MAINTENANCE CHECK LIST - SISTEM PEMADAM KEBAKARAN 
EQUIPMENT NAME/TAG No. : 
NO. ITEM TO CHECK 
ACCEPTED 
REMARKS 
YES NO N/A 
1 WEEKLY CHECK 
Pompa Diesel 
Battery, Solar, Oli mesin & Sistem Pendingin 
- Voltage battery normal 
- 
- 
- Check level oli engine dengan dipstick di crankcase engine. 
- 
- Check level campuran air pendingin / Coolant 
- 
Pemipaan dan Valve 
Test running pompa electric dan diesel 
- 
Pompa Electric 
- 
Pompa Diesel 
Automatic Start 
- 
- 
7 Bar : Jockey start / ON 
6 Bar : Electric start / ON 
5 Bar : Diesel start / ON 
- 
- 
Check tangki dan selang solar, terhadap kontaminasi air, endapan 
ataupun kotoran 
Level solar di tangki minimal harus 2/3 (dua per tiga) penuh. Jika 
kurang solar harus ditambah. 
Tidak ada kebocoran pada selang solar dari Tangki ke Diesel. Valve 
Inlet dan Return pada pipa solar Open/buka. 
Check pipa dan valve saluran air pendingin dari pompa ke Heat 
Exchanger. Bersihkan strainer jika diperlukan 
- Tidak ada kebocoran di pipa suction dan discharge pompa Electric, 
Diesel dan Jockey 
- Semua valve pada pipa suction dan discharge pompa electric, diesel 
dan Jockey dalam kondisi Open/buka 
Dengan "Manual Mode", jalankan pompa minimal minimal selama 10 
menit 
Dengan "Manual Mode", jalankan engine diesel pada rated speed 
(2950 rpm) minimal selama 30 menit, untuk memanaskan semua 
komponen dan agar menghilangkan kondensasi atau kelembaban yang 
dapat mengurangi umurnya 
Check pada ketiga panel Controller (Electric, Diesel dan Jockey), 
selector switch pada posisi Automatic start. 
Test automatic start dengan membuka valve Test Drain, sehingga 
tekanan di pipa berkurang. Buka valve test drain sehingga ketiga 
pompa start, pompa harus start sesuai setting sbb : 
Matikan ketiga pompa secara manual dengan merubah selector switch 
ke OFF dari masing-masing panel
NO. ITEM TO CHECK 
ACCEPTED 
REMARKS 
YES NO N/A 
2 MONTHLY CHECK 
- Level air aki di battery normal 
- 
- Casing battery bersih, kering dan bebas dari korosi 
- Bersihkan saringan dan filter di saluran bahan bakar 
- Buka dan bersihkan water strainer pada pipa saluran pendingin 
- 
- 
- 
5 BIANNUAL CHECK / PER ENAM BULAN 
- Ganti oli mesin Diesel, kapasitas oli mesin 14,7 liter 
- 
6 ANNUAL CHECK 
- 
- 
- 
Remarks : 
Prepared by Checked by 
Name 
Signature 
Date 
Terminal battery harus bebas dari korosi/karat. Connections to 
electrical system acceptable? 
Bersihkan box panel dan kabel-kabel listrik ke pompa (electric, diesel 
dan jockey) ke panel listrik 
Check kabel listrik terhadap pengelupasan ataupun hubung 
singkat/short circuit 
Kalibari pressure switch dan flow meter sehingga pembacaan nya tetap 
akurat 
Lubrikasi seluruh bearing/bantalan pada seluruh pompa dan diesel 
engine

More Related Content

What's hot

Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3
Al Marson
 
Materi pelatihan apar 1
Materi pelatihan apar 1Materi pelatihan apar 1
Materi pelatihan apar 1Eko Kiswanto
 
Presentation Apar
Presentation AparPresentation Apar
Presentation Apar
Robi Ananda
 
K3 Angkat Angkut
K3 Angkat AngkutK3 Angkat Angkut
K3 Angkat Angkut
Al Marson
 
Waste management
Waste managementWaste management
Waste management
Universitas Indonesia
 
Cara pemakaian scba
Cara pemakaian scbaCara pemakaian scba
Cara pemakaian scba
Winarso Arso
 
Training apar
Training aparTraining apar
Training apar
Titip Novika
 
HIRADC
HIRADCHIRADC
Daily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaaDaily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaa
SastraDiharlan1
 
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat KerjaSNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
Muhamad Imam Khairy
 
