SlideShare a Scribd company logo
HOW TO IMPROVE YOUR ON-
TIME DELIVERY WITH A SMART
PRODUCTION PLANNING AND
SCHEDULING SOLUTION
MICHAL PRĘTCZYŃSKI
PROJECT MANAGER FOR SIMATIC IT
PREACTOR APS IMPLEMENTATIONS AT
PRĘTCZYŃSKI LTD.
4/15/2016
2
AGENDA
AGENDA
1. Understanding the problem
2. Finding the solution with SIMATIC IT
Preactor APS
3. Presentation of SIMATIC IT Preactor APS
4. Areas of potential benefits
5. Questions and answers
A REAL-LIFE EXAMPLE
• Manufacturing company was aware that due to changing market requirements, one
of its main problems was the process of production planning. Ineffective planning
process influenced their responsiveness and on-time deliveries.
• Company went from understanding market requirements, through creating business
requirements for better process, to looking for better software tools that would help.
• The goal was to help Planner in Make to Order environment with many products,
smaller batch sizes, more orders = more data to be scheduled by Planner.
• To ensure maximum flexibility in generating a production schedule while extending
planning horizon.
3
A REAL-LIFE EXAMPLE
• To achieve higher optimization with possible cost reductions and to consider many
criteria while scheduling.
• To integrate with new ERP system and to distribute schedule within organization.
• To introduce the concept of priorities set by Management and not individual Sales
representatives within Sales Department.
• To change the planning process that was divided into three planning departments
and to introduce a concept of a central schedule with a ‘Main Planner’.
4
5
First department - planning using
Excel/manual work
Third department - planning using
Excel/manual work
Sales Department
has received new
order enquiry from
Customer
24 Hours to answer - 72
Hours in total ->
Unacceptable waiting
time.
24 Hours to answer
order enquiry
24 Hours to answer -
48 Hours in total
When we can deliver
this order ?
Second department - planning
using Excel/manual work
A REAL-LIFE EXAMPLE
CHALLENGES IN PRODUCTION PLANNING
• Planning using Excel / Decision on shop floor. All in the mind and hands of Planner /
Planners. Little support from ERP system with its standard functionality.
• No central planning using global priorities. The necessity of arrangements between
different departments.
• No representation of actual capacity. No interactivity and no automation in
sequencing. A need to optimize sequence to reduce cost.
• Short planning horizon. Unknown impact of changes (new priorities, machine
breakdown) in a longer term.
• Problems with due date performance and the answer to the question "When we can
deliver this order?" The pressure on Planning Department.
6
BASIC FUNCTIONALITY THAT IS NEEDED
FOR SCHEDULING SYSTEM
• The ability to schedule more accurately at the machine level and to schedule
precisely (hours, minutes) as opposed to time buckets like week.
• The ability to integrate with other systems like ERP.
• The ability to sequence orders based on due date, priority or minimize changeover
times.
• The ability to schedule using multiple constraints, such as tooling and operators. The
ability to synchronize the schedule with material constraints.
• The ability to schedule quickly (minutes or seconds) and maintain a real-time view of
the schedule.
7
8
AGENDA
AGENDA
1. Understanding the problem
2. Finding the solution with SIMATIC IT
Preactor APS
3. Presentation of SIMATIC IT Preactor APS
4. Areas of potential benefits
5. Questions and answers
INTRODUCING SIMATIC IT PREACTOR APS
9
Siemens SIMATIC IT Preactor is a range of advanced
planning and scheduling (APS) software for the
manufacturing industry.
Quick facts:
 SIMATIC IT Preactor AS is a scheduling tool primarily for
manufacturers who need to schedule machines, production
lines and resources, but Preactor is also used in services and
logistics.
 SIMATIC IT Preactor AP considers forecast and long term
orders to decide feasibility and set general direction of
production; Dynamically sets target stock levels to meet
future demand; Load balance across multiple resources
considering eg constraints, materials shelf life.
INTRODUCING SIMATIC IT PREACTOR APS
Key functionality:
• Modelling actual production capacity (machinery / operators / tooling) - operations
planned when resources and materials are available.
• Automating planning by generating production plan using scheduling rules. The rules
may include customer priorities/due dates or minimization of changeovers.
• Interactive planning board where Planner can change sequence. Analysis of different
versions of the schedule before accepting.
• Simulations "When we can deliver this order?" Analysis of due date performance. Early
information on potential late orders.
• Including material control calculations to check that all materials required are available
10
INTRODUCING SIMATIC IT PREACTOR APS
11
Examples of integrations
available: Microsoft Dynamics
AX and NAV.
INTRODUCING SIMATIC IT PREACTOR APS
12
Large install base serving the manufacturing sector
across the globe. Implementations in Baltic region with
Columbus.
Quick facts:
 Customer base ranges from mid-size to some of the largest
multi-national companies in the world.
 Operates across multiple sectors, this shows the flexibility to
solve any scheduling requirement.
 Global presence of the Siemens Manufacturing Operations
