OUTPUT PLAN
LOADING
SEQUENCING
SCHEDULING
EXPEDITING
SCHEDULING
• Scheduling is the last of the planning functions.
• It determines when an operation is to be performed, or when
work is to be completed; the difference lies in the detail of the
scheduling procedure.
• In a centralized control situation - where all process planning,
loading, and scheduling for the plant are done in a central
office- the details of the schedule may specify the starting and
finishing time for an operation.
• On the other hand, the central schedule may simply give a
completion time for the work in a given department.
LOADING
• Once the route has been established, the work required can
be loaded against the selected machine or workstation.
• The total time required to perform the operation is computed
by multiplying the unit operation times given on the standard
process sheet by the number of parts to be processed.
• This total time is then added to the work already planned for
the workstation.
• This is the function of loading, and it results in a tabulated list
or chart showing the planned utilization of the machines or
workstations in the plant
LOADING AND SCHEDULING
PRODUCTION CONTROL
MASTER SCHEDULING
SCHEDULING -BENEFITS
• Inventory reduction,
• Process change-over reduction
• leveling
• Reduced scheduling effort
• Increased production efficiency
• Labor load leveling
• Accurate delivery date quotes
• Real time information
GANTT CHART
•A Gantt chart is a type of bar chart, developed by Henry Gantt,
that illustrates a project schedule.
• Gantt charts illustrate the start
and finish dates of the terminal elements and summary elements
of a project. Terminal elements and summary elements comprise
the work breakdown structure of the project.
•Some Gantt charts also show the dependency (i.e., precedence network)
relationships between activities.
Production Control
• Perpetual loading
– Tabulation of the time necessary to finish unfulfilled orders and
determine how long it will take to finish this work.
Perpetual loading
LINE OF BALANCE
• Find a feasible defined replacement for all undefined
(‘ANY’) ergonomic constraints on workstations, i.e. one
compatible with the ergonomic constraints and
precedence constraints defined on operations, as well as
zoning constraints and possible drifting operations
• Solve the within-workstation scheduling problem on all
workstations, for all products being assembled on the line
• Assign the operations to workstations to achieve the best
average balance, while keeping the peak times at a
manageable level.
Linear Scheduling Method
• Linear Scheduling Method (LSM) is a graphical scheduling method
focusing on continuous resource utilization in repetitive activities. It is
believed that it originally adopted the idea of Line-Of-Balance method.
• The main advantages of LSM over Critical Path Method (CPM) is its
underlying idea of keeping resources continuously at work. In other
words, it schedules activities in such a way that:
1. resource utilization is maximized;
2. interruption in on-going process is minimized, including hiring-and-
firing; and
3. the effect of the learning curve phenomenon is minimized
BATCH PRODUCTION SCHEDULING
• Batch production scheduling is the practice of planning and
scheduling of batch manufacturing processes.
• Although, scheduling may apply to traditionally continuous
processes, such as refining, it is especially important for batch
processes such as those for pharmaceutical active ingredients,
biotechnology processes and many specialty chemical
processes.
• Batch production scheduling shares some concepts and
techniques with finite capacity scheduling which has been
applied to many manufacturing problems.
• The specific issues of scheduling batch manufacturing
processes have generated considerable industrial and
academic interest
MRP
KANBAN
DISPATCHING
• Authorizing the start of an operation on the shop
floor is the function of dispatching.
• This function may be centralized or decentralized.
• The departmental dispatcher would authorize the
start of each of the machine operations – the
dispatch actions are based on the foreman’s routing
and scheduling of the work through his department.
This is decentralized dispatching.
PROGRESS REPORTING AND EXPEDITING
• The manufacturing activity of a plant is said to be “in
control” when the actual performance is within the
objectives of the planned performance.
• When jobs are started and completed on schedule,
there should be very little, if any, concern about the
meeting of commitments.
• Optimum operation of the plant, however, is attained
only if the original plan has been carefully prepared
to utilize the manufacturing facilities fully and
effectively.
Mfg. lead time
Mfg. lead time

More Related Content

What's hot

Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
karthi keyan
 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
Aravind Ra
 
