 
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
AHMED MOHAMED HEGAB
 
IEEE Guide for the Application and Interpretation of FRA for oil Transformer
IEEE Guide for the Application and Interpretation of FRA for oil TransformerIEEE Guide for the Application and Interpretation of FRA for oil Transformer
IEEE Guide for the Application and Interpretation of FRA for oil Transformer
AHMED MOHAMED HEGAB
 
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
AHMED MOHAMED HEGAB
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
AHMED MOHAMED HEGAB
 
Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)
AHMED MOHAMED HEGAB
 

More from AHMED MOHAMED HEGAB (20)

Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
 
NEETRAC (Chapter 14: Glossary)
NEETRAC (Chapter 14: Glossary)NEETRAC (Chapter 14: Glossary)
NEETRAC (Chapter 14: Glossary)
 
NEETRAC (Chapter 13: Benefits of Diagnostics)
NEETRAC (Chapter 13: Benefits of Diagnostics)NEETRAC (Chapter 13: Benefits of Diagnostics)
NEETRAC (Chapter 13: Benefits of Diagnostics)
 
NEETRAC (Chapter 12: Other Diagnostic Techniques)
NEETRAC (Chapter 12: Other Diagnostic Techniques)NEETRAC (Chapter 12: Other Diagnostic Techniques)
NEETRAC (Chapter 12: Other Diagnostic Techniques)
 
NEETRAC (Chapter 11: Metallic Shield Assessment)
NEETRAC (Chapter 11: Metallic Shield Assessment)NEETRAC (Chapter 11: Metallic Shield Assessment)
NEETRAC (Chapter 11: Metallic Shield Assessment)
 
NEETRAC (Chapter 10: Monitored Withstand Techniques)
NEETRAC (Chapter 10: Monitored Withstand Techniques)NEETRAC (Chapter 10: Monitored Withstand Techniques)
NEETRAC (Chapter 10: Monitored Withstand Techniques)
 
NEETRAC (Chapter 9: Simple Dielectric Withstand)
NEETRAC (Chapter 9: Simple Dielectric Withstand)NEETRAC (Chapter 9: Simple Dielectric Withstand)
NEETRAC (Chapter 9: Simple Dielectric Withstand)
 
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
NEETRAC (Chapter 8: Partial Discharge for HV and EHV Cable Systems)
 
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
NEETRAC (Chapter 7: Medium Voltage Cable System Partial Discharge) )
 
NEETRAC (Chapter 6: Dissipation Factor)
NEETRAC (Chapter 6: Dissipation Factor)NEETRAC (Chapter 6: Dissipation Factor)
NEETRAC (Chapter 6: Dissipation Factor)
 
NEETRAC (Chapter 5: Time Domain Reflectomertry)
NEETRAC (Chapter 5: Time Domain Reflectomertry)NEETRAC (Chapter 5: Time Domain Reflectomertry)
NEETRAC (Chapter 5: Time Domain Reflectomertry)
 
NEETRAC (Chapter 4: How to Start)
NEETRAC (Chapter 4: How to Start)NEETRAC (Chapter 4: How to Start)
NEETRAC (Chapter 4: How to Start)
 
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
NEETRAC (Chapter 3: HV and EHV Cable System Aging and Testing Issues)
 
NEETRAC (Chapter 2: MV Cable System Issues)
NEETRAC (Chapter 2: MV Cable System Issues)NEETRAC (Chapter 2: MV Cable System Issues)
NEETRAC (Chapter 2: MV Cable System Issues)
 
NEETRAC (Chapter 1: introduction)
NEETRAC (Chapter 1: introduction)NEETRAC (Chapter 1: introduction)
NEETRAC (Chapter 1: introduction)
 
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
IEEE Guide for Field Testing of Shielded Power Cable (IEEE 400.2 2013)
 
