Building Construction II
Project 1-Temporary Bus Shelter
Group Members:
Low En Huey 0317889
Tan Jo Lynn 0318518
Teo Hong Wei 0322990
Tiong Jia Min 0323763
Yan Wai Chun 0319626
Tutor : Ms. Norita Johar
1
C o n t e n t
I n t r o d u c t i o n 3
D e s i g n d e v e l o p m e n t 4 - 5
T e c h n i c a l d r a w i n g 6 - 8
C o n s t r u c t i o n p r o c e s s 9 - 1 1
M a t e r i a l s 1 2
J o i n t s d e t a i l s 1 3 - 1 5
L o a d a n d f o r c e s 1 6 - 1 7
C o n c l u s i o n 1 8
R e f e r e n c e s 1 9
2
I n t r o d u c t i o n
This subject allows student to experience and understand the importance of skeletal construction as it is one of the most widely
used structures for building support. In a group of five, we are to construct a temporary bus shelter that can accommodate 5-6
people using the scale of 1:20. The maximum base size of the bus shelter is 400mm x 800mm with the maximum height of
600mm. The bus shelter is elevated 50mm from the ground. We are encouraged to use recycled materials to construct the bus
shelter
O bj e c t i v e s
- To understand how a skeletal structure reacts under loading.
- To demonstrate a convincing understanding of how skeletal construction works.
- To be able to manipulate skeletal construction to solve an oblique design problem.
- Apply construction system in design.
- Recognise the implication o construction system in designs.
- Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and
strain and laws of static.
L e a r n i n g o u t c o m e s
3
D e s i g n d e v e l o p m e n t
S k e t c h e s
4
D e s i g n d e v e l o p m e n t
M o c k u p 0 1
M o c k u p 0 2
M o c k u p 0 3
Random arrangement of
cross braces result in
uneven forces. Upper roof
has no perpendicular
support.
Adding seats and adjusted
bracings for even support
of the upper roof.
Carefully arranged cross
bracing and different
thickness of components
are used result in a more
stable structure.
5
T E C H N I CA L D R AW I N G S
FRONT ELEVATION
SCALE 1:5
BACK ELEVATION
SCALE 1:5
6
T E C H N I CA L D R AW I N G S
LEFT ELEVATION
SCALE 1:5
RIGHT ELEVATION
SCALE 1:5
7
T E C H N I CA L D R AW I N G S
FLOOR PLAN
SCALE 1:5
8
C o n s t r u c t i o n p r o c e s s
Wood are measured to
correct dimensions to be cut.
Cutting wood to correct sizes . Ground beam are laid out
properly.
Floor joists are arranged
accordingly.
Floor joists are then nailed
to the ground beam.
The main column structures
are drilled to connect to the
ground beams.
Nuts and bolts are installed
at the joints.
Columns are set up.
Laying out the roof frame. Purlins are nailed to the roof
beams.
Screwing the tie plate to the
wood.
Installed tie plate.
9
C o n s t r u c t i o n p r o c e s s
Lower roof frame and floor
frame are completed.
Measuring the plywood
sheet to be cut properly.
Plywood sheet is precisely
cut at the corners.
Arranging the plywood sheet
on the floor frame.
Plywood sheet is completely
nailed to the floor frame.
Nailing the plywood to the
floor frame.
Setting up the diagonal wall
studs.
The studs are adjusted to
correct angle.
Walls studs are labelled for
installation.
The studs are glued to the
beam using wood glue.
Silver paper is used as an
representation of pin joint
base.
Setting up the bracings.
10
C o n s t r u c t i o n p r o c e s s
Holes on the tie plates are
made by nailing through
metal sheet.
DIY tie plates.
Setting up the upper roof
frame.
Main frame and the
secondary structures are
constructed.
Secondary structures are
completed.
The roof material is cut to
correct size and
T i e p l at e s c o n s t r u c t i o n
11
M at e r i a ls
Representation : Corrugated Plastic Board
Actual : Poly-carbonate Roof
• Able to withstand force and virtually
unbreakable.
• High percentage of UV blockage.
• Light weight and easy installation.
Representation : Wood
Actual : Chengal Wood
• Very resistant to termite attack.
• Weather resistant.
• High strength.
Representation : Plywood Sheet
Actual : Pressured Treated Wood
• Insect resistance.
• Long lasting up to many years.
• Able to withstand scratches and dent.
f r a m e
f l o o r i n g
