SlideShare a Scribd company logo
Project planning and estimating


               How long is a piece of string?




1               © Copyright ISC 2012
Hofstadter’s Law

   Hofstadter’s Law states that,
    when planning any task, it
    always takes longer than you
    expect, even when you take
    into account Hofstadter’s Law
   In other words, projects over-
    running are almost inevitable
    because of the way our brains
    think about how long stuff takes
    to do
   Estimating tools can help you…

2                         © Copyright ISC 2012
Estimates and Estimating

               An estimate is an approximation of project
                time and cost targets that is refined
                throughout the project life cycle

               Estimating uses a range of tools and
                techniques to produce estimates




                                  © Copyright ISC 2012
Estimating: 3
Estimating methods
       High
     Accuracy
     & Detail
                                                                         Bottom-up
                                                           Parametric    Estimate
                                                           Estimate
                                             Comparative
                                             Estimate

                              3-point
                              Estimate

                     Expert
                     Judge-
      “Quick &       ment
        Dirty”

                 Perception                                             Fact



                                    © Copyright ISC 2012
Estimating: 4
Bottom-up estimating
           Assumes that future costs for a product can
            be predicted accurately from historical costs
            of that product
           Uses detailed costs of components, built up
            into an end product (WBS/PBS)
               e.g. 10,000 bricks, 250 tiles, 20 litres of paint =
                total cost of £xxx

           Also known as Detailed Estimate,
            Engineering Build-up, or Grass Roots method

                                    © Copyright ISC 2012
Estimating: 5
Parametric estimating

               Collecting relevant historical data, usually at
                an aggregated level of detail, and relating it to
                the project to be estimated through the use of
                statistical techniques
               At the heart of the parametric estimating
                methodology are cost estimating
                relationships (CERs)
                   e.g. 1 hour of filming will require 5 hours of editing
                   e.g. 10% of the cost of developing a new website
                    is associated with User Testing
                                        © Copyright ISC 2012
Estimating: 6
Comparative estimating

               Takes actual costs of similar existing or past
                projects, and makes adjustments for
                complexity, technical, or physical differences
                to derive the new project estimate
                   e.g. 10 new web pages took 3 weeks and £15k on
                    project X, so we estimate project Y requiring 20
                    new pages will take 5 weeks and cost £25k

               Also known as Analogous Estimating

                                     © Copyright ISC 2012
Estimating: 7
Other estimating methods
       3-point estimates                                 Expert judgement
        Come up with 3 numbers:                          Ask the project team and
                   Realistic (most likely)                Subject Matter Experts
                   Best case (optimistic)
                   Worst case (pessimistic)


               Estimate =
                   (B + 4R + W)/6
                   N.B. the formula is usually
                    weighted (4 x R), but
                    sometimes is the “simple”
                    average of B, R & W


                                             © Copyright ISC 2012
Estimating: 8
Example 3-point estimate
      ID               Tas k Nam e                 Duration        Optimis tic Dur. Expected Dur. Pes sim is tic Dur.
      1 Programm e plan                              200 days           180 days         200 days         280 days
      2     Office project                             10 mons            9 m ons         10 mons          11 mons
      3     New technology project                   9.67 mons            8 m ons          9 m ons         14 mons
      4     Project re staff                        66.67 days           50 days          65 days          95 days
      5          Com munications                    66.67 days           50 days          65 days          90 days
      6               Group s taff types              1.17 wks              1 wk             1 wk            2 wks
      7               Develop comms plan              2.33 wks             2 wks            2 wks            4 wks
      8               Staff prepared                    0 days            0 days           0 days           0 days
      9               Com municate intentions         9.83 wks             7 wks           10 wks           12 wks
      10         Staff numbers                      46.67 days           35 days          45 days          65 days
      11              Set up database                 1.17 wks              1 wk             1 wk            2 wks
      12              Count s taff                    5.17 wks             4 wks            5 wks            7 wks
      13              Set up s urvey                     2 wks              1 wk            2 wks            3 wks
      14              Input data                      2.17 wks             2 wks            2 wks            3 wks


