B U I L D ING S T R U C T U R E [ A R C 2 5 2 3 ] 
F e t t u c c i n e T r u s s B r i d g e A n a l y s i s 
G e r t r u d e L e e ( 0 3 0 6 2 6 5 ) 
K e e T i n g T i n g ( 0 3 1 0 0 1 9 ) 
M e e r a N a z r e e n ( 0 3 0 9 6 3 0 ) 
N u r u l J a n n a h J a i l a n i ( 0 3 1 0 2 1 0 ) 
S o n i a M a n y i e ( 0 8 0 1 A 6 5 7 0 4 )
T A B L E O F C O N T E N T 
I N T R O D U C T I O N 
M E T H O D O L O G Y 
P R E C E D E N T S T U D Y – H E N S Z E Y ’ S W R O U G H T I R O N B R I D G E 
A N A L Y S I S 
S t r e n g t h o f M a t e r i a l s 
T r u s s A n a l y s i s – I n i t i a l t o F i n a l D e s i g n 
T E S T I N G 
T r u s s S t r u c t u r e A n a l y s i s 
R e a s o n f o r B r i d g e F a i l u r e 
S u g g e s t i o n t o S t r e n g t h e n B r i d g e 
C O N C L U S I O N 
A P P E N D I X 
R E F E R E N C E S
I N T R O D U C T I O N 
For this project, we were assigned in a group of 5 to carry out precedent study of a truss bridge. Using the knowledge from the research, we 
are required to design and construct a fettuccine bridge of 750mm clear span and maximum weight of 200g. 
The bridge must be of high efficiency, which means using the least amount of materials to sustain a higher amount of load. This bridge is 
tested to fail, therefore, its strengths has to be determined in terms of tension and compression strength as well as the material strength. 
Upon the agreement of the bowstring truss as our topic of interest, the Henszey’s Wrought Iron Bridge was chosen as our precedent study. 
The report will be based on the compilation of our research on the bowstring truss and the application of our understanding to the 
construction of our fettuccine bridge. 
Bridge Requirement: 
• 750mm clear span and maximum weight of 200g. 
• Only fettuccine and glue are allowed. 
• Loads have to be point load. 
• Must be able to withstand each weight that is put on for 10 seconds.
ME T H O D O L O G Y 
In order to complete the project, the following methods were carried out: 
Precedent Study 
Gives an understanding of a truss bridge. The connections, arrangement of members and truss type are focused on. Based on the study, we 
would then adopt the desired truss design into our own fettuccine bridge design. 
Material and Adhesive Strength Testing 
Before constructing the bridge, the physical properties of the fettuccine is to be understood. Therefore, we have tested the behavior of the 
materials when subjected to either tension or compression. 
Model Making 
In the beginning, simple sketches of the trusses were made. Once decision was made, a CAD drawing of 1:1 scale was generated to ease the 
process in creating a more accurate model. 
Structural Model 
The truss is analyzed by determining which members are in tension or compression. The structural analysis is done using the same method 
as that of the truss analysis exercises (appendix).
Precedent Study - Henszey’s Wrought Iron Bridge 
Figure 1 is a picture of Henszey’s Wrought-Iron Bridge, a single span wrought 
iron bowstring truss bridge. The bridge is named and based after Joseph 
Henszey’s patent design in 1869, a prominent engineer during his time. The 
durability and longevity of surviving metal bridges built in the United States 
from the 1800s is truly impressive. The ability of these bridges to defy time 
itself in a way that no modern bridge today can is due to a variety of reasons. 
The wrought iron used during this period was actually more rust-resistant and 
long-lasting than the steel used today. Some bridges were overbuilt by 
engineers who may have not been able to calculate the design of a bridge, 
while in contrast 
A B O U T T H E B R I D G E 
Figure 1 
others may have been designed by engineers who were very skilled and creative and were able to come up with a bridge design that was 
uniquely effective. After design, skilled craftsmen would carefully fabricate the parts for these bridges, producing a well-built structure that 
would be ready to stand for over a century. All of these types of things might be applicable to the long life that Henszey's Wrought Iron 
Bridge has enjoyed, however some might find cause to question the skills of the craftsmen who fabricated this bridge. Today, Henszey's 
Bridge serves as a pedestrian walkway for students, faculty, staff and visitors on the campus of Central Penn College, Cumberland, 
Pennsylvania. The bridge symbolizes the high-quality, hands-on education that the college provides to connect students to their career 
dreams.
T E C H N I C A L F A C T S O F H E N S Z E Y ’ S W R O U G H T - I R O N B R I D G E 
Figure 2 Span Layout 
Figure 3 Foot Clear Roadway 
Figure 2 shows the span layout of the bridge at 92 foot 4 inches (28.14m) from end shoe to end shoe with each truss subdivided into eight 
panels. The approaches are formed by stone wing wall which rise to the level of the roadway and are fitted with pipe railings. The span 
carries a 15 foot clear roadway of wood plank deck with a 4” by 4” wheel guard (Figure 3). U1 to U7 represents the top chords positions 
while L0 to L8 represents the lower/bottom chords positions. All members and chords are wrought iron, but there are also cast iron 
components for the bridge's connections, floor beams, and bearings. The cast iron components increase the rarity and significance of the 
bridge. 
The top chords are fashioned from 7 15/16” x 5/16”cast Phoenix sections, between which is a 
riveted a stem plate 11 ¼” x 5/16”. Stiffening bars, 2” wide and 5/16” thick are inserted horizontally 
through the stem plate regular intervals and are riveted to the outer flanges of the Phoenix 
sections (Figure 4). 
Figure 4 Phoenix Section with Stem Plate 
and Stiffening Bars
Figure 4 Phoenix Section with Stem Figure 5 Top Chord Overview 
Figure 6 Top Chord Connections 
Plate and Stiffening Bars 
The top chords are fashioned from 7 15/16” x 5/16”cast Phoenix sections, between which is a riveted a stem plate 11 ¼” x 5/16”. 
Stiffening bars, 2” wide and 5/16” thick are inserted horizontally through the stem plate regular intervals and are riveted to the 
