Maintenance and Road Repairs
Prof. Hole G.R.
Civil Engineering Department
J.S.Polytchnic, Hadapsar.
 Maintenance of road reduces petrol consumption and
wear and tear of vehicles.
 Also provide comfort to passenger.
Introduction
 Sufficient thickness to distribute the wheel load stresses to a safe value
on the sub-grade soil.
 Structurally strong to withstand all types of stresses imposed upon it.
 Adequate coefficient of friction to prevent skidding of vehicles.
 Smooth surface to provide comfort to road users even at high speed
 Produce least noise from moving vehicles.
 Dust proof surface so that traffic safety is not impaired by reducing
visibility.
 Impervious surface, so that sub-grade soil is well protected, and
Long design life with low maintenance cost.
Requirement of Good Pavement
To prevent accidents.
To maintain all the components of road in better
working condition ex. Pavement,shoulder,drains etc.
To provide safe and convenient movement of
passenger.
To maintain road in best possible condition for
smooth driving.
To increase life of road.
To keep safety for road users.
Necessity of Maintenance Of Highway
Flexible pavements
Flexible pavements will transmit wheel load stresses to the lower layers by
grain-to-grain transfer through the points of contact in the granular structure
(see Figure 1).
Figure 1: Load transfer in granular structure.
Causes of Failure Flexible Pavement
 Excessive load application.
 Inadequate stability.
 Loss of course materials.
 Loss of binding action between highway materials.
 Use of low quality material in different layers.
 Inadequate wearing course.
 Inadequate Strength of material.
 Inadequate drainage of rainwater from different layers.
 Improper compaction of layers of flexible pavement.
 Environmental factors like heavy rain, frost action etc.
Failure of Flexible Pavement can be caused by
following reason:
A. Subgrade Failure of flexible Pavements:
• Failure of subgrade soil is due to :
1.Improper compaction of subgrade soli.
2.Improper drainage in subgrade or inadequate camber to subgrade layer.
Types of Failure of Flexible Pavement
 Failure of wearing course is due to:
1.Improper bonding between top course
highway material.
2.Less quantity of binding material is
used during construction.
3. Aggregates used in wearing course
is not clean which affects binding .
B.Wearing Course Failure:
 Failure of Base Course Due to:
1.Improper Drainage.
2.Heavy Load.
3.Improper Compaction.
4.Material used is of low
quality in base course.
C. Failure of Base Course:
a) Cracks
b) Rutting and Shoving
c) Pot Holes and Patching
Types Of Defects Of Flexible Pavement
Following are types of cracks observed in flexible pavement
alligator Cracking
Longitudinal Cracking
Block Cracking
Edge Cracking
Centre Cracking
A.Cracks:
General Description:
 Series of interconnected cracks.
 Many sided, sharp angled, usually longest side < 1 feet.
 Initially appears a longitudinal crack.
Causes:
 Ageing of binder or initial over heating leads to brittleness of binder.
 Inadequate pavement thickness or excessive overloading or both.
 Unstable subgrade or lower layers.
Treatment:
 cracks should be filled with low viscosity binder.
 Slurry seal or sand bituminous premix patching can be used to fill
wide cracks.
 cut back or an emulsified bitumen or fog seal can be broomed into the
cracks and lightly filled with sand to prevent the picking up of the
binder by the traffic.
1. Alligator Cracking
General Description:
 These cracks are relatively parallel to pavement center line, may appear
either at the joint between the pavement and the shoulder or at the joint
between two paving lanes.
Causes:
 variation in temperature.
 week joint between adjoining layers of the pavement.
Treatment:
Treatment depends on whether pavement remains structurally sound or not,
if structurally sound then treatment is done as follow:
 Fill cracks with bituminous binder.
 A slurry seal or sand
 bituminous premix patching for wide
cracks.
2. Longitudinal Cracking
General Description:
 These cracks appear as interconnected cracks forming blocks of square or
rectangular shape on pavement Surface.
 The size of the block cracking varies from 1000 sq.cm to 10000 sq.cm
Causes:
The possible causes are summarized as below:
 Inadequate pavement thickness and unstable condition of subgrade and lower
layers.
 Shrinkage of bituminous layer itself with age.
 Ageing and brittleness of binding material.
Treatment:
The block cracking should be repaired by laying a interface treatment followed
by giving surface layer as per original existing surface
3. Block Cracking
General Description:
These are fairly continuous cracks, parallel to and usually up to 0.5m from the
edge of pavement. Edge cracks if not repaired in time lead to edge breaking
and lane to shoulder drop off and separation occurs.
Causes:
 Lack of lateral support from shoulder.
 Poor drainage and frost heavy condition.
 Settlement or yielding of the underlying materials.
 Non provision of extra width of pavement on curve.
Treatment:
 Improve the shoulder condition and give lateral support to pavement.
 Seal the cracks with either of these depending on severity level and width of
cracks as follows:
1.Low viscosity binder.
2.A slurry seal.
4. Edge Cracking.
General Description:-
 The cracking pattern appears all along the center line of pavement.
Causes:
 Improper or weak joint between adjoining, spreads all along the center line
of the pavement.
 Different moisture conditions on both sides of the pavement.
 Improper design of pavement with reference to camber.
Treatment:
