Penalties for Violations of
EMF Norms in India
Presentation by:
Naveen Jakhar
ITS– 2014 Batch
TERM Cell Punjab
1
Topics covered in this
presentation:
 Approach for Violations
 TSP Penalty guidelines dated 11th January, 2012
 TSP Penalty guidelines dated 11th October, 2012
 TSP Penalty guidelines dated 20th November, 2013
 TSP Penalty guidelines dated 10th June, 2014
2
Approach for Violations
3
Violations
Technical violations/EMF
threshold value violations
Signage related Violations
Penalty Guidelines dated 11th
January 2012
4
 TERM Cells to check compliance of EMF radiation norms
 In a LSA where more than 1 TERM Cells are present,
TERM Cell of that LSA will impose penalty
 Demand notice to deposit penalty -> issued by Director
TERM -> 21 days given to TSP for depositing penalty
 TSP may represent their case to DDG of same TERM Cell
within a week -> if TSP does not agree with penalty
imposed -> above provision to be made clear to TSP with
the demand notice
Penalty Guidelines dated 11th
January 2012
5
 Decision of DDG TERM is final
 Amount of penalty to be deposited within one week of
DDG TERM’s decision or within 21 days of receiving
demand notice, whichever later
 Penalty to be submitted in a demand draft in favour of
CAO, office of CCA
 If penalty not paid within this time frame, Interest rate =
SBI Personal loan rate +2% to be levied on TSP
Penalties as per DoT order dated
11th October, 2012
6
Penalties as per DoT order 11/10/2012
Penalties for Non-
compliance to EMF
Radiation norms
Penalties for Non-submission
of Self Certificates
Penalty for non-
provision of signage
1
Rs 5 Lakh per BTS per
licensee – single &
shared sites case
Rs 5 Lakh per BTS per
licensee if self certificates not
submitted by due date
Penalty of Rs 5000 per
signage per site on
first verification
2
If BTS site is not made
compliant within 30
days, shut down of entire
BTS site
If no self submission within
30 days after due date, shut
down of entire BTS site
after 30 days of
verification date Rs
5000 per week subject
to a max. Rs 50000
Signage guidelines as per TEC Doc
August, 2010
7
Penalty Guidelines dated 11th
October, 2012
8
• Shared Site -> Penalty of Rs 5 lakhs per BTS to be imposed
on each TSP licensee on that site if BTS site is non –
compliant to EMF Radiation norms
• Shared site -> 30 days time given for making the BTS site
compliant to EMF norms -> No -> Complete BTS site
shutdown
• Time for submission of self certificates expired on
31/03/2011 -> Penalty of Rs 5 Lakhs per BTS per TSP ->
still don’t pay -> BTS site shut down after 2 weeks
Penalties as per DoT order dated
20th November, 2013
9
 Penalty to be imposed for Non-submission/Delayed
submission of Self Certificates in case of new BTSs
 New BTS -> Self certificate to be submitted to TERM Cell
-> Commercially radiation of BTS can be started
 TSP to submit self certificate to TERM cell within 15 days
of first radiation done for testing purpose
 Operation support system snapshot corresponding to first
radiation for testing purpose to be submitted to TERM
Cell
 This 15th day is called due date
Penalties as per DoT order dated
20th November, 2013
10
Penalties as per DoT order dated
20th November, 2013
11
 Revised self certificate to be submitted by TSP for :
 Increase in TRX/channels
 Change of antenna
 Change in electrical/mechanical tilt
 Change in azimuth (more than 2 degree change)
 Change in antenna height
 Revised self certificate to be submitted with 15 days.
 15th day is called due date
Penalties as per DoT order dated
20th November, 2013
12
Penalties as per DoT order dated
20th November, 2013
13
 TSPs to submit self certificate once in every 2 years
 The minimum time duration between two successive
submissions for any BTS site by any TSP should be one
year or more
Penalties as per DoT order dated
20th November, 2013
14
 If TSP submit incomplete/improper self certificate –
Penalty of Rs 5000 on detection of these by TERM Cell
 TSP pays the penalty and submit revised correct self
certificate within 15 days

