INTRODUCTION TO
PROJECT MANAGEMENT
by Kris Kimmerle
ABOUT THE AUTHOR

PROJECT MANAGEMENT

2
Certifications

Hi.

I have

My name is Kris Kimmerle.

I am training for

I have 9 years of comprehensive and international experience in the following domains.
Business Continuity Planning

Security Intelligence Technician

Project Management

Chain of Custody

Duty Segregation

Disaster Recovery Planning

Physical Security Management

Agile Project Management

Change Management

Defense-in-Depth

Risk Management

Security Operations Management

SharePoint Administrator

IdM Solutions

Supply Chain Processes

Vulnerability Management

Business Operations Management

Enterprise Application Development

Repudiation

Enterprise Risk Management

Threat Profiling

Information Security Instructor

Enterprise Architecture

Automation

ISO 27000 Family of Standards

Compliance Management

Third Party Risk Management

Enterprise Security Architecture

Security Awareness

Simplicity in Complex Security

Auditor

Asset Management

Security Analyst

Access Control

Flexibility in Security

Information Security Instructor

Network Operations

Cloud Computing

MySQL

Interoperability

PROJECT MANAGEMENT

3
Let’s get started.

PROJECT MANAGEMENT

4
PURPOSE

PROJECT MANAGEMENT

5
✔
✔
✔
✔
✔

Basic understanding of project management terms and definitions
Basic understanding of project stages, objectives, and deliverables
Basic knowledge of project management software tools
Introduction to essential project management references
Introduction to highly specialized project management methodologies
PROJECT MANAGEMENT

6
TERMINOLOGY

PROJECT MANAGEMENT

7
👤👤

🏃🏃

💃💃

Project Manager

Project Team

Project Stakeholders

Professional in the field of project
management. Responsible of the
planning, execution, and closing of
any project, typically relating to
construction industry, architecture,
computer networking,
telecommunications or software
development.

The management team leading the
project, and provide services to the
project. Projects often bring
together a variety number of
problems. Stakeholders have
important issues with others.

Those entities within or without an
organization which sponsor a
project or, have an interest or a gain
upon a successful completion of a
project.

PROJECT MANAGEMENT

8
📅📅

🎉🎉

🔖🔖
Schedule

Project Plan

Kickoff Meeting

This consists of a list of a project's
terminal elements with intended
start and finish dates.

is a formal, approved document
used to guide both project
execution and project control.

The first meeting with the project
team and the client of the project.

PROJECT MANAGEMENT

9
📃📃

🔢🔢

☑
WBS

Work Breakdown Structure (WBS) is
a tool that defines a project and
groups the project’s discrete work
elements in a way that helps
organize and define the total work
scope of the project.

Tasks

Gantt Chart

in project management are activity
that needs to be accomplished
within a defined period of time.

Type of bar chart that illustrates a
project schedule. It illustrate the
start and finish dates of the terminal
elements and summary elements of
a project. Terminal elements and
summary elements comprise the
work breakdown structure of the
project.

PROJECT MANAGEMENT

10
🎯🎯

💥💥

🐛🐛
Scope

Scope Creep

Risk

of a project in project management
is the sum total of all of its products
and their requirements or features.

refers to uncontrolled changes in a
project's scope. This phenomenon
can occur when the scope of a
project is not properly defined,
documented, or controlled. It is
generally considered a negative
occurrence that is to be avoided.

is the precise probability of specific
eventualities.

PROJECT MANAGEMENT

11
OVERVIEW

PROJECT MANAGEMENT

12
What is Project Management?
The discipline of planning, organizing, and managing resources to
bring about the successful completion of specific project goals and
objectives. A project is a finite endeavor (having specific start and
completion dates) undertaken to create a unique product or
service which brings about beneficial change or added value. This
finite characteristic of projects stands in sharp contrast to processes,
or operations, which are permanent or semi-permanent functional
work to repetitively produce the same product or service.

⏳
PROJECT MANAGEMENT

13
All Projects…

Have a Start.

