PIGGING
PIGGING ADALAH AKTIFITAS DI DALAM PERPIPAAN PADA
DUNIA INDUSTRI, MIGAS DAN PETROKIMIA.
SALAH SATU KEGIATAN PIGGING ADALAH TEKNIK
MEMBERSIKAN BAGIAN DALAM PIPA DARI SOFT - SCALE ATAU
DEPOSIT YANG MENEMPEL PADA DINDING PIPA BAGIAN DALAM
PIG BERGERAK MENGIKUTI ALIRAN DIDALAM PIPA DARI UJUNG
KE UJUNG. ATAU DARI PIG LAUNCHER SAMPAI KE PIG
RECEIVER
PIG LAUNCHER & RECEVER
DIGUNAKAN UNTUK MENGIRIM & MENERIMA "PIG"
PIG YANG DIKIRIM DARI STATION A KE STATION B
AKAN MENGIKUTI ALIRAN MINYAK SEKALIGUS MEMBERSIHKAN PIPA
DARI WAX, SEDIMEN DAN MENDORONG AIR YANG MENGENDAP
DIBAGIAN BAWAH PIPA KE ARAH STATION PENERIMA.
BILA PIPE LINE TIDAK DIBERSIHKAN DENGAN PIG MAKIN LAMA
SEDIMEN & WAX AKAN MENEMPEL DIDINDING DALAM PIPA
YANG MENGAKIBATKAN ID – PIPA AKAN MENGECIL DAN
MENIMBULKAN FRIKSI & PRESSURE LOSS YANG MAKIN
MENINGKAT
SEDANGKAN AIR AKAN MENGAKIBATKAN TIMBULNYA KOROSI PADA
PIPA
PIG DILUNCURKAN KE PIPE LINE SEMAKIN SERING SEMAKIN BAGUS.
SETIAP 2 MINGGU SATU KALI PELUNCURAN SUDAH CUKUP BAIK.
NAMUN HAL INI BISA DISESUAIKAN DENGAN KONDISI PIPA,
DILIHAT DARI HASIL KOTORAN YANG DITERIMA DI PIG – RECEIVER
MAKSUDNYA BILA DEPOSIT / KOTORAN YANG DITERIMA RELATIF SEDIKIT
MAKA JADWAL RUTIN BISA DILANJUTKAN ,
NAMUN BILA DEPOSIT YANG DITERIMA MULAI MENINGKAT ,
MAKA FREKWENSI PELUNCURAN PIG BISA DITINGKATKAN
NORMAL OPERATION
TYPICAL PIG LAUNCHER
A
B
FROM PROCESS
NORMAL OPERATION BEFORE LAUNCHING PIG
A
B
FROM PROCESS
PIGGING ACTIVITY & S.O.P.
PERSIAPAN SEBELUM LAUNCHING - PIG
1. HUBUNGI STATION PENERIMA BAHWA ANDA AKAN MELUNCURKAN PIG,
SUPAYA MEREKA MEMPERSIAPKAN “ PIG RECEIVER “ DALAM KONDISI “
SIAP MENERIMA “
2. TUNGGU RESPONSE / INFORMASI DARI STATION PENERIMA BAHWA
MEREKA SUDAH SIAPSETELAH MENDAPAT KONFIRMASI , LAKUKAN
PERSIAPAN PENGIRIMAN PIG DENGAN SEKSAMA SESUAI DENGAN S.O.P.
PERSIAPAN DI PIG LAUNCHER
1. LIHAT PRESSURE GAUGE DI “ G “ DAN USAHAKAN MENCAPAI 0 PSIG
2. BILA PEMBACAAN PADA “ G “ TIDAK ZERO = O PSIG,LAKUKAN DRAIN MELALUI
VALVE “ K “ DENGAN PERLAHAN SAMPAI “ G “ MENUNJUKKAN ANGKA  0 PSIG
3. TUTUP DRAI DAN TUNGGU BEBERAPA SAAT APAKAH PRESSURENYA “ BUILD UP “ 
BILA BUILD UP LAGI  BERARTI ADA KEBOCORAN  LAKUKAN PENGECEKAN
DIMANA TERDAPAT KEBOCORAN & DAN BATALKAN PELUNCURAN PIG SAMPAI
KEBOCORAN DIATASI
A
B
FROM PROCESS
PIGGING ACTIVITY & S.O.P.
PERSIAPAN LAUNCHING – PIG / BILA KONDISI SEMUA
DALAM KEADAAN ACCEPTABLE NORMAL
1. BILA PRESSURE GAUGE “ G “ MENUNJUK = O PSIG  YAKINKAN DENGAN MEMBUKA DRAIN VALVE “ F “ DAN
BILA TIDAK ADA GAS YANG KELUAR MAKA STEP BERIKUTNYA DAPAT DILAKUKAN
2. BUKA PIG – DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN
ADA KEBOCORAN  BILA OK LANJUTKAN STEP BERIKUTNYA
3. MASUKKAN PIG KEDALAM PIG – LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE “ B “ ( YANG PENTING
DIDEPAN DARI INLET VALVE “ C “
4. TUTUP PIGDOOR DAN DRAIN VALVE “ F “  MULAI MEMBUKA BY PASS VALVE “ C “ SECARA PERLAHAN &
SAMPAI PENUH TERBUKA , DAN MONITOR TEKANAN PADA “ G “  BILA TEKANAN SUDAH SAMA DENGAN DI
MAIN PIPE LINE DI “ H “ MAKA
5. MULAI MEMBUKA VALVE DI PIG – LAUNCHER “ B “ PERLAHAN DAN SAMPAI PENUH
6. TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE “ A “ SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG “
PIG “ SAMPAI TERDENGAR SUARA / GETARAN BAHWA PIG SUDAH MELEWATI VALVE ‘ B “.
7. TUTUP VALVE B “ DAN TUTUP VALVE “ C “  BUKA DRAIN VALVE ‘ K “ YANG KE SUMP – PILE SEACAR
PERLAHAN SAMBIL MONITOR PRESSURE GAUGE “ G “ SAMPAI MENUNJUK ANGKA NOL = 0  YAKINKAN LAGI
DENGAN MEMBUKA DRAIN VALVE “ F “ BAHWA TIDAK ADA GAS YANG KELUAR.
8. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL.
9. TUTUP PIG DOOR “ D “ DAN VALVE “ F “  KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA
SEDANG MELUNCURKAN PIG
10. HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS
KEDATANGANNYA
1. BILA PRESSURE GAUGE “ G “ MENUNJUK = O PSIG  YAKINKAN DENGAN MEMBUKA DRAIN VALVE “ F “ DAN BILA TIDAK ADA GAS YANG KELUAR MAKA
STEP BERIKUTNYA DAPAT DILAKUKAN
2. BUKA PIG – DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN ADA KEBOCORAN  BILA OK
LANJUTKAN STEP BERIKUTNYA
3. MASUKKAN PIG KEDALAM PIG – LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE “ B “ ( YANG PENTING DIDEPAN DARI INLET VALVE “ C “
4. TUTUP PIGDOOR DAN DRAIN VALVE “ F “  MULAI MEMBUKA BY PASS VALVE “ C “ SECARA PERLAHAN & SAMPAI PENUH TERBUKA , DAN MONITOR
TEKANAN PADA “ G “  BILA TEKANAN SUDAH SAMA DENGAN DI MAIN PIPE LINE DI “ H “ MAKA
5. MULAI MEMBUKA VALVE DI PIG – LAUNCHER “ B “ PERLAHAN DAN SAMPAI PENUH
6. TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE “ A “ SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG “ PIG “ SAMPAI TERDENGAR SUARA /
GETARAN BAHWA PIG SUDAH MELEWATI VALVE ‘ B “.
7. TUTUP VALVE B “ DAN TUTUP VALVE “ C “  BUKA DRAIN VALVE ‘ K “ YANG KE SUMP – PILE SEACAR PERLAHAN SAMBIL MONITOR PRESSURE
GAUGE “ G “ SAMPAI MENUNJUK ANGKA NOL = 0  YAKINKAN LAGI DENGAN MEMBUKA DRAIN VALVE “ F “ BAHWA TIDAK ADA GAS YANG KELUAR.
8. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL.
9. TUTUP PIG DOOR “ D “ DAN VALVE “ F “  KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA SEDANG MELUNCURKAN PIG
10. HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS KEDATANGANNYA
PERSIAPAN LAUNCHING – PIG / BILA KONDISI SEMUA
DALAM KEADAAN ACCEPTABLE NORMAL
PIG DALAM PERJALANAN
A
B
FROM PROCESS
LIHAT JALANNYA PIG DIDALAM PIPA
PIG SETELAH MELEWATI VALVE “ B “ DAN “ T “ MAKA AKAN
TERUS BERJALAN MENGIKUTI ALIRAN MINYAK SAMPAI KE
STATION PENERIMA
G
TYPICAL PIG RECEIVER
NORMAL OPERATION – RECEIVEING PIG
SETELAH MENDAPAT INFORMASI BAHWA
STATION LAIN AKAN MENGIRIM PIG KE STATION ANDA
1. PERSIAPKAN PIG RECEIVER DENGAN BAIK DAN MENGIKUTI S.O.P.
2. PERHATIKAN PRESSURE GAUGE “ G “ BILA MENUNJUKKAN ANGKA O, MAKA COBA BUKA DRAIN
VALVE “ F “ PERLAHAN DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP SELANJUTNYA BISA
DILAKSANAKAN
3. SEBELUM MEMBUKA VALVE “ B “ PADA RECEICER , BUKA DULU BY PASS VALVE “ C “ PERLAHAN
SAMPAI FULLY OPENED, CEK APAKAH ADA KEBOCORAN, BILA TIDAK ADA LANJUTKAN STEP
BERIKUTNYA
4. SETELAH TEKANAN SAMA DANGAN MAIN LINE, SECARA PERLAHAN BUKA PENUH MAIN VALVE “ B “
PIG RECEIVER DAN SETELAH TIDAK ADA KEBOCORAN MAKA PIG RECEIVER BISA DITINGGAL
5. SEBELUM MENINGGALKAN HARAP DI PIG RECEIVER DIKASIH TANDA – BENDERA, BAHWA ANDA
SEDANG DALAM PROSES PENERIMAAN PIG
6. SAMPAIKAN KE STATION YANG AKAN MENGIRIM PIG  BAHWA ANDA SIAP MENERIMA.
7. BILA SUDAH DILUNCURKAN DARI STATION PENGIRIM , CATAT JAM PENGIRIMANNYA , JADI ESTIMASI
KEDATANGAN PIG BISA DIPREDIKSI
8. BIASANYA ADA “ PIG – SIGNAL “ YANG MEMBRI TANDA BAHWA PIG SUDAH DATANHG
TO SUMP TANK
K
F
D
E
A
B
C
ESD
PERJALANAN PIG DARI STATION A KE B
SEA FLOOR
SUMP PILE
MACAM – MACAM PIG
PIPE LINE - PIGS
Scraper - Pig Brush - Pig
Sphere - Pig Poly - Pig
Smart - Pig
TYPES OF PIGS - CLEANING PIGS
( BRUSH & CUP )
THERE ARE A VARIETY OF TYPES INCLUDING THOSE MADE
ENTIRELY OF POLY-URETHANE, AND THOSE MADE OF STEEL
WITH URETHANE CUPS TO SEAL THE PIG ON THE PIPE WALL.
THE URETHANE PIGS COME IN GENERAL TYPES:
HARD
URETHANE (THE CONSISTENCY OF RUBBER),
AND THE SOFTER
POLY-URETHANE (CALLED POLY PIGS, BEING THE CONSISTENCY
OF FURNITURE CUSHIONS). THE POLY PIG IS THE SOFTEST PIG,
AND BECAUSE OF ITS FLEXIBILITY IS USUALLY THE FIRST PIG RUN
THROUGH A PIPELINE.
THEY CAN BE COATED IN HARDER
URETHANE TO PROTECT THE SOFT POLY-URETHANE FROM