outer flanges of the Phoenix sections (Figure 4). 
Figure 7 
The vertical posts of each truss consist of pairs of T-bars 3” x 1/2” x ½” which by means of flanges at the 
bottom are riveted to the upper flange of each floor beam and the plates are riveted to the top chord (Figure 
7).The deck is suspended from the top chord, thereby placing all verticals in tension. 
The bottom chords consist of pairs of flat bars 4 ¾” x ½” with turnbuckles, on which rest the I-beam floor 
beams which carries the I-beam stringers on which the flooring is laid (Figure 10).
Figure 9 Cast Iron Bottom Chord Connections 
Figure 8 Bottom Chord Connections 
The bottoms chords is also in tension as a result of the horizontal thrust exerted by the arched top chord. When a load passes 
over the bridge, the load is conveyed to the vertical posts. As the posts are placed in greater tension, the segment of top chord 
between the two posts is placed in compression. The flat verticals between posts of the bridge thus appear to have been 
installed in order to counteract the tendency of a given arched segment of the top chord to buckle upward under the force of 
the added compression. 
Figure 10(a) Lower/Bottom Chord Connections to Flooring and Upper Chord Figure 10. Bottom Bracing at Lower Chord 2 and Lower Chord 6.
Figure 11 King Post under Floor Beam Figure 12 View of under the Bridge 
In conclusion, the trusses for the Henszey’s Bridge are rather shallow. This is because the ratio between the maximum truss depth 
(8 feet) and the overall length (92feet) is only about 1:11. Due to the arch configuration, deflection and vibration increases 
especially when the outer end of the trusses are considerably shallower. Therefore, to decrease deflection, inverted king posts are 
used below the floor beams (Figure 11). Moreover, placement of camber rods below each beam in a king-post configuration also 
reduces lateral movement of the upper chords under live loads.
A N A L Y S I S 
S T R E N G T H O F T H E M A T E R I A L 
Materials used for this project are: 
1. San Remo Tubular Spaghetti 
Based on our research, the properties of the fettuccine are below: 
1. Ultimate tensile strength = 2000 psi 
2. Stiffness (Young’s modulus) E= 10,000,000 psi 
(E=stress/strain) 
Failure occurs when ultimate tensile strength is exceeded. As the length of the fettuccine increases, 
the maximum load a fettuccini can carry before it breaks decreases. 
2. UHU Super Glue 
UHU super glue dries relatively quickly but is slightly flexible when dry. Moreover, the required 
rigid glue joints can be achieved. PVA glue is not a suitable adhesive. Since it is water based, the 
spaghetti is softened by the glue. Glue joints take forever to dry. Once dry, joints are not very 
strong.
E X P E R I M E N T A T I O N O F T H E S T R E N G T H O F M A T E R I A L S 
Types of Beams Numbers of Layers Result 
L-beam 1 layer all sides Flattens and bends 
L-beam 2 layers all sides Bends 
I- beam 3 pieces Breaks at 5 seconds 
I- beam 5 pieces Did not break 
I- beam 6 pieces Did not break but heavy 
Lamination 2 layers 
3 layers 
4 layers 
1 seconds 
3 seconds 
More than 40 seconds 
Types of Glues Used Result 
Bonding UHU Super Glue 
3 second glue 
PVA 
Did not break 
Bends/ flexible 
Twists and breaks 
Based on the results, it can be concluded that the I-beam made up of 5 pieces of fettuccines is the strongest. Moreover, 4-layered 
lamination has also proved quite strong. The C-beam, L-beam and joists on the other hand, either buckled or twisted when tested. 
Therefore, we have chosen to use I-beams and laminated fettuccine in our bridge. Finally, as an adhesive, UHU super glue turned 
out to be the best option.
T R U S S A N A L Y S I S – F R O M I N I T I A L T O F I N A L D E S I G N 
Bowstring Truss was selected as our fettuccine bridge design. 
Figure above is a Typical Bowstring Truss 
Figure below shows how the tension, compression and buckling may occur to the beams of a bridge while in this case, the fettuccines. 
We have found that for a regular fettuccine (diameter = 2mm), maximum load is approximately 4.5kg. Moreover, a structure that relies on 
bending strength to support a load has very little strength. Triangles is the best design for trusses as there are no bending moments in 
triangular element(truss strength depends on bending strength of members)
T R U S S A N A L Y S I S – F R O M I N I T I A L T O F I N A L D E S I G N 
Bowstring Truss was selected as our fettuccine bridge design. 
Front Elevation of Initial Fettuccine Bridge Design 
The initial design of the fettuccine truss bridge weight was 286g. It was tested. Load was added until the bridge fails. The bottom bracing 
deflected downwards when more weight was added and broke when it reached its limit. The other parts of the bridge was still in tack. It is as 
shown below. 
Side Elevation of Initial Fettuccine Bridge 
Design 
Besides being advice to test the bracing, as our bridge is weight, 286g, more than the requirement of the brief, 
which is 200g, we were also advice to decrease the amount of fettuccines used at the truss of the bridge. From 
the advice that was given, we designed a new bridge.
Front Elevation of Final Fettuccine Bridge Design 
The final design of the fettuccine bridge weight was 198g as we have decided to adjust our final design to lesser bracings which, reduces its 
weight. Instead of making all the truss X-bracing(diagonal), we decided to make the three most middle trusses diagonal to each other while 
the rest triangular. In order to make the middle bracing stronger, we made the middle bracing that was holding the load the strongest by 
sticking more fettuccines together. We also decreased the length of the bridge 
Final Fettuccine Bridge Design
P R E - T E S T I N G 
TRUSS STRUCTURE ANALYSIS (Mock Up Model for Initial Design) 
We have chosen the truss member based on the required force to withstand tension and compression after referring to past material testing 
