SlideShare a Scribd company logo
BUILDING CONSTRUCTION II
BLD 60703 / ARC 2513
PROJECT 1: SKELETAL CONSTRUCTION
(TEMPORARY BUS SHELTER) ANALYSIS REPORT
Tutor: Ar. Edwin Chan
Prepared by: Anderson Wong Chun Seng 0323836
Goh Tze June 0327511
Khoo Yung Keat 0324688
Lim Zhao Yin 0329356
Ooi Wenn Yeaw 0323836
Introduction
Design Concept
Massing
Design Development
Design Considerations
Orthogonal Drawings
Exploded AxonometricExploded Axonometric
Material Analysis
Construction Details
Construction Process
Loads & Forces
Final Outcome
Load Bearing Test
ConclusionConclusion
References
1
2
3
4
5-6
7-8
9
10-11
12-13
14
15
16
17
18
19
INDEX
INTRODUCTION
1
The objectives of this project are to create an
understanding of skeletal structure and its relevant
structural components, and how it reacts under
loading. In a group of five, we were assigned to
construct a temporary bus shelter to accommodate
5-6 users in the scale of 1:5, where the maximum
height and base area are 600mm and 400mm x
800mm respectively.800mm respectively.
We are required to demonstrate a convincing
understanding of how a skeletal construction works,
while taking factors such as form, frames, joints and
materials into account.
DESIGN CONCEPT
2
In relation with the ever-increasing urban
population in Malaysia, the design of our
temporary bus shelter is made to blend in
with the urban areas of our country, where
urbanites nowadays prioritize stability and
practicality in their buildings and structures.
Hence, our design tends to focus more on
construction and user needs.construction and user needs.
+
MASSING
3
The massing of the bus shelter is to be a combination
of two forms, which we have chosen a triangular prism
and a cuboid for our design.
The triangular prism is placed on top of the cuboid to
shape the form of the roof. Slanted flat roofs are
practical – they can reduce the velocity of falling
raindrops and direct the waterflow.
Triangular forms are also made to distribute the forcesTriangular forms are also made to distribute the forces
applied from one point to the other two equally.
Cuboid forms are typically used and easy to be
calculated in dimensions. Their right-angled form
maximizes the usage of space, as well as providing
stability and consistency in nature.
DESIGN DEVELOPMENT
The initial idea was to combine both
cuboid and triangular prism to
create a trapezoid form. The frame
at the back were slanted to create
a more interesting form of design.
However, difficult calculations were
needed to be made to determine
the degree of the slant. Hence, thethe degree of the slant. Hence, the
design was improvised.
4
The structure were simplified and
the front columns were removed,
maximizing the availability of
space. The columns at the back
were straightened but not entirely
to retain some degree of slant.
This design, yet provides sufficient
stability for the structure to hold.stability for the structure to hold.
The slanted flat roof was in risk of
collapsing.
As the design progresses, the
columns at the back were
straightened vertically, shifted
forward to the near middle and
pierced through the roof. Ten-
sion strings were attached from
the top of the columns to the
middle front of the roof to holdmiddle front of the roof to hold
it in place. Structural supports
for the back of the roof and
joists were added as well.
1 2 3
SCALE 1:50
SCALE 1:50 SCALE 1:50
SCALE 1:50 SCALE 1:50
7
ORTHOGRAPHIC DRAWINGS
ORTHOGRAPHIC DRAWINGS
SCALE 1:50 SCALE 1:50
8
EXPLODED AXONOMETRIC
SILL PLATE
STEEL HOLLOW COLUMN
CONCRETE STUMP
PAD FOUNDATION
PURLINS
TIMBER SEATING
TIMBER TILING
FLOOR JOISTS
9
KNEE BRACE
POLYCARBONATE ROOFING SHEET
KNUCKLE BOLT
BEAM
TENSILE STRING
All the floor beams and floor joists
are welded together.
The floor beam is welded with with
the sill plate.
The sill plate is screwed to the con-
crete stump.
FLOOR JOIST
FLOOR BEAM
CONCRETE STUMP
CONCRETE STUMP
PAD FOUNDATION
PAD FOUNDATION
ANCHOR ROD
TIMBER TILE
TIMBER TILE
SCREW
SQUARE HOLLOW SECTION
GROUND LEVEL
GROUND LEVEL
FINISH FLOOR LEVEL
FINISH FLOOR LEVEL
CONSTRUCTION DETAILS
12
Roof beam and rafter are
welded together using
knee brace and a tensile
string for support.
Metal plate is screwed with
the column to hold the
knuckle bolt. The knuckle
bolt is tightened with a ten-
sile string to hold the roof.
The seating steel plate
sits on the square
hollow section and is
welded to it.
A
B
C
A B C
SCREW
L-CHANNEL
TIMBER TILE
FINISH FLOOR
LEVEL
STEEL BAR
COLUMN
RAFTER
TENSILE STRING
KNUCKLE BOLT
KNEE BRACE
COLUMN
CONSTRUCTION DETAILS
13
FORCE AND LOAD
These are the components which bears the main
load of the structure. They also make up the general
framework of the bus shelter.
15
The secondary components functions as load
distributors as they distribute load evenly to the
primary components. This prevents the primary
components from being unevenly stressed.
The roof is supported by bracing to deal with tensile
force as an additional support while retaining the
head room.
1 2
3 4 The main load is transferred from the roof, which
then the active load from the roof is distributed
to the connecting bracing following to the
column.
CONCLUSION
Upon completion of this project, we were able
to grasp a more thorough understanding on
skeletal constructions and how each joint is
connected.
We have also acknowledged the need toWe have also acknowledged the need to
manipulate the construction of the structure to
accommodate with the issues on the strength
and stability of our design, the ability to
construct it, and how it reacts under forces,
stress and strain.
Material-wise, by understanding each of theMaterial-wise, by understanding each of the
chemical and physical properties, we were
able to select the most suitable materials to be
used, thus improving the practicality of our
temporary bus shelter. In the context of real life
working situations, the cost benefit analysis of
the selected materials should also be
considered.considered.
18