                               Estimate =
                                   (O + 4E + P)/6
                                   N.B. the formula is usually weighted (4
                                   x E), but sometimes is the “simple”
                                   average of O, E & P


                                                © Copyright ISC 2012
Estimating: 9
Test yourself: Which method does the project team use to
       estimate costs of building a new e-learning course?
                                                  Expert           3-     Compa-    Para-    Bottom-
                                                                  Point    rative   metric     up
  The team identifies a best, worst and
  most likely case and averages them
  The team asks two suppliers who have
  built e-learning courses before
  The team uses a spreadsheet of data
  from previous projects and it calculates
  cost and time estimates for them
  Members of the team have been
  involved in 4 previous e-learning projects
  and know exactly how long each one
  took and what they cost
  There’s so much work to be done that
  the team breaks the project down into 75
  work packages



                                               © Copyright ISC 2012
Estimating: 10
A final thought…

    Quote from a client’s Project Manager:


        “We try to fall behind as early as possible because
         that gives us longer to catch up”




11                         © Copyright ISC 2012
© Copyright ISC 2012
Estimating: 12

More Related Content

What's hot

2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
Mazhar Poohlah
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Hayat Denzi
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
Andersson Lujan Ojeda
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
PedadaSaikumar
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
MaRS Discovery District
 
Project integration management
Project  integration managementProject  integration management
Project integration management
deep sharma
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
341741357
 
project management
project managementproject management
project management
Sanchita Siromoni
 
Project Execution
Project ExecutionProject Execution
Project Execution
megat zainurul anuar
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
Kasun Ranga Wijeweera
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
ChandraShekhar Patel
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
Muhammad Rehman
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
6.3 Sequence Activities
6.3 Sequence Activities6.3 Sequence Activities
6.3 Sequence Activities
DavidMcLachlan1
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
Reetesh Gupta
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
pankajsh10
 
Project time management
Project time managementProject time management
Project time management
Jack Pumpuni Frimpong-Manso
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
Maher Almohamad
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
Emanuele Della Valle
 

What's hot (20)

2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project integration management
Project  integration managementProject  integration management
Project integration management
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 
project management
project managementproject management
project management
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
6.3 Sequence Activities
6.3 Sequence Activities6.3 Sequence Activities
6.3 Sequence Activities
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 
Project time management
Project time managementProject time management
Project time management
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 

Similar to Project Estimating

ISPA/SCEA conference Brussels 2012
ISPA/SCEA conference Brussels 2012ISPA/SCEA conference Brussels 2012
ISPA/SCEA conference Brussels 2012
Harold van Heeringen
 
Software Test Estimation
Software Test EstimationSoftware Test Estimation
Software Test Estimation
Jatin Kochhar
 
Test Estimation
Test Estimation Test Estimation
Test Estimation
SQALab
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
Harold van Heeringen
 
Critical Chain Project Management
Critical Chain Project ManagementCritical Chain Project Management
Critical Chain Project Management
Fred Wiersma
 
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
Jihun Park
 
Painful Test Estimation
Painful Test EstimationPainful Test Estimation
Painful Test Estimation
GlobalLogic Ukraine
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
Jan De Baere
 
CocomoModels MGK .ppt
CocomoModels MGK .pptCocomoModels MGK .ppt
CocomoModels MGK .ppt
ssuser3d1dad3
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
Acumen
 
Effort estimation
Effort estimationEffort estimation
Effort estimation
Hanokh Aloni
 
Delight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates WayDelight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates Waytroytuttle
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
McLachlan Lister Pty Limited
 
Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpasyamputra
 
Agile Estimation
Agile EstimationAgile Estimation
Agile Estimation
Saltmarch Media
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
Chandrabhan Seniya
 