Have an End.

Are Temporary.

Are Unique.

PROJECT MANAGEMENT

14
Project Management Knowledge Domains

Integration.

Human Resources.

Scope.

Communications.

Procurement.

Cost.

Stakeholder Management.

Quality.

Time.

Risk Management.

PROJECT MANAGEMENT

15
TRADITIONAL PROJECT MANAGEMENT

PROJECT MANAGEMENT

16
Project Management Stages
Regardless of the methodology used, the project development process will have the same major stages: initiation, development, implementation, monitoring, and closing. The
approach and any considerations need to be clarified prior to the project objectives, goals, and importantly, the roles and responsibilities of all participants and stakeholders. The
use of a project control system (i.e. Microsoft Office Project), help assure that projects are developed successfully

Closure
Monitor & Control
Execution
Planning
Initiation
Definition

PROJECT MANAGEMENT

17
Overview of Stages
Definition

Initiation

Before a project starts the
project manager must make
sure the project goals,
objectives, scope, risks, issues,
budget, timescale and
approach have been defined.
This must be communicated
to all the stakeholders to get
their agreement. Any
differences of opinion need to
be resolved before work
starts.

This is perhaps the most
important stage of any
project as it sets the terms of
reference within which the
project will be run. If this is
not done well, the project will
have a high likelihood of
failure. The initiation stage is
where the business case is
declared, scope of the project
decided and stakeholder
expectations set. Time spent
on planning, refining the
business case and
communicating the expected
benefits will help increase the
likelihood of success. It is
tempting to start working
quickly, but a poor initiation
stage often leads to problems
and even failure.

Planning

The key to a successful
project is in the planning.
Creating a project plan is the
first task you should do when
undertaking any project.
Often project planning is
ignored in favor of getting on
with the work. However,
many people fail to realize
the value of a project plan in
saving time, money and many
other problems.

Execution

Doing the work to deliver the
product, service or wanted
result. Most of the work
related to the project is
realized at this stage and
needs complete attention
from the project manager.

Monitor & Control

Closure

Once the project is running it
is important the project
manager keeps control. This
is achieved by regular
reporting of issues, risks,
progress and the constant
checking of the business case
to ensure that expected
benefits will be delivered and
are still valid. A project that is
not controlled is out of
control.

Often neglected, it is
important to ensure a project
is closed properly. Many
projects never end because
there is no formal sign-off. It
is important to get the
customers agreement that a
project has ended and no
more work will be carried out.
Once closed, the project
manager should review the
project and record the good
and bad points, so successes
can be repeated and failures
avoided. A project that is not
closed will continue to
consume resources.

PROJECT MANAGEMENT

18
Definition Stage

Before a project starts the project manager must make sure the project goals, objectives, scope, risks, issues, budget, timescale and approach
have been defined. This must be communicated to all the stakeholders to get their agreement. Any differences of opinion need to be resolved
before work starts.

The Objectives

The Deliverables

⬜

Establish realistic expectations with participants

☑

Preliminary project timeline

⬜

Define the project as to a relative time frame

☑

Preliminary project scope

⬜

Determine and define participants roles & responsibilities

☑

Preliminary roles & responsibilities

⬜

Develop approaches to manage project scope and issues

☑

Preliminary guidelines for communication

⬜

Define project guidelines for communication

▶

PROJECT MANAGEMENT

19
Initiation Stage

This is perhaps the most important stage of any project as it sets the terms of reference within which the project will be run. If this is not done
well, the project will have a high likelihood of failure. The initiation stage is where the business case is declared, scope of the project decided
and stakeholder expectations set. Time spent on planning, refining the business case and communicating the expected benefits will help
increase the likelihood of success. It is tempting to start working quickly, but a poor initiation stage often leads to problems and even failure.