r o o f
12
J O I N T p h o t o s
1
2
3
5
4
1 4
6
2
6
3
5
7
7
13
J o i n t d e ta i ls
1. P u r l i n s to r o o f b ea m s
Lap Joint is used to connect the
purlins to the roof beams. With
plenty of gluing surface, this
connection is strong enough to
withstand uplift of roof and able
to hold the roofing materials.
2. M i d po i n t o f d i ag o n a l s t u d s
Nuts and bolts are used to hold the middle part of the
crossed studs together to have a stronger joint between
the studs.
3. P i n j o i n t fo r s t u d s 4. B ea m to c o l u m n
Steel plates are inserted into the
studs for desired angles and the
steel base is screwed on the wall
plate to transfer forces.
Mortise on the roof beam
and the tenon of the
column is inserted to create
strong and stable
connection.
14
J o i n t d e ta i ls
5 . B r ac i n g to ro o f b ea m
Mortise and tenon joint is used. Mortise is cut on the
beam and column for the diagonal bracing to slot into it.
6.G r o u n d b ea m to c o l u m n
7. FL O O R J O I S TS TO G RO U N D B EA M 8. Po s t a n d bas e c o n n ect i o n
Mortise and tenon joint is
used for the connection of
these components. Simple
and strong connection to
support the load of the floor.
Lap Joint allow the ground
beam to partially rest on the
column to transfer the load to
the ground.
15
L o a d a n d f o r c e s
WIND
L at e r a l f o r c e d e s i g n
WIND
GROUND MOTION
To withstand lateral forces like wind and earthquakes,
bracing is added as secondary support.
- Connected by frictionless joints.
- Forces transferred down non-perpendicularly.
- Full potential of stress are reduced.
- Secure longitudinally.
- Flexible when loaded perpendicularly to their
longitudinal axis.
- Stress point assembled at center point. Single intersection.
- Provide lateral stability.
- Aids in strengthening joints.
- No side support thus increases tendency of structure.
- Take advantage of the material in their strongest manner.
D i a g o n a l b r a c i n g C r o s s b r a c i n g
16
L o a d a n d f o r c e s
The common live loads for a bus shelter is the people
waiting and sitting in it. Other than that, the bus shelter
is able to withstand extra movable load like luggage and
extra items that people carry along.
L i v e l o a d d e s i g n
d e a d l o a d d e s i g n
Loads are transferred perpendicularly
to the ground. Furthermore, FREE
HANGING of roof was incorporated to
enhance the spatial experiences of the
design. Therefore, bracings and
secondary diagonal supports are
inserted to reduce full potential of load
support by the main vertical planes
(columns) and to support the load of
the horizontal planes (roof structures).
17
C o n c l u s i o n
On median, each group worked for around at the Carpentry Workshop but we have carried out our tasks in the
workshop for about 5 days due to experiments executed for the production of joints and load sustainability testing. We used the
extra workshop schedules to combat our faults in the construction of our joints and we managed to catch up with the agenda on
the third and forth day of the construction in the workshop.
Upon completion, we have learnt the knowledge of applications of skeletal construction and different kind of joints
to actual construction and design. We have also understood the capability of a structure to withstand and react to the loads
exerted. Beside that, beyond recall, we were able to manipulate the construction to solve design problem and recognize the
implication of construction systems upon creation.
18
R e f e r e n c e s
19
 http://www.buildmagazine.org.nz/articles/show/distributing-lateral-loads-in-timber-framed-buildings/
 http://kisi.deu.edu.tr/ozgur.ozcelik/AR361/AR361_Lecture_1.pdf
 http://zhan.renren.com/structuresmaterials?gid=3602888498044603443&from=post&checked=true
 http://www.steelconstruction.info/Bracing_systems
 http://www.ripsdiy.co.za/woodjoins.shtml
 http://www.vermonttimberworks.com/learn/timber-frame-joinery/purlins-and-joists/
 http://timberframehq.com/construction-details/masonryconcrete-to-timber/
Photo Sources :
All members of this group.