Kanban 101 - An Introduction to Planning with Little's Law
Kanban 101 - An Introduction to Planning with Little's LawKanban 101 - An Introduction to Planning with Little's Law
Kanban 101 - An Introduction to Planning with Little's Law
Jack Speranza
 
Earned Value
Earned ValueEarned Value
Earned Value
ahmad bassiouny
 

Similar to Project Estimating (20)

ISPA/SCEA conference Brussels 2012
ISPA/SCEA conference Brussels 2012ISPA/SCEA conference Brussels 2012
ISPA/SCEA conference Brussels 2012
 
Software Test Estimation
Software Test EstimationSoftware Test Estimation
Software Test Estimation
 
Test Estimation
Test Estimation Test Estimation
Test Estimation
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Critical Chain Project Management
Critical Chain Project ManagementCritical Chain Project Management
Critical Chain Project Management
 
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
[SEKE 2014] Practical Human Resource Allocation in Software Projects Using Ge...
 
Painful Test Estimation
Painful Test EstimationPainful Test Estimation
Painful Test Estimation
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
 
Highlight OpenStack survey
Highlight OpenStack surveyHighlight OpenStack survey
Highlight OpenStack survey
 
CocomoModels MGK .ppt
CocomoModels MGK .pptCocomoModels MGK .ppt
CocomoModels MGK .ppt
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
 
Effort estimation
Effort estimationEffort estimation
Effort estimation
 
Delight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates WayDelight Your Customers: The #noestimates Way
Delight Your Customers: The #noestimates Way
 
Forensic schedule analysis acesss
Forensic schedule analysis acesssForensic schedule analysis acesss
Forensic schedule analysis acesss
 
Syam critical path cpa
Syam critical path cpaSyam critical path cpa
Syam critical path cpa
 
Agile Estimation
Agile EstimationAgile Estimation
Agile Estimation
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
Assign9
Assign9Assign9
Assign9
 
Kanban 101 - An Introduction to Planning with Little's Law
Kanban 101 - An Introduction to Planning with Little's LawKanban 101 - An Introduction to Planning with Little's Law
Kanban 101 - An Introduction to Planning with Little's Law
 
Earned Value
Earned ValueEarned Value
Earned Value
 

More from Improvement Skills Consulting Ltd.

Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data
Improvement Skills Consulting Ltd.
 
Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021
Improvement Skills Consulting Ltd.
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
Improvement Skills Consulting Ltd.
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
Improvement Skills Consulting Ltd.
 
Pro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogsPro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogs
Improvement Skills Consulting Ltd.
 
Behavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case studyBehavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case study
Improvement Skills Consulting Ltd.
 
Making sense of data - Learning Lab slides
Making sense of data - Learning Lab slidesMaking sense of data - Learning Lab slides
Making sense of data - Learning Lab slides
Improvement Skills Consulting Ltd.
 
Making Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning LabMaking Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning Lab
Improvement Skills Consulting Ltd.
 
Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?
Improvement Skills Consulting Ltd.
 
Monitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisationsMonitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisations
Improvement Skills Consulting Ltd.
 
Workshop design and facilitation
Workshop design and facilitationWorkshop design and facilitation
Workshop design and facilitation
Improvement Skills Consulting Ltd.
 
Data4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and StatisticsData4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and Statistics
Improvement Skills Consulting Ltd.
 
Writing Skills for Scientists - workshop
Writing Skills for Scientists - workshopWriting Skills for Scientists - workshop
Writing Skills for Scientists - workshop
Improvement Skills Consulting Ltd.
 
Getting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your CharityGetting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your Charity
Improvement Skills Consulting Ltd.
 
50 Creativity and Change Cards
50 Creativity and Change Cards50 Creativity and Change Cards
50 Creativity and Change Cards
Improvement Skills Consulting Ltd.
 
Charities: why bother with digital transformation?
Charities: why bother with digital transformation?Charities: why bother with digital transformation?
Charities: why bother with digital transformation?
Improvement Skills Consulting Ltd.
 