Management Team - probably the largest Manufacturing IT
organization in the world.
13
AGENDA
AGENDA
1. Understanding the problem
2. Finding the solution with SIMATIC IT
Preactor APS
3. Presentation of SIMATIC IT Preactor APS
4. Areas of potential benefits
5. Questions and answers
PLANNING SCENARIOS FOR LIVE
DEMONSTRATION
• Automating planning for all orders. Are all orders on-time?
• High priority order that requires re-planning. Which orders will be delayed?
• A breakdown of machine occurs. Which orders will be affected?
• How changes in material delivery will affect our plan?
• Can we combine priority for due date and a need to minimize changeover times?
14
27
AGENDA
AGENDA
1. Understanding the problem
2. Finding the solution with SIMATIC IT
Preactor APS
3. Presentation of SIMATIC IT Preactor APS
4. Areas of potential benefits
5. Questions and answers
A REAL-LIFE SUCCESS STORY
• To introduce a concept of a central schedule with a ‘Main Planner’ -> central schedule
with Preactor and changing planning procedures.
• Flexibility in generating a production schedule -> visualization on Gantt chart and drag &
drop on planning board.
• Optimization with possible cost reductions -> sequence dependent changeover time
matrices and scheduling rules minimizing changeover times.
• Priorities -> introducing concept of customer-based priorities.
„Together with an instant feedback about expected delivery dates it has improved
effectiveness of work in the sales department and decreased time needed for customer
service.”
„Flexibility and an easy way to change schedules gives us the ability to react quickly to
market requirements.”
28
PLANNING PROCEDURE FOR PLANNER
1
All the production data from previous day,
including quantities produced, must be
entered by Shift leader into ERP till 8:00
Importing current status of
operations and orders from ERP
to Preactor
2
Planner can analyze changes in Preactor and
initiate schedule repair function
Updating schedule in Preactor
with current status of
operations/orders
3
All new production orders, generated from
sales orders by Sales Department, must be
entered till 12:00, so Planner can schedule a
batch of orders and look at priorities
Importing new orders from ERP
to Preactor, updating orders in
schedule with changes
4
Planner reviews new orders, applies
preferred sequence rules, runs What-If
scenarios, accepts the schedule
Generating new schedule in
Preactor
5
Around 14:00 Sales Department receives
information on new dates for work orders
within ERP system
Exporting schedule with new
order dates back to ERP system
6
New production plan is send to Shift Leaders
in each of Departments. Gantt chart is
published on website
Printing new 'Work to-do list'
reports for resources
A REAL-LIFE SUCCESS STORY
30
First department - planning in
central schedule with APS, view on
all resources
Third department - Preactor Viewer
Sales Department has
received new order
enquiry from Customer
-> Order in ERP
When we can deliver
this order ?
Second department - Preactor
Viewer
Exchanging information
based on prepared
schedule - dealing mainly
with exceptions
Answer with expected
Order End Date
within hours
Before 72 hours
-
After within 4 hours
AREAS OF POTENTIAL BENEFITS
31
Improving the planning process
 Automation of the process, compared to manual system
or Excel can allow for extra time that can be used to
optimize the process.
 In the case of centralized schedule less demand for
planning resources, for example reducing overtime.
One of the users with Case Studies reported 70% reduction
time needed for production planning.
Improving the customer service
 The ability to quickly give feedback on the planned
delivery date of the order, especially in the case of
changes to the plan.
 Lowering the cost of delays for example penalties or
additional costs for the logistics.
Some of the users with Case Studies reported up to 80%
improvement in delivery performance.
Improving the productivity
 Better use of resources, for example by minimizing
changeover times due to dynamic aggregation of
operations on machines, or reduction of overtime.
 Better use of subcontractors based on real production
plan.
Some of the users with Case Studies reported up to 25%
increase in productivity.
Improving material management and
make span reduction
 Extension of the planning horizon and better
synchronization of raw material purchases to the
production plan based on the limited manufacturing
capacity.
 Improving synchronization of operations and orders
between departments.
Some of the users with Case Studies reported 50%
reduction in raw material stock.
AREAS OF POTENTIAL BENEFITS
32
More than 200 case studies published at preactor.com
25% increase in productivity
50% reduction in raw material stock
50% reduction in work-in-process
80% improvement in delivery performance
Preactor
Detailed
Scheduling
(figures taken from various Preactor case studies)
33
AGENDA
AGENDA
1. Understanding the problem
2. Finding the solution with SIMATIC IT
Preactor APS
3. Presentation of SIMATIC IT Preactor APS
4. Areas of potential benefits
5. Questions and answers
34
Contact local Columbus just now:
Estonia: eesti@columbusglobal.com
Latvia sales@columbus.lv
Lithuania erp.lt@columbusglobal.com
Presenter:
Michał Prętczyński
E-mail: mp@pretczynski.pl
www.pretczynski.biz
THANK YOU!

