myassignmenthelp.net provides assignment help in almost all programming languages for more info visit our website
http://www.myassignmenthelp.net/programming-assignment-help.php
Course: Programming Languages and Paradigms:
This introduces concepts related to programming languate design: abstraction, a bit of history, the syntax, semantics and pragmatics of programming languages, languages as abstraction, thought shaper, simplifier and law enforcer.program verification, denotational and operational semantics
PROGRAMMING AND LANGUAGES
Describe the six steps of programming
Discuss design tools
Describe program testing
Describe CASE tools & object-oriented software development
Explain the five generations of programming languages
Course: Programming Languages and Paradigms:
A brief introduction to imperative programming principles: history, von neumann, BNF, variables (r-values, l-values), modifiable data structures, order of evaluation, static and dynamic scopes, referencing environments, call by value, control flow (sequencing, selection, iteration), ...
Programming is the process of taking an algorithm and encoding it into a notation, a programming language so that it can be executed by a computer. Although many programming languages and many different types of computers exist, the important first step is the need to have the solution. Without an algorithm, there can be no program.
To know more: https://hackr.io/blog/what-is-programming-language
Course: Programming Languages and Paradigms:
This introduces concepts related to programming languate design: abstraction, a bit of history, the syntax, semantics and pragmatics of programming languages, languages as abstraction, thought shaper, simplifier and law enforcer.program verification, denotational and operational semantics
PROGRAMMING AND LANGUAGES
Describe the six steps of programming
Discuss design tools
Describe program testing
Describe CASE tools & object-oriented software development
Explain the five generations of programming languages
Course: Programming Languages and Paradigms:
A brief introduction to imperative programming principles: history, von neumann, BNF, variables (r-values, l-values), modifiable data structures, order of evaluation, static and dynamic scopes, referencing environments, call by value, control flow (sequencing, selection, iteration), ...
Programming is the process of taking an algorithm and encoding it into a notation, a programming language so that it can be executed by a computer. Although many programming languages and many different types of computers exist, the important first step is the need to have the solution. Without an algorithm, there can be no program.
To know more: https://hackr.io/blog/what-is-programming-language
Want to know how programming works? how it helps the human being with their everyday work? well you can easily find the answers to those questions that are in your minds. Programming, well it is a kind of software that can make games, applications, movies and a lot more. For a start, programming can help us students with our home works and such stuffs. and now, we can learn more about the different languages used in programming, program life cycle, rules and symbols used and its level. Let us discover how programming works!
Artificial intelligence or AI in short is the latest technology on which the whole world is working today. We at myassignmenthelp.net are providing help with all the assignments and projects. So when ever you need help with any work related to AI feel free to get in touch
myassignmenthelp is premier service provider for NLP related assignments and projects. Given PPT describes processes involved in NLP programming.so whenever you need help in any work related to natural language processing feel free to get in touch with us.
myassignmenthelp.net provides in all assignments and projects related to python. Go through ppt for more details about python programming languages.Incase you need help with any of the task related to programming feel free to get in touch with us.
classifiers idc assignment help is provided by myassignmenthelp.net. so when ever you need help in any of the assignment feel free to get in touch with myassignmenthelp
myassignmenthelp.net provides uml assignment help whether its simple visio digramm or complex ones for more info visit
http://www.myassignmenthelp.net/uml-assignment-help.php
Get help with all er diagram assignments only at my assignment help. myassignmenthelp.net has team of experts who are available round the clock to help you.
entity relationship diagram or ERD is always required while starting any database project. myassignmenthelp provides help with all kinds of such assignments.
writing case study requires clear understanding of case. So it becomes imperative that one follows step required to write a good case study. myassignmenthelp has team of expert writers who can help you write case study assignments which can help you secure good garde
Learn about critical path method by myassignmenthelp.net
Get help with all project management assignment help
http://www.myassignmenthelp.net/project-management-assignment-help.php
Myassignmenthelp.net has a team of experts competent to handle all kinds of computer network assignments and homework. We are capable of handling all kinds of homework and assignments. Our team of dedicated experts has a rich experience of working with top-tier software firms across the world and understand all the aspects of a programming language http://www.myassignmenthelp.net/programming-assignment-help.php
ActionScript is a object oriented scripting language. Like ECMAScript the Actionscript is similar to the java script. Actionscript provides the interactive functionalitry to the the web site. Actionscript is mostly used in the flash software developer can set and control the actions of the Flash objects. Actionscript provide the additional features to the animation with flash and to create advance interactive animations and applications for the users. Actionscript is used for the kids tutorials and games so that kids can understand the lessons more easily. This is used by many advertisement companies to create the advertisements banners with flash and small animations http://www.myassignmenthelp.net/programming-assignment-help.php
We at myassignmenthelp.net offers students with several ways and technique that can surely help them remember all the reaction and formulae paving their way. The methods are always delivered to the students in the simple ways, so that students feel free, comfortable and easy to complete the Chemistry Assignment Help on time. Our teachers interact with the students, understand their problem and hence satisfy them with perfect solution
myassignmenthelp provides help with all kind of hysys related work. so whenever you need help in any assignment related to it feel free to get in touch with us.
want to learn about Aspect-Oriented Software Development with Use Cases. These ppts will help you . Still need more info or help with any assignment related to use case visit http://www.myassignmenthelp.net/uml-assignment-help.php
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
2. Generations of
programming languages
• Based on the characteristic of various computers
developed from time to time, they're classified because
generation associated with computers.
3. First generation languages
• The first generation languages, or even 1GL tend
to be low-level languages which are machine
language.
• 1GL or even first-generation language had been
machine language or even the level of instructions
as well as data that the processor is actually given
to work on (which in conventional computers is a
string of 0s as well as 1s).
4. Second generation languages
• The second generation languages, or even 2GL will
also be low-level languages which contain
assembly languages.
• 2GL or even second-generation language is
assembler (sometimes known as "assembly")
language. A typical 2GL instruction looks like this:
• An assembler converts the assembler language
statements into machine language.
ADD 12,8
5. Third generation languages
• The third generation languages, or even 3GL
are high-level languages known as C.
public boolean handleEvent (Event evt) {
switch (evt.id) { case Event.ACTION_EVENT: {
if ("Try me" .equald(evt.arg)) {
6. Fourth generation languages
• The fourth generation languages, or even 4GL
tend to be languages that consist of statements
similar to statements in a human language.
Fourth generation languages are generally
utilized in database programming and scripts.
EXTRACT ALL CUSTOMERS WHERE "PREVIOUS PURCHASES"
TOTAL MORE THAN $1000
7. Fifth generation languages
• The fifth generation languages, or 5GL even
tend to be programming languages which
contain visual tools to assist develop a
program. A example of a fifth generation
language is Visual Basic.
8. Program Development Cycle
1) Analyze: Determine the issue
2) Design: Plan the answer towards the issue
3) Choose the Interface: Find the objects
4) Code: Translate the algorithm into a programming
language.
5) Debug and Test: Locate and also remove any
errors in the program.
6) Complete the Documentation: Organize all the
materials that identify the program.
10. What is a flowchart?
• Logic diagram to explain every action that the
program must perform to arrive at the solution.
• A popular logic tool used for showing an
algorithm in graphics form.
• Programmer prepares flowchart before coding.
• Most typical flowchart symbols tend to be:
11. What is a Pseudocode?
• A program design technique that uses
English words.
• Has no formal syntactical rules.
12. What is a Hierarchy Chart?
• Shows the entire program’s structure.
• Describes what each part, or even module, of
the program does.
• Also how each module relates to other
modules within the program.