The Objectives
⬜

Review Project Statement of Work

⬜

Review of Project Enterprise Environmental Factors

⬜

The Deliverables

Review of Project Organizational Assets

▶

☑

Develop Project Charter

☑

Develop Preliminary Project Scope Statement

PROJECT MANAGEMENT

20
Planning Stage

The key to a successful project is in the planning. Creating a project plan is the first task you should do when undertaking any project. Often
project planning is ignored in favor of getting on with the work. However, many people fail to realize the value of a project plan in saving
time, money and many other problems.

The Objectives
⬜
⬜
⬜

⬜
⬜

⬜

⬜

The Deliverables
☑

Perform Scope Definition and Planning

☑

Create Project WBS
Define Project Activities and Sequence
Define Each Activities Resource cost and duration
Establish Risk Management Plan with initial Risk Identification
Establish Risk Analysis and Response Planning

▶

☑
☑

☑

☑

Create Scope Management Plan
Create Activity Plan
Create Quality Assurance Plan
Create Human Resource Plan
Create Project Communication Plan
Create Risk Management Plan

Plan Project Purchases, Acquisitions, and Contracting

PROJECT MANAGEMENT

21
Execution

Doing the work to deliver the product, service or wanted result. Most of the work related to the project is realized at this stage and needs
complete attention from the project manager.

The Objectives
⬜

Applicable Product or Process Life Cycle

⬜

Direct and Management Project Execution

⬜

The Deliverables

Monitoring and Controlling Processes

▶

☑

Preliminary Project Completion Review

☑

Schedule Work For Future Requirements

PROJECT MANAGEMENT

22
Monitor & Control

Once the project is running it is important the project manager keeps control. This is achieved by regular reporting of issues, risks, progress
and the constant checking of the business case to ensure that expected benefits will be delivered and are still valid. A project that is not
controlled is out of control.

The Objectives
⬜

Monitoring and Controlling Processes

▶

The Deliverables
☑

Preliminary Project Completion Review

PROJECT MANAGEMENT

23
Closure

Often neglected, it is important to ensure a project is closed properly. Many projects never end because there is no formal sign-off. It is
important to get the customers agreement that a project has ended and no more work will be carried out. Once closed, the project manager
should review the project and record the good and bad points, so successes can be repeated and failures avoided. A project that is not closed
will continue to consume resources.

The Objectives
⬜

Stakeholder Review and Acceptance of Project

The Deliverables

▶

☑

Close Project

☑

Close Project Contracts

PROJECT MANAGEMENT

24
PROJECT TOOLS

PROJECT MANAGEMENT

25
Project Management Software

PROJECT MANAGEMENT

26
OTHER PROJECT MANAGEMENT METHODLOGIES

PROJECT MANAGEMENT

27
Waterfall

Waterfall model is a sequential design process, often used in software development processes, in which progress is seen as flowing
steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design, Construction, Testing,
Production/Implementation, and Maintenance.

Agile

Agile project management is an iterative and incremental method of managing the design and build activities for engineering,
information technology, and new product or service development projects in a highly flexible and interactive manner, for example
agile software development. It requires capable individuals from the relevant business, with supplier and customer input.

Critical Path

Critical path calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and
latest that each activity can start and finish without making the project longer. This process determines which activities are "critical"
(i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer). In project
management, a critical path is the sequence of project network activities which add up to the longest overall duration.

PriSM

PRISM is the sustainability based project delivery method which incorporates tangible tools and methods to manage the balance
between finite resources, social responsibility, and delivering “green” project outcomes. It was developed for organizations to
integrate project processes with sustainability initiatives to achieve business objectives while decreasing negative environmental
impact.

PRINCE2

PRINCE2 (Projects in Controlled Environments) is a project management methodology. It was developed by the UK government
agency Office of Government Commerce (OGC) and is used extensively within the UK as the de facto project management
standard for its public projects. The methodology encompasses the management, control and organization of a project.