Unit 5
Unit 5Unit 5
Unit 5
Aravind Ra
 
Unit 1
Unit 1Unit 1
Unit 1
dinesh babu
 
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Mohanumar S
 
production scheduling
production schedulingproduction scheduling
production scheduling
PraveenManickam2
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
karthi keyan
 
PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5
prakash0712
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
PraveenManickam2
 
Unit 3
Unit 3Unit 3
Unit 3
Aravind Ra
 
Work Study
Work Study Work Study
Work Study
PraveenManickam2
 
Inventory production and Recent trends in PPC
Inventory production and Recent trends in PPCInventory production and Recent trends in PPC
Inventory production and Recent trends in PPC
PraveenManickam2
 
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Mohanumar S
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
Kritika Garg
 
Unit 2
Unit 2Unit 2
Unit 2
dinesh babu
 

What's hot (15)

Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
 
Unit 5
Unit 5Unit 5
Unit 5
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
Unit 3
Unit 3Unit 3
Unit 3
 
Work Study
Work Study Work Study
Work Study
 
Inventory production and Recent trends in PPC
Inventory production and Recent trends in PPCInventory production and Recent trends in PPC
Inventory production and Recent trends in PPC
 
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Plant layout and its types
Plant layout and its typesPlant layout and its types
Plant layout and its types
 
Unit 2
Unit 2Unit 2
Unit 2
 

Similar to PRODUCTION PLANNING AND CONTROL-Unit 4

Unit 4 PPC
Unit 4 PPCUnit 4 PPC
Unit 4 PPC
sivaprakash250
 
Unit 4
Unit 4Unit 4
Unit 4
MeganathanJ4
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
SIVASHANKAR N
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
rknatarajan
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 
scheduling in operations Management PPT O and M
scheduling in operations Management PPT O and Mscheduling in operations Management PPT O and M
scheduling in operations Management PPT O and M
ProfessionalDeeksha
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
Scheduling Topic of Production and Operations
Scheduling Topic of Production and OperationsScheduling Topic of Production and Operations
Scheduling Topic of Production and Operations
ProfessionalDeeksha
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on scheduling
Gunjan Lal
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling
RASHMIPANWAR10
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
Ashish Jain
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
ArpanKumar79
 
Production management
Production managementProduction management
Production management
Purnesh Aloni
 
Scheduling
SchedulingScheduling
Scheduling
Nishant Agrawal
 
Unit 3 Manufacturing system design
Unit   3 Manufacturing system designUnit   3 Manufacturing system design
Unit 3 Manufacturing system design
Lakshmi Life Sciences Ltd.
 
MMS PRESENTAION.pptx
MMS PRESENTAION.pptxMMS PRESENTAION.pptx
MMS PRESENTAION.pptx
bankarimjhimkumari
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PratikDalvi17
 
Operations management
Operations managementOperations management
Operations management
Dr Sathaiah Manimuthu
 

Similar to PRODUCTION PLANNING AND CONTROL-Unit 4 (20)

Unit 4 PPC
Unit 4 PPCUnit 4 PPC
Unit 4 PPC
 
Unit 4
Unit 4Unit 4
Unit 4
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
scheduling in operations Management PPT O and M
scheduling in operations Management PPT O and Mscheduling in operations Management PPT O and M
scheduling in operations Management PPT O and M
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Scheduling Topic of Production and Operations
Scheduling Topic of Production and OperationsScheduling Topic of Production and Operations
Scheduling Topic of Production and Operations
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on scheduling
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Production management
Production managementProduction management
Production management
 
Scheduling
SchedulingScheduling
Scheduling
 
Unit 3 Manufacturing system design
Unit   3 Manufacturing system designUnit   3 Manufacturing system design
Unit 3 Manufacturing system design
 
MMS PRESENTAION.pptx
MMS PRESENTAION.pptxMMS PRESENTAION.pptx
MMS PRESENTAION.pptx
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
 
Operations management
Operations managementOperations management
Operations management
 

More from prakash0712

UNIT-1-Steam Power Plant.pptx
UNIT-1-Steam Power Plant.pptxUNIT-1-Steam Power Plant.pptx
UNIT-1-Steam Power Plant.pptx
prakash0712
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptx
prakash0712
 
Unit-IV-Renewable Energy Sources.pptx
Unit-IV-Renewable Energy Sources.pptxUnit-IV-Renewable Energy Sources.pptx
Unit-IV-Renewable Energy Sources.pptx
prakash0712
 