More Related Content

What's hot

Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
Sanskriti Jindal
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
Soumitra Smart
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
Prasad Thanthratey
 
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORTBUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
emily9199
 
Post lintel structure
Post lintel structurePost lintel structure
Post lintel structure
Tonmoy Barua
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
Akshay Revekar
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
iftekhar rafat
 
Long span structure
Long span structureLong span structure
Long span structure
Prashant Borge
 
Space frames
Space framesSpace frames
Space frames
Pankti Gajjar
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Dimple Poddar
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
Rithika Ravishankar
 
Folded plates and space truss structures
Folded plates and space truss  structuresFolded plates and space truss  structures
Folded plates and space truss structures
Rajesh Kolli
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Booklet
leejanett3
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
Dania Abdel-aziz
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
Shreelekha Kulkarni
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
Nuruzzamanpeash
 
Service core
Service coreService core
Service core
aduiti
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
Meer Musabber ali (joyous)
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstop
chuenmin
 

What's hot (20)

Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORTBUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
BUILDING CONSTRUCTION 2 - BUS SHELTER REPORT
 
Post lintel structure
Post lintel structurePost lintel structure
Post lintel structure
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
Long span structure
Long span structureLong span structure
Long span structure
 
Space frames
Space framesSpace frames
Space frames
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
Folded plates and space truss structures
Folded plates and space truss  structuresFolded plates and space truss  structures
Folded plates and space truss structures
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Booklet
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 
High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
 
Service core
Service coreService core
Service core
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Final bcon 1 busstop
Final bcon 1 busstopFinal bcon 1 busstop
Final bcon 1 busstop
 

Similar to bus shelter

BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
Nur Zaas
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
Bolin Loong
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
Ong Seng Peng Jeff
 
Bcon
BconBcon
Bcon
YowHue
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
Ow Cong
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
ForestedTiger
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2
Baddy Peigun
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
Felicia Novera
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
Dexter Ng
 
Time history analysis of braced and unbraced steel Structures
Time history analysis of braced and unbraced steel StructuresTime history analysis of braced and unbraced steel Structures
Time history analysis of braced and unbraced steel Structures
Soumitra Das
 
Fettuccine bridge Full report
Fettuccine bridge Full reportFettuccine bridge Full report
Fettuccine bridge Full report
Teo Kean Hui
 
