DELHI METRO RAIL CORP LTD.
CONTRACTOR:
L&T – SUCG JV
PRESENTED BY :MOHAMMAD SHAHBAZ KHAN
CIVIL ENGINEERING DEPARTMENT
AFSET
SUMMER VOCATIONAL INDUSTRIAL TRAINING
UNDER
Delhi Metro
Background
Locale NCR, India
Transit type Rapid transit
Number of lines 6
Number of stations 142[1]
Daily ridership 2.06 million[2]
Chief executive Mangu Singh, MD[3]
Headquarters Metro Bhawan, Barakhamba Road, New Delhi
Website www.delhimetrorail.com
Operation
Began operation 24 December 2002 (2002-12-24)
Operator(s) Delhi Metro Rail Corporation Ltd (DMRC)
Number of vehicles 210 trains[4]
Train length 4/6 coaches[4][5]
Technical
System length 189.7 kilometres (117.9 mi)[1]
Track gauge 1,676 mm (5 ft 6 in) broad gauge
1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification 23 kV, 50 Hz AC through overhead catenary
[hide]System map
DELHI METRO RAIL CORPORATION LTD.
1st SITE JAMA MASJID
Metro Tunneling Work: Near jama masjid @ subhash park
•At the site of jama masjid work starts from the south shaft of the site
that is the Grid 1.
•Soldier piles of dimension of 22.5 m are used and are installed at 3
metres below the ground level. Main function of the soldier piles are to
retain the soil.
At jama masjid site it was reported us that in geotechnical survey of
the soil the strata was rocky, therefore the method of bottom – up is
used.
•CC-05 PROJECT STATIONS HELD FROM MANDI HOUSE TO JAMA
•MASJID
• PACKAGE = RS 725 CRORE
Station Box levels:
•Undercraft level
•Platform level
•Concourse level
•Top slab level
•Total no of 29 grids and the tunnel distance is 2.58 km.
•It is line 8: starts from central secretariat - janpath - ITO – delhi gate –
• jm upto kashmiri gate.
•Length of the underground station is about 250 m.
2ND SITE
MANDI HOUSE
Day 1
A cage is constructed with diff bars according to BBS to be placed in a trench of
13.69m under GL.
COVER TOP TO BOTTOM=150CM
16mm*20mm bars
G3 polymer is used to avoid seepage. Different polymud tanks are provided, the
length of polymud tanks are same butt width, height and volume is different.
Cover blocks-
These are provided to maintain gap between earth and steel. it also helps to crawl
the cage in ground.
There are all total 22 panels.
Water walls-
These are provided to compact water bath and to avoid sliding of polymud.
To avoid seepage pvc, water stopper is used
Width-300 and 800mm
Depth-200
Pvc water stopper.
KODEN MACHINE-
To check the symmetry of trench with the help of trench with the help of graph.
DM-604: MACHINE USED FOR OPERATING GRAPH.
AS PER BBS –
INVERTED L SHAPE-
-it prevents the collapse of soil while boring d wall.
Provide alignment
Gives edge protection.
Cage-
c/c dist is 25mm as 20mm aggs are used.
Guide wall-
8mm bars @200mm*200mm spacing
-depth of guide wall-1.5mt from GL.
COMPACTION IS NECESSARY.
DAY3
Grade of concrete-m35
Cement- Ultratech OPC 53gRADE
Workability of concrete desired slump-after 150 min
Max size of agg-20mm
Sieve analysis-.27%
Day 4
Instruments that are fitted in the area near the site.
.
Piezometer- for measuring the level of flow.
Soil settlement point (ssp)-for keeping info about soil settled.
Building settlement point (bsp)-to check settlement of building
affected by const.
Tilt meter-knowing how much nearby buildings have tilted.