SOP EXCAVATOR.docx
SOP EXCAVATOR.docxSOP EXCAVATOR.docx
SOP EXCAVATOR.docx
BudiRestianTomasa
 
Ppt Limbah B3
Ppt Limbah B3Ppt Limbah B3
Ppt Limbah B3
Doris Agusnita
 
PELAPORAN PENGELOLAAM LIMBAH B3
PELAPORAN PENGELOLAAM LIMBAH B3PELAPORAN PENGELOLAAM LIMBAH B3
PELAPORAN PENGELOLAAM LIMBAH B3
Gistya
 
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. TalaudRancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
YOHANIS SAHABAT
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
SintaMarlina3
 
PPT APD - K3
PPT APD - K3PPT APD - K3
PPT APD - K3
Qoimah Adielah
 
LOTO TRAINING.ppt
LOTO TRAINING.pptLOTO TRAINING.ppt
LOTO TRAINING.ppt
Wahyudi Sardi
 
power point Alat pelindung diri
power point Alat pelindung diripower point Alat pelindung diri
power point Alat pelindung diri
gabrielirfan
 
Pengawasan Norma K3 Bahan Kimia Berbahaya
Pengawasan Norma K3 Bahan Kimia BerbahayaPengawasan Norma K3 Bahan Kimia Berbahaya
Pengawasan Norma K3 Bahan Kimia Berbahaya
AliHafid3
 

What's hot (20)

Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3Interpretasi Kriteria Audit SMK3
Interpretasi Kriteria Audit SMK3
 
Materi pelatihan apar 1
Materi pelatihan apar 1Materi pelatihan apar 1
Materi pelatihan apar 1
 
Presentation Apar
Presentation AparPresentation Apar
Presentation Apar
 
K3 Angkat Angkut
K3 Angkat AngkutK3 Angkat Angkut
K3 Angkat Angkut
 
Waste management
Waste managementWaste management
Waste management
 
Cara pemakaian scba
Cara pemakaian scbaCara pemakaian scba
Cara pemakaian scba
 
Training apar
Training aparTraining apar
Training apar
 
HIRADC
HIRADCHIRADC
HIRADC
 
Daily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaaDaily report hse 10 januari 2022 mmp pomalaa
Daily report hse 10 januari 2022 mmp pomalaa
 
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat KerjaSNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja
 
SOP EXCAVATOR.docx
SOP EXCAVATOR.docxSOP EXCAVATOR.docx
SOP EXCAVATOR.docx
 
Ppt Limbah B3
Ppt Limbah B3Ppt Limbah B3
Ppt Limbah B3
 
PELAPORAN PENGELOLAAM LIMBAH B3
PELAPORAN PENGELOLAAM LIMBAH B3PELAPORAN PENGELOLAAM LIMBAH B3
PELAPORAN PENGELOLAAM LIMBAH B3
 
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. TalaudRancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
Rancangan Kebutuhan Dan Penempatan APAR Gedung Kantor SETDA Kab. Kepl. Talaud
 
Meeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdfMeeting P2K3 28-03-23.pdf
Meeting P2K3 28-03-23.pdf
 
Hydrant
HydrantHydrant
Hydrant
 
PPT APD - K3
PPT APD - K3PPT APD - K3
PPT APD - K3
 
LOTO TRAINING.ppt
LOTO TRAINING.pptLOTO TRAINING.ppt
LOTO TRAINING.ppt
 
power point Alat pelindung diri
power point Alat pelindung diripower point Alat pelindung diri
power point Alat pelindung diri
 
Pengawasan Norma K3 Bahan Kimia Berbahaya
Pengawasan Norma K3 Bahan Kimia BerbahayaPengawasan Norma K3 Bahan Kimia Berbahaya
Pengawasan Norma K3 Bahan Kimia Berbahaya
 

Viewers also liked

2c handout-perawatan-dan-perbaikan-mesin
2c handout-perawatan-dan-perbaikan-mesin2c handout-perawatan-dan-perbaikan-mesin
2c handout-perawatan-dan-perbaikan-mesinAgus Witono
 
Scissor lift 2 daily inspection log
Scissor lift 2 daily inspection logScissor lift 2 daily inspection log
Scissor lift 2 daily inspection log
Azmeel Contracting Company
 
Vehicle plant daily inspection log
Vehicle plant daily inspection logVehicle plant daily inspection log
Vehicle plant daily inspection log
Azmeel Contracting Company
 
Mewp inspection checklist-copy1
Mewp inspection checklist-copy1Mewp inspection checklist-copy1
Mewp inspection checklist-copy1wirethehouse
 