as well as the precedent study to make appropriate joint connections. 
Failure Analysis: 
The material needed to sustain the loads for this model was overwhelming. From our first testing, 2 fettuccine was placed in the middle for 
bracing to hang the load. The bridge weighing at 284g was able to withstand 1.45kg of load. Using the same model and with minor 
adjustments (placing 2 bracings, both shaped as I-beam), the model now weighing 286g was able to withstand 2.5kg of load. While the 
bridge did not break during the first testing, its weight is way over the requirement of 200g. 
Based on the calculation, we have found that although the weight has increased, the extra support and strength from the I-beams increases 
the efficiency of the bridge. 
First testing on First Mock-Up Model 
Load: 1.45kg 
Weight of bridge: 284g 
Efficiency = (load) ^2 / mass of bridge 
Efficiency =0.007 
Second testing on First Mock-Up Model 
Load: 2.5kg 
Weight of bridge: 286g 
Efficiency = (load) ^2 / mass of bridge 
Efficiency = 0.02
P R E - T E S T I N G 
TRUSS STRUCTURE ANALYSIS (Mock Up Model for Final Design 
After decreasing the number of trusses, the length of span of the bridge and the amount of fettuccines used, this is the result of the bridge. 
Load = 198g 
Mass of bridge = 4.2kg 
Efficiency = (Load) ^ 2/mass of bridge 
Efficiency = 
Failure Analysis: 
For the final model, critical, tension and compression members were reduced. The diagonal bracings are only for the three most middle 
trusses while the rest are triangular. From the truss analysis, triangular members are the obvious choice as these members has no bending 
moments.
T E S T I N G 
TRUSS STRUCTURE ANALYSIS 
During the testing day, the 2 tables were 750mm apart from each other. The bridge was tested with a bucket and water as the load. The 
water was poured into the bucket until the bridge fails. 
During the testing, as water was poured into the bridge, one of the trusses popped out. As more water was poured in, the bridge started to 
tilt. The bridge broke and was only able to withstand 2.648kg of load. 
Load = 198g 
Mass of bridge = 2.648kg 
Efficiency = (Load) ^ 2/mass of bridge 
Efficiency = 0.04
R E A S O N F O R F A I L U R E O F B R I D G E 
Tension 
Compression 
All the vertical members 
before was thought to be 
compression members 
LOAD 
1. Decreasing the amount of compression and tension members and misinterpretation of compression and tension members. 
We decreased the amount of members in order to fit to the 200g bridge requirement but then we forgot about how 
decreasing the number of members affect the compression and tension between the remaining members on the bridge. 
Besides that, we also misinterpreted which member will have compression and tension force acting on it.
2. The members are too far apart 
Too far apart 
As the members of the bridge was too far apart, it fails to support the compression force that was acting on the members. 
The further the members are from each other, the amount of compression force that is acting on one member is more 
resulting in the deflection of the base of the bridge.
3. The height of the bridge 
The height of the bridge is too tall as the members are too tall. The taller the members, the weaker are the members in 
withstanding the compression force of the bridge. As shown in the diagram above, the bridge started tilting due to the load 
that was exerted on the bracing that was holding the load.
S U G G E S T I O N S T O S T R E N G T H E N B R I D G E 
1. Decreasing the height of the bridge. 
By decreasing the height of the bridge, the bridge will be more firm as the height of the bridge affects the stability of the bridge. The 
shorter the members in the bridge, the stronger the members resulting on a more solid bridge. 
2. Decrease the length between each members and add more members 
HEIGHT 
By decreasing the length between each members and adding more members, the force distribution will be more equal and also it will be 
more solid compared to when it is further apart.
C O N C L U S I O N 
Based on the research of the precedent studies and experiments that were done, we have developed an understanding of the tension and 
compressive strength of construction materials and the force distribution in a truss. This understanding has enabled us to evaluate, explore 
and improve the attributes of construction materials as well as to explore and apply the understanding of load distribution in a truss. We 
are also able to evaluate and identify tension and compression members in a truss structure, and explore different arrangement of members 
in a truss structure. Finally through this project, we are able to design a perfect truss bridge which has a high aesthetic value and is made of 
minimal construction material. 
Therefore, we would consider our truss bridge model a success. This is due to the fact that for the final model, the material and weight 
lessened from 286g to 198g. Consequently, this produces better efficiency as the weight of load carried increases from 2.5kg to 4.2kg. We 
were able to discover the strategy in achieving better efficiency by doing testing according to the maximum load the bridge can sustain. 
Moreover, we have discovered that time management and teamwork is crucial in producing a bridge that is not only aesthetically appealing 
but also of high quality during a limited time.
A P P E N D I X 
Exercise: Truss analysis 
A total of 5 different truss systems which carry the same loads are analysed to determine 
which truss arrangement is the most effective and why. 
The following are the task distribution for the cases: 
Case 1: Kee Ting Ting 
Case 2: Gertrude Lee 
Case 3: Meera Nazreen 
Case 4: Nurul Jannah Jailani 
Case 5: Sonia Manyie 
The analysis and calculations of trusses are attached after this page.
Case 1: Kee Ting Ting
Case 2 : Gertrude Lee
Case 3 : Meera Nazreen
Case 4: Nurul Jannah Jailani
Case 5 : Sonia Manyie
Building structure [arc 2523]
Building structure [arc 2523]
Building structure [arc 2523]
Building structure [arc 2523]