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptxUnit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
prakash0712
 
Unit-III-Nuclear Power Plants.pptx
Unit-III-Nuclear Power Plants.pptxUnit-III-Nuclear Power Plants.pptx
Unit-III-Nuclear Power Plants.pptx
prakash0712
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
prakash0712
 
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptxUNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
prakash0712
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
prakash0712
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
prakash0712
 
UNIT-III-TRANSMISSION SYSTEMS.pptx
UNIT-III-TRANSMISSION SYSTEMS.pptxUNIT-III-TRANSMISSION SYSTEMS.pptx
UNIT-III-TRANSMISSION SYSTEMS.pptx
prakash0712
 
AICE-Unit 3
AICE-Unit   3AICE-Unit   3
AICE-Unit 3
prakash0712
 
AICE-Unit 2
AICE-Unit   2AICE-Unit   2
AICE-Unit 2
prakash0712
 
AICE-Unit 5
AICE-Unit   5AICE-Unit   5
AICE-Unit 5
prakash0712
 
AICE-Unit 4
AICE-Unit   4AICE-Unit   4
AICE-Unit 4
prakash0712
 
AICE-Unit 1
AICE-Unit   1AICE-Unit   1
AICE-Unit 1
prakash0712
 
PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1
prakash0712
 
PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2
prakash0712
 
ENGINEERING THERMODYNAMICS-Unit 2
ENGINEERING THERMODYNAMICS-Unit 2ENGINEERING THERMODYNAMICS-Unit 2
ENGINEERING THERMODYNAMICS-Unit 2
prakash0712
 
ENGINEERING THERMODYNAMICS- unit 2
ENGINEERING THERMODYNAMICS- unit 2ENGINEERING THERMODYNAMICS- unit 2
ENGINEERING THERMODYNAMICS- unit 2
prakash0712
 
ENGINEERING THERMODYNAMICS- unit-3
ENGINEERING THERMODYNAMICS- unit-3ENGINEERING THERMODYNAMICS- unit-3
ENGINEERING THERMODYNAMICS- unit-3
prakash0712
 

More from prakash0712 (20)

UNIT-1-Steam Power Plant.pptx
UNIT-1-Steam Power Plant.pptxUNIT-1-Steam Power Plant.pptx
UNIT-1-Steam Power Plant.pptx
 
Unit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptxUnit-V-Power Plant Economics and Environment.pptx
Unit-V-Power Plant Economics and Environment.pptx
 
Unit-IV-Renewable Energy Sources.pptx
Unit-IV-Renewable Energy Sources.pptxUnit-IV-Renewable Energy Sources.pptx
Unit-IV-Renewable Energy Sources.pptx
 
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptxUnit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
Unit-II-Diesel Gas turbine and Combined Cycle Power Plant.pptx
 
Unit-III-Nuclear Power Plants.pptx
Unit-III-Nuclear Power Plants.pptxUnit-III-Nuclear Power Plants.pptx
Unit-III-Nuclear Power Plants.pptx
 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
 
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptxUNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
UNIT-II-ENGINE AUXILIARY SYSTEMS.pptx
 
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptxUNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
UNIT-V-ELECTRIC AND HYBRID VEHICLES.pptx
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
UNIT-III-TRANSMISSION SYSTEMS.pptx
UNIT-III-TRANSMISSION SYSTEMS.pptxUNIT-III-TRANSMISSION SYSTEMS.pptx
UNIT-III-TRANSMISSION SYSTEMS.pptx
 
AICE-Unit 3
AICE-Unit   3AICE-Unit   3
AICE-Unit 3
 
AICE-Unit 2
AICE-Unit   2AICE-Unit   2
AICE-Unit 2
 
AICE-Unit 5
AICE-Unit   5AICE-Unit   5
AICE-Unit 5
 
AICE-Unit 4
AICE-Unit   4AICE-Unit   4
AICE-Unit 4
 
AICE-Unit 1
AICE-Unit   1AICE-Unit   1
AICE-Unit 1
 
PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1
 
PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2PRODUCTION PLANNING AND CONTROL-Unit 2
PRODUCTION PLANNING AND CONTROL-Unit 2
 