Crack meter-
Fixed in crack location of building.
Pavement meter-
How much pavement is affected by const.
Inclinometer-how much the d wall has moved from its position.
Day 5
Crabbing was done.
Cement bags were collected
3RD SITE
ITO STATION
SITE VISIT:
Guide wall
Diaphragm wall
Diaphragm wall cage
Reinforcement details
NECESSITY OF D- WALL
To carry the total load of the slab.
Concourse slab (station, ticket lab etc.)
Base slab (platform) and train passes.
Diaphragm wall is a foundational structure which carries total load i.e.
dead and live load.
Length of the underground station is about 250m.
At the ITO station TOP to BOTTOM method is used.
Polymers or bentonite is used to prevent the soil collapse.
These are applied where soils are loose or the bearing capacity is low.
We have to maintain the bentonite after the 1m of depth.
And the depth of the D – wall from top is 22.5m
SITE = 5
CASTING YARD @ MUNDKA
Casting yard is the site where the casting of the segments are
done.
It was reported us that six segments makes one ring.
For turning left:”t” symbol is given
And for straight:”z” symbol is given
“zk” stands for straight key
THESE ARE THE PLAN AND ELEVATION OF A
SEGMENT
TYPICAL ELEVATION OF TUNNEL RING
THIS IS THE YARD WHERE REINFORCEMENT
WORK IS DONE
IN THIS WAY CASTING OF SEGMENTS IS DONE
And total capacity of a ring is 7.89 m3 (exact)
1 cubic meter of concrete
•410 kg of cement
•1110 kg of aggregate (666+444)
Since two grade of aggregates are used i.e. 20mm and 10mm whose specific
gravity is 2.74 and 2.0 respectively.
•760 kg of sand
•151 l of water
•0.5 % (by weight of cement microsilica)
•Microsilica- 22kg
•Admixture 2.16 kg
•W/C ratio – 0.35 to 0.4
•Cement used – ULTRA TECH 53 GRADE
•Admixture used is gallanium
The capacity of the Batching Plant at the CASTING YARD is 30 cu m. And at the batching plant
there are four buckets for the aggregates, one for 10mm aggr, two for 10 mm and one for
sand. And the plant is set as AUTO
TESTING RING
BATCHING PLANT @ SARAI KALEI KHAN
CONCRETE MIX DESIGN
W2=265g
W3=72g
Loss=0 AGGREGATE IMPACT VALUE TEST:
Sieve test
Two sets of sieves i.e. 12.5 mm and 10mm is taken.
Wt of pan=253g
Agg tamped 25 times and filled in three layers
Now wt of agg=336g
Release time of hammer=2 sec
Sieve of 2.36 mm
Passing agg=91g
Retain agg =245g
W1=passing 12.5 mm and retain on 10mm
W2=wt of agg retain on 2.36mm
W3=wt of agg pass through 2.36mm
Loss of material during test=0%
IMPACT VALUE: W3/W1*100
=91/ 336*100=27%
SAMPLE2
W1=337g
I.V.=72/337*100
=21.4%
Avg I.V. =24.2%
Limit of I.V. = 45%
TUNNEL BORING MACHINE
A tunnel boring machine (TBM) also known as a "mole", is a machine
used to excavate tunnels with a circular cross section through a
variety of soil and rock strata. They can bore through anything from
hard rock to sand. Tunnel diameters can range from a metre (done
with micro-TBMs) to 19.25 m to date. Tunnels of less than a metre or
so in diameter are typically done usingtrenchless
construction methods or horizontal directional drilling rather than
TBMs.
LASER DISTOMETER
Laser Distometer is a superb device or machine or equipment used to
find out the distance at 100% accuracy without using any chain or tape.
Delhi Metro Rail Corp Ltd Contractor L&T Site Visit Report