RIPPING OR ABSORBING FLUID IN THE PIPELINE.
THEY CAN ALSO BE MOLDED WITH WIRE BRUSHES IMBEDDED TO
INCREASE CLEANING CAPABILITY.
GAUGE, CALIPER AND INERTIAL TOOLS.
THE SIMPLEST GEOMETRY TOOL IS ROUND GAUGE PLATES OF DIFFERENT
SIZES ATTACHED TO A PIG.
DENTS, DEFORMATIONS AND TIGHT BENDS WILL DEFORM THE GAUGE
PLATE OF THE CORRESPONDING SIZE OF THE DEFECT.
ALTHOUGH THE GAUGE PIG CAN DETERMINE THE MINIMUM BORE AND
BEND RADIUS OF A PIPELINE, IT DOES NOT LOG THE LOCATION.
CALIPER TOOLS LOG THE INSIDE BORE OF THE PIPELINE AND HAVE AN
ODOMETER TO LOG THE DISTANCE TO DEFECTS.
INERTIAL TOOLS CONSIST OF SOPHISTICATED INERTIAL GUIDANCE
SYSTEMS, WHICH LOG THE 3-D PROFILE OF THE PIPELINE.
MAGNETIC FLUX LEAKAGE INSPECTION
TOOLS.
THESE ARE THE OLDEST AND MOST COMMON
INSPECTION TOOLS, WHICH MAGNETIZE THE
PIPE WITH A STRONG MAGNETIC FIELD AND
THEN MAP THE MAGNETIC FIELD.
THE MAGNETIC FIELD INCREASES AND
DECREASES IN STRENGTH ACCORDING TO THE
WALL THICKNESS AND HARDNESS OF THE
STEEL.
THESE TOOLS ARE OFTEN RUN EVERY THREE TO
FIVE YEARS TO MONITOR GROWTH OF
CORROSION AND NEW MECHANICAL DAMAGE ON
THE PIPELINE.
ULTRASONIC INSPECTION TOOLS.
THIS IS THE MOST ADVANCED AND EXPENSIVE
INSPECTION METHOD, CAPABLE OF DETECTING
SMALL CORROSION PITS (<0.1” DIAMETER, AND
WITH WALL LOSS OF <10%), CRACKS
(HYDROGEN-INDUCED CRACKING, STRESS-
CORROSION CRACKING, AND CRACKS IN
WELDS), LAMINATIONS, AND SEVERAL OTHER
MILL DEFECTS AS WELL AS MECHANICAL
DAMAGE.
SOME UT TOOLS USE THE PIPELINE PRODUCT AS
A COUPLENT BETWEEN THE PIPE WALL AND
TRANSDUCER, AND THEREFORE MUST BE
CALIBRATED TO THE PRODUCT AND
TEMPERATURE OF EVERY RUN.
RADIO TRANSMITTERS
RADIO TRANSMITTERS ARE OFTEN ATTACHED TO A PIG
ENABLING A TRACKER TO LOCATE IT AT ANY TIME.
BECAUSE PIPELINE PIGS OFTEN FIND BUCKLES OR
OTHER RESTRICTIONS IN PIPELINES, THEY OFTEN
BECOME STUCK.
A STUCK PIG CAN ACT LIKE A CORK IN A BOTTLE TO
GREATLY REDUCE OR ENTIRELY STOP THE FLOW OF
THE PRODUCT THROUGH THE PIPELINE.
UTILIZING TRANSMITTERS ALLOWS A STUCK PIG TO BE
SUCCESSFULLY LOCATED WITH A RECEIVER, AND
ALLOWS YOU TO MAKE QUICK, COST-SAVING
DECISIONS TO REMOVE THE PIG.
ALASAN UNTUK MELUNCURKAN PIG
DRYING PIPELINE / MENGOSONGKAN PIPA:
SETELAH MELAKSANAKAN HYDROTEST.
DISNI AIR HARUS DIKOSONGKAN TERUTAMA PADA GAS PIPELINE
MEMBERSIHKAN PIPA :
PEMBERSIHAN PIPA TERMASUK MEMEBERSIHKAN AIR, DEBRIS, PARAFFIN, INTERNAL
CORROSION PRODUCT DAN MIL SCALE
CLEANING A PIPELINE.
CLEANING CAN INCLUDE REMOVING WATER, DEBRIS, PARAFFIN, INTERNAL CORROSION
PRODUCTS, MILL SCALE, ETC.
SEBAGAI SPACER / INTERFACE ATAU PEMISAH
ANTARA DUA PRODUK AGAR PRODUK TIDAK BERCAMPUR SATU SAMA LAIN
ALASAN UNTUK MELUNCURKAN PIG
PURGING PIPELINE
BIASANYA MENGGUNAKAN NITROGEN UNTUK MENDORONG CAIRAN YANG ADA DALAM PIPA
PADA SAAT MAU ADAKAN AKTIVITAS PADA PIPA YANG DAPAT MENIMBULKAN BAHAYA
KEBAKARAN.
COATING PIPELINE
MELAKSANAKAN INTERNAL COATING DENGAN MEMOMPAKAN CAIRAN COATING DIANTARA
DUA PIG DARI UJUNG KE UJUNG.
MENGUKUR DIAMETER PIPELINE
DENGAN PERALATAN CALIPER PIG DAPAT MENGUKUR DIAMETER DALAM PIPA, DAN DAPAT
MENDITEKSI BILA TERJADI PIPA PENYOK
MENCARI KEBOCORAN PIPA
DENGAN MENGGUNAKAN METODE TERTENTU DAPAT MENDITEKSI KEBOCORAN PIPA.
1. DRYING PIPELINE
2. MEMBERSIHKAN PIPA
3. CLEANING A PIPELINE.
4. SEBAGAI SPACER / PEMISAH
5. PURGING PIPELINE:
6. COATING PIPELINE
7. MENGUKUR DIAMETER PIPELINE
8. MENCARI KEBOCORAN PIPA
ALASAN UNTUK MELUNCURKAN PIG
BATCH PIGS.
THESE ARE USUALLY CLEANING PIGS
WITH EXTRA CUPS OR DISCS TO SEAL ON
THE PIPE WALL.
THESE PIGS ARE ALSO USED FOR
NITROGEN PURGES.
BATCHING AND INHIBITOR APPLICATIONS
ARE DONE WITH CLEANING PIGS, WITH
ONLY MINOR MODIFICATIONS.
GATHERING STATION STORAGE
TANKER

