Practical Surveying
Distance Measurement
Prepared by
2020-2021
1
Asst.Lecturer. Dilveen H. Omar
Report Number (2)
Report name
Obstacles in Chaining, and Perpendicular (Off Sets )
for Building
2
1-Tape(1)
2-Pin(10)
3-Range Pole(5)
4-Optical Square ( 1)
5-Plumb bob . (1)
3
Distance measurement in case of existence obstacles.
To Set an existing building and Draw it proper by
Scale.
4
 Obstacles in chaining
The various obstruction such as
Forest, Hills, Ponds, Rivers, Building…
Type of Obstacle's
1-Directe Methods.
2-In Direct Methods.
5

1-Ranging Obstacles

2-Measure Obstacles

3-Ranging and Measuring Obstacles
6
1- By eye
2- By theodolite
3-By total Station (TS)
7
8
9
10
11
12
13
Offsetting : this may be done by taking the
known points that are existed on the both
sides of lines, in a way to spread the tape
between traverse lines and set the known
points by using one of the following methods:
(Offsets or Ties method)
14
Procedures:
1-Choose a site which is to be located .
2-Choose a line and fix two range pole at
Start and end points.
3-Set out (drop ) perpendiculars' from the
corners of the building .Or objects to be
drawn
On the line and measuring the distance.
4- Draw to certain scale (1:100,1:200,
1:500)
 SKETCH
15
16
AVERAGE
D Y2
D Y1
AVERAGE
D X2
DISTANCE X1
LINE
NO
Draw With Scale
17
 To learn how we can drop a building and draw it an
paper by suite scale .
 Using the tape and optical square.
18
1. Instrument error.
2. Personal error.
3. Natural errors.
19
Thank you
20

Practical Surveying Distance Measurement