Penalties as per DoT order dated
20th November, 2013
15
 Incomplete/Improper/Non-submission/ of Site
Photographs, Site layout or
 Submission of single certificate for BTS(s) of multiple
technologies at shared site or submission of unsigned
document by TSP
 Penalty of Rs 2000 per certificate when detected by
TERM cell &
 30 days time given to TSPs to remove all deficiencies
 No compliance received within 30 days -> penalty of Rs
3000 per week, subject to maximum of Rs 20000 per
certficate
Penalties as per DoT order dated
20th November, 2013
16
 If simultaneous existence of deficiencies as discussed on
Slide No. 12 and 13 -> single penalty as per Slide No. 12 to
be imposed
 TERM Cell to indicate all deficiencies to TSPs
 In case of multiple shortcomings and deficiencies in Self
Certificate -> most severe of all penalties to be imposed
per BTS per incidence
 Non –compliance of BTS EMF norms -> Penalty of Rs 10
lakhs per BTS per incidence
Penalties as per DoT order dated
10th June, 2014
17
 TSPs have different operational systems installed in their
telecom networks and snapshot from OSS corresponding
to first EMF radiation indicating date and time etc. varies
from system to system
 Therefore, one page snapshot from any system in any
format indicating date and time of first radiation will
suffice
 Undertaking -> “We hereby confirm that the above site is
compliant to the EMF levels as specified by DoT and
effective at present. Date of Upgrade: DD/MM/YYYY ”
Penalties as per DoT order dated
10th June, 2014
18
 Penalty Table present on slide 12 had one ambiguity – the
due date of 15 days was not explicitly mentioned. It was
corrected in DoT Order dated 10th June,2014
Penalties as per DoT order dated
10th June, 2014
19
 Dot Order dated 10th June, 2014 -> Revised self certificate
to be submitted by TSP for :
 Increase in TRX/channels
 Change of antenna
 Change in electrical/mechanical tilt
 Change in azimuth (more than 2 degree change)
 Change in antenna height
 Increase in Transmitter Output power (TX power)
 Revised self certificate to be submitted with 15 days.
 15th day is called due date
20
 http://dot.gov.in/journey-emf
 http://dot.gov.in
 http://tec.gov.in
 Test Procedure Supplement on Test Procedure for
Measurement of Electromagnetic Fields from Base
Station Antenna (Addendum to TEC Doc. No.
TEC/TP/EMF/001/01.SEP-2009)
References:
Thank you
“Instant Telecommunication allows better and
updated information”
21

More Related Content

What's hot

RF Antenna Planning
RF Antenna PlanningRF Antenna Planning
RF Antenna Planning
Mohammed Abuibaid
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
AIRTEL
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
123sudha
 
Beginners: Fixed Wireless Access (FWA)
Beginners: Fixed Wireless Access (FWA)Beginners: Fixed Wireless Access (FWA)
Beginners: Fixed Wireless Access (FWA)
3G4G
 
Base Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RANBase Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RAN
3G4G
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
Vijay Anand
 
Microwave Antenna -- MW Transmission
Microwave Antenna -- MW TransmissionMicrowave Antenna -- MW Transmission
Microwave Antenna -- MW Transmission
Mohamed Sewailam
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
ibrahimnabil17
 
Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installationAli Usman
 
Base Transceiver Station (BTS)
Base Transceiver Station (BTS)Base Transceiver Station (BTS)
Base Transceiver Station (BTS)
Waqas Ahmed Nawaz
 
Bsnl Industrial training report
Bsnl Industrial training reportBsnl Industrial training report
Bsnl Industrial training report
Shivam Gupta
 
Gsm channel calculations
Gsm channel calculationsGsm channel calculations
Gsm channel calculations
Althaf Hussain
 
Cellphone signal detector and jammer ppt
Cellphone signal detector and jammer pptCellphone signal detector and jammer ppt
Cellphone signal detector and jammer ppt
Amar Raj
 
Wireless network (cellular network architecture and http.)
Wireless network (cellular network architecture and http.)Wireless network (cellular network architecture and http.)
Wireless network (cellular network architecture and http.)
Abdullah Moin
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
ibrahimnabil17
 
Ibs Rajeesh
Ibs RajeeshIbs Rajeesh
Wi-Fi Architecture
Wi-Fi ArchitectureWi-Fi Architecture
Wi-Fi Architecture
Arnab Ghosal
 
Base Station System
Base Station SystemBase Station System
Base Station SystemSokunth Che
 

What's hot (20)

RF Antenna Planning
RF Antenna PlanningRF Antenna Planning
RF Antenna Planning
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
 