ENGINEERING THERMODYNAMICS-Unit 2
ENGINEERING THERMODYNAMICS-Unit 2ENGINEERING THERMODYNAMICS-Unit 2
ENGINEERING THERMODYNAMICS-Unit 2
 
ENGINEERING THERMODYNAMICS- unit 2
ENGINEERING THERMODYNAMICS- unit 2ENGINEERING THERMODYNAMICS- unit 2
ENGINEERING THERMODYNAMICS- unit 2
 
ENGINEERING THERMODYNAMICS- unit-3
ENGINEERING THERMODYNAMICS- unit-3ENGINEERING THERMODYNAMICS- unit-3
ENGINEERING THERMODYNAMICS- unit-3
 

Recently uploaded

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 

PRODUCTION PLANNING AND CONTROL-Unit 4

  • 3. SCHEDULING • Scheduling is the last of the planning functions. • It determines when an operation is to be performed, or when work is to be completed; the difference lies in the detail of the scheduling procedure. • In a centralized control situation - where all process planning, loading, and scheduling for the plant are done in a central office- the details of the schedule may specify the starting and finishing time for an operation. • On the other hand, the central schedule may simply give a completion time for the work in a given department.
  • 4. LOADING • Once the route has been established, the work required can be loaded against the selected machine or workstation. • The total time required to perform the operation is computed by multiplying the unit operation times given on the standard process sheet by the number of parts to be processed. • This total time is then added to the work already planned for the workstation. • This is the function of loading, and it results in a tabulated list or chart showing the planned utilization of the machines or workstations in the plant
  • 8. SCHEDULING -BENEFITS • Inventory reduction, • Process change-over reduction • leveling • Reduced scheduling effort • Increased production efficiency • Labor load leveling • Accurate delivery date quotes • Real time information
  • 9. GANTT CHART •A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule. • Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. •Some Gantt charts also show the dependency (i.e., precedence network) relationships between activities.
  • 10. Production Control • Perpetual loading – Tabulation of the time necessary to finish unfulfilled orders and determine how long it will take to finish this work. Perpetual loading
  • 11. LINE OF BALANCE • Find a feasible defined replacement for all undefined (‘ANY’) ergonomic constraints on workstations, i.e. one compatible with the ergonomic constraints and precedence constraints defined on operations, as well as zoning constraints and possible drifting operations • Solve the within-workstation scheduling problem on all workstations, for all products being assembled on the line • Assign the operations to workstations to achieve the best average balance, while keeping the peak times at a manageable level.
  • 12. Linear Scheduling Method • Linear Scheduling Method (LSM) is a graphical scheduling method focusing on continuous resource utilization in repetitive activities. It is believed that it originally adopted the idea of Line-Of-Balance method. • The main advantages of LSM over Critical Path Method (CPM) is its underlying idea of keeping resources continuously at work. In other words, it schedules activities in such a way that: 1. resource utilization is maximized; 2. interruption in on-going process is minimized, including hiring-and- firing; and 3. the effect of the learning curve phenomenon is minimized
  • 13. BATCH PRODUCTION SCHEDULING • Batch production scheduling is the practice of planning and scheduling of batch manufacturing processes. • Although, scheduling may apply to traditionally continuous processes, such as refining, it is especially important for batch processes such as those for pharmaceutical active ingredients, biotechnology processes and many specialty chemical processes. • Batch production scheduling shares some concepts and techniques with finite capacity scheduling which has been applied to many manufacturing problems. • The specific issues of scheduling batch manufacturing processes have generated considerable industrial and academic interest
  • 14. MRP
  • 16. DISPATCHING • Authorizing the start of an operation on the shop floor is the function of dispatching. • This function may be centralized or decentralized. • The departmental dispatcher would authorize the start of each of the machine operations – the dispatch actions are based on the foreman’s routing and scheduling of the work through his department. This is decentralized dispatching.
  • 17. PROGRESS REPORTING AND EXPEDITING • The manufacturing activity of a plant is said to be “in control” when the actual performance is within the objectives of the planned performance. • When jobs are started and completed on schedule, there should be very little, if any, concern about the meeting of commitments. • Optimum operation of the plant, however, is attained only if the original plan has been carefully prepared to utilize the manufacturing facilities fully and effectively.