IEEE Guide for the Application and Interpretation of FRA for oil Transformer
IEEE Guide for the Application and Interpretation of FRA for oil TransformerIEEE Guide for the Application and Interpretation of FRA for oil Transformer
IEEE Guide for the Application and Interpretation of FRA for oil Transformer
 
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
High Voltage On-Site Testing with Partial Discharge Measurement (Cigre 502)
 
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
Guidelines for Unconventional Partial Discharge Measurement (CIGRE 444)
 
Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)Tan Delta on MV Cables (Megger)
Tan Delta on MV Cables (Megger)
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

Protection Relays Numbering (ANSI)

  • 1. Advanced Power Technologies, Inc. www.aptinc.net Standard Electrical Power System Device Function Numbers (from ANSI C37.2). Dev. Function Dev. Function 1 Master Element 51 AC Time Overcurrent Relay 2 Time-Delay Starting or Closing Relay 52 AC Circuit Breaker 3 Checking or Interlocking Relay 53 Exciter or DC Generator Relay 4 Master Contactor 54 Reserved for future application 5 Stopping Device 55 Power Factor Relay 6 Starting Circuit Breaker 56 Field Application Relay 7 Anode Circuit Breaker 57 Short-Circuiting or Grounding Device 8 Control Power Disconnecting Device 58 Rectification Failure Relay 9 Reversing Device 59 Overvoltage Relay 10 Unit Sequence Switch 60 Voltage or Current Balance Relay 11 Reserved for future application 61 Reserved for future application 12 Over-speed Device 62 Time-Delay Stopping or Opening Relay 13 Synchronous-Speed Device 63 Pressure Switch 14 Under-Speed Device 64 Ground Protective Relay 15 Speed or Frequency Matching Device 65 Governor 16 Reserved for future applications 66 Notching or Jogging Device 17 Shunting or Discharge Switch 67 AC Directional Overcurrent Relay 18 Accelerating or Decelerating Device 68 Blocking Relay 19 Start-to-Run Transition Contactor 69 Permissive Control Device 20 Electrically Operated Valve 70 Rheostat 21 Distance Relay 71 Level Switch 22 Equalizer Circuit Breaker 72 DC Circuit Breaker 23 Temperature Control Device 73 Load-Resistor Contactor 24 Reserved for future application 74 Alarm Relay 25 Synchronism-Check Device 75 Position Changing Mechanism 26 Apparatus Thermal Device 76 DC Overcurrent Relay 27 Undervoltage Relay 77 Pulse Transmitter 28 Flame Detector 78 Phase-Angle Measuring or Out-of-Step 29 Isolating Contactor 79 AC Reclosing Relay 30 Annunciator Relay 80 Flow Switch 31 Separate Excitation Device 81 Frequency Relay 32 Directional Power Relay 82 DC Reclosing Relay 33 Position Switch/Cell Switch 83 Auto Selective Control/Transfer Relay 34 Master Sequence Device 84 Operating Mechanism 35 Slip-Ring Short-Circuiting 85 Carrier or Pilot-Wire Receiver Relay 36 Polarity or Polarizing Voltage Device 86 Locking-Out Relay 37 Undercurrent or Underpower Relay 87 Differential Protective Relay 38 Bearing Protective Device 88 Auxiliary Motor or Motor Generator 39 Mechanical Condition Monitor 89 Line Switch 40 Field Relay 90 Regulating Device 41 Field Circuit Breaker 91 Voltage Directional Relay 42 Running Circuit Breaker 92 Voltage and Power Directional Relay 43 Manual Transfer or Selector Device 93 Field-Changing Contactor 44 Unit Sequence Starting Relay 94 Tripping or Trip-Free Relay 45 Atmospheric Condition Monitor 95 Used only for specific applications 46 Phase-Balance Current Relay 96 in individual installations where 47 Phase-Sequence Voltage Relay 97 none of the assigned numbered 48 Incomplete Sequence Relay 98 functions from 1 to 94 are suitable 49 Machine or Transformer Thermal Relay 99 50 Instantaneous Overcurrent