Beginners: Fixed Wireless Access (FWA)
Beginners: Fixed Wireless Access (FWA)Beginners: Fixed Wireless Access (FWA)
Beginners: Fixed Wireless Access (FWA)
 
Base Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RANBase Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RAN
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
 
Microwave Antenna -- MW Transmission
Microwave Antenna -- MW TransmissionMicrowave Antenna -- MW Transmission
Microwave Antenna -- MW Transmission
 
Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000Ericsson RBS 6000 & 3000 & 2000
Ericsson RBS 6000 & 3000 & 2000
 
Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
 
Base Transceiver Station (BTS)
Base Transceiver Station (BTS)Base Transceiver Station (BTS)
Base Transceiver Station (BTS)
 
Bsnl Industrial training report
Bsnl Industrial training reportBsnl Industrial training report
Bsnl Industrial training report
 
rf planning
rf planningrf planning
rf planning
 
Gsm channel calculations
Gsm channel calculationsGsm channel calculations
Gsm channel calculations
 
Cellphone signal detector and jammer ppt
Cellphone signal detector and jammer pptCellphone signal detector and jammer ppt
Cellphone signal detector and jammer ppt
 
Wireless network (cellular network architecture and http.)
Wireless network (cellular network architecture and http.)Wireless network (cellular network architecture and http.)
Wireless network (cellular network architecture and http.)
 
ZTE BTS Manual
ZTE BTS ManualZTE BTS Manual
ZTE BTS Manual
 
cellular ppt
cellular pptcellular ppt
cellular ppt
 
Ibs Rajeesh
Ibs RajeeshIbs Rajeesh
Ibs Rajeesh
 
Wi-Fi Architecture
Wi-Fi ArchitectureWi-Fi Architecture
Wi-Fi Architecture
 
Base Station System
Base Station SystemBase Station System
Base Station System
 

Similar to Penalty for violations of EMF radiation norms in India

Andhra Pradesh Right of Way Policy Review
Andhra Pradesh Right of Way Policy Review Andhra Pradesh Right of Way Policy Review
Andhra Pradesh Right of Way Policy Review
Nilesh Singh
 
EMF session
EMF sessionEMF session
EMF session
Harish Negi
 
Electricity Tariff (1).pptx
Electricity Tariff (1).pptxElectricity Tariff (1).pptx
Electricity Tariff (1).pptx
suman943324
 
133/2008 Amendments
133/2008 Amendments133/2008 Amendments
133/2008 Amendments
traoman
 
Elec act
Elec actElec act
Elec act
Pedagogueseven
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
Headway Solar
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
PRIYANK JAIN
 
Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...
Headway Solar
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
Harish Sharma
 
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012GreenergyTechnologies
 
133/2008 Issuing the regulation
133/2008 Issuing the regulation133/2008 Issuing the regulation
133/2008 Issuing the regulation
traoman
 
Presentation2 (6)
Presentation2 (6)Presentation2 (6)
Presentation2 (6)
Ajay Rathee
 
1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt
GeorgeKGeorge3
 
Understanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
Understanding TLD Management: Ensuring Radiographer Safety in X-ray ProceduresUnderstanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
Understanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
yhari822
 
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
GLC
 
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptxCRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
DoraDora58
 
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Rishi Srivastava
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Harish Sharma
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295
Ramesh Meti
 

Similar to Penalty for violations of EMF radiation norms in India (20)

Andhra Pradesh Right of Way Policy Review
Andhra Pradesh Right of Way Policy Review Andhra Pradesh Right of Way Policy Review
Andhra Pradesh Right of Way Policy Review
 
EMF session
EMF sessionEMF session
EMF session
 
Electricity Tariff (1).pptx
Electricity Tariff (1).pptxElectricity Tariff (1).pptx
Electricity Tariff (1).pptx
 
133/2008 Amendments
133/2008 Amendments133/2008 Amendments
133/2008 Amendments
 
Elec act
Elec actElec act
Elec act
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012
Tamil nadu tangedco_1000_mw_solar_tender_05-12-2012
 
133/2008 Issuing the regulation
133/2008 Issuing the regulation133/2008 Issuing the regulation
133/2008 Issuing the regulation
 
Cerc
CercCerc
Cerc
 
Presentation2 (6)
Presentation2 (6)Presentation2 (6)
Presentation2 (6)
 
1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt1. ERS PPT - 20 OCT 2022.ppt
1. ERS PPT - 20 OCT 2022.ppt
 
Understanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
Understanding TLD Management: Ensuring Radiographer Safety in X-ray ProceduresUnderstanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
Understanding TLD Management: Ensuring Radiographer Safety in X-ray Procedures
 
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
Technical Assistance and Consultancy Service Agreement Sample (Purchase this ...
 