More Related Content

What's hot

Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro stationAmit Kumar Tiwari
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION Ved Jangid
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadLachhmikant. Prasad
 
Concrete equipment
Concrete equipmentConcrete equipment
Concrete equipmentFazal-E- Jalal
 
Delhi metro presention
Delhi   metro presentionDelhi   metro presention
Delhi metro presentionDharmendra Kumar
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential buildingsuraj jha
 
Metro Construction
Metro ConstructionMetro Construction
Metro ConstructionMayur Soni
 
Highway engineering
Highway engineeringHighway engineering
Highway engineeringEr. Akash Gupta
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topicsShubham Sadh
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Shubham Bhargava Slideshares
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING Ram1239
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel StructureGaurang Kakadiya
 
Metro Project
Metro ProjectMetro Project
Metro ProjectVipul Naidu
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT Amol Pawar
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating EquipmentKiran Goswami
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO Akanksha Priya
 

What's hot (20)

Construction of metro station
Construction of metro stationConstruction of metro station
Construction of metro station
 
Casting yard
Casting yardCasting yard
Casting yard
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 
Ppt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasadPpt u girder casting by l.k.prasad
Ppt u girder casting by l.k.prasad
 
Concrete equipment
Concrete equipmentConcrete equipment
Concrete equipment
 
Delhi metro presention
Delhi   metro presentionDelhi   metro presention
Delhi metro presention
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential building
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Highway engineering
Highway engineeringHighway engineering
Highway engineering
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 
Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)Delhi metro internship Report (05.05.2018 04.06.2018)
Delhi metro internship Report (05.05.2018 04.06.2018)
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Shib
ShibShib
Shib
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel Structure
 
Metro Project
Metro ProjectMetro Project
Metro Project
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 

Viewers also liked

Delhi metro(underground system) ppt
Delhi metro(underground system) pptDelhi metro(underground system) ppt
Delhi metro(underground system) pptGurudutt Bagha
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro projectVinay Bardia
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC pptVimal Maurya
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metrojerry christo
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project ManagementAnurag Sureka
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metroShreyanand Patel
 
Bridge Monitoring Systems
Bridge Monitoring SystemsBridge Monitoring Systems
Bridge Monitoring SystemsChristopher Huck
 
Tunneling configuration
Tunneling configurationTunneling configuration
Tunneling configurationNaranont Atima
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluationgouravranjan27
 
Interaction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroInteraction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroKaran Dudeja
 
Delhi Metro App Makeover : Smartphone Ticketing Concept
Delhi Metro App Makeover : Smartphone Ticketing ConceptDelhi Metro App Makeover : Smartphone Ticketing Concept
Delhi Metro App Makeover : Smartphone Ticketing ConceptViraj Verma
 
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014apollohyperbaric
 
APP-TunnelBro_AM_EN_201405_v3 (3) (1)
APP-TunnelBro_AM_EN_201405_v3 (3) (1)APP-TunnelBro_AM_EN_201405_v3 (3) (1)
APP-TunnelBro_AM_EN_201405_v3 (3) (1)Christopher Cudworth
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro railkarthik1923
 

Viewers also liked (20)

Delhi metro(underground system) ppt
Delhi metro(underground system) pptDelhi metro(underground system) ppt
Delhi metro(underground system) ppt
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro project
Delhi metro projectDelhi metro project
Delhi metro project
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
 
Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project Management
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
ELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONSELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONS
 
Bridge Monitoring Systems
Bridge Monitoring SystemsBridge Monitoring Systems
Bridge Monitoring Systems
 
Tunneling configuration
Tunneling configurationTunneling configuration
Tunneling configuration
 
Delhi metro project evaluation
Delhi metro project evaluationDelhi metro project evaluation
Delhi metro project evaluation
 
Interaction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroInteraction Design Project - Delhi Metro
Interaction Design Project - Delhi Metro
 
Site visit presentation: Kwun Tong line extension
Site visit presentation: Kwun Tong line extensionSite visit presentation: Kwun Tong line extension
Site visit presentation: Kwun Tong line extension
 
Delhi Metro App Makeover : Smartphone Ticketing Concept
Delhi Metro App Makeover : Smartphone Ticketing ConceptDelhi Metro App Makeover : Smartphone Ticketing Concept
Delhi Metro App Makeover : Smartphone Ticketing Concept
 
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
 
APP-TunnelBro_AM_EN_201405_v3 (3) (1)
APP-TunnelBro_AM_EN_201405_v3 (3) (1)APP-TunnelBro_AM_EN_201405_v3 (3) (1)
APP-TunnelBro_AM_EN_201405_v3 (3) (1)
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 

Similar to Delhi Metro Rail Corp Ltd Contractor L&T Site Visit Report

construction procedure of DMC piling
construction procedure of DMC pilingconstruction procedure of DMC piling
construction procedure of DMC pilingNikhil Kumar
 
Dmrctrainingpresentation 161115165907
Dmrctrainingpresentation 161115165907Dmrctrainingpresentation 161115165907
Dmrctrainingpresentation 161115165907yogesh pal
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanDavid H Moloney
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training pptVikas Kumar
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptxErLavKushPrasad
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Summer training report
Summer training reportSummer training report
Summer training reportRaj Vaibhav Singh
 
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxPLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxRajeshKumar25548
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machinerutuldave
 
DELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTDELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTGLA University
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019David H Moloney
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptbala506586
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 
B.Tech Final Year Internship @ Delhi Metro Rail Corporation
B.Tech Final Year Internship @ Delhi Metro Rail CorporationB.Tech Final Year Internship @ Delhi Metro Rail Corporation
B.Tech Final Year Internship @ Delhi Metro Rail CorporationChandan Kushwaha
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChandra Mohan Lodha
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017ktx500
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 