More Related Content

What's hot

Preparing cost estimation
Preparing cost estimationPreparing cost estimation
Preparing cost estimationSomashekar S.M
 
Production module in erp
Production module in erpProduction module in erp
Production module in erpiymani
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
Erp Presentation
Erp Presentation Erp Presentation
Erp Presentation guest0269c8
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2Ari Limpo
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Dr.Adel Ghannam
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)Chitrangada Roy
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainSaad Munami
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
CAPP , JIT, FMS
CAPP , JIT, FMSCAPP , JIT, FMS
CAPP , JIT, FMSDenny John
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationPankaj Kumar
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentationAkash Maurya
 
Mp cn6 master production schedule
Mp cn6  master production scheduleMp cn6  master production schedule
Mp cn6 master production schedulepatiltushar96
 

What's hot (19)

Mrp ii
Mrp iiMrp ii
Mrp ii
 
Preparing cost estimation
Preparing cost estimationPreparing cost estimation
Preparing cost estimation
 
Production module in erp
Production module in erpProduction module in erp
Production module in erp
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Mrp, mrp 2 n bpr
Mrp, mrp 2 n bprMrp, mrp 2 n bpr
Mrp, mrp 2 n bpr
 
Erp Presentation
Erp Presentation Erp Presentation
Erp Presentation
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
0201B Aggregate Resource Planning
0201B Aggregate Resource Planning0201B Aggregate Resource Planning
0201B Aggregate Resource Planning
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
CAPP , JIT, FMS
CAPP , JIT, FMSCAPP , JIT, FMS
CAPP , JIT, FMS
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Production module
Production moduleProduction module
Production module
 
mohsin dalvi mrp ii presentation
mohsin dalvi   mrp ii presentationmohsin dalvi   mrp ii presentation
mohsin dalvi mrp ii presentation
 
