The document discusses maintenance of roads and flexible pavements. It describes the requirements of a good pavement including sufficient thickness to distribute wheel loads, structural strength, adequate friction, a smooth surface, and long design life. It then discusses the necessity of road maintenance to prevent accidents, maintain components in good working condition, and increase road life. Various types of defects in flexible pavements are described such as cracks, rutting, shoving, and potholes. Causes and treatments of these defects are provided. Maintenance techniques for flexible pavements like patching potholes, ruts, and conducting surface treatments are outlined.
Objective and classification of highway maintenance works. Distresses and maintenance measures in flexible and rigid pavements. Concept of pavement evaluation: Functional and Structural
Objective and classification of highway maintenance works. Distresses and maintenance measures in flexible and rigid pavements. Concept of pavement evaluation: Functional and Structural
types of pavement materials
types of paving material
types of road pavement
types of flexible pavement
flexible pavement of road construction
types of pavement for driveways
types of rigid pavements
asphalt pavement types
types of flexible pavements
flexible pavement design
flexible pavement manual
flexible pavement construction
flexible pavement vs rigid pavement
flexible pavement design example
flexible pavement of road construction
flexible pavement ppt
types of rigid pavements
rigid pavement design
rigid pavement pdf
rigid pavement construction
rigid pavement design example
rigid pavement construction michigan
aashto rigid pavement design
aashto rigid pavement design spreadsheet
ppt on construction and design of flexible pavementSUSMITAMAITY4
types of pavement.\,failure of flexible pavement,cross section of flexible pavement,advantages and disadvantages of flexible pavement,load distribution etc
For good condition of pavement, an engineer should have to silent knowledge about failures and causes of pavement to minimize the road accident and for better life of road highway.
Highway Engineering for BE Civil Engineering Students
History of Roads in India, IRC, CRRI, Classification of Roads, Three 20 year Road Development Plans, Road patterns, Accident Studies,
Inadequate Stability or Strength
Loss of binding action
Loss of base course materials
Inadequate wearing course
Use of inferior materials and crushing of base course materials
Lack of lateral confinement for the granular base course.
types of pavement materials
types of paving material
types of road pavement
types of flexible pavement
flexible pavement of road construction
types of pavement for driveways
types of rigid pavements
asphalt pavement types
types of flexible pavements
flexible pavement design
flexible pavement manual
flexible pavement construction
flexible pavement vs rigid pavement
flexible pavement design example
flexible pavement of road construction
flexible pavement ppt
types of rigid pavements
rigid pavement design
rigid pavement pdf
rigid pavement construction
rigid pavement design example
rigid pavement construction michigan
aashto rigid pavement design
aashto rigid pavement design spreadsheet
ppt on construction and design of flexible pavementSUSMITAMAITY4
types of pavement.\,failure of flexible pavement,cross section of flexible pavement,advantages and disadvantages of flexible pavement,load distribution etc
For good condition of pavement, an engineer should have to silent knowledge about failures and causes of pavement to minimize the road accident and for better life of road highway.
Highway Engineering for BE Civil Engineering Students
History of Roads in India, IRC, CRRI, Classification of Roads, Three 20 year Road Development Plans, Road patterns, Accident Studies,
Inadequate Stability or Strength
Loss of binding action
Loss of base course materials
Inadequate wearing course
Use of inferior materials and crushing of base course materials
Lack of lateral confinement for the granular base course.
Building crack,types,causes & its repairingGAUTAMSWALA
This presentation is all about cracks occur in building.It includes all types of cracks,its major causes and repairing techniques and finally a conclusion from which viewers can fully understand
about building cracks.
Highway Construction Materials and PracticeSenthamizhan M
Sub grade soil is an integral part of the road pavement structure as it provides the support to the pavement from beneath.
The sub grade soil and its properties are important in the design of pavement structure.
The main function of the sub grade is to give adequate support to the pavement and for this the sub grade should possess sufficient stability under adverse climatic and loading conditions.
The Research on the Cracks of the Asphalt PavementIJERA Editor
The cracking is one of the common diseases of the asphalt pavement. According to the shape and the forming reasons, the cracks can be divided into two categories. Each categories can be divided into several types. Through the comparison and the analysis of the causes of different cracks, the prevention and the treatments are proposed in the respects of the structural design, material design and construction
Metro Manila, the Philippines, serving as the junction between the South Luzon Expressway (SLEx) and Epifanio de los Santos Avenue (EDSA). It is also an interchange between the 2 train lines of Metro Manila, the MRT-3, which is over EDSA, and the PNR Metro Commuter, beside SLEx.
This will gives a idea about various types of flexible pavement failure in roads with a most specific pictures.This was the report submitted as an assignment at Nepal engineering college,Kumari club ,Balkhu kathmandu in MSC-TEAM classes.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
1. Maintenance and Road Repairs
Prof. Hole G.R.