Similar to Delhi Metro Rail Corp Ltd Contractor L&T Site Visit Report (20)

DMC piling
DMC pilingDMC piling
DMC piling
 
DMC Piling
DMC PilingDMC Piling
DMC Piling
 
construction procedure of DMC piling
construction procedure of DMC pilingconstruction procedure of DMC piling
construction procedure of DMC piling
 
Dmrctrainingpresentation 161115165907
Dmrctrainingpresentation 161115165907Dmrctrainingpresentation 161115165907
Dmrctrainingpresentation 161115165907
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training ppt
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Summer training report
Summer training reportSummer training report
Summer training report
 
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxPLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
DELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECTDELHI-AGRA ROAD PROJECT
DELHI-AGRA ROAD PROJECT
 
Construction Presentations 2019
Construction Presentations 2019Construction Presentations 2019
Construction Presentations 2019
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
B.Tech Final Year Internship @ Delhi Metro Rail Corporation
B.Tech Final Year Internship @ Delhi Metro Rail CorporationB.Tech Final Year Internship @ Delhi Metro Rail Corporation
B.Tech Final Year Internship @ Delhi Metro Rail Corporation
 
Chhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodhaChhabra Thermal Power plant ppt by Cm lodha
Chhabra Thermal Power plant ppt by Cm lodha
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 