PROJECT MANAGEMENT

28
REFERENCES
Project-Management.com

2014

http://www.project-management.com

Project Management Institution

2014

http://www.pmi.org

PlanAnything.com

2014

http://www.plananything.com

Project Management Bibliography

2011

Authored by Safari Content Team

Published by Safari Books Online

CAPM/PMP Project Management Certification All-in-One Exam Guide

2014

Authored by Joseph Phillips

Published by McGraw Hill

Workplace Ecology: A Case Study in Project Management

2010

Authored by Robert E. Perrine

Published by Smashwords Edition
Send me a message.
🔻🔻
@KrisKimmerle

kris.kimmerle@outlook.com

http://1drv.ms/1cgfZn0

http://www.linkedin.com/in/kriskimmerle

Introduction to Project Management

  • 1.
  • 2.
  • 3.
    Certifications Hi. I have My nameis Kris Kimmerle. I am training for I have 9 years of comprehensive and international experience in the following domains. Business Continuity Planning Security Intelligence Technician Project Management Chain of Custody Duty Segregation Disaster Recovery Planning Physical Security Management Agile Project Management Change Management Defense-in-Depth Risk Management Security Operations Management SharePoint Administrator IdM Solutions Supply Chain Processes Vulnerability Management Business Operations Management Enterprise Application Development Repudiation Enterprise Risk Management Threat Profiling Information Security Instructor Enterprise Architecture Automation ISO 27000 Family of Standards Compliance Management Third Party Risk Management Enterprise Security Architecture Security Awareness Simplicity in Complex Security Auditor Asset Management Security Analyst Access Control Flexibility in Security Information Security Instructor Network Operations Cloud Computing MySQL Interoperability PROJECT MANAGEMENT 3
  • 4.
  • 5.
  • 6.
    ✔ ✔ ✔ ✔ ✔ Basic understanding ofproject management terms and definitions Basic understanding of project stages, objectives, and deliverables Basic knowledge of project management software tools Introduction to essential project management references Introduction to highly specialized project management methodologies PROJECT MANAGEMENT 6
  • 7.
  • 8.
    👤👤 🏃🏃 💃💃 Project Manager Project Team ProjectStakeholders Professional in the field of project management. Responsible of the planning, execution, and closing of any project, typically relating to construction industry, architecture, computer networking, telecommunications or software development. The management team leading the project, and provide services to the project. Projects often bring together a variety number of problems. Stakeholders have important issues with others. Those entities within or without an organization which sponsor a project or, have an interest or a gain upon a successful completion of a project. PROJECT MANAGEMENT 8
  • 9.
    📅📅 🎉🎉 🔖🔖 Schedule Project Plan Kickoff Meeting Thisconsists of a list of a project's terminal elements with intended start and finish dates. is a formal, approved document used to guide both project execution and project control. The first meeting with the project team and the client of the project. PROJECT MANAGEMENT 9
  • 10.
    📃📃 🔢🔢 ☑ WBS Work Breakdown Structure(WBS) is a tool that defines a project and groups the project’s discrete work elements in a way that helps organize and define the total work scope of the project. Tasks Gantt Chart in project management are activity that needs to be accomplished within a defined period of time. Type of bar chart that illustrates a project schedule. It illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. PROJECT MANAGEMENT 10
  • 11.
    🎯🎯 💥💥 🐛🐛 Scope Scope Creep Risk of aproject in project management is the sum total of all of its products and their requirements or features. refers to uncontrolled changes in a project's scope. This phenomenon can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered a negative occurrence that is to be avoided. is the precise probability of specific eventualities. PROJECT MANAGEMENT 11
  • 12.
  • 13.
    What is ProjectManagement? The discipline of planning, organizing, and managing resources to bring about the successful completion of specific project goals and objectives. A project is a finite endeavor (having specific start and completion dates) undertaken to create a unique product or service which brings about beneficial change or added value. This finite characteristic of projects stands in sharp contrast to processes, or operations, which are permanent or semi-permanent functional work to repetitively produce the same product or service. ⏳ PROJECT MANAGEMENT 13
  • 14.
    All Projects… Have aStart. Have an End. Are Temporary. Are Unique. PROJECT MANAGEMENT 14
  • 15.