More Related Content

What's hot

Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
Adelinetingg
 
Building construction report
Building construction reportBuilding construction report
Building construction report
miranazrin
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
Soh Shing
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
Josia Tannos, EIT
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
Jason Juen
 

What's hot (19)

Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Bridge report
Bridge reportBridge report
Bridge report
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 
Fettucine recipe
Fettucine recipeFettucine recipe
Fettucine recipe
 
Fettucine
FettucineFettucine
Fettucine
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSS
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Building structure report
Building structure reportBuilding structure report
Building structure report
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 

Similar to Building structure [arc 2523]

CE4410 Final Design Report
CE4410 Final Design ReportCE4410 Final Design Report
CE4410 Final Design Report
Chase Bowman
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1
Keith Daggett
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
Minhal Haider
 

Similar to Building structure [arc 2523] (20)

Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Project 1 Building Construction 2
Project 1 Building Construction 2Project 1 Building Construction 2
Project 1 Building Construction 2
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
 
B.structure report
B.structure reportB.structure report
B.structure report
 
building structures 1 fettuccine report
building structures 1 fettuccine reportbuilding structures 1 fettuccine report
building structures 1 fettuccine report
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstop
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 
BCON II PROJECT 1
BCON II PROJECT 1BCON II PROJECT 1
BCON II PROJECT 1
 
bus shelter
bus shelterbus shelter
bus shelter
 
Bcon project 1 pdf report
Bcon project 1 pdf reportBcon project 1 pdf report
Bcon project 1 pdf report
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Influence line diagram for model arch bridge
Influence line diagram for model arch bridgeInfluence line diagram for model arch bridge
Influence line diagram for model arch bridge
 
Formwork
FormworkFormwork
Formwork
 
Bcon
BconBcon
Bcon
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
CE4410 Final Design Report
CE4410 Final Design ReportCE4410 Final Design Report
CE4410 Final Design Report
 