More Related Content

What's hot

LNG and LPG
LNG and LPGLNG and LPG
LNG and LPG
Purwa Prasetya
 
Basic Slicklines Operation.pptx
Basic Slicklines Operation.pptxBasic Slicklines Operation.pptx
Basic Slicklines Operation.pptx
Ario Arief iswandhani
 
Artificial lift
Artificial liftArtificial lift
Artificial lift
Hendri Anur
 
Teknik Produksi Migas - Proses Produksi Migas
Teknik Produksi Migas - Proses Produksi MigasTeknik Produksi Migas - Proses Produksi Migas
Teknik Produksi Migas - Proses Produksi Migas
lombkTBK
 
Bab 2 (motor bakar)
Bab 2 (motor bakar)Bab 2 (motor bakar)
Bab 2 (motor bakar)
Dwi Ratna
 
Fire tube boiler power point
Fire tube boiler power pointFire tube boiler power point
Fire tube boiler power point
Stefany Rumahlatu
 
Maintenance check list fire protection system
Maintenance check list  fire protection systemMaintenance check list  fire protection system
Maintenance check list fire protection system
Rudy Harahap
 
Boiler sop 20100217
Boiler sop 20100217Boiler sop 20100217
Boiler sop 20100217
Salim Siregar
 
4. gas detektor
4. gas detektor4. gas detektor
4. gas detektor
Winarso Arso
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
Andi Anriansyah
 
13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt
ArieOtong1
 
Preassure Safety Valve
Preassure Safety ValvePreassure Safety Valve
Preassure Safety Valve
Ricco Riyan Kurniawan
 
PENGUKURAN ALIRAN DENGAN PLATE ORIFICE
PENGUKURAN ALIRAN DENGAN PLATE ORIFICEPENGUKURAN ALIRAN DENGAN PLATE ORIFICE
PENGUKURAN ALIRAN DENGAN PLATE ORIFICE
Albert Agri
 
pompa dan kompressor
pompa dan kompressorpompa dan kompressor
pompa dan kompressor
restu aprilianto
 
DAMPER
DAMPERDAMPER
Laporan resmi semen pemboran
Laporan resmi semen pemboranLaporan resmi semen pemboran
Laporan resmi semen pemboran
Hendri Anur
 
Perencanaan casing pada pemboran
Perencanaan casing pada pemboranPerencanaan casing pada pemboran
Perencanaan casing pada pemboran
Hendri Anur
 
Production Packer
Production PackerProduction Packer
Production Packer
Syamsul Bahri
 
K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89
Al Marson
 
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat KerjaSNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
Muhamad Imam Khairy
 

What's hot (20)

LNG and LPG
LNG and LPGLNG and LPG
LNG and LPG
 
Basic Slicklines Operation.pptx
Basic Slicklines Operation.pptxBasic Slicklines Operation.pptx
Basic Slicklines Operation.pptx
 
Artificial lift
Artificial liftArtificial lift
Artificial lift
 
Teknik Produksi Migas - Proses Produksi Migas
Teknik Produksi Migas - Proses Produksi MigasTeknik Produksi Migas - Proses Produksi Migas
Teknik Produksi Migas - Proses Produksi Migas
 
Bab 2 (motor bakar)
Bab 2 (motor bakar)Bab 2 (motor bakar)
Bab 2 (motor bakar)
 
Fire tube boiler power point
Fire tube boiler power pointFire tube boiler power point
Fire tube boiler power point
 
Maintenance check list fire protection system
Maintenance check list  fire protection systemMaintenance check list  fire protection system
Maintenance check list fire protection system
 
Boiler sop 20100217
Boiler sop 20100217Boiler sop 20100217
Boiler sop 20100217
 
4. gas detektor
4. gas detektor4. gas detektor
4. gas detektor
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt13. FORMASI REGU HIDRANT -2.ppt
13. FORMASI REGU HIDRANT -2.ppt
 
Preassure Safety Valve
Preassure Safety ValvePreassure Safety Valve
Preassure Safety Valve
 
PENGUKURAN ALIRAN DENGAN PLATE ORIFICE
PENGUKURAN ALIRAN DENGAN PLATE ORIFICEPENGUKURAN ALIRAN DENGAN PLATE ORIFICE
PENGUKURAN ALIRAN DENGAN PLATE ORIFICE
 
pompa dan kompressor
pompa dan kompressorpompa dan kompressor
pompa dan kompressor
 
DAMPER
DAMPERDAMPER
DAMPER
 
Laporan resmi semen pemboran
Laporan resmi semen pemboranLaporan resmi semen pemboran
Laporan resmi semen pemboran
 
Perencanaan casing pada pemboran
Perencanaan casing pada pemboranPerencanaan casing pada pemboran
Perencanaan casing pada pemboran
 
Production Packer
Production PackerProduction Packer
Production Packer
 
K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89K3 sistem proteksi bahaya petir per.02.89
K3 sistem proteksi bahaya petir per.02.89
 
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat KerjaSNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
SNI 7231:2009 tentang Metoda Pengukuran Intensitas Kebisingan di Tempat Kerja
 

More from Hendri Anur

Sutat lamaran kerja yogyakarta.output
Sutat lamaran kerja yogyakarta.outputSutat lamaran kerja yogyakarta.output
Sutat lamaran kerja yogyakarta.output
Hendri Anur
 
Reservoir managenet
Reservoir managenetReservoir managenet
Reservoir managenet
Hendri Anur
 
Kimia Fisika hidrocarbon
Kimia Fisika hidrocarbonKimia Fisika hidrocarbon
Kimia Fisika hidrocarbon
Hendri Anur
 
Pengantar teknik perminyakan
Pengantar teknik perminyakanPengantar teknik perminyakan
Pengantar teknik perminyakan
Hendri Anur
 