Undergraduate major project_-_design_of
Undergraduate major project_-_design_ofUndergraduate major project_-_design_of
Undergraduate major project_-_design_of
Vijay Singh
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
Pengeneee Peng
 
Fettucine
FettucineFettucine
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
JoyeeLee0131
 
Bcon report
Bcon reportBcon report
Bcon report
Benjamin Tan
 
Influence line diagram for model arch bridge
Influence line diagram for model arch bridgeInfluence line diagram for model arch bridge
Influence line diagram for model arch bridge
kunalsahu9883
 
Bridge
BridgeBridge
Bridge
illpa
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
Atiqah Ghazali
 
Building structure report
Building structure reportBuilding structure report
Building structure report
Chenyi Teo
 

Similar to bus shelter (20)

BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
 
Building construction 2 project 1 report
Building construction 2 project 1 reportBuilding construction 2 project 1 report
Building construction 2 project 1 report
 
Bcon
BconBcon
Bcon
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Time history analysis of braced and unbraced steel Structures
Time history analysis of braced and unbraced steel StructuresTime history analysis of braced and unbraced steel Structures
Time history analysis of braced and unbraced steel Structures
 
Fettuccine bridge Full report
Fettuccine bridge Full reportFettuccine bridge Full report
Fettuccine bridge Full report
 
Undergraduate major project_-_design_of
Undergraduate major project_-_design_ofUndergraduate major project_-_design_of
Undergraduate major project_-_design_of
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
Fettucine
FettucineFettucine
Fettucine
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Bcon report
Bcon reportBcon report
Bcon report
 
Influence line diagram for model arch bridge
Influence line diagram for model arch bridgeInfluence line diagram for model arch bridge
Influence line diagram for model arch bridge
 
Bridge
BridgeBridge
Bridge
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Building structure report
Building structure reportBuilding structure report
Building structure report
 

More from James Ooi

Urban Theories
Urban TheoriesUrban Theories
Urban Theories
James Ooi
 
Building Science 0.2
Building Science 0.2Building Science 0.2
Building Science 0.2
James Ooi
 
Building Science 0.1
Building Science 0.1Building Science 0.1
Building Science 0.1
James Ooi
 

More from James Ooi (9)

Urban Theories
Urban TheoriesUrban Theories
Urban Theories
 
6
66
6
 
5
55
5
 
4
44
4
 
3
33
3
 
2
22
2
 
1
11
1
 
Building Science 0.2
Building Science 0.2Building Science 0.2
Building Science 0.2
 
Building Science 0.1
Building Science 0.1Building Science 0.1
Building Science 0.1
 

Recently uploaded

Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
rosedainty
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 

Recently uploaded (20)

Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 

bus shelter

  • 1. BUILDING CONSTRUCTION II BLD 60703 / ARC 2513 PROJECT 1: SKELETAL CONSTRUCTION (TEMPORARY BUS SHELTER) ANALYSIS REPORT Tutor: Ar. Edwin Chan Prepared by: Anderson Wong Chun Seng 0323836 Goh Tze June 0327511 Khoo Yung Keat 0324688 Lim Zhao Yin 0329356 Ooi Wenn Yeaw 0323836
  • 2. Introduction Design Concept Massing Design Development Design Considerations Orthogonal Drawings Exploded AxonometricExploded Axonometric Material Analysis Construction Details Construction Process Loads & Forces Final Outcome Load Bearing Test ConclusionConclusion References 1 2 3 4 5-6 7-8 9 10-11 12-13 14 15 16 17 18 19 INDEX
  • 3. INTRODUCTION 1 The objectives of this project are to create an understanding of skeletal structure and its relevant structural components, and how it reacts under loading. In a group of five, we were assigned to construct a temporary bus shelter to accommodate 5-6 users in the scale of 1:5, where the maximum height and base area are 600mm and 400mm x 800mm respectively.800mm respectively. We are required to demonstrate a convincing understanding of how a skeletal construction works, while taking factors such as form, frames, joints and materials into account.
  • 4. DESIGN CONCEPT 2 In relation with the ever-increasing urban population in Malaysia, the design of our temporary bus shelter is made to blend in with the urban areas of our country, where urbanites nowadays prioritize stability and practicality in their buildings and structures. Hence, our design tends to focus more on construction and user needs.construction and user needs.
  • 5. + MASSING 3 The massing of the bus shelter is to be a combination of two forms, which we have chosen a triangular prism and a cuboid for our design. The triangular prism is placed on top of the cuboid to shape the form of the roof. Slanted flat roofs are practical – they can reduce the velocity of falling raindrops and direct the waterflow. Triangular forms are also made to distribute the forcesTriangular forms are also made to distribute the forces applied from one point to the other two equally. Cuboid forms are typically used and easy to be calculated in dimensions. Their right-angled form maximizes the usage of space, as well as providing stability and consistency in nature.
  • 6. DESIGN DEVELOPMENT The initial idea was to combine both cuboid and triangular prism to create a trapezoid form. The frame at the back were slanted to create a more interesting form of design. However, difficult calculations were needed to be made to determine the degree of the slant. Hence, thethe degree of the slant. Hence, the design was improvised. 4 The structure were simplified and the front columns were removed, maximizing the availability of space. The columns at the back were straightened but not entirely to retain some degree of slant. This design, yet provides sufficient stability for the structure to hold.stability for the structure to hold. The slanted flat roof was in risk of collapsing. As the design progresses, the columns at the back were straightened vertically, shifted forward to the near middle and pierced through the roof. Ten- sion strings were attached from the top of the columns to the middle front of the roof to holdmiddle front of the roof to hold it in place. Structural supports for the back of the roof and joists were added as well. 1 2 3
  • 7.
  • 8.
  • 9. SCALE 1:50 SCALE 1:50 SCALE 1:50 SCALE 1:50 SCALE 1:50 7 ORTHOGRAPHIC DRAWINGS
  • 11. EXPLODED AXONOMETRIC SILL PLATE STEEL HOLLOW COLUMN CONCRETE STUMP PAD FOUNDATION PURLINS TIMBER SEATING TIMBER TILING FLOOR JOISTS 9 KNEE BRACE POLYCARBONATE ROOFING SHEET KNUCKLE BOLT BEAM TENSILE STRING
  • 12.
  • 13.
  • 14. All the floor beams and floor joists are welded together. The floor beam is welded with with the sill plate. The sill plate is screwed to the con- crete stump. FLOOR JOIST FLOOR BEAM CONCRETE STUMP CONCRETE STUMP PAD FOUNDATION PAD FOUNDATION ANCHOR ROD TIMBER TILE TIMBER TILE SCREW SQUARE HOLLOW SECTION GROUND LEVEL GROUND LEVEL FINISH FLOOR LEVEL FINISH FLOOR LEVEL CONSTRUCTION DETAILS 12
  • 15. Roof beam and rafter are welded together using knee brace and a tensile string for support. Metal plate is screwed with the column to hold the knuckle bolt. The knuckle bolt is tightened with a ten- sile string to hold the roof. The seating steel plate sits on the square hollow section and is welded to it. A B C A B C SCREW L-CHANNEL TIMBER TILE FINISH FLOOR LEVEL STEEL BAR COLUMN RAFTER TENSILE STRING KNUCKLE BOLT KNEE BRACE COLUMN CONSTRUCTION DETAILS 13
  • 16. FORCE AND LOAD These are the components which bears the main load of the structure. They also make up the general framework of the bus shelter. 15 The secondary components functions as load distributors as they distribute load evenly to the primary components. This prevents the primary components from being unevenly stressed. The roof is supported by bracing to deal with tensile force as an additional support while retaining the head room. 1 2 3 4 The main load is transferred from the roof, which then the active load from the roof is distributed to the connecting bracing following to the column.
  • 17. CONCLUSION Upon completion of this project, we were able to grasp a more thorough understanding on skeletal constructions and how each joint is connected. We have also acknowledged the need toWe have also acknowledged the need to manipulate the construction of the structure to accommodate with the issues on the strength and stability of our design, the ability to construct it, and how it reacts under forces, stress and strain. Material-wise, by understanding each of theMaterial-wise, by understanding each of the chemical and physical properties, we were able to select the most suitable materials to be used, thus improving the practicality of our temporary bus shelter. In the context of real life working situations, the cost benefit analysis of the selected materials should also be considered.considered. 18