Estimating Systems for Homes1
Estimating Systems for Homes1Estimating Systems for Homes1
Estimating Systems for Homes1
 
report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
IRJET- Sandwich Plate System in Bridge Deck – A Review
IRJET-  	  Sandwich Plate System in Bridge Deck – A ReviewIRJET-  	  Sandwich Plate System in Bridge Deck – A Review
IRJET- Sandwich Plate System in Bridge Deck – A Review
 

More from Jannah Jailani

Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
Jannah Jailani
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] final
Jannah Jailani
 

More from Jannah Jailani (20)

Part 2
Part 2Part 2
Part 2
 
Part 1
Part 1Part 1
Part 1
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Building science 2 project 1
Building science 2 project 1Building science 2 project 1
Building science 2 project 1
 
Portfolio final
Portfolio finalPortfolio final
Portfolio final
 
Design report
Design reportDesign report
Design report
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Theories Project 1 final
Theories Project 1 finalTheories Project 1 final
Theories Project 1 final
 
Theories Project 1 Part 1
Theories Project 1 Part 1Theories Project 1 Part 1
Theories Project 1 Part 1
 
Theories Project 1 Part 2
Theories Project 1 Part 2Theories Project 1 Part 2
Theories Project 1 Part 2
 
Islamic architecture project 2
Islamic architecture   project 2Islamic architecture   project 2
Islamic architecture project 2
 
Turnitin results
Turnitin resultsTurnitin results
Turnitin results
 
Asian architecture [arc2234] case study paper
Asian architecture [arc2234]   case study paperAsian architecture [arc2234]   case study paper
Asian architecture [arc2234] case study paper
 
Building structures report [individual]
Building structures report [individual]Building structures report [individual]
Building structures report [individual]
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]
 
Church of Seed booklet
Church of Seed bookletChurch of Seed booklet
Church of Seed booklet
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] final
 

Recently uploaded

plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated crops
parmarsneha2
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 

Recently uploaded (20)

Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Extraction Of Natural Dye From Beetroot (Beta Vulgaris) And Preparation Of He...
Extraction Of Natural Dye From Beetroot (Beta Vulgaris) And Preparation Of He...Extraction Of Natural Dye From Beetroot (Beta Vulgaris) And Preparation Of He...
Extraction Of Natural Dye From Beetroot (Beta Vulgaris) And Preparation Of He...
 
plant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated cropsplant breeding methods in asexually or clonally propagated crops
plant breeding methods in asexually or clonally propagated crops
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 

Building structure [arc 2523]