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptxCRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
CRAN-Spectrum-Fee-Regulations-Public-Hearing-29-July-2020-RLG.pptx
 
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295
 

More from Naveen Jakhar, I.T.S

Security in Embedded systems
Security in Embedded systems Security in Embedded systems
Security in Embedded systems
Naveen Jakhar, I.T.S
 
MNP sixth adendment regulations
MNP sixth adendment regulationsMNP sixth adendment regulations
MNP sixth adendment regulations
Naveen Jakhar, I.T.S
 
Inter-Ministerial R&D for EMF radiation guidelines
Inter-Ministerial R&D for EMF radiation guidelinesInter-Ministerial R&D for EMF radiation guidelines
Inter-Ministerial R&D for EMF radiation guidelines
Naveen Jakhar, I.T.S
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
Naveen Jakhar, I.T.S
 
UMTS Protocols
UMTS ProtocolsUMTS Protocols
UMTS Protocols
Naveen Jakhar, I.T.S
 
UMTS core network and its evolution
UMTS core network and its evolutionUMTS core network and its evolution
UMTS core network and its evolution
Naveen Jakhar, I.T.S
 
GSM Air Interface
GSM Air Interface GSM Air Interface
GSM Air Interface
Naveen Jakhar, I.T.S
 
Introduction to SIM and USIM
Introduction to SIM and USIMIntroduction to SIM and USIM
Introduction to SIM and USIM
Naveen Jakhar, I.T.S
 
Drive testing in mobile networks
Drive testing in mobile networksDrive testing in mobile networks
Drive testing in mobile networks
Naveen Jakhar, I.T.S
 
Operating support subsystem (oss) presentation
Operating  support subsystem (oss) presentationOperating  support subsystem (oss) presentation
Operating support subsystem (oss) presentation
Naveen Jakhar, I.T.S
 
Journey of Evolution of UMTS and CDMA
Journey of Evolution of UMTS and CDMAJourney of Evolution of UMTS and CDMA
Journey of Evolution of UMTS and CDMA
Naveen Jakhar, I.T.S
 
Concepts of optical fiber communication
Concepts of optical fiber communicationConcepts of optical fiber communication
Concepts of optical fiber communication
Naveen Jakhar, I.T.S
 
Radio resource management in wcdma
Radio resource management in wcdmaRadio resource management in wcdma
Radio resource management in wcdma
Naveen Jakhar, I.T.S
 
Satellite Communication Theory
Satellite  Communication TheorySatellite  Communication Theory
Satellite Communication Theory
Naveen Jakhar, I.T.S
 
Presentation on satellite antenna
Presentation on satellite antennaPresentation on satellite antenna
Presentation on satellite antenna
Naveen Jakhar, I.T.S
 
Data communication basics
Data communication basicsData communication basics
Data communication basics
Naveen Jakhar, I.T.S
 
Over view of Transmission Technologies & Optical Fiber Communication
Over view of Transmission Technologies & Optical Fiber Communication Over view of Transmission Technologies & Optical Fiber Communication
Over view of Transmission Technologies & Optical Fiber Communication
Naveen Jakhar, I.T.S
 
Overview of Radio Communication
Overview of Radio CommunicationOverview of Radio Communication
Overview of Radio Communication
Naveen Jakhar, I.T.S
 
Internet of Things
Internet of ThingsInternet of Things
Internet of Things
Naveen Jakhar, I.T.S
 
RFC and internet standards presentation
RFC and internet standards presentationRFC and internet standards presentation
RFC and internet standards presentation
Naveen Jakhar, I.T.S
 

More from Naveen Jakhar, I.T.S (20)

Security in Embedded systems
Security in Embedded systems Security in Embedded systems
Security in Embedded systems
 
MNP sixth adendment regulations
MNP sixth adendment regulationsMNP sixth adendment regulations
MNP sixth adendment regulations
 
Inter-Ministerial R&D for EMF radiation guidelines
Inter-Ministerial R&D for EMF radiation guidelinesInter-Ministerial R&D for EMF radiation guidelines
Inter-Ministerial R&D for EMF radiation guidelines
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
 