    Project Management KnowledgeDomains Integration. Human Resources. Scope. Communications. Procurement. Cost. Stakeholder Management. Quality. Time. Risk Management. PROJECT MANAGEMENT 15
  • 16.
  • 17.
    Project Management Stages Regardlessof the methodology used, the project development process will have the same major stages: initiation, development, implementation, monitoring, and closing. The approach and any considerations need to be clarified prior to the project objectives, goals, and importantly, the roles and responsibilities of all participants and stakeholders. The use of a project control system (i.e. Microsoft Office Project), help assure that projects are developed successfully Closure Monitor & Control Execution Planning Initiation Definition PROJECT MANAGEMENT 17
  • 18.
    Overview of Stages Definition Initiation Beforea project starts the project manager must make sure the project goals, objectives, scope, risks, issues, budget, timescale and approach have been defined. This must be communicated to all the stakeholders to get their agreement. Any differences of opinion need to be resolved before work starts. This is perhaps the most important stage of any project as it sets the terms of reference within which the project will be run. If this is not done well, the project will have a high likelihood of failure. The initiation stage is where the business case is declared, scope of the project decided and stakeholder expectations set. Time spent on planning, refining the business case and communicating the expected benefits will help increase the likelihood of success. It is tempting to start working quickly, but a poor initiation stage often leads to problems and even failure. Planning The key to a successful project is in the planning. Creating a project plan is the first task you should do when undertaking any project. Often project planning is ignored in favor of getting on with the work. However, many people fail to realize the value of a project plan in saving time, money and many other problems. Execution Doing the work to deliver the product, service or wanted result. Most of the work related to the project is realized at this stage and needs complete attention from the project manager. Monitor & Control Closure Once the project is running it is important the project manager keeps control. This is achieved by regular reporting of issues, risks, progress and the constant checking of the business case to ensure that expected benefits will be delivered and are still valid. A project that is not controlled is out of control. Often neglected, it is important to ensure a project is closed properly. Many projects never end because there is no formal sign-off. It is important to get the customers agreement that a project has ended and no more work will be carried out. Once closed, the project manager should review the project and record the good and bad points, so successes can be repeated and failures avoided. A project that is not closed will continue to consume resources. PROJECT MANAGEMENT 18
  • 19.
    Definition Stage Before aproject starts the project manager must make sure the project goals, objectives, scope, risks, issues, budget, timescale and approach have been defined. This must be communicated to all the stakeholders to get their agreement. Any differences of opinion need to be resolved before work starts. The Objectives The Deliverables ⬜ Establish realistic expectations with participants ☑ Preliminary project timeline ⬜ Define the project as to a relative time frame ☑ Preliminary project scope ⬜ Determine and define participants roles & responsibilities ☑ Preliminary roles & responsibilities ⬜ Develop approaches to manage project scope and issues ☑ Preliminary guidelines for communication ⬜ Define project guidelines for communication ▶ PROJECT MANAGEMENT 19
  • 20.
    Initiation Stage This isperhaps the most important stage of any project as it sets the terms of reference within which the project will be run. If this is not done well, the project will have a high likelihood of failure. The initiation stage is where the business case is declared, scope of the project decided and stakeholder expectations set. Time spent on planning, refining the business case and communicating the expected benefits will help increase the likelihood of success. It is tempting to start working quickly, but a poor initiation stage often leads to problems and even failure. The Objectives ⬜ Review Project Statement of Work ⬜ Review of Project Enterprise Environmental Factors ⬜ The Deliverables Review of Project Organizational Assets ▶ ☑ Develop Project Charter ☑ Develop Preliminary Project Scope Statement PROJECT MANAGEMENT 20
  • 21.