  • 1. B U I L D ING S T R U C T U R E [ A R C 2 5 2 3 ] F e t t u c c i n e T r u s s B r i d g e A n a l y s i s G e r t r u d e L e e ( 0 3 0 6 2 6 5 ) K e e T i n g T i n g ( 0 3 1 0 0 1 9 ) M e e r a N a z r e e n ( 0 3 0 9 6 3 0 ) N u r u l J a n n a h J a i l a n i ( 0 3 1 0 2 1 0 ) S o n i a M a n y i e ( 0 8 0 1 A 6 5 7 0 4 )
  • 2. T A B L E O F C O N T E N T I N T R O D U C T I O N M E T H O D O L O G Y P R E C E D E N T S T U D Y – H E N S Z E Y ’ S W R O U G H T I R O N B R I D G E A N A L Y S I S S t r e n g t h o f M a t e r i a l s T r u s s A n a l y s i s – I n i t i a l t o F i n a l D e s i g n T E S T I N G T r u s s S t r u c t u r e A n a l y s i s R e a s o n f o r B r i d g e F a i l u r e S u g g e s t i o n t o S t r e n g t h e n B r i d g e C O N C L U S I O N A P P E N D I X R E F E R E N C E S
  • 3. I N T R O D U C T I O N For this project, we were assigned in a group of 5 to carry out precedent study of a truss bridge. Using the knowledge from the research, we are required to design and construct a fettuccine bridge of 750mm clear span and maximum weight of 200g. The bridge must be of high efficiency, which means using the least amount of materials to sustain a higher amount of load. This bridge is tested to fail, therefore, its strengths has to be determined in terms of tension and compression strength as well as the material strength. Upon the agreement of the bowstring truss as our topic of interest, the Henszey’s Wrought Iron Bridge was chosen as our precedent study. The report will be based on the compilation of our research on the bowstring truss and the application of our understanding to the construction of our fettuccine bridge. Bridge Requirement: • 750mm clear span and maximum weight of 200g. • Only fettuccine and glue are allowed. • Loads have to be point load. • Must be able to withstand each weight that is put on for 10 seconds.
  • 4. ME T H O D O L O G Y In order to complete the project, the following methods were carried out: Precedent Study Gives an understanding of a truss bridge. The connections, arrangement of members and truss type are focused on. Based on the study, we would then adopt the desired truss design into our own fettuccine bridge design. Material and Adhesive Strength Testing Before constructing the bridge, the physical properties of the fettuccine is to be understood. Therefore, we have tested the behavior of the materials when subjected to either tension or compression. Model Making In the beginning, simple sketches of the trusses were made. Once decision was made, a CAD drawing of 1:1 scale was generated to ease the process in creating a more accurate model. Structural Model The truss is analyzed by determining which members are in tension or compression. The structural analysis is done using the same method as that of the truss analysis exercises (appendix).
  • 5. Precedent Study - Henszey’s Wrought Iron Bridge Figure 1 is a picture of Henszey’s Wrought-Iron Bridge, a single span wrought iron bowstring truss bridge. The bridge is named and based after Joseph Henszey’s patent design in 1869, a prominent engineer during his time. The durability and longevity of surviving metal bridges built in the United States from the 1800s is truly impressive. The ability of these bridges to defy time itself in a way that no modern bridge today can is due to a variety of reasons. The wrought iron used during this period was actually more rust-resistant and long-lasting than the steel used today. Some bridges were overbuilt by engineers who may have not been able to calculate the design of a bridge, while in contrast A B O U T T H E B R I D G E Figure 1 others may have been designed by engineers who were very skilled and creative and were able to come up with a bridge design that was uniquely effective. After design, skilled craftsmen would carefully fabricate the parts for these bridges, producing a well-built structure that would be ready to stand for over a century. All of these types of things might be applicable to the long life that Henszey's Wrought Iron Bridge has enjoyed, however some might find cause to question the skills of the craftsmen who fabricated this bridge. Today, Henszey's Bridge serves as a pedestrian walkway for students, faculty, staff and visitors on the campus of Central Penn College, Cumberland, Pennsylvania. The bridge symbolizes the high-quality, hands-on education that the college provides to connect students to their career dreams.
  • 6. T E C H N I C A L F A C T S O F H E N S Z E Y ’ S W R O U G H T - I R O N B R I D G E Figure 2 Span Layout Figure 3 Foot Clear Roadway Figure 2 shows the span layout of the bridge at 92 foot 4 inches (28.14m) from end shoe to end shoe with each truss subdivided into eight panels. The approaches are formed by stone wing wall which rise to the level of the roadway and are fitted with pipe railings. The span carries a 15 foot clear roadway of wood plank deck with a 4” by 4” wheel guard (Figure 3). U1 to U7 represents the top chords positions while L0 to L8 represents the lower/bottom chords positions. All members and chords are wrought iron, but there are also cast iron components for the bridge's connections, floor beams, and bearings. The cast iron components increase the rarity and significance of the bridge. The top chords are fashioned from 7 15/16” x 5/16”cast Phoenix sections, between which is a riveted a stem plate 11 ¼” x 5/16”. Stiffening bars, 2” wide and 5/16” thick are inserted horizontally through the stem plate regular intervals and are riveted to the outer flanges of the Phoenix sections (Figure 4). Figure 4 Phoenix Section with Stem Plate and Stiffening Bars