Bahagian 3 senarai semak pjkm
Bahagian 3 senarai semak pjkmBahagian 3 senarai semak pjkm
Bahagian 3 senarai semak pjkmAsif Yahya
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-worksimaduddin91
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklistimaduddin91
 

Viewers also liked (9)

2c handout-perawatan-dan-perbaikan-mesin
2c handout-perawatan-dan-perbaikan-mesin2c handout-perawatan-dan-perbaikan-mesin
2c handout-perawatan-dan-perbaikan-mesin
 
Scissor lift 2 daily inspection log
Scissor lift 2 daily inspection logScissor lift 2 daily inspection log
Scissor lift 2 daily inspection log
 
Vehicle plant daily inspection log
Vehicle plant daily inspection logVehicle plant daily inspection log
Vehicle plant daily inspection log
 
Teknik perawatan
Teknik perawatanTeknik perawatan
Teknik perawatan
 
Mewp inspection checklist-copy1
Mewp inspection checklist-copy1Mewp inspection checklist-copy1
Mewp inspection checklist-copy1
 
Bahagian 3 senarai semak pjkm
Bahagian 3 senarai semak pjkmBahagian 3 senarai semak pjkm
Bahagian 3 senarai semak pjkm
 
50727481 checklist-for-site-works
50727481 checklist-for-site-works50727481 checklist-for-site-works
50727481 checklist-for-site-works
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 

Similar to Maintenance check list fire protection system

Diesel pemeriksaan.11
Diesel pemeriksaan.11Diesel pemeriksaan.11
Diesel pemeriksaan.11Rustam Aji
 
Tugas tune up motor bensin
Tugas tune up motor bensinTugas tune up motor bensin
Tugas tune up motor bensinrahimbesoll
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
NishlovHozeb
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
NishlovHozeb
 
Materi-operation-gas-engine-tarakan.pdf
Materi-operation-gas-engine-tarakan.pdfMateri-operation-gas-engine-tarakan.pdf
Materi-operation-gas-engine-tarakan.pdf
yusuf699644
 
Materi-operation-kupang-amp-sumbagut.pdf
Materi-operation-kupang-amp-sumbagut.pdfMateri-operation-kupang-amp-sumbagut.pdf
Materi-operation-kupang-amp-sumbagut.pdf
yusuf699644
 
O&P Obermeyer - Pneumatic Spillway Gate.pdf
O&P Obermeyer - Pneumatic Spillway Gate.pdfO&P Obermeyer - Pneumatic Spillway Gate.pdf
O&P Obermeyer - Pneumatic Spillway Gate.pdf
MohammadZakiUsman
 
charging-system.ppt
charging-system.pptcharging-system.ppt
charging-system.ppt
FataMuslimAlMashuri
 
charging-system_2.ppt
charging-system_2.pptcharging-system_2.ppt
charging-system_2.ppt
aguspramono75
 
charging-system.ppt
charging-system.pptcharging-system.ppt
charging-system.ppt
sandirustandi8
 
Tune-up Motor Bensin
Tune-up Motor BensinTune-up Motor Bensin
Tune-up Motor Bensin
Ahmad Faozi
 
Modul praktikumprestasipompa2014
Modul praktikumprestasipompa2014Modul praktikumprestasipompa2014
Modul praktikumprestasipompa2014
aminsmk
 
Sistem hidraulik.pptx
Sistem hidraulik.pptxSistem hidraulik.pptx
Sistem hidraulik.pptx
AsYrafPercaya
 
TUNE – UP MESIN BENSIN - Copy.ppt
TUNE – UP MESIN BENSIN - Copy.pptTUNE – UP MESIN BENSIN - Copy.ppt
TUNE – UP MESIN BENSIN - Copy.ppt
fendikristanto1
 
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptxMateri PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
DanesqyHerlintangMud
 
IS - CU 10.pdf
IS - CU 10.pdfIS - CU 10.pdf
IS - CU 10.pdf
RosliedaYatie
 

Similar to Maintenance check list fire protection system (20)

Diesel pemeriksaan.11
Diesel pemeriksaan.11Diesel pemeriksaan.11
Diesel pemeriksaan.11
 
Tune up
Tune upTune up
Tune up
 
Tugas tune up motor bensin
Tugas tune up motor bensinTugas tune up motor bensin
Tugas tune up motor bensin
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.ppt
 
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
182201224-ENGINE-CAN-T-RUNNING-PC-1250-8R-ppt.pdf
 