Control Charts: their use and benefits
Control Charts: their use and benefitsControl Charts: their use and benefits
Control Charts: their use and benefits
Improvement Skills Consulting Ltd.
 
Digital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for CharitesDigital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for Charites
Improvement Skills Consulting Ltd.
 
OR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case studyOR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case study
Improvement Skills Consulting Ltd.
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projects
Improvement Skills Consulting Ltd.
 

More from Improvement Skills Consulting Ltd. (20)

Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data Pro bono OR webinar - Making sense of data
Pro bono OR webinar - Making sense of data
 
Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021Making sense of data - Learning Lab 2021
Making sense of data - Learning Lab 2021
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
 
Quantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning LabQuantitative data essentials for charities - Learning Lab
Quantitative data essentials for charities - Learning Lab
 
Pro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogsPro Bono OR: Making a difference for dogs
Pro Bono OR: Making a difference for dogs
 
Behavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case studyBehavioural change - a few thoughts, a model and a case study
Behavioural change - a few thoughts, a model and a case study
 
Making sense of data - Learning Lab slides
Making sense of data - Learning Lab slidesMaking sense of data - Learning Lab slides
Making sense of data - Learning Lab slides
 
Making Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning LabMaking Sense of Data - 3rd Sector Learning Lab
Making Sense of Data - 3rd Sector Learning Lab
 
Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?Are your processes obvious, complicated or complex?
Are your processes obvious, complicated or complex?
 
Monitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisationsMonitoring, Evaluation and Learning - services for Third Sector organisations
Monitoring, Evaluation and Learning - services for Third Sector organisations
 
Workshop design and facilitation
Workshop design and facilitationWorkshop design and facilitation
Workshop design and facilitation
 
Data4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and StatisticsData4Good Conference 2018 Pro Bono OR and Statistics
Data4Good Conference 2018 Pro Bono OR and Statistics
 
Writing Skills for Scientists - workshop
Writing Skills for Scientists - workshopWriting Skills for Scientists - workshop
Writing Skills for Scientists - workshop
 
Getting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your CharityGetting started with Digital Transformation in your Charity
Getting started with Digital Transformation in your Charity
 
50 Creativity and Change Cards
50 Creativity and Change Cards50 Creativity and Change Cards
50 Creativity and Change Cards
 
Charities: why bother with digital transformation?
Charities: why bother with digital transformation?Charities: why bother with digital transformation?
Charities: why bother with digital transformation?
 
Control Charts: their use and benefits
Control Charts: their use and benefitsControl Charts: their use and benefits
Control Charts: their use and benefits
 
Digital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for CharitesDigital transformation and you: a seminar for Charites
Digital transformation and you: a seminar for Charites
 
OR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case studyOR58 Conference: Pro bono OR and a case study
OR58 Conference: Pro bono OR and a case study
 
Not all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projectsNot all projects are the same: One size does not fit all for managing projects
Not all projects are the same: One size does not fit all for managing projects
 

Recently uploaded

Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
SalesTown
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 

Recently uploaded (20)

Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
How to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM SoftwareHow to Implement a Real Estate CRM Software
How to Implement a Real Estate CRM Software
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 