 It is better to take full precautions while constructing a pavement.
 This can be rectified by sealing the cracks with slurry seal and or fog seal
depending on width of the cracks.
5. Center Cracking.
a.Rutting:
Rutting is a longitudinal surface depression or groove in the wheel path
Causes:
 Weak pavement and heavy channelized traffic.
 Improper mix design and lack of stability.
 Inadequate compaction of underlying layers during construction.
Treatment:
 Fill with premix open/dense graded material and compact to the desired
levels after applying a tack coat.
 rutting is due to subgrade failure then excavation and rectification of
subgrade is done
B. Rutting and shoving
b.Shoving:
It is a form of plastic movement resulting into localized bulging of surface.
Causes:
 Lack of stability in mix (excessive binder, high proportion of fines, too
soft binder) of surface or base course.
 Pushing action by wheels of heavy traffic at time of acceleration and de-
acceleration
Treatment:
 Filling the depression with premix materials after applying suitable tack
coat.
 Remove the material in the affected area down to a firm base and laying
a suitable premix patch.
These are bowl shaped holes of various sizes in the surface layer or
extending into the base course.
Causes:
 Localized disintegration of materials.
 Ingress of water in the pavement through cracks in surface course.
 Poor bond between surface and base course layers.
 Less bitumen content in localized areas or too thin bituminous surface
Treatment:
 Treatment is done by patch work or patch repairs.
 To fill pot holes (after cleaning) with the premix open/dense graded
patching or even penetration patching and followed by compaction
C.Pot Holes:
1. Shrinkage crack
2. Scaling of cement concrete.
3. Mud pumping
4. Warping of cracks.
Shrinkage crack:
 These are longitudinal and transverse
crack developed due to heat of
hydration and less curing.
Types of Failure in Rigid Pavement:
Scaling of cement concrete:
Scaling is nothing but formation of layer of cement slurry on
surface
Of road.
It is caused due to
1. Deficiency in mix
2. Presence of chemical impurities.
3. Excessive vibration
Mud pumpimng:
 When soil slurry comes out through the joints and cracks of
rigid pavement due to heavy wheel load then it is called mud
pumping.
 Following are the various factors which responsible for mud
pumping:
1.Amount of free water.
2. Slab Deflection.
3.Subgrade Soil Type.
4.Lack of support from subgrade which develops cracks in
pavements.
Warping Cracks:
 Improper design of joints makes warping of slab at
edge.
 Due to this there is development of excess stresses
producing cracks at edges.
 Warping cracks are prevented by providing Hing joints
1. Patching pot holes
2. Patching ruts.
3. Patching corrugation.
4. Base repairs.
5. Surface treatment.
6. Re-surfacing.
1.Patching pot holes:
 Pot holes are caused due to heavy load, variation in climatic condition
and improper quality material.
 In this process pot holes are first cut square or rectangular in shape up
to required depth
 Then holes are cleaned and suitable bitumen coat is applied.
 Then placing of premixed patching mix in hole and compact it well.
 In cold weather, cutback or bitumen emulsion is used as refilling
material under traffic.
Maintenance of Flexible Pavement:
2.Patching Ruts:
 Ruts are the formation of depression along the length of road below the wheel
path .
 In the process of patching ruts,continous trenches are duged along the ruts.
 Then trenches are cleaned .
 Then Application of bitumen coat for bonding with old surface.
 Placing of premixed bitumen mix in duged trenches and compaction is carried
out.
3.Patching Shoving (Corrugatuon):
 Corrugation are nothing but bulging or formation of undulating surface
 It caused due to increase in temperature.
 This can be prepared by cutting the crest or high ridge of corrugation.
up to small depth .
 These cutting portion is then filled with premixed bitumen and compacted .
4.Base Patching:
 this defect observed due to insufficient thickness of base
course.
 It is repaired by providing additional thickness in base course.
 The old loose material of base course is removed and then new
base course is prepared by using good material.
 New layer of base course should not be more than 75 mm.
5.Surface treatment:
 Surface treatment is carried out in two stages-
1.correcting bleeding
2.Applying renewal coat or seal coat.
 It is carried out when cracks are formed on road surface.
6.Re-Surfacing:
 It is the process of renewal or surface dressing of the pavement
which damaged after its useful life known as re-surfacing.
 When existing road pavement is completely out of use due to wear
and tear then re-surfacing is carried out.
 In this process existing surface is repaired by patching and
suitable tack coat is applied over surface .
 After that surface dressing is done.
Thank You

More Related Content

What's hot

HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
Fresher Thinking
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
pradip dangar
 
Types of pavements
Types of pavementsTypes of pavements
Types of pavements
Aglaia Connect
 
Highway failure and their maintenance
Highway failure and their maintenanceHighway failure and their maintenance
Highway failure and their maintenance
MantoshRajput
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
pradip dangar
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
holegajendra
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
reemajadwani
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
ramgsvhce