Laporan resmi penilaian formasi
Laporan resmi penilaian formasiLaporan resmi penilaian formasi
Laporan resmi penilaian formasi
Hendri Anur
 
Srp soker rod pomp
Srp soker rod pompSrp soker rod pomp
Srp soker rod pomp
Hendri Anur
 
Laporan resmi paktikum peralatan pemboran dan produksi.output
Laporan resmi paktikum peralatan pemboran dan produksi.outputLaporan resmi paktikum peralatan pemboran dan produksi.output
Laporan resmi paktikum peralatan pemboran dan produksi.output
Hendri Anur
 
Enhached oil recovery EOR
Enhached oil recovery EOREnhached oil recovery EOR
Enhached oil recovery EOR
Hendri Anur
 
Teori pembentukan migas
Teori pembentukan  migasTeori pembentukan  migas
Teori pembentukan migas
Hendri Anur
 
Ekonomi rekayasa migas
Ekonomi rekayasa migasEkonomi rekayasa migas
Ekonomi rekayasa migas
Hendri Anur
 
Penyuluhan Anti Narkoba LPAN (DIY)
Penyuluhan Anti Narkoba LPAN (DIY)Penyuluhan Anti Narkoba LPAN (DIY)
Penyuluhan Anti Narkoba LPAN (DIY)
Hendri Anur
 
Oil storakge tank
Oil storakge tankOil storakge tank
Oil storakge tank
Hendri Anur
 
Pengoprasian metering system
Pengoprasian metering systemPengoprasian metering system
Pengoprasian metering system
Hendri Anur
 
Diagram fasa
Diagram fasaDiagram fasa
Diagram fasa
Hendri Anur
 
Lost circulation
Lost circulationLost circulation
Lost circulation
Hendri Anur
 
Wellhead and casing
Wellhead and casingWellhead and casing
Wellhead and casing
Hendri Anur
 
Tahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksiTahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksi
Hendri Anur
 
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSI DEMI KESEJAHTERAAN MASYARAKAT
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSIDEMI KESEJAHTERAAN MASYARAKATMEWUJUDKAN INDONESIA BERSIH DARI KORUPSIDEMI KESEJAHTERAAN MASYARAKAT
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSI DEMI KESEJAHTERAAN MASYARAKAT
Hendri Anur
 
Kerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMOKerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMO
Hendri Anur
 
Kerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMOKerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMO
Hendri Anur
 

More from Hendri Anur (20)

Sutat lamaran kerja yogyakarta.output
Sutat lamaran kerja yogyakarta.outputSutat lamaran kerja yogyakarta.output
Sutat lamaran kerja yogyakarta.output
 
Reservoir managenet
Reservoir managenetReservoir managenet
Reservoir managenet
 
Kimia Fisika hidrocarbon
Kimia Fisika hidrocarbonKimia Fisika hidrocarbon
Kimia Fisika hidrocarbon
 
Pengantar teknik perminyakan
Pengantar teknik perminyakanPengantar teknik perminyakan
Pengantar teknik perminyakan
 
Laporan resmi penilaian formasi
Laporan resmi penilaian formasiLaporan resmi penilaian formasi
Laporan resmi penilaian formasi
 
Srp soker rod pomp
Srp soker rod pompSrp soker rod pomp
Srp soker rod pomp
 
Laporan resmi paktikum peralatan pemboran dan produksi.output
Laporan resmi paktikum peralatan pemboran dan produksi.outputLaporan resmi paktikum peralatan pemboran dan produksi.output
Laporan resmi paktikum peralatan pemboran dan produksi.output
 
Enhached oil recovery EOR
Enhached oil recovery EOREnhached oil recovery EOR
Enhached oil recovery EOR
 
Teori pembentukan migas
Teori pembentukan  migasTeori pembentukan  migas
Teori pembentukan migas
 
Ekonomi rekayasa migas
Ekonomi rekayasa migasEkonomi rekayasa migas
Ekonomi rekayasa migas
 
Penyuluhan Anti Narkoba LPAN (DIY)
Penyuluhan Anti Narkoba LPAN (DIY)Penyuluhan Anti Narkoba LPAN (DIY)
Penyuluhan Anti Narkoba LPAN (DIY)
 
Oil storakge tank
Oil storakge tankOil storakge tank
Oil storakge tank
 
Pengoprasian metering system
Pengoprasian metering systemPengoprasian metering system
Pengoprasian metering system
 
Diagram fasa
Diagram fasaDiagram fasa
Diagram fasa
 
Lost circulation
Lost circulationLost circulation
Lost circulation
 
Wellhead and casing
Wellhead and casingWellhead and casing
Wellhead and casing
 
Tahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksiTahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksi
 
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSI DEMI KESEJAHTERAAN MASYARAKAT
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSIDEMI KESEJAHTERAAN MASYARAKATMEWUJUDKAN INDONESIA BERSIH DARI KORUPSIDEMI KESEJAHTERAAN MASYARAKAT
MEWUJUDKAN INDONESIA BERSIH DARI KORUPSI DEMI KESEJAHTERAAN MASYARAKAT
 
Kerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMOKerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMO
 
Kerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMOKerja Praktek PT.Pertamina PHE WMO
Kerja Praktek PT.Pertamina PHE WMO
 

Recently uploaded

CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
PIMR BHOPAL
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 

Recently uploaded (20)

CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 

Pigging Activity

  • 1. Fakultas Teknik Jurusan teknik Perminyakan Universitas Proklamasi 45 Yogyakarta Hendri/082331317678 Hendri anur #Hendri_anur
  • 2. PIGGING PIGGING ADALAH AKTIFITAS DI DALAM PERPIPAAN PADA DUNIA INDUSTRI, MIGAS DAN PETROKIMIA. SALAH SATU KEGIATAN PIGGING ADALAH TEKNIK MEMBERSIKAN BAGIAN DALAM PIPA DARI SOFT - SCALE ATAU DEPOSIT YANG MENEMPEL PADA DINDING PIPA BAGIAN DALAM PIG BERGERAK MENGIKUTI ALIRAN DIDALAM PIPA DARI UJUNG KE UJUNG. ATAU DARI PIG LAUNCHER SAMPAI KE PIG RECEIVER
  • 3. PIG LAUNCHER & RECEVER DIGUNAKAN UNTUK MENGIRIM & MENERIMA "PIG" PIG YANG DIKIRIM DARI STATION A KE STATION B AKAN MENGIKUTI ALIRAN MINYAK SEKALIGUS MEMBERSIHKAN PIPA DARI WAX, SEDIMEN DAN MENDORONG AIR YANG MENGENDAP DIBAGIAN BAWAH PIPA KE ARAH STATION PENERIMA. BILA PIPE LINE TIDAK DIBERSIHKAN DENGAN PIG MAKIN LAMA SEDIMEN & WAX AKAN MENEMPEL DIDINDING DALAM PIPA YANG MENGAKIBATKAN ID – PIPA AKAN MENGECIL DAN MENIMBULKAN FRIKSI & PRESSURE LOSS YANG MAKIN MENINGKAT SEDANGKAN AIR AKAN MENGAKIBATKAN TIMBULNYA KOROSI PADA PIPA PIG DILUNCURKAN KE PIPE LINE SEMAKIN SERING SEMAKIN BAGUS. SETIAP 2 MINGGU SATU KALI PELUNCURAN SUDAH CUKUP BAIK. NAMUN HAL INI BISA DISESUAIKAN DENGAN KONDISI PIPA, DILIHAT DARI HASIL KOTORAN YANG DITERIMA DI PIG – RECEIVER MAKSUDNYA BILA DEPOSIT / KOTORAN YANG DITERIMA RELATIF SEDIKIT MAKA JADWAL RUTIN BISA DILANJUTKAN , NAMUN BILA DEPOSIT YANG DITERIMA MULAI MENINGKAT , MAKA FREKWENSI PELUNCURAN PIG BISA DITINGKATKAN NORMAL OPERATION
  • 4. TYPICAL PIG LAUNCHER A B FROM PROCESS NORMAL OPERATION BEFORE LAUNCHING PIG
  • 5. A B FROM PROCESS PIGGING ACTIVITY & S.O.P. PERSIAPAN SEBELUM LAUNCHING - PIG 1. HUBUNGI STATION PENERIMA BAHWA ANDA AKAN MELUNCURKAN PIG, SUPAYA MEREKA MEMPERSIAPKAN “ PIG RECEIVER “ DALAM KONDISI “ SIAP MENERIMA “ 2. TUNGGU RESPONSE / INFORMASI DARI STATION PENERIMA BAHWA MEREKA SUDAH SIAPSETELAH MENDAPAT KONFIRMASI , LAKUKAN PERSIAPAN PENGIRIMAN PIG DENGAN SEKSAMA SESUAI DENGAN S.O.P. PERSIAPAN DI PIG LAUNCHER 1. LIHAT PRESSURE GAUGE DI “ G “ DAN USAHAKAN MENCAPAI 0 PSIG 2. BILA PEMBACAAN PADA “ G “ TIDAK ZERO = O PSIG,LAKUKAN DRAIN MELALUI VALVE “ K “ DENGAN PERLAHAN SAMPAI “ G “ MENUNJUKKAN ANGKA  0 PSIG 3. TUTUP DRAI DAN TUNGGU BEBERAPA SAAT APAKAH PRESSURENYA “ BUILD UP “  BILA BUILD UP LAGI  BERARTI ADA KEBOCORAN  LAKUKAN PENGECEKAN DIMANA TERDAPAT KEBOCORAN & DAN BATALKAN PELUNCURAN PIG SAMPAI KEBOCORAN DIATASI
  • 6. A B FROM PROCESS PIGGING ACTIVITY & S.O.P. PERSIAPAN LAUNCHING – PIG / BILA KONDISI SEMUA DALAM KEADAAN ACCEPTABLE NORMAL 1. BILA PRESSURE GAUGE “ G “ MENUNJUK = O PSIG  YAKINKAN DENGAN MEMBUKA DRAIN VALVE “ F “ DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP BERIKUTNYA DAPAT DILAKUKAN 2. BUKA PIG – DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN ADA KEBOCORAN  BILA OK LANJUTKAN STEP BERIKUTNYA 3. MASUKKAN PIG KEDALAM PIG – LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE “ B “ ( YANG PENTING DIDEPAN DARI INLET VALVE “ C “ 4. TUTUP PIGDOOR DAN DRAIN VALVE “ F “  MULAI MEMBUKA BY PASS VALVE “ C “ SECARA PERLAHAN & SAMPAI PENUH TERBUKA , DAN MONITOR TEKANAN PADA “ G “  BILA TEKANAN SUDAH SAMA DENGAN DI MAIN PIPE LINE DI “ H “ MAKA 5. MULAI MEMBUKA VALVE DI PIG – LAUNCHER “ B “ PERLAHAN DAN SAMPAI PENUH 6. TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE “ A “ SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG “ PIG “ SAMPAI TERDENGAR SUARA / GETARAN BAHWA PIG SUDAH MELEWATI VALVE ‘ B “. 7. TUTUP VALVE B “ DAN TUTUP VALVE “ C “  BUKA DRAIN VALVE ‘ K “ YANG KE SUMP – PILE SEACAR PERLAHAN SAMBIL MONITOR PRESSURE GAUGE “ G “ SAMPAI MENUNJUK ANGKA NOL = 0  YAKINKAN LAGI DENGAN MEMBUKA DRAIN VALVE “ F “ BAHWA TIDAK ADA GAS YANG KELUAR. 8. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL. 9. TUTUP PIG DOOR “ D “ DAN VALVE “ F “  KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA SEDANG MELUNCURKAN PIG 10. HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS KEDATANGANNYA