More Related Content

What's hot

Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
Joe Onn Lim
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
Bolin Loong
 
Building Construction 2 - Project 1 - Temporary Bus Shelter
Building Construction 2 - Project 1 - Temporary Bus ShelterBuilding Construction 2 - Project 1 - Temporary Bus Shelter
Building Construction 2 - Project 1 - Temporary Bus Shelter
jiuaN59
 
Site report
Site reportSite report
Site report
Penny3688
 
Masonry structures behavior and design
Masonry structures behavior and designMasonry structures behavior and design
Masonry structures behavior and design
Nour Samir
 
Underpinning
UnderpinningUnderpinning
Underpinning
Khuzema Olia
 
Lecture2 classification of structures
Lecture2 classification of structuresLecture2 classification of structures
Lecture2 classification of structures
Afroz Khan
 
Design of masonry structures 2004
Design of masonry structures 2004Design of masonry structures 2004
Design of masonry structures 2004
Kheena Elaine Macaraig
 
Slabs by Rhythm Murgai
Slabs by Rhythm MurgaiSlabs by Rhythm Murgai
Slabs by Rhythm Murgai
Rhythm Murgai
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
Thien Hee
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
aman kumar
 
What Is A Slab? And What Are The Different Types Of Slab?
What Is A Slab? And What Are The Different Types Of Slab?What Is A Slab? And What Are The Different Types Of Slab?
What Is A Slab? And What Are The Different Types Of Slab?
PoojaGurnule
 
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGESMETHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
Umer Farooq
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Bala murali
 
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستناديةSoils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
Dr.Youssef Hammida
 
Krishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry wallsKrishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry walls
krishna
 
Foundation Rehabilitation
Foundation RehabilitationFoundation Rehabilitation
Foundation Rehabilitation
Aani4
 
Reinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining wallsReinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining walls
Timóteo Rocha
 
Framed structures
Framed structures Framed structures
Framed structures
Shivangi Saini
 

What's hot (19)

Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
 
Building Construction 2 - Project 1 - Temporary Bus Shelter
Building Construction 2 - Project 1 - Temporary Bus ShelterBuilding Construction 2 - Project 1 - Temporary Bus Shelter
Building Construction 2 - Project 1 - Temporary Bus Shelter
 
Site report
Site reportSite report
Site report
 
Masonry structures behavior and design
Masonry structures behavior and designMasonry structures behavior and design
Masonry structures behavior and design
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Lecture2 classification of structures
Lecture2 classification of structuresLecture2 classification of structures
Lecture2 classification of structures
 
Design of masonry structures 2004
Design of masonry structures 2004Design of masonry structures 2004
Design of masonry structures 2004
 
Slabs by Rhythm Murgai
Slabs by Rhythm MurgaiSlabs by Rhythm Murgai
Slabs by Rhythm Murgai
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
 
What Is A Slab? And What Are The Different Types Of Slab?
What Is A Slab? And What Are The Different Types Of Slab?What Is A Slab? And What Are The Different Types Of Slab?
What Is A Slab? And What Are The Different Types Of Slab?
 
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGESMETHODS OF RETROFITTING EARTHQUAKE DAMAGES
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
 
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستناديةSoils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
Soils Reinforcement Retaing walls- التربة المسلحة في الجدران الاستنادية
 
Krishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry wallsKrishna final overall ppt (2) eccentrically loaded masonry walls
Krishna final overall ppt (2) eccentrically loaded masonry walls
 
Foundation Rehabilitation
Foundation RehabilitationFoundation Rehabilitation
Foundation Rehabilitation
 
Reinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining wallsReinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining walls
 
Framed structures
Framed structures Framed structures
Framed structures
 

Similar to Project 1 Building Construction 2

Merged
MergedMerged
Merged
kerneng
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
Jannah Jailani
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
Gertrude Lee
 
Building construction report
Building construction reportBuilding construction report
Building construction report
Jannah Jailani
 
Building construction report
Building construction reportBuilding construction report
Building construction report
miranazrin
 
Building Construction Project 1 Report
Building Construction Project 1 ReportBuilding Construction Project 1 Report
Building Construction Project 1 Report
Sürayyn Selvan
 
Building construction report
Building construction reportBuilding construction report
Building construction report
Soh Shing
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
ForestedTiger
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2
leejanicee
 
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate SystemsSeismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
IRJET Journal
 