Mp cn6 master production schedule
Mp cn6  master production scheduleMp cn6  master production schedule
Mp cn6 master production schedule
 

Similar to Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo įrankius

Oracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionOracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionTony Sebastian
 
Planning the AMPPLE Way
Planning the AMPPLE WayPlanning the AMPPLE Way
Planning the AMPPLE Wayatif.hussain
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 
Oracle Demantra - Demand Planning Overview
Oracle Demantra - Demand Planning OverviewOracle Demantra - Demand Planning Overview
Oracle Demantra - Demand Planning OverviewMihir Jhaveri (26,000+)
 
3CIT Consulting - ERP for sales planning using master production schedule con...
3CIT Consulting - ERP for sales planning using master production schedule con...3CIT Consulting - ERP for sales planning using master production schedule con...
3CIT Consulting - ERP for sales planning using master production schedule con...Mahesh Rao
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
026 Fast React-Productivity improvement
026 Fast React-Productivity improvement026 Fast React-Productivity improvement
026 Fast React-Productivity improvementDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementdrdej19
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptxvirshit
 
Preactor Sage1000 Integration
Preactor Sage1000 IntegrationPreactor Sage1000 Integration
Preactor Sage1000 Integrationsteve littlewood
 
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdf
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdfMaximizing Efficiency_ The Benefits of Production Scheduling Software.pdf
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdfEnterprise Wired
 
Schema on read with runtime fields
Schema on read with runtime fieldsSchema on read with runtime fields
Schema on read with runtime fieldsElasticsearch
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 

Similar to Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo įrankius (20)

Oracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionOracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP Solution
 
Planning the AMPPLE Way
Planning the AMPPLE WayPlanning the AMPPLE Way
Planning the AMPPLE Way
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Oracle Demantra - Demand Planning Overview
Oracle Demantra - Demand Planning OverviewOracle Demantra - Demand Planning Overview
Oracle Demantra - Demand Planning Overview
 
3CIT Consulting - ERP for sales planning using master production schedule con...
3CIT Consulting - ERP for sales planning using master production schedule con...3CIT Consulting - ERP for sales planning using master production schedule con...
3CIT Consulting - ERP for sales planning using master production schedule con...
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
026 Fast React-Productivity improvement
026 Fast React-Productivity improvement026 Fast React-Productivity improvement
026 Fast React-Productivity improvement
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Rccp report
Rccp reportRccp report
Rccp report
 
5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx5.Production Scheduling and Sequencing.pptx
5.Production Scheduling and Sequencing.pptx
 
Preactor Sage1000 Integration
Preactor Sage1000 IntegrationPreactor Sage1000 Integration
Preactor Sage1000 Integration
 
VCP Roadmap
VCP RoadmapVCP Roadmap
VCP Roadmap
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Unit 1 manufacturing system design
Unit   1 manufacturing system designUnit   1 manufacturing system design
Unit 1 manufacturing system design
 
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdf
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdfMaximizing Efficiency_ The Benefits of Production Scheduling Software.pdf
Maximizing Efficiency_ The Benefits of Production Scheduling Software.pdf
 
Schema on read with runtime fields
Schema on read with runtime fieldsSchema on read with runtime fields
Schema on read with runtime fields
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 

Recently uploaded

Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Globus
 
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILBeyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILNatan Silnitsky
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfAMB-Review
 
Into the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdfInto the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdfOrtus Solutions, Corp
 
Advanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should KnowAdvanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should KnowPeter Caitens
 
top nidhi software solution freedownload
top nidhi software solution freedownloadtop nidhi software solution freedownload
top nidhi software solution freedownloadvrstrong314
 
A Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdfA Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdfkalichargn70th171
 
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Globus
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessWSO2
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...informapgpstrackings
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of ProgrammingMatt Welsh
 
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...Shahin Sheidaei
 
SOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfMayankTawar1
 
2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptxGeorgi Kodinov
 
Enhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfEnhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfGlobus
 
Agnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in KrakówAgnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in Krakówbim.edu.pl
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyanic lab
 
Studiovity film pre-production and screenwriting software
Studiovity film pre-production and screenwriting softwareStudiovity film pre-production and screenwriting software
Studiovity film pre-production and screenwriting softwareinfo611746
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...Juraj Vysvader
 

Recently uploaded (20)

Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
 
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.ILBeyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
Beyond Event Sourcing - Embracing CRUD for Wix Platform - Java.IL
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
 
Into the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdfInto the Box 2024 - Keynote Day 2 Slides.pdf
Into the Box 2024 - Keynote Day 2 Slides.pdf
 
Advanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should KnowAdvanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should Know
 
top nidhi software solution freedownload
top nidhi software solution freedownloadtop nidhi software solution freedownload
top nidhi software solution freedownload
 
A Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdfA Comprehensive Look at Generative AI in Retail App Testing.pdf
A Comprehensive Look at Generative AI in Retail App Testing.pdf
 
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
 
Large Language Models and the End of Programming
Large Language Models and the End of ProgrammingLarge Language Models and the End of Programming
Large Language Models and the End of Programming
 
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
Gamify Your Mind; The Secret Sauce to Delivering Success, Continuously Improv...
 
SOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBroker
 
Software Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdfSoftware Testing Exam imp Ques Notes.pdf
Software Testing Exam imp Ques Notes.pdf
 
2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx2024 RoOUG Security model for the cloud.pptx
2024 RoOUG Security model for the cloud.pptx
 
Enhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdfEnhancing Research Orchestration Capabilities at ORNL.pdf
Enhancing Research Orchestration Capabilities at ORNL.pdf
 
Agnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in KrakówAgnieszka Andrzejewska - BIM School Course in Kraków
Agnieszka Andrzejewska - BIM School Course in Kraków
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
 
Studiovity film pre-production and screenwriting software
Studiovity film pre-production and screenwriting softwareStudiovity film pre-production and screenwriting software
Studiovity film pre-production and screenwriting software
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
 

Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo įrankius

  • 1. HOW TO IMPROVE YOUR ON- TIME DELIVERY WITH A SMART PRODUCTION PLANNING AND SCHEDULING SOLUTION MICHAL PRĘTCZYŃSKI PROJECT MANAGER FOR SIMATIC IT PREACTOR APS IMPLEMENTATIONS AT PRĘTCZYŃSKI LTD. 4/15/2016
  • 2. 2 AGENDA AGENDA 1. Understanding the problem 2. Finding the solution with SIMATIC IT Preactor APS 3. Presentation of SIMATIC IT Preactor APS 4. Areas of potential benefits 5. Questions and answers
  • 3. A REAL-LIFE EXAMPLE • Manufacturing company was aware that due to changing market requirements, one of its main problems was the process of production planning. Ineffective planning process influenced their responsiveness and on-time deliveries. • Company went from understanding market requirements, through creating business requirements for better process, to looking for better software tools that would help. • The goal was to help Planner in Make to Order environment with many products, smaller batch sizes, more orders = more data to be scheduled by Planner. • To ensure maximum flexibility in generating a production schedule while extending planning horizon. 3
  • 4. A REAL-LIFE EXAMPLE • To achieve higher optimization with possible cost reductions and to consider many criteria while scheduling. • To integrate with new ERP system and to distribute schedule within organization. • To introduce the concept of priorities set by Management and not individual Sales representatives within Sales Department. • To change the planning process that was divided into three planning departments and to introduce a concept of a central schedule with a ‘Main Planner’. 4
  • 5. 5 First department - planning using Excel/manual work Third department - planning using Excel/manual work Sales Department has received new order enquiry from Customer 24 Hours to answer - 72 Hours in total -> Unacceptable waiting time. 24 Hours to answer order enquiry 24 Hours to answer - 48 Hours in total When we can deliver this order ? Second department - planning using Excel/manual work A REAL-LIFE EXAMPLE
  • 6. CHALLENGES IN PRODUCTION PLANNING • Planning using Excel / Decision on shop floor. All in the mind and hands of Planner / Planners. Little support from ERP system with its standard functionality. • No central planning using global priorities. The necessity of arrangements between different departments. • No representation of actual capacity. No interactivity and no automation in sequencing. A need to optimize sequence to reduce cost. • Short planning horizon. Unknown impact of changes (new priorities, machine breakdown) in a longer term. • Problems with due date performance and the answer to the question "When we can deliver this order?" The pressure on Planning Department. 6
  • 7. BASIC FUNCTIONALITY THAT IS NEEDED FOR SCHEDULING SYSTEM • The ability to schedule more accurately at the machine level and to schedule precisely (hours, minutes) as opposed to time buckets like week. • The ability to integrate with other systems like ERP. • The ability to sequence orders based on due date, priority or minimize changeover times. • The ability to schedule using multiple constraints, such as tooling and operators. The ability to synchronize the schedule with material constraints. • The ability to schedule quickly (minutes or seconds) and maintain a real-time view of the schedule. 7
  • 8. 8 AGENDA AGENDA 1. Understanding the problem 2. Finding the solution with SIMATIC IT Preactor APS 3. Presentation of SIMATIC IT Preactor APS 4. Areas of potential benefits 5. Questions and answers
  • 9. INTRODUCING SIMATIC IT PREACTOR APS 9 Siemens SIMATIC IT Preactor is a range of advanced planning and scheduling (APS) software for the manufacturing industry. Quick facts:  SIMATIC IT Preactor AS is a scheduling tool primarily for manufacturers who need to schedule machines, production lines and resources, but Preactor is also used in services and logistics.  SIMATIC IT Preactor AP considers forecast and long term orders to decide feasibility and set general direction of production; Dynamically sets target stock levels to meet future demand; Load balance across multiple resources considering eg constraints, materials shelf life.
  • 10. INTRODUCING SIMATIC IT PREACTOR APS Key functionality: • Modelling actual production capacity (machinery / operators / tooling) - operations planned when resources and materials are available. • Automating planning by generating production plan using scheduling rules. The rules may include customer priorities/due dates or minimization of changeovers. • Interactive planning board where Planner can change sequence. Analysis of different versions of the schedule before accepting. • Simulations "When we can deliver this order?" Analysis of due date performance. Early information on potential late orders. • Including material control calculations to check that all materials required are available 10
  • 11. INTRODUCING SIMATIC IT PREACTOR APS 11 Examples of integrations available: Microsoft Dynamics AX and NAV.
  • 12. INTRODUCING SIMATIC IT PREACTOR APS 12 Large install base serving the manufacturing sector across the globe. Implementations in Baltic region with Columbus. Quick facts:  Customer base ranges from mid-size to some of the largest multi-national companies in the world.  Operates across multiple sectors, this shows the flexibility to solve any scheduling requirement.  Global presence of the Siemens Manufacturing Operations Management Team - probably the largest Manufacturing IT organization in the world.