  • 7. 1. BILA PRESSURE GAUGE “ G “ MENUNJUK = O PSIG  YAKINKAN DENGAN MEMBUKA DRAIN VALVE “ F “ DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP BERIKUTNYA DAPAT DILAKUKAN 2. BUKA PIG – DOOR SECARA PERLAHAN & HATI 2 SAMPAI PENUH TERBUKA , SAMBIL MEMONITOR KEMUNGKINAN ADA KEBOCORAN  BILA OK LANJUTKAN STEP BERIKUTNYA 3. MASUKKAN PIG KEDALAM PIG – LAUNCHER DAN DORONG SAMPAI MENDEKATI VALVE “ B “ ( YANG PENTING DIDEPAN DARI INLET VALVE “ C “ 4. TUTUP PIGDOOR DAN DRAIN VALVE “ F “  MULAI MEMBUKA BY PASS VALVE “ C “ SECARA PERLAHAN & SAMPAI PENUH TERBUKA , DAN MONITOR TEKANAN PADA “ G “  BILA TEKANAN SUDAH SAMA DENGAN DI MAIN PIPE LINE DI “ H “ MAKA 5. MULAI MEMBUKA VALVE DI PIG – LAUNCHER “ B “ PERLAHAN DAN SAMPAI PENUH 6. TUTUP SEDIKIT SAJA /DIJEPIT DI MAIN VALVE “ A “ SEHINGGA ALIRAN MINYAK CUKUP UNTUK MENDORONG “ PIG “ SAMPAI TERDENGAR SUARA / GETARAN BAHWA PIG SUDAH MELEWATI VALVE ‘ B “. 7. TUTUP VALVE B “ DAN TUTUP VALVE “ C “  BUKA DRAIN VALVE ‘ K “ YANG KE SUMP – PILE SEACAR PERLAHAN SAMBIL MONITOR PRESSURE GAUGE “ G “ SAMPAI MENUNJUK ANGKA NOL = 0  YAKINKAN LAGI DENGAN MEMBUKA DRAIN VALVE “ F “ BAHWA TIDAK ADA GAS YANG KELUAR. 8. BUKA PIG DOOR DAN YAKINKAN BAHWA PIG SUDAH LEWAT, BILA BELUM LEWAT ULANGI PROSEDUR DAI AWAL. 9. TUTUP PIG DOOR “ D “ DAN VALVE “ F “  KASIH TANDA BENDERA PADA PIG LAUNCHER BAHWA ANDA SEDANG MELUNCURKAN PIG 10. HUBUNGI KE STATION PENERIMA BAHWA PIG SUDAH MELUNCUR AGAR MEREKA JUGA MEMPERSIAPKAN ATAS KEDATANGANNYA PERSIAPAN LAUNCHING – PIG / BILA KONDISI SEMUA DALAM KEADAAN ACCEPTABLE NORMAL
  • 8. PIG DALAM PERJALANAN A B FROM PROCESS LIHAT JALANNYA PIG DIDALAM PIPA PIG SETELAH MELEWATI VALVE “ B “ DAN “ T “ MAKA AKAN TERUS BERJALAN MENGIKUTI ALIRAN MINYAK SAMPAI KE STATION PENERIMA
  • 9. G TYPICAL PIG RECEIVER NORMAL OPERATION – RECEIVEING PIG SETELAH MENDAPAT INFORMASI BAHWA STATION LAIN AKAN MENGIRIM PIG KE STATION ANDA 1. PERSIAPKAN PIG RECEIVER DENGAN BAIK DAN MENGIKUTI S.O.P. 2. PERHATIKAN PRESSURE GAUGE “ G “ BILA MENUNJUKKAN ANGKA O, MAKA COBA BUKA DRAIN VALVE “ F “ PERLAHAN DAN BILA TIDAK ADA GAS YANG KELUAR MAKA STEP SELANJUTNYA BISA DILAKSANAKAN 3. SEBELUM MEMBUKA VALVE “ B “ PADA RECEICER , BUKA DULU BY PASS VALVE “ C “ PERLAHAN SAMPAI FULLY OPENED, CEK APAKAH ADA KEBOCORAN, BILA TIDAK ADA LANJUTKAN STEP BERIKUTNYA 4. SETELAH TEKANAN SAMA DANGAN MAIN LINE, SECARA PERLAHAN BUKA PENUH MAIN VALVE “ B “ PIG RECEIVER DAN SETELAH TIDAK ADA KEBOCORAN MAKA PIG RECEIVER BISA DITINGGAL 5. SEBELUM MENINGGALKAN HARAP DI PIG RECEIVER DIKASIH TANDA – BENDERA, BAHWA ANDA SEDANG DALAM PROSES PENERIMAAN PIG 6. SAMPAIKAN KE STATION YANG AKAN MENGIRIM PIG  BAHWA ANDA SIAP MENERIMA. 7. BILA SUDAH DILUNCURKAN DARI STATION PENGIRIM , CATAT JAM PENGIRIMANNYA , JADI ESTIMASI KEDATANGAN PIG BISA DIPREDIKSI 8. BIASANYA ADA “ PIG – SIGNAL “ YANG MEMBRI TANDA BAHWA PIG SUDAH DATANHG TO SUMP TANK K F D E A B C ESD
  • 10. PERJALANAN PIG DARI STATION A KE B SEA FLOOR SUMP PILE
  • 12. PIPE LINE - PIGS Scraper - Pig Brush - Pig Sphere - Pig Poly - Pig Smart - Pig