Lecture07 Types & Processes A Sr
Lecture07 Types & Processes A SrLecture07 Types & Processes A Sr
Lecture07 Types & Processes A Sr
Galala University
 
Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)
Sukhvir Singh Gill
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss Structure
Haiqal Ehlam
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
Wilden How
 
Formwork
FormworkFormwork
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
Puneet Chhonker
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
hongbinng
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
Yung Kai
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
Lim Zhao Yin
 
bus shelter
bus shelterbus shelter
bus shelter
James Ooi
 

Similar to Project 1 Building Construction 2 (20)

Merged
MergedMerged
Merged
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building Construction Project 1 Report
Building Construction Project 1 ReportBuilding Construction Project 1 Report
Building Construction Project 1 Report
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2
 
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate SystemsSeismic Behaviour of Reinforced Concrete Flat Plate Systems
Seismic Behaviour of Reinforced Concrete Flat Plate Systems
 
Lecture07 Types & Processes A Sr
Lecture07 Types & Processes A SrLecture07 Types & Processes A Sr
Lecture07 Types & Processes A Sr
 
Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss Structure
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Formwork
FormworkFormwork
Formwork
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
 
bus shelter
bus shelterbus shelter
bus shelter
 

More from En Huey

Building Services
Building ServicesBuilding Services
Building Services
En Huey
 
Bstruc p2
Bstruc p2Bstruc p2
Bstruc p2
En Huey
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
En Huey
 
Asian Architecture Report
Asian Architecture Report Asian Architecture Report
Asian Architecture Report
En Huey
 
Timeline
TimelineTimeline
Timeline
En Huey
 
Webbook
Webbook Webbook
Webbook
En Huey
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
En Huey
 
Cape Rachado Site Analysis
Cape Rachado Site Analysis Cape Rachado Site Analysis
Cape Rachado Site Analysis
En Huey
 
Psycho slide
Psycho slidePsycho slide
Psycho slide
En Huey
 
Psy final report (1)
Psy final report (1)Psy final report (1)
Psy final report (1)
En Huey
 
Journal 1
Journal 1Journal 1
Journal 1
En Huey
 
Charity drive report
Charity drive reportCharity drive report
Charity drive report
En Huey
 
Music is a_very_important_element_in_life2 (1)
Music is a_very_important_element_in_life2 (1)Music is a_very_important_element_in_life2 (1)
Music is a_very_important_element_in_life2 (1)
En Huey
 
Eng sem 2_pro_15
Eng sem 2_pro_15Eng sem 2_pro_15
Eng sem 2_pro_15
En Huey
 
Epc final (1)
Epc final (1)Epc final (1)
Epc final (1)
En Huey
 
Epc presentation
Epc presentationEpc presentation
Epc presentation
En Huey
 
Effective public communication (1)
Effective public communication (1)Effective public communication (1)
Effective public communication (1)
En Huey
 
Enbe final
Enbe finalEnbe final
Enbe final
En Huey
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
En Huey
 

More from En Huey (20)

Building Services
Building ServicesBuilding Services
Building Services
 
Bstruc p2
Bstruc p2Bstruc p2
Bstruc p2
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Asian Architecture Report
Asian Architecture Report Asian Architecture Report
Asian Architecture Report
 
Timeline
TimelineTimeline
Timeline
 
Webbook
Webbook Webbook
Webbook
 
Bcon Report
Bcon Report Bcon Report
Bcon Report
 
Cape Rachado Site Analysis
Cape Rachado Site Analysis Cape Rachado Site Analysis
Cape Rachado Site Analysis
 
Psycho slide
Psycho slidePsycho slide
Psycho slide
 
Psy final report (1)
Psy final report (1)Psy final report (1)
Psy final report (1)
 
Journal 1
Journal 1Journal 1
Journal 1
 
Charity drive report
Charity drive reportCharity drive report
Charity drive report
 
Music is a_very_important_element_in_life2 (1)
Music is a_very_important_element_in_life2 (1)Music is a_very_important_element_in_life2 (1)
Music is a_very_important_element_in_life2 (1)
 
Eng sem 2_pro_15
Eng sem 2_pro_15Eng sem 2_pro_15
Eng sem 2_pro_15
 
Epc final (1)
Epc final (1)Epc final (1)
Epc final (1)
 