    Planning Stage The keyto a successful project is in the planning. Creating a project plan is the first task you should do when undertaking any project. Often project planning is ignored in favor of getting on with the work. However, many people fail to realize the value of a project plan in saving time, money and many other problems. The Objectives ⬜ ⬜ ⬜ ⬜ ⬜ ⬜ ⬜ The Deliverables ☑ Perform Scope Definition and Planning ☑ Create Project WBS Define Project Activities and Sequence Define Each Activities Resource cost and duration Establish Risk Management Plan with initial Risk Identification Establish Risk Analysis and Response Planning ▶ ☑ ☑ ☑ ☑ Create Scope Management Plan Create Activity Plan Create Quality Assurance Plan Create Human Resource Plan Create Project Communication Plan Create Risk Management Plan Plan Project Purchases, Acquisitions, and Contracting PROJECT MANAGEMENT 21
  • 22.
    Execution Doing the workto deliver the product, service or wanted result. Most of the work related to the project is realized at this stage and needs complete attention from the project manager. The Objectives ⬜ Applicable Product or Process Life Cycle ⬜ Direct and Management Project Execution ⬜ The Deliverables Monitoring and Controlling Processes ▶ ☑ Preliminary Project Completion Review ☑ Schedule Work For Future Requirements PROJECT MANAGEMENT 22
  • 23.
    Monitor & Control Oncethe project is running it is important the project manager keeps control. This is achieved by regular reporting of issues, risks, progress and the constant checking of the business case to ensure that expected benefits will be delivered and are still valid. A project that is not controlled is out of control. The Objectives ⬜ Monitoring and Controlling Processes ▶ The Deliverables ☑ Preliminary Project Completion Review PROJECT MANAGEMENT 23
  • 24.
    Closure Often neglected, itis important to ensure a project is closed properly. Many projects never end because there is no formal sign-off. It is important to get the customers agreement that a project has ended and no more work will be carried out. Once closed, the project manager should review the project and record the good and bad points, so successes can be repeated and failures avoided. A project that is not closed will continue to consume resources. The Objectives ⬜ Stakeholder Review and Acceptance of Project The Deliverables ▶ ☑ Close Project ☑ Close Project Contracts PROJECT MANAGEMENT 24
  • 25.
  • 26.
  • 27.
    OTHER PROJECT MANAGEMENTMETHODLOGIES PROJECT MANAGEMENT 27
  • 28.
    Waterfall Waterfall model isa sequential design process, often used in software development processes, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design, Construction, Testing, Production/Implementation, and Maintenance. Agile Agile project management is an iterative and incremental method of managing the design and build activities for engineering, information technology, and new product or service development projects in a highly flexible and interactive manner, for example agile software development. It requires capable individuals from the relevant business, with supplier and customer input. Critical Path Critical path calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer). In project management, a critical path is the sequence of project network activities which add up to the longest overall duration. PriSM PRISM is the sustainability based project delivery method which incorporates tangible tools and methods to manage the balance between finite resources, social responsibility, and delivering “green” project outcomes. It was developed for organizations to integrate project processes with sustainability initiatives to achieve business objectives while decreasing negative environmental impact. PRINCE2 PRINCE2 (Projects in Controlled Environments) is a project management methodology. It was developed by the UK government agency Office of Government Commerce (OGC) and is used extensively within the UK as the de facto project management standard for its public projects. The methodology encompasses the management, control and organization of a project. PROJECT MANAGEMENT 28
  • 29.
    REFERENCES Project-Management.com 2014 http://www.project-management.com Project Management Institution 2014 http://www.pmi.org PlanAnything.com 2014 http://www.plananything.com ProjectManagement Bibliography 2011 Authored by Safari Content Team Published by Safari Books Online CAPM/PMP Project Management Certification All-in-One Exam Guide 2014 Authored by Joseph Phillips Published by McGraw Hill Workplace Ecology: A Case Study in Project Management 2010 Authored by Robert E. Perrine Published by Smashwords Edition
  • 30.
    Send me amessage. 🔻🔻 @KrisKimmerle kris.kimmerle@outlook.com http://1drv.ms/1cgfZn0 http://www.linkedin.com/in/kriskimmerle