Civil Engineering Department
J.S.Polytchnic, Hadapsar.
2. Maintenance of road reduces petrol consumption and
wear and tear of vehicles.
Also provide comfort to passenger.
Introduction
3. Sufficient thickness to distribute the wheel load stresses to a safe value
on the sub-grade soil.
Structurally strong to withstand all types of stresses imposed upon it.
Adequate coefficient of friction to prevent skidding of vehicles.
Smooth surface to provide comfort to road users even at high speed
Produce least noise from moving vehicles.
Dust proof surface so that traffic safety is not impaired by reducing
visibility.
Impervious surface, so that sub-grade soil is well protected, and
Long design life with low maintenance cost.
Requirement of Good Pavement
4. To prevent accidents.
To maintain all the components of road in better
working condition ex. Pavement,shoulder,drains etc.
To provide safe and convenient movement of
passenger.
To maintain road in best possible condition for
smooth driving.
To increase life of road.
To keep safety for road users.
Necessity of Maintenance Of Highway
5. Flexible pavements
Flexible pavements will transmit wheel load stresses to the lower layers by
grain-to-grain transfer through the points of contact in the granular structure
(see Figure 1).
Figure 1: Load transfer in granular structure.
Causes of Failure Flexible Pavement
6. Excessive load application.
Inadequate stability.
Loss of course materials.
Loss of binding action between highway materials.
Use of low quality material in different layers.
Inadequate wearing course.
Inadequate Strength of material.
Inadequate drainage of rainwater from different layers.
Improper compaction of layers of flexible pavement.
Environmental factors like heavy rain, frost action etc.
Failure of Flexible Pavement can be caused by
following reason:
7. A. Subgrade Failure of flexible Pavements:
• Failure of subgrade soil is due to :
1.Improper compaction of subgrade soli.
2.Improper drainage in subgrade or inadequate camber to subgrade layer.
Types of Failure of Flexible Pavement
8. Failure of wearing course is due to:
1.Improper bonding between top course
highway material.
2.Less quantity of binding material is
used during construction.
3. Aggregates used in wearing course
is not clean which affects binding .
B.Wearing Course Failure:
9. Failure of Base Course Due to:
1.Improper Drainage.
2.Heavy Load.
3.Improper Compaction.
4.Material used is of low
quality in base course.
C. Failure of Base Course:
10. a) Cracks
b) Rutting and Shoving
c) Pot Holes and Patching
Types Of Defects Of Flexible Pavement
11. Following are types of cracks observed in flexible pavement
alligator Cracking
Longitudinal Cracking
Block Cracking
Edge Cracking
Centre Cracking
A.Cracks:
12. General Description:
Series of interconnected cracks.
Many sided, sharp angled, usually longest side < 1 feet.
Initially appears a longitudinal crack.
Causes:
Ageing of binder or initial over heating leads to brittleness of binder.
Inadequate pavement thickness or excessive overloading or both.
Unstable subgrade or lower layers.
Treatment:
cracks should be filled with low viscosity binder.
Slurry seal or sand bituminous premix patching can be used to fill
wide cracks.
cut back or an emulsified bitumen or fog seal can be broomed into the
cracks and lightly filled with sand to prevent the picking up of the
binder by the traffic.
1. Alligator Cracking
13. General Description:
These cracks are relatively parallel to pavement center line, may appear
either at the joint between the pavement and the shoulder or at the joint
between two paving lanes.
Causes:
variation in temperature.
week joint between adjoining layers of the pavement.
Treatment:
Treatment depends on whether pavement remains structurally sound or not,
if structurally sound then treatment is done as follow:
Fill cracks with bituminous binder.
A slurry seal or sand
bituminous premix patching for wide
cracks.
2. Longitudinal Cracking
14. General Description:
These cracks appear as interconnected cracks forming blocks of square or
rectangular shape on pavement Surface.
The size of the block cracking varies from 1000 sq.cm to 10000 sq.cm
Causes:
The possible causes are summarized as below:
Inadequate pavement thickness and unstable condition of subgrade and lower
layers.
Shrinkage of bituminous layer itself with age.
Ageing and brittleness of binding material.
Treatment:
The block cracking should be repaired by laying a interface treatment followed
by giving surface layer as per original existing surface
3. Block Cracking
15. General Description:
These are fairly continuous cracks, parallel to and usually up to 0.5m from the
edge of pavement. Edge cracks if not repaired in time lead to edge breaking
and lane to shoulder drop off and separation occurs.
Causes:
Lack of lateral support from shoulder.
Poor drainage and frost heavy condition.
Settlement or yielding of the underlying materials.
Non provision of extra width of pavement on curve.
Treatment:
Improve the shoulder condition and give lateral support to pavement.