  • 7. Figure 4 Phoenix Section with Stem Figure 5 Top Chord Overview Figure 6 Top Chord Connections Plate and Stiffening Bars The top chords are fashioned from 7 15/16” x 5/16”cast Phoenix sections, between which is a riveted a stem plate 11 ¼” x 5/16”. Stiffening bars, 2” wide and 5/16” thick are inserted horizontally through the stem plate regular intervals and are riveted to the outer flanges of the Phoenix sections (Figure 4). Figure 7 The vertical posts of each truss consist of pairs of T-bars 3” x 1/2” x ½” which by means of flanges at the bottom are riveted to the upper flange of each floor beam and the plates are riveted to the top chord (Figure 7).The deck is suspended from the top chord, thereby placing all verticals in tension. The bottom chords consist of pairs of flat bars 4 ¾” x ½” with turnbuckles, on which rest the I-beam floor beams which carries the I-beam stringers on which the flooring is laid (Figure 10).
  • 8. Figure 9 Cast Iron Bottom Chord Connections Figure 8 Bottom Chord Connections The bottoms chords is also in tension as a result of the horizontal thrust exerted by the arched top chord. When a load passes over the bridge, the load is conveyed to the vertical posts. As the posts are placed in greater tension, the segment of top chord between the two posts is placed in compression. The flat verticals between posts of the bridge thus appear to have been installed in order to counteract the tendency of a given arched segment of the top chord to buckle upward under the force of the added compression. Figure 10(a) Lower/Bottom Chord Connections to Flooring and Upper Chord Figure 10. Bottom Bracing at Lower Chord 2 and Lower Chord 6.
  • 9. Figure 11 King Post under Floor Beam Figure 12 View of under the Bridge In conclusion, the trusses for the Henszey’s Bridge are rather shallow. This is because the ratio between the maximum truss depth (8 feet) and the overall length (92feet) is only about 1:11. Due to the arch configuration, deflection and vibration increases especially when the outer end of the trusses are considerably shallower. Therefore, to decrease deflection, inverted king posts are used below the floor beams (Figure 11). Moreover, placement of camber rods below each beam in a king-post configuration also reduces lateral movement of the upper chords under live loads.
  • 10. A N A L Y S I S S T R E N G T H O F T H E M A T E R I A L Materials used for this project are: 1. San Remo Tubular Spaghetti Based on our research, the properties of the fettuccine are below: 1. Ultimate tensile strength = 2000 psi 2. Stiffness (Young’s modulus) E= 10,000,000 psi (E=stress/strain) Failure occurs when ultimate tensile strength is exceeded. As the length of the fettuccine increases, the maximum load a fettuccini can carry before it breaks decreases. 2. UHU Super Glue UHU super glue dries relatively quickly but is slightly flexible when dry. Moreover, the required rigid glue joints can be achieved. PVA glue is not a suitable adhesive. Since it is water based, the spaghetti is softened by the glue. Glue joints take forever to dry. Once dry, joints are not very strong.
  • 11. E X P E R I M E N T A T I O N O F T H E S T R E N G T H O F M A T E R I A L S Types of Beams Numbers of Layers Result L-beam 1 layer all sides Flattens and bends L-beam 2 layers all sides Bends I- beam 3 pieces Breaks at 5 seconds I- beam 5 pieces Did not break I- beam 6 pieces Did not break but heavy Lamination 2 layers 3 layers 4 layers 1 seconds 3 seconds More than 40 seconds Types of Glues Used Result Bonding UHU Super Glue 3 second glue PVA Did not break Bends/ flexible Twists and breaks Based on the results, it can be concluded that the I-beam made up of 5 pieces of fettuccines is the strongest. Moreover, 4-layered lamination has also proved quite strong. The C-beam, L-beam and joists on the other hand, either buckled or twisted when tested. Therefore, we have chosen to use I-beams and laminated fettuccine in our bridge. Finally, as an adhesive, UHU super glue turned out to be the best option.
  • 12. T R U S S A N A L Y S I S – F R O M I N I T I A L T O F I N A L D E S I G N Bowstring Truss was selected as our fettuccine bridge design. Figure above is a Typical Bowstring Truss Figure below shows how the tension, compression and buckling may occur to the beams of a bridge while in this case, the fettuccines. We have found that for a regular fettuccine (diameter = 2mm), maximum load is approximately 4.5kg. Moreover, a structure that relies on bending strength to support a load has very little strength. Triangles is the best design for trusses as there are no bending moments in triangular element(truss strength depends on bending strength of members)
  • 13. T R U S S A N A L Y S I S – F R O M I N I T I A L T O F I N A L D E S I G N Bowstring Truss was selected as our fettuccine bridge design. Front Elevation of Initial Fettuccine Bridge Design The initial design of the fettuccine truss bridge weight was 286g. It was tested. Load was added until the bridge fails. The bottom bracing deflected downwards when more weight was added and broke when it reached its limit. The other parts of the bridge was still in tack. It is as shown below. Side Elevation of Initial Fettuccine Bridge Design Besides being advice to test the bracing, as our bridge is weight, 286g, more than the requirement of the brief, which is 200g, we were also advice to decrease the amount of fettuccines used at the truss of the bridge. From the advice that was given, we designed a new bridge.
  • 14. Front Elevation of Final Fettuccine Bridge Design The final design of the fettuccine bridge weight was 198g as we have decided to adjust our final design to lesser bracings which, reduces its weight. Instead of making all the truss X-bracing(diagonal), we decided to make the three most middle trusses diagonal to each other while the rest triangular. In order to make the middle bracing stronger, we made the middle bracing that was holding the load the strongest by sticking more fettuccines together. We also decreased the length of the bridge Final Fettuccine Bridge Design