Delhi Metro Rail Corp Ltd Contractor L&T Site Visit Report

  • 1. DELHI METRO RAIL CORP LTD. CONTRACTOR: L&T – SUCG JV PRESENTED BY :MOHAMMAD SHAHBAZ KHAN CIVIL ENGINEERING DEPARTMENT AFSET SUMMER VOCATIONAL INDUSTRIAL TRAINING UNDER
  • 2. Delhi Metro Background Locale NCR, India Transit type Rapid transit Number of lines 6 Number of stations 142[1] Daily ridership 2.06 million[2] Chief executive Mangu Singh, MD[3] Headquarters Metro Bhawan, Barakhamba Road, New Delhi Website www.delhimetrorail.com Operation Began operation 24 December 2002 (2002-12-24) Operator(s) Delhi Metro Rail Corporation Ltd (DMRC) Number of vehicles 210 trains[4] Train length 4/6 coaches[4][5] Technical System length 189.7 kilometres (117.9 mi)[1] Track gauge 1,676 mm (5 ft 6 in) broad gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification 23 kV, 50 Hz AC through overhead catenary [hide]System map DELHI METRO RAIL CORPORATION LTD.
  • 3. 1st SITE JAMA MASJID Metro Tunneling Work: Near jama masjid @ subhash park •At the site of jama masjid work starts from the south shaft of the site that is the Grid 1. •Soldier piles of dimension of 22.5 m are used and are installed at 3 metres below the ground level. Main function of the soldier piles are to retain the soil. At jama masjid site it was reported us that in geotechnical survey of the soil the strata was rocky, therefore the method of bottom – up is used.
  • 4. •CC-05 PROJECT STATIONS HELD FROM MANDI HOUSE TO JAMA •MASJID • PACKAGE = RS 725 CRORE Station Box levels: •Undercraft level •Platform level •Concourse level •Top slab level •Total no of 29 grids and the tunnel distance is 2.58 km. •It is line 8: starts from central secretariat - janpath - ITO – delhi gate – • jm upto kashmiri gate. •Length of the underground station is about 250 m.
  • 5. 2ND SITE MANDI HOUSE Day 1 A cage is constructed with diff bars according to BBS to be placed in a trench of 13.69m under GL. COVER TOP TO BOTTOM=150CM 16mm*20mm bars G3 polymer is used to avoid seepage. Different polymud tanks are provided, the length of polymud tanks are same butt width, height and volume is different. Cover blocks- These are provided to maintain gap between earth and steel. it also helps to crawl the cage in ground. There are all total 22 panels. Water walls- These are provided to compact water bath and to avoid sliding of polymud.
  • 6. To avoid seepage pvc, water stopper is used Width-300 and 800mm Depth-200 Pvc water stopper. KODEN MACHINE- To check the symmetry of trench with the help of trench with the help of graph. DM-604: MACHINE USED FOR OPERATING GRAPH. AS PER BBS – INVERTED L SHAPE- -it prevents the collapse of soil while boring d wall. Provide alignment Gives edge protection. Cage- c/c dist is 25mm as 20mm aggs are used.
  • 7. Guide wall- 8mm bars @200mm*200mm spacing -depth of guide wall-1.5mt from GL. COMPACTION IS NECESSARY. DAY3 Grade of concrete-m35 Cement- Ultratech OPC 53gRADE Workability of concrete desired slump-after 150 min Max size of agg-20mm Sieve analysis-.27% Day 4 Instruments that are fitted in the area near the site. .
  • 8. Piezometer- for measuring the level of flow. Soil settlement point (ssp)-for keeping info about soil settled. Building settlement point (bsp)-to check settlement of building affected by const. Tilt meter-knowing how much nearby buildings have tilted. Crack meter- Fixed in crack location of building. Pavement meter- How much pavement is affected by const. Inclinometer-how much the d wall has moved from its position. Day 5 Crabbing was done. Cement bags were collected
  • 9. 3RD SITE ITO STATION SITE VISIT: Guide wall Diaphragm wall Diaphragm wall cage Reinforcement details NECESSITY OF D- WALL To carry the total load of the slab. Concourse slab (station, ticket lab etc.) Base slab (platform) and train passes. Diaphragm wall is a foundational structure which carries total load i.e. dead and live load. Length of the underground station is about 250m. At the ITO station TOP to BOTTOM method is used. Polymers or bentonite is used to prevent the soil collapse. These are applied where soils are loose or the bearing capacity is low. We have to maintain the bentonite after the 1m of depth. And the depth of the D – wall from top is 22.5m
  • 10.
  • 11. SITE = 5 CASTING YARD @ MUNDKA Casting yard is the site where the casting of the segments are done. It was reported us that six segments makes one ring. For turning left:”t” symbol is given And for straight:”z” symbol is given “zk” stands for straight key
  • 12.
  • 13. THESE ARE THE PLAN AND ELEVATION OF A SEGMENT
  • 14. TYPICAL ELEVATION OF TUNNEL RING
  • 15. THIS IS THE YARD WHERE REINFORCEMENT WORK IS DONE
  • 16.
  • 17. IN THIS WAY CASTING OF SEGMENTS IS DONE
  • 18. And total capacity of a ring is 7.89 m3 (exact) 1 cubic meter of concrete •410 kg of cement •1110 kg of aggregate (666+444) Since two grade of aggregates are used i.e. 20mm and 10mm whose specific gravity is 2.74 and 2.0 respectively. •760 kg of sand •151 l of water •0.5 % (by weight of cement microsilica) •Microsilica- 22kg •Admixture 2.16 kg •W/C ratio – 0.35 to 0.4 •Cement used – ULTRA TECH 53 GRADE •Admixture used is gallanium
  • 19. The capacity of the Batching Plant at the CASTING YARD is 30 cu m. And at the batching plant there are four buckets for the aggregates, one for 10mm aggr, two for 10 mm and one for sand. And the plant is set as AUTO TESTING RING
  • 20. BATCHING PLANT @ SARAI KALEI KHAN
  • 21. CONCRETE MIX DESIGN W2=265g W3=72g Loss=0 AGGREGATE IMPACT VALUE TEST: Sieve test Two sets of sieves i.e. 12.5 mm and 10mm is taken. Wt of pan=253g Agg tamped 25 times and filled in three layers Now wt of agg=336g Release time of hammer=2 sec Sieve of 2.36 mm Passing agg=91g
  • 22. Retain agg =245g W1=passing 12.5 mm and retain on 10mm W2=wt of agg retain on 2.36mm W3=wt of agg pass through 2.36mm Loss of material during test=0% IMPACT VALUE: W3/W1*100 =91/ 336*100=27% SAMPLE2 W1=337g I.V.=72/337*100 =21.4% Avg I.V. =24.2% Limit of I.V. = 45%
  • 23.
  • 25. A tunnel boring machine (TBM) also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They can bore through anything from hard rock to sand. Tunnel diameters can range from a metre (done with micro-TBMs) to 19.25 m to date. Tunnels of less than a metre or so in diameter are typically done usingtrenchless construction methods or horizontal directional drilling rather than TBMs. LASER DISTOMETER Laser Distometer is a superb device or machine or equipment used to find out the distance at 100% accuracy without using any chain or tape.