UMTS Protocols
UMTS ProtocolsUMTS Protocols
UMTS Protocols
 
UMTS core network and its evolution
UMTS core network and its evolutionUMTS core network and its evolution
UMTS core network and its evolution
 
GSM Air Interface
GSM Air Interface GSM Air Interface
GSM Air Interface
 
Introduction to SIM and USIM
Introduction to SIM and USIMIntroduction to SIM and USIM
Introduction to SIM and USIM
 
Drive testing in mobile networks
Drive testing in mobile networksDrive testing in mobile networks
Drive testing in mobile networks
 
Operating support subsystem (oss) presentation
Operating  support subsystem (oss) presentationOperating  support subsystem (oss) presentation
Operating support subsystem (oss) presentation
 
Journey of Evolution of UMTS and CDMA
Journey of Evolution of UMTS and CDMAJourney of Evolution of UMTS and CDMA
Journey of Evolution of UMTS and CDMA
 
Concepts of optical fiber communication
Concepts of optical fiber communicationConcepts of optical fiber communication
Concepts of optical fiber communication
 
Radio resource management in wcdma
Radio resource management in wcdmaRadio resource management in wcdma
Radio resource management in wcdma
 
Satellite Communication Theory
Satellite  Communication TheorySatellite  Communication Theory
Satellite Communication Theory
 
Presentation on satellite antenna
Presentation on satellite antennaPresentation on satellite antenna
Presentation on satellite antenna
 
Data communication basics
Data communication basicsData communication basics
Data communication basics
 
Over view of Transmission Technologies & Optical Fiber Communication
Over view of Transmission Technologies & Optical Fiber Communication Over view of Transmission Technologies & Optical Fiber Communication
Over view of Transmission Technologies & Optical Fiber Communication
 
Overview of Radio Communication
Overview of Radio CommunicationOverview of Radio Communication
Overview of Radio Communication
 
Internet of Things
Internet of ThingsInternet of Things
Internet of Things
 
RFC and internet standards presentation
RFC and internet standards presentationRFC and internet standards presentation
RFC and internet standards presentation
 

Recently uploaded

Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 

Recently uploaded (20)

Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 

Penalty for violations of EMF radiation norms in India

  • 1. Penalties for Violations of EMF Norms in India Presentation by: Naveen Jakhar ITS– 2014 Batch TERM Cell Punjab 1
  • 2. Topics covered in this presentation:  Approach for Violations  TSP Penalty guidelines dated 11th January, 2012  TSP Penalty guidelines dated 11th October, 2012  TSP Penalty guidelines dated 20th November, 2013  TSP Penalty guidelines dated 10th June, 2014 2
  • 3. Approach for Violations 3 Violations Technical violations/EMF threshold value violations Signage related Violations
  • 4. Penalty Guidelines dated 11th January 2012 4  TERM Cells to check compliance of EMF radiation norms  In a LSA where more than 1 TERM Cells are present, TERM Cell of that LSA will impose penalty  Demand notice to deposit penalty -> issued by Director TERM -> 21 days given to TSP for depositing penalty  TSP may represent their case to DDG of same TERM Cell within a week -> if TSP does not agree with penalty imposed -> above provision to be made clear to TSP with the demand notice
  • 5. Penalty Guidelines dated 11th January 2012 5  Decision of DDG TERM is final  Amount of penalty to be deposited within one week of DDG TERM’s decision or within 21 days of receiving demand notice, whichever later  Penalty to be submitted in a demand draft in favour of CAO, office of CCA  If penalty not paid within this time frame, Interest rate = SBI Personal loan rate +2% to be levied on TSP
  • 6. Penalties as per DoT order dated 11th October, 2012 6 Penalties as per DoT order 11/10/2012 Penalties for Non- compliance to EMF Radiation norms Penalties for Non-submission of Self Certificates Penalty for non- provision of signage 1 Rs 5 Lakh per BTS per licensee – single & shared sites case Rs 5 Lakh per BTS per licensee if self certificates not submitted by due date Penalty of Rs 5000 per signage per site on first verification 2 If BTS site is not made compliant within 30 days, shut down of entire BTS site If no self submission within 30 days after due date, shut down of entire BTS site after 30 days of verification date Rs 5000 per week subject to a max. Rs 50000
  • 7. Signage guidelines as per TEC Doc August, 2010 7
  • 8. Penalty Guidelines dated 11th October, 2012 8 • Shared Site -> Penalty of Rs 5 lakhs per BTS to be imposed on each TSP licensee on that site if BTS site is non – compliant to EMF Radiation norms • Shared site -> 30 days time given for making the BTS site compliant to EMF norms -> No -> Complete BTS site shutdown • Time for submission of self certificates expired on 31/03/2011 -> Penalty of Rs 5 Lakhs per BTS per TSP -> still don’t pay -> BTS site shut down after 2 weeks
  • 9. Penalties as per DoT order dated 20th November, 2013 9  Penalty to be imposed for Non-submission/Delayed submission of Self Certificates in case of new BTSs  New BTS -> Self certificate to be submitted to TERM Cell -> Commercially radiation of BTS can be started  TSP to submit self certificate to TERM cell within 15 days of first radiation done for testing purpose  Operation support system snapshot corresponding to first radiation for testing purpose to be submitted to TERM Cell  This 15th day is called due date
  • 10. Penalties as per DoT order dated 20th November, 2013 10
  • 11. Penalties as per DoT order dated 20th November, 2013 11  Revised self certificate to be submitted by TSP for :  Increase in TRX/channels  Change of antenna  Change in electrical/mechanical tilt  Change in azimuth (more than 2 degree change)  Change in antenna height  Revised self certificate to be submitted with 15 days.  15th day is called due date
  • 12. Penalties as per DoT order dated 20th November, 2013 12
  • 13. Penalties as per DoT order dated 20th November, 2013 13  TSPs to submit self certificate once in every 2 years  The minimum time duration between two successive submissions for any BTS site by any TSP should be one year or more
  • 14. Penalties as per DoT order dated 20th November, 2013 14  If TSP submit incomplete/improper self certificate – Penalty of Rs 5000 on detection of these by TERM Cell  TSP pays the penalty and submit revised correct self certificate within 15 days 
  • 15. Penalties as per DoT order dated 20th November, 2013 15  Incomplete/Improper/Non-submission/ of Site Photographs, Site layout or  Submission of single certificate for BTS(s) of multiple technologies at shared site or submission of unsigned document by TSP  Penalty of Rs 2000 per certificate when detected by TERM cell &  30 days time given to TSPs to remove all deficiencies  No compliance received within 30 days -> penalty of Rs 3000 per week, subject to maximum of Rs 20000 per certficate
  • 16. Penalties as per DoT order dated 20th November, 2013 16  If simultaneous existence of deficiencies as discussed on Slide No. 12 and 13 -> single penalty as per Slide No. 12 to be imposed  TERM Cell to indicate all deficiencies to TSPs  In case of multiple shortcomings and deficiencies in Self Certificate -> most severe of all penalties to be imposed per BTS per incidence  Non –compliance of BTS EMF norms -> Penalty of Rs 10 lakhs per BTS per incidence
  • 17. Penalties as per DoT order dated 10th June, 2014 17  TSPs have different operational systems installed in their telecom networks and snapshot from OSS corresponding to first EMF radiation indicating date and time etc. varies from system to system  Therefore, one page snapshot from any system in any format indicating date and time of first radiation will suffice  Undertaking -> “We hereby confirm that the above site is compliant to the EMF levels as specified by DoT and effective at present. Date of Upgrade: DD/MM/YYYY ”
  • 18. Penalties as per DoT order dated 10th June, 2014 18  Penalty Table present on slide 12 had one ambiguity – the due date of 15 days was not explicitly mentioned. It was corrected in DoT Order dated 10th June,2014
  • 19. Penalties as per DoT order dated 10th June, 2014 19  Dot Order dated 10th June, 2014 -> Revised self certificate to be submitted by TSP for :  Increase in TRX/channels  Change of antenna  Change in electrical/mechanical tilt  Change in azimuth (more than 2 degree change)  Change in antenna height  Increase in Transmitter Output power (TX power)  Revised self certificate to be submitted with 15 days.  15th day is called due date
  • 20. 20  http://dot.gov.in/journey-emf  http://dot.gov.in  http://tec.gov.in  Test Procedure Supplement on Test Procedure for Measurement of Electromagnetic Fields from Base Station Antenna (Addendum to TEC Doc. No. TEC/TP/EMF/001/01.SEP-2009) References:
  • 21. Thank you “Instant Telecommunication allows better and updated information” 21