  • 15. P R E - T E S T I N G TRUSS STRUCTURE ANALYSIS (Mock Up Model for Initial Design) We have chosen the truss member based on the required force to withstand tension and compression after referring to past material testing as well as the precedent study to make appropriate joint connections. Failure Analysis: The material needed to sustain the loads for this model was overwhelming. From our first testing, 2 fettuccine was placed in the middle for bracing to hang the load. The bridge weighing at 284g was able to withstand 1.45kg of load. Using the same model and with minor adjustments (placing 2 bracings, both shaped as I-beam), the model now weighing 286g was able to withstand 2.5kg of load. While the bridge did not break during the first testing, its weight is way over the requirement of 200g. Based on the calculation, we have found that although the weight has increased, the extra support and strength from the I-beams increases the efficiency of the bridge. First testing on First Mock-Up Model Load: 1.45kg Weight of bridge: 284g Efficiency = (load) ^2 / mass of bridge Efficiency =0.007 Second testing on First Mock-Up Model Load: 2.5kg Weight of bridge: 286g Efficiency = (load) ^2 / mass of bridge Efficiency = 0.02
  • 16. P R E - T E S T I N G TRUSS STRUCTURE ANALYSIS (Mock Up Model for Final Design After decreasing the number of trusses, the length of span of the bridge and the amount of fettuccines used, this is the result of the bridge. Load = 198g Mass of bridge = 4.2kg Efficiency = (Load) ^ 2/mass of bridge Efficiency = Failure Analysis: For the final model, critical, tension and compression members were reduced. The diagonal bracings are only for the three most middle trusses while the rest are triangular. From the truss analysis, triangular members are the obvious choice as these members has no bending moments.
  • 17. T E S T I N G TRUSS STRUCTURE ANALYSIS During the testing day, the 2 tables were 750mm apart from each other. The bridge was tested with a bucket and water as the load. The water was poured into the bucket until the bridge fails. During the testing, as water was poured into the bridge, one of the trusses popped out. As more water was poured in, the bridge started to tilt. The bridge broke and was only able to withstand 2.648kg of load. Load = 198g Mass of bridge = 2.648kg Efficiency = (Load) ^ 2/mass of bridge Efficiency = 0.04
  • 18. R E A S O N F O R F A I L U R E O F B R I D G E Tension Compression All the vertical members before was thought to be compression members LOAD 1. Decreasing the amount of compression and tension members and misinterpretation of compression and tension members. We decreased the amount of members in order to fit to the 200g bridge requirement but then we forgot about how decreasing the number of members affect the compression and tension between the remaining members on the bridge. Besides that, we also misinterpreted which member will have compression and tension force acting on it.
  • 19. 2. The members are too far apart Too far apart As the members of the bridge was too far apart, it fails to support the compression force that was acting on the members. The further the members are from each other, the amount of compression force that is acting on one member is more resulting in the deflection of the base of the bridge.
  • 20. 3. The height of the bridge The height of the bridge is too tall as the members are too tall. The taller the members, the weaker are the members in withstanding the compression force of the bridge. As shown in the diagram above, the bridge started tilting due to the load that was exerted on the bracing that was holding the load.
  • 21. S U G G E S T I O N S T O S T R E N G T H E N B R I D G E 1. Decreasing the height of the bridge. By decreasing the height of the bridge, the bridge will be more firm as the height of the bridge affects the stability of the bridge. The shorter the members in the bridge, the stronger the members resulting on a more solid bridge. 2. Decrease the length between each members and add more members HEIGHT By decreasing the length between each members and adding more members, the force distribution will be more equal and also it will be more solid compared to when it is further apart.
  • 22. C O N C L U S I O N Based on the research of the precedent studies and experiments that were done, we have developed an understanding of the tension and compressive strength of construction materials and the force distribution in a truss. This understanding has enabled us to evaluate, explore and improve the attributes of construction materials as well as to explore and apply the understanding of load distribution in a truss. We are also able to evaluate and identify tension and compression members in a truss structure, and explore different arrangement of members in a truss structure. Finally through this project, we are able to design a perfect truss bridge which has a high aesthetic value and is made of minimal construction material. Therefore, we would consider our truss bridge model a success. This is due to the fact that for the final model, the material and weight lessened from 286g to 198g. Consequently, this produces better efficiency as the weight of load carried increases from 2.5kg to 4.2kg. We were able to discover the strategy in achieving better efficiency by doing testing according to the maximum load the bridge can sustain. Moreover, we have discovered that time management and teamwork is crucial in producing a bridge that is not only aesthetically appealing but also of high quality during a limited time.
  • 23. A P P E N D I X Exercise: Truss analysis A total of 5 different truss systems which carry the same loads are analysed to determine which truss arrangement is the most effective and why. The following are the task distribution for the cases: Case 1: Kee Ting Ting Case 2: Gertrude Lee Case 3: Meera Nazreen Case 4: Nurul Jannah Jailani Case 5: Sonia Manyie The analysis and calculations of trusses are attached after this page.
  • 24. Case 1: Kee Ting Ting
  • 25.
  • 26.
  • 27.
  • 28.
  • 29. Case 2 : Gertrude Lee
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. Case 3 : Meera Nazreen
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. Case 4: Nurul Jannah Jailani
  • 40.
  • 41.
  • 42.
  • 43.
  • 44. Case 5 : Sonia Manyie