Materi-operation-gas-engine-tarakan.pdf
Materi-operation-gas-engine-tarakan.pdfMateri-operation-gas-engine-tarakan.pdf
Materi-operation-gas-engine-tarakan.pdf
 
Materi-operation-kupang-amp-sumbagut.pdf
Materi-operation-kupang-amp-sumbagut.pdfMateri-operation-kupang-amp-sumbagut.pdf
Materi-operation-kupang-amp-sumbagut.pdf
 
O&P Obermeyer - Pneumatic Spillway Gate.pdf
O&P Obermeyer - Pneumatic Spillway Gate.pdfO&P Obermeyer - Pneumatic Spillway Gate.pdf
O&P Obermeyer - Pneumatic Spillway Gate.pdf
 
Tune
TuneTune
Tune
 
charging-system.ppt
charging-system.pptcharging-system.ppt
charging-system.ppt
 
charging-system_2.ppt
charging-system_2.pptcharging-system_2.ppt
charging-system_2.ppt
 
charging-system.ppt
charging-system.pptcharging-system.ppt
charging-system.ppt
 
Tune-up Motor Bensin
Tune-up Motor BensinTune-up Motor Bensin
Tune-up Motor Bensin
 
Modul praktikumprestasipompa2014
Modul praktikumprestasipompa2014Modul praktikumprestasipompa2014
Modul praktikumprestasipompa2014
 
Sistem hidraulik.pptx
Sistem hidraulik.pptxSistem hidraulik.pptx
Sistem hidraulik.pptx
 
TUNE – UP MESIN BENSIN - Copy.ppt
TUNE – UP MESIN BENSIN - Copy.pptTUNE – UP MESIN BENSIN - Copy.ppt
TUNE – UP MESIN BENSIN - Copy.ppt
 
Laporan
LaporanLaporan
Laporan
 
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptxMateri PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
Materi PPT Perawatan Berkala (Servis) Sepeda Motor.pptx
 
turbin gas
turbin gasturbin gas
turbin gas
 
IS - CU 10.pdf
IS - CU 10.pdfIS - CU 10.pdf
IS - CU 10.pdf
 

Recently uploaded

Matematika diskrit: metode pohon/trees.ppt
Matematika diskrit: metode pohon/trees.pptMatematika diskrit: metode pohon/trees.ppt
Matematika diskrit: metode pohon/trees.ppt
AzrilAld
 
Pembangkit Listrik Tenaga Surya PLTS.pptx
Pembangkit Listrik Tenaga Surya PLTS.pptxPembangkit Listrik Tenaga Surya PLTS.pptx
Pembangkit Listrik Tenaga Surya PLTS.pptx
muhhaekalsn
 
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASASURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
AnandhaAdkhaM1
 
436102098-0-K3-Elevator-Dan-Eskalator.ppt
436102098-0-K3-Elevator-Dan-Eskalator.ppt436102098-0-K3-Elevator-Dan-Eskalator.ppt
436102098-0-K3-Elevator-Dan-Eskalator.ppt
rhamset
 
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdfTUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
jayakartalumajang1
 
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptxTUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
indahrosantiTeknikSi
 
Daftar Lembaga Penyedia Jasa Linkungan.pdf
Daftar Lembaga Penyedia Jasa Linkungan.pdfDaftar Lembaga Penyedia Jasa Linkungan.pdf
Daftar Lembaga Penyedia Jasa Linkungan.pdf
Tsabitpattipeilohy
 
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
HADIANNAS
 
COOLING TOWER petrokimia gresik okdong d
COOLING TOWER petrokimia gresik okdong dCOOLING TOWER petrokimia gresik okdong d
COOLING TOWER petrokimia gresik okdong d
delphijean1
 
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptxRANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
muhammadiswahyudi12
 

Recently uploaded (10)

Matematika diskrit: metode pohon/trees.ppt
Matematika diskrit: metode pohon/trees.pptMatematika diskrit: metode pohon/trees.ppt
Matematika diskrit: metode pohon/trees.ppt
 
Pembangkit Listrik Tenaga Surya PLTS.pptx
Pembangkit Listrik Tenaga Surya PLTS.pptxPembangkit Listrik Tenaga Surya PLTS.pptx
Pembangkit Listrik Tenaga Surya PLTS.pptx
 
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASASURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
SURVEY REKAYASA SURVEY REKAYASA SURVEY REKAYASA
 