Epc presentation
Epc presentationEpc presentation
Epc presentation
 
Effective public communication (1)
Effective public communication (1)Effective public communication (1)
Effective public communication (1)
 
Enbe final
Enbe finalEnbe final
Enbe final
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Ici
IciIci
Ici
 

Recently uploaded

Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 

Project 1 Building Construction 2

  • 1. Building Construction II Project 1-Temporary Bus Shelter Group Members: Low En Huey 0317889 Tan Jo Lynn 0318518 Teo Hong Wei 0322990 Tiong Jia Min 0323763 Yan Wai Chun 0319626 Tutor : Ms. Norita Johar 1
  • 2. C o n t e n t I n t r o d u c t i o n 3 D e s i g n d e v e l o p m e n t 4 - 5 T e c h n i c a l d r a w i n g 6 - 8 C o n s t r u c t i o n p r o c e s s 9 - 1 1 M a t e r i a l s 1 2 J o i n t s d e t a i l s 1 3 - 1 5 L o a d a n d f o r c e s 1 6 - 1 7 C o n c l u s i o n 1 8 R e f e r e n c e s 1 9 2
  • 3. I n t r o d u c t i o n This subject allows student to experience and understand the importance of skeletal construction as it is one of the most widely used structures for building support. In a group of five, we are to construct a temporary bus shelter that can accommodate 5-6 people using the scale of 1:20. The maximum base size of the bus shelter is 400mm x 800mm with the maximum height of 600mm. The bus shelter is elevated 50mm from the ground. We are encouraged to use recycled materials to construct the bus shelter O bj e c t i v e s - To understand how a skeletal structure reacts under loading. - To demonstrate a convincing understanding of how skeletal construction works. - To be able to manipulate skeletal construction to solve an oblique design problem. - Apply construction system in design. - Recognise the implication o construction system in designs. - Analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static. L e a r n i n g o u t c o m e s 3
  • 4. D e s i g n d e v e l o p m e n t S k e t c h e s 4
  • 5. D e s i g n d e v e l o p m e n t M o c k u p 0 1 M o c k u p 0 2 M o c k u p 0 3 Random arrangement of cross braces result in uneven forces. Upper roof has no perpendicular support. Adding seats and adjusted bracings for even support of the upper roof. Carefully arranged cross bracing and different thickness of components are used result in a more stable structure. 5
  • 6. T E C H N I CA L D R AW I N G S FRONT ELEVATION SCALE 1:5 BACK ELEVATION SCALE 1:5 6
  • 7. T E C H N I CA L D R AW I N G S LEFT ELEVATION SCALE 1:5 RIGHT ELEVATION SCALE 1:5 7
  • 8. T E C H N I CA L D R AW I N G S FLOOR PLAN SCALE 1:5 8
  • 9. C o n s t r u c t i o n p r o c e s s Wood are measured to correct dimensions to be cut. Cutting wood to correct sizes . Ground beam are laid out properly. Floor joists are arranged accordingly. Floor joists are then nailed to the ground beam. The main column structures are drilled to connect to the ground beams. Nuts and bolts are installed at the joints. Columns are set up. Laying out the roof frame. Purlins are nailed to the roof beams. Screwing the tie plate to the wood. Installed tie plate. 9
  • 10. C o n s t r u c t i o n p r o c e s s Lower roof frame and floor frame are completed. Measuring the plywood sheet to be cut properly. Plywood sheet is precisely cut at the corners. Arranging the plywood sheet on the floor frame. Plywood sheet is completely nailed to the floor frame. Nailing the plywood to the floor frame. Setting up the diagonal wall studs. The studs are adjusted to correct angle. Walls studs are labelled for installation. The studs are glued to the beam using wood glue. Silver paper is used as an representation of pin joint base. Setting up the bracings. 10
  • 11. C o n s t r u c t i o n p r o c e s s Holes on the tie plates are made by nailing through metal sheet. DIY tie plates. Setting up the upper roof frame. Main frame and the secondary structures are constructed. Secondary structures are completed. The roof material is cut to correct size and T i e p l at e s c o n s t r u c t i o n 11
  • 12. M at e r i a ls Representation : Corrugated Plastic Board Actual : Poly-carbonate Roof • Able to withstand force and virtually unbreakable. • High percentage of UV blockage. • Light weight and easy installation. Representation : Wood Actual : Chengal Wood • Very resistant to termite attack. • Weather resistant. • High strength. Representation : Plywood Sheet Actual : Pressured Treated Wood • Insect resistance. • Long lasting up to many years. • Able to withstand scratches and dent. f r a m e f l o o r i n g r o o f 12