  • 13. TYPES OF PIGS - CLEANING PIGS ( BRUSH & CUP ) THERE ARE A VARIETY OF TYPES INCLUDING THOSE MADE ENTIRELY OF POLY-URETHANE, AND THOSE MADE OF STEEL WITH URETHANE CUPS TO SEAL THE PIG ON THE PIPE WALL. THE URETHANE PIGS COME IN GENERAL TYPES: HARD URETHANE (THE CONSISTENCY OF RUBBER), AND THE SOFTER POLY-URETHANE (CALLED POLY PIGS, BEING THE CONSISTENCY OF FURNITURE CUSHIONS). THE POLY PIG IS THE SOFTEST PIG, AND BECAUSE OF ITS FLEXIBILITY IS USUALLY THE FIRST PIG RUN THROUGH A PIPELINE. THEY CAN BE COATED IN HARDER URETHANE TO PROTECT THE SOFT POLY-URETHANE FROM RIPPING OR ABSORBING FLUID IN THE PIPELINE. THEY CAN ALSO BE MOLDED WITH WIRE BRUSHES IMBEDDED TO INCREASE CLEANING CAPABILITY. GAUGE, CALIPER AND INERTIAL TOOLS. THE SIMPLEST GEOMETRY TOOL IS ROUND GAUGE PLATES OF DIFFERENT SIZES ATTACHED TO A PIG. DENTS, DEFORMATIONS AND TIGHT BENDS WILL DEFORM THE GAUGE PLATE OF THE CORRESPONDING SIZE OF THE DEFECT. ALTHOUGH THE GAUGE PIG CAN DETERMINE THE MINIMUM BORE AND BEND RADIUS OF A PIPELINE, IT DOES NOT LOG THE LOCATION. CALIPER TOOLS LOG THE INSIDE BORE OF THE PIPELINE AND HAVE AN ODOMETER TO LOG THE DISTANCE TO DEFECTS. INERTIAL TOOLS CONSIST OF SOPHISTICATED INERTIAL GUIDANCE SYSTEMS, WHICH LOG THE 3-D PROFILE OF THE PIPELINE.
  • 14. MAGNETIC FLUX LEAKAGE INSPECTION TOOLS. THESE ARE THE OLDEST AND MOST COMMON INSPECTION TOOLS, WHICH MAGNETIZE THE PIPE WITH A STRONG MAGNETIC FIELD AND THEN MAP THE MAGNETIC FIELD. THE MAGNETIC FIELD INCREASES AND DECREASES IN STRENGTH ACCORDING TO THE WALL THICKNESS AND HARDNESS OF THE STEEL. THESE TOOLS ARE OFTEN RUN EVERY THREE TO FIVE YEARS TO MONITOR GROWTH OF CORROSION AND NEW MECHANICAL DAMAGE ON THE PIPELINE. ULTRASONIC INSPECTION TOOLS. THIS IS THE MOST ADVANCED AND EXPENSIVE INSPECTION METHOD, CAPABLE OF DETECTING SMALL CORROSION PITS (<0.1” DIAMETER, AND WITH WALL LOSS OF <10%), CRACKS (HYDROGEN-INDUCED CRACKING, STRESS- CORROSION CRACKING, AND CRACKS IN WELDS), LAMINATIONS, AND SEVERAL OTHER MILL DEFECTS AS WELL AS MECHANICAL DAMAGE. SOME UT TOOLS USE THE PIPELINE PRODUCT AS A COUPLENT BETWEEN THE PIPE WALL AND TRANSDUCER, AND THEREFORE MUST BE CALIBRATED TO THE PRODUCT AND TEMPERATURE OF EVERY RUN. RADIO TRANSMITTERS RADIO TRANSMITTERS ARE OFTEN ATTACHED TO A PIG ENABLING A TRACKER TO LOCATE IT AT ANY TIME. BECAUSE PIPELINE PIGS OFTEN FIND BUCKLES OR OTHER RESTRICTIONS IN PIPELINES, THEY OFTEN BECOME STUCK. A STUCK PIG CAN ACT LIKE A CORK IN A BOTTLE TO GREATLY REDUCE OR ENTIRELY STOP THE FLOW OF THE PRODUCT THROUGH THE PIPELINE. UTILIZING TRANSMITTERS ALLOWS A STUCK PIG TO BE SUCCESSFULLY LOCATED WITH A RECEIVER, AND ALLOWS YOU TO MAKE QUICK, COST-SAVING DECISIONS TO REMOVE THE PIG.
  • 15. ALASAN UNTUK MELUNCURKAN PIG DRYING PIPELINE / MENGOSONGKAN PIPA: SETELAH MELAKSANAKAN HYDROTEST. DISNI AIR HARUS DIKOSONGKAN TERUTAMA PADA GAS PIPELINE MEMBERSIHKAN PIPA : PEMBERSIHAN PIPA TERMASUK MEMEBERSIHKAN AIR, DEBRIS, PARAFFIN, INTERNAL CORROSION PRODUCT DAN MIL SCALE CLEANING A PIPELINE. CLEANING CAN INCLUDE REMOVING WATER, DEBRIS, PARAFFIN, INTERNAL CORROSION PRODUCTS, MILL SCALE, ETC. SEBAGAI SPACER / INTERFACE ATAU PEMISAH ANTARA DUA PRODUK AGAR PRODUK TIDAK BERCAMPUR SATU SAMA LAIN ALASAN UNTUK MELUNCURKAN PIG PURGING PIPELINE BIASANYA MENGGUNAKAN NITROGEN UNTUK MENDORONG CAIRAN YANG ADA DALAM PIPA PADA SAAT MAU ADAKAN AKTIVITAS PADA PIPA YANG DAPAT MENIMBULKAN BAHAYA KEBAKARAN. COATING PIPELINE MELAKSANAKAN INTERNAL COATING DENGAN MEMOMPAKAN CAIRAN COATING DIANTARA DUA PIG DARI UJUNG KE UJUNG. MENGUKUR DIAMETER PIPELINE DENGAN PERALATAN CALIPER PIG DAPAT MENGUKUR DIAMETER DALAM PIPA, DAN DAPAT MENDITEKSI BILA TERJADI PIPA PENYOK MENCARI KEBOCORAN PIPA DENGAN MENGGUNAKAN METODE TERTENTU DAPAT MENDITEKSI KEBOCORAN PIPA.
  • 16. 1. DRYING PIPELINE 2. MEMBERSIHKAN PIPA 3. CLEANING A PIPELINE. 4. SEBAGAI SPACER / PEMISAH 5. PURGING PIPELINE: 6. COATING PIPELINE 7. MENGUKUR DIAMETER PIPELINE 8. MENCARI KEBOCORAN PIPA ALASAN UNTUK MELUNCURKAN PIG BATCH PIGS. THESE ARE USUALLY CLEANING PIGS WITH EXTRA CUPS OR DISCS TO SEAL ON THE PIPE WALL. THESE PIGS ARE ALSO USED FOR NITROGEN PURGES. BATCHING AND INHIBITOR APPLICATIONS ARE DONE WITH CLEANING PIGS, WITH ONLY MINOR MODIFICATIONS.
  • 17.