436102098-0-K3-Elevator-Dan-Eskalator.ppt
436102098-0-K3-Elevator-Dan-Eskalator.ppt436102098-0-K3-Elevator-Dan-Eskalator.ppt
436102098-0-K3-Elevator-Dan-Eskalator.ppt
 
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdfTUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
TUGAS pelaksana pekerjaan jalan jenjang empat 4 .pptx -.pdf
 
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptxTUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
TUGAS UJI KOMPETENSI-INDAH ROSANTI-AHLI UTAMA MANAJEMEN KONSTRUKSI.pptx
 
Daftar Lembaga Penyedia Jasa Linkungan.pdf
Daftar Lembaga Penyedia Jasa Linkungan.pdfDaftar Lembaga Penyedia Jasa Linkungan.pdf
Daftar Lembaga Penyedia Jasa Linkungan.pdf
 
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
Power Point TEMA 7 SUB TEMA 3 Pembelajaran 2
 
COOLING TOWER petrokimia gresik okdong d
COOLING TOWER petrokimia gresik okdong dCOOLING TOWER petrokimia gresik okdong d
COOLING TOWER petrokimia gresik okdong d
 
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptxRANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
RANGKAIAN LISTRIK MATERI 7 ANALISIS MESH.pptx
 

Maintenance check list fire protection system

  • 1. Form No. Date Proyek FP-003 Report No. Page of of C l i e n t : Ref Drawing No.: MAINTENANCE CHECK LIST - SISTEM PEMADAM KEBAKARAN EQUIPMENT NAME/TAG No. : NO. ITEM TO CHECK ACCEPTED REMARKS YES NO N/A 1 WEEKLY CHECK Pompa Diesel Battery, Solar, Oli mesin & Sistem Pendingin - Voltage battery normal - - - Check level oli engine dengan dipstick di crankcase engine. - - Check level campuran air pendingin / Coolant - Pemipaan dan Valve Test running pompa electric dan diesel - Pompa Electric - Pompa Diesel Automatic Start - - 7 Bar : Jockey start / ON 6 Bar : Electric start / ON 5 Bar : Diesel start / ON - - Check tangki dan selang solar, terhadap kontaminasi air, endapan ataupun kotoran Level solar di tangki minimal harus 2/3 (dua per tiga) penuh. Jika kurang solar harus ditambah. Tidak ada kebocoran pada selang solar dari Tangki ke Diesel. Valve Inlet dan Return pada pipa solar Open/buka. Check pipa dan valve saluran air pendingin dari pompa ke Heat Exchanger. Bersihkan strainer jika diperlukan - Tidak ada kebocoran di pipa suction dan discharge pompa Electric, Diesel dan Jockey - Semua valve pada pipa suction dan discharge pompa electric, diesel dan Jockey dalam kondisi Open/buka Dengan "Manual Mode", jalankan pompa minimal minimal selama 10 menit Dengan "Manual Mode", jalankan engine diesel pada rated speed (2950 rpm) minimal selama 30 menit, untuk memanaskan semua komponen dan agar menghilangkan kondensasi atau kelembaban yang dapat mengurangi umurnya Check pada ketiga panel Controller (Electric, Diesel dan Jockey), selector switch pada posisi Automatic start. Test automatic start dengan membuka valve Test Drain, sehingga tekanan di pipa berkurang. Buka valve test drain sehingga ketiga pompa start, pompa harus start sesuai setting sbb : Matikan ketiga pompa secara manual dengan merubah selector switch ke OFF dari masing-masing panel
  • 2. NO. ITEM TO CHECK ACCEPTED REMARKS YES NO N/A 2 MONTHLY CHECK - Level air aki di battery normal - - Casing battery bersih, kering dan bebas dari korosi - Bersihkan saringan dan filter di saluran bahan bakar - Buka dan bersihkan water strainer pada pipa saluran pendingin - - - 5 BIANNUAL CHECK / PER ENAM BULAN - Ganti oli mesin Diesel, kapasitas oli mesin 14,7 liter - 6 ANNUAL CHECK - - - Remarks : Prepared by Checked by Name Signature Date Terminal battery harus bebas dari korosi/karat. Connections to electrical system acceptable? Bersihkan box panel dan kabel-kabel listrik ke pompa (electric, diesel dan jockey) ke panel listrik Check kabel listrik terhadap pengelupasan ataupun hubung singkat/short circuit Kalibari pressure switch dan flow meter sehingga pembacaan nya tetap akurat Lubrikasi seluruh bearing/bantalan pada seluruh pompa dan diesel engine