Project Estimating

  • 1. Project planning and estimating How long is a piece of string? 1 © Copyright ISC 2012
  • 2. Hofstadter’s Law  Hofstadter’s Law states that, when planning any task, it always takes longer than you expect, even when you take into account Hofstadter’s Law  In other words, projects over- running are almost inevitable because of the way our brains think about how long stuff takes to do  Estimating tools can help you… 2 © Copyright ISC 2012
  • 3. Estimates and Estimating  An estimate is an approximation of project time and cost targets that is refined throughout the project life cycle  Estimating uses a range of tools and techniques to produce estimates © Copyright ISC 2012 Estimating: 3
  • 4. Estimating methods High Accuracy & Detail Bottom-up Parametric Estimate Estimate Comparative Estimate 3-point Estimate Expert Judge- “Quick & ment Dirty” Perception Fact © Copyright ISC 2012 Estimating: 4
  • 5. Bottom-up estimating  Assumes that future costs for a product can be predicted accurately from historical costs of that product  Uses detailed costs of components, built up into an end product (WBS/PBS)  e.g. 10,000 bricks, 250 tiles, 20 litres of paint = total cost of £xxx  Also known as Detailed Estimate, Engineering Build-up, or Grass Roots method © Copyright ISC 2012 Estimating: 5
  • 6. Parametric estimating  Collecting relevant historical data, usually at an aggregated level of detail, and relating it to the project to be estimated through the use of statistical techniques  At the heart of the parametric estimating methodology are cost estimating relationships (CERs)  e.g. 1 hour of filming will require 5 hours of editing  e.g. 10% of the cost of developing a new website is associated with User Testing © Copyright ISC 2012 Estimating: 6
  • 7. Comparative estimating  Takes actual costs of similar existing or past projects, and makes adjustments for complexity, technical, or physical differences to derive the new project estimate  e.g. 10 new web pages took 3 weeks and £15k on project X, so we estimate project Y requiring 20 new pages will take 5 weeks and cost £25k  Also known as Analogous Estimating © Copyright ISC 2012 Estimating: 7
  • 8. Other estimating methods 3-point estimates Expert judgement  Come up with 3 numbers:  Ask the project team and  Realistic (most likely) Subject Matter Experts  Best case (optimistic)  Worst case (pessimistic)  Estimate =  (B + 4R + W)/6  N.B. the formula is usually weighted (4 x R), but sometimes is the “simple” average of B, R & W © Copyright ISC 2012 Estimating: 8
  • 9. Example 3-point estimate ID Tas k Nam e Duration Optimis tic Dur. Expected Dur. Pes sim is tic Dur. 1 Programm e plan 200 days 180 days 200 days 280 days 2 Office project 10 mons 9 m ons 10 mons 11 mons 3 New technology project 9.67 mons 8 m ons 9 m ons 14 mons 4 Project re staff 66.67 days 50 days 65 days 95 days 5 Com munications 66.67 days 50 days 65 days 90 days 6 Group s taff types 1.17 wks 1 wk 1 wk 2 wks 7 Develop comms plan 2.33 wks 2 wks 2 wks 4 wks 8 Staff prepared 0 days 0 days 0 days 0 days 9 Com municate intentions 9.83 wks 7 wks 10 wks 12 wks 10 Staff numbers 46.67 days 35 days 45 days 65 days 11 Set up database 1.17 wks 1 wk 1 wk 2 wks 12 Count s taff 5.17 wks 4 wks 5 wks 7 wks 13 Set up s urvey 2 wks 1 wk 2 wks 3 wks 14 Input data 2.17 wks 2 wks 2 wks 3 wks Estimate = (O + 4E + P)/6 N.B. the formula is usually weighted (4 x E), but sometimes is the “simple” average of O, E & P © Copyright ISC 2012 Estimating: 9
  • 10. Test yourself: Which method does the project team use to estimate costs of building a new e-learning course? Expert 3- Compa- Para- Bottom- Point rative metric up The team identifies a best, worst and most likely case and averages them The team asks two suppliers who have built e-learning courses before The team uses a spreadsheet of data from previous projects and it calculates cost and time estimates for them Members of the team have been involved in 4 previous e-learning projects and know exactly how long each one took and what they cost There’s so much work to be done that the team breaks the project down into 75 work packages © Copyright ISC 2012 Estimating: 10
  • 11. A final thought…  Quote from a client’s Project Manager:  “We try to fall behind as early as possible because that gives us longer to catch up” 11 © Copyright ISC 2012
  • 12. © Copyright ISC 2012 Estimating: 12