  • 13. J O I N T p h o t o s 1 2 3 5 4 1 4 6 2 6 3 5 7 7 13
  • 14. J o i n t d e ta i ls 1. P u r l i n s to r o o f b ea m s Lap Joint is used to connect the purlins to the roof beams. With plenty of gluing surface, this connection is strong enough to withstand uplift of roof and able to hold the roofing materials. 2. M i d po i n t o f d i ag o n a l s t u d s Nuts and bolts are used to hold the middle part of the crossed studs together to have a stronger joint between the studs. 3. P i n j o i n t fo r s t u d s 4. B ea m to c o l u m n Steel plates are inserted into the studs for desired angles and the steel base is screwed on the wall plate to transfer forces. Mortise on the roof beam and the tenon of the column is inserted to create strong and stable connection. 14
  • 15. J o i n t d e ta i ls 5 . B r ac i n g to ro o f b ea m Mortise and tenon joint is used. Mortise is cut on the beam and column for the diagonal bracing to slot into it. 6.G r o u n d b ea m to c o l u m n 7. FL O O R J O I S TS TO G RO U N D B EA M 8. Po s t a n d bas e c o n n ect i o n Mortise and tenon joint is used for the connection of these components. Simple and strong connection to support the load of the floor. Lap Joint allow the ground beam to partially rest on the column to transfer the load to the ground. 15
  • 16. L o a d a n d f o r c e s WIND L at e r a l f o r c e d e s i g n WIND GROUND MOTION To withstand lateral forces like wind and earthquakes, bracing is added as secondary support. - Connected by frictionless joints. - Forces transferred down non-perpendicularly. - Full potential of stress are reduced. - Secure longitudinally. - Flexible when loaded perpendicularly to their longitudinal axis. - Stress point assembled at center point. Single intersection. - Provide lateral stability. - Aids in strengthening joints. - No side support thus increases tendency of structure. - Take advantage of the material in their strongest manner. D i a g o n a l b r a c i n g C r o s s b r a c i n g 16
  • 17. L o a d a n d f o r c e s The common live loads for a bus shelter is the people waiting and sitting in it. Other than that, the bus shelter is able to withstand extra movable load like luggage and extra items that people carry along. L i v e l o a d d e s i g n d e a d l o a d d e s i g n Loads are transferred perpendicularly to the ground. Furthermore, FREE HANGING of roof was incorporated to enhance the spatial experiences of the design. Therefore, bracings and secondary diagonal supports are inserted to reduce full potential of load support by the main vertical planes (columns) and to support the load of the horizontal planes (roof structures). 17
  • 18. C o n c l u s i o n On median, each group worked for around at the Carpentry Workshop but we have carried out our tasks in the workshop for about 5 days due to experiments executed for the production of joints and load sustainability testing. We used the extra workshop schedules to combat our faults in the construction of our joints and we managed to catch up with the agenda on the third and forth day of the construction in the workshop. Upon completion, we have learnt the knowledge of applications of skeletal construction and different kind of joints to actual construction and design. We have also understood the capability of a structure to withstand and react to the loads exerted. Beside that, beyond recall, we were able to manipulate the construction to solve design problem and recognize the implication of construction systems upon creation. 18
  • 19. R e f e r e n c e s 19  http://www.buildmagazine.org.nz/articles/show/distributing-lateral-loads-in-timber-framed-buildings/  http://kisi.deu.edu.tr/ozgur.ozcelik/AR361/AR361_Lecture_1.pdf  http://zhan.renren.com/structuresmaterials?gid=3602888498044603443&from=post&checked=true  http://www.steelconstruction.info/Bracing_systems  http://www.ripsdiy.co.za/woodjoins.shtml  http://www.vermonttimberworks.com/learn/timber-frame-joinery/purlins-and-joists/  http://timberframehq.com/construction-details/masonryconcrete-to-timber/ Photo Sources : All members of this group.