  • 13. 13 AGENDA AGENDA 1. Understanding the problem 2. Finding the solution with SIMATIC IT Preactor APS 3. Presentation of SIMATIC IT Preactor APS 4. Areas of potential benefits 5. Questions and answers
  • 14. PLANNING SCENARIOS FOR LIVE DEMONSTRATION • Automating planning for all orders. Are all orders on-time? • High priority order that requires re-planning. Which orders will be delayed? • A breakdown of machine occurs. Which orders will be affected? • How changes in material delivery will affect our plan? • Can we combine priority for due date and a need to minimize changeover times? 14
  • 15. 27 AGENDA AGENDA 1. Understanding the problem 2. Finding the solution with SIMATIC IT Preactor APS 3. Presentation of SIMATIC IT Preactor APS 4. Areas of potential benefits 5. Questions and answers
  • 16. A REAL-LIFE SUCCESS STORY • To introduce a concept of a central schedule with a ‘Main Planner’ -> central schedule with Preactor and changing planning procedures. • Flexibility in generating a production schedule -> visualization on Gantt chart and drag & drop on planning board. • Optimization with possible cost reductions -> sequence dependent changeover time matrices and scheduling rules minimizing changeover times. • Priorities -> introducing concept of customer-based priorities. „Together with an instant feedback about expected delivery dates it has improved effectiveness of work in the sales department and decreased time needed for customer service.” „Flexibility and an easy way to change schedules gives us the ability to react quickly to market requirements.” 28
  • 17. PLANNING PROCEDURE FOR PLANNER 1 All the production data from previous day, including quantities produced, must be entered by Shift leader into ERP till 8:00 Importing current status of operations and orders from ERP to Preactor 2 Planner can analyze changes in Preactor and initiate schedule repair function Updating schedule in Preactor with current status of operations/orders 3 All new production orders, generated from sales orders by Sales Department, must be entered till 12:00, so Planner can schedule a batch of orders and look at priorities Importing new orders from ERP to Preactor, updating orders in schedule with changes 4 Planner reviews new orders, applies preferred sequence rules, runs What-If scenarios, accepts the schedule Generating new schedule in Preactor 5 Around 14:00 Sales Department receives information on new dates for work orders within ERP system Exporting schedule with new order dates back to ERP system 6 New production plan is send to Shift Leaders in each of Departments. Gantt chart is published on website Printing new 'Work to-do list' reports for resources
  • 18. A REAL-LIFE SUCCESS STORY 30 First department - planning in central schedule with APS, view on all resources Third department - Preactor Viewer Sales Department has received new order enquiry from Customer -> Order in ERP When we can deliver this order ? Second department - Preactor Viewer Exchanging information based on prepared schedule - dealing mainly with exceptions Answer with expected Order End Date within hours Before 72 hours - After within 4 hours
  • 19. AREAS OF POTENTIAL BENEFITS 31 Improving the planning process  Automation of the process, compared to manual system or Excel can allow for extra time that can be used to optimize the process.  In the case of centralized schedule less demand for planning resources, for example reducing overtime. One of the users with Case Studies reported 70% reduction time needed for production planning. Improving the customer service  The ability to quickly give feedback on the planned delivery date of the order, especially in the case of changes to the plan.  Lowering the cost of delays for example penalties or additional costs for the logistics. Some of the users with Case Studies reported up to 80% improvement in delivery performance. Improving the productivity  Better use of resources, for example by minimizing changeover times due to dynamic aggregation of operations on machines, or reduction of overtime.  Better use of subcontractors based on real production plan. Some of the users with Case Studies reported up to 25% increase in productivity. Improving material management and make span reduction  Extension of the planning horizon and better synchronization of raw material purchases to the production plan based on the limited manufacturing capacity.  Improving synchronization of operations and orders between departments. Some of the users with Case Studies reported 50% reduction in raw material stock.
  • 20. AREAS OF POTENTIAL BENEFITS 32 More than 200 case studies published at preactor.com 25% increase in productivity 50% reduction in raw material stock 50% reduction in work-in-process 80% improvement in delivery performance Preactor Detailed Scheduling (figures taken from various Preactor case studies)
  • 21. 33 AGENDA AGENDA 1. Understanding the problem 2. Finding the solution with SIMATIC IT Preactor APS 3. Presentation of SIMATIC IT Preactor APS 4. Areas of potential benefits 5. Questions and answers
  • 22. 34 Contact local Columbus just now: Estonia: eesti@columbusglobal.com Latvia sales@columbus.lv Lithuania erp.lt@columbusglobal.com Presenter: Michał Prętczyński E-mail: mp@pretczynski.pl www.pretczynski.biz THANK YOU!