Seal the cracks with either of these depending on severity level and width of
cracks as follows:
1.Low viscosity binder.
2.A slurry seal.
4. Edge Cracking.
16. General Description:-
The cracking pattern appears all along the center line of pavement.
Causes:
Improper or weak joint between adjoining, spreads all along the center line
of the pavement.
Different moisture conditions on both sides of the pavement.
Improper design of pavement with reference to camber.
Treatment:
It is better to take full precautions while constructing a pavement.
This can be rectified by sealing the cracks with slurry seal and or fog seal
depending on width of the cracks.
5. Center Cracking.
17. a.Rutting:
Rutting is a longitudinal surface depression or groove in the wheel path
Causes:
Weak pavement and heavy channelized traffic.
Improper mix design and lack of stability.
Inadequate compaction of underlying layers during construction.
Treatment:
Fill with premix open/dense graded material and compact to the desired
levels after applying a tack coat.
rutting is due to subgrade failure then excavation and rectification of
subgrade is done
B. Rutting and shoving
18. b.Shoving:
It is a form of plastic movement resulting into localized bulging of surface.
Causes:
Lack of stability in mix (excessive binder, high proportion of fines, too
soft binder) of surface or base course.
Pushing action by wheels of heavy traffic at time of acceleration and de-
acceleration
Treatment:
Filling the depression with premix materials after applying suitable tack
coat.
Remove the material in the affected area down to a firm base and laying
a suitable premix patch.
19. These are bowl shaped holes of various sizes in the surface layer or
extending into the base course.
Causes:
Localized disintegration of materials.
Ingress of water in the pavement through cracks in surface course.
Poor bond between surface and base course layers.
Less bitumen content in localized areas or too thin bituminous surface
Treatment:
Treatment is done by patch work or patch repairs.
To fill pot holes (after cleaning) with the premix open/dense graded
patching or even penetration patching and followed by compaction
C.Pot Holes:
20. 1. Shrinkage crack
2. Scaling of cement concrete.
3. Mud pumping
4. Warping of cracks.
Shrinkage crack:
These are longitudinal and transverse
crack developed due to heat of
hydration and less curing.
Types of Failure in Rigid Pavement:
21. Scaling of cement concrete:
Scaling is nothing but formation of layer of cement slurry on
surface
Of road.
It is caused due to
1. Deficiency in mix
2. Presence of chemical impurities.
3. Excessive vibration
22. Mud pumpimng:
When soil slurry comes out through the joints and cracks of
rigid pavement due to heavy wheel load then it is called mud
pumping.
Following are the various factors which responsible for mud
pumping:
1.Amount of free water.
2. Slab Deflection.
3.Subgrade Soil Type.
4.Lack of support from subgrade which develops cracks in
pavements.
23. Warping Cracks:
Improper design of joints makes warping of slab at
edge.
Due to this there is development of excess stresses
producing cracks at edges.
Warping cracks are prevented by providing Hing joints
24. 1. Patching pot holes
2. Patching ruts.
3. Patching corrugation.
4. Base repairs.
5. Surface treatment.
6. Re-surfacing.
1.Patching pot holes:
Pot holes are caused due to heavy load, variation in climatic condition
and improper quality material.
In this process pot holes are first cut square or rectangular in shape up
to required depth
Then holes are cleaned and suitable bitumen coat is applied.
Then placing of premixed patching mix in hole and compact it well.
In cold weather, cutback or bitumen emulsion is used as refilling
material under traffic.
Maintenance of Flexible Pavement:
25. 2.Patching Ruts:
Ruts are the formation of depression along the length of road below the wheel
path .
In the process of patching ruts,continous trenches are duged along the ruts.
Then trenches are cleaned .
Then Application of bitumen coat for bonding with old surface.
Placing of premixed bitumen mix in duged trenches and compaction is carried
out.
3.Patching Shoving (Corrugatuon):
Corrugation are nothing but bulging or formation of undulating surface
It caused due to increase in temperature.
This can be prepared by cutting the crest or high ridge of corrugation.
up to small depth .
These cutting portion is then filled with premixed bitumen and compacted .
26. 4.Base Patching:
this defect observed due to insufficient thickness of base
course.
It is repaired by providing additional thickness in base course.
The old loose material of base course is removed and then new
base course is prepared by using good material.
New layer of base course should not be more than 75 mm.
5.Surface treatment:
Surface treatment is carried out in two stages-
1.correcting bleeding
2.Applying renewal coat or seal coat.
It is carried out when cracks are formed on road surface.
27. 6.Re-Surfacing:
It is the process of renewal or surface dressing of the pavement
which damaged after its useful life known as re-surfacing.
When existing road pavement is completely out of use due to wear
and tear then re-surfacing is carried out.
In this process existing surface is repaired by patching and
suitable tack coat is applied over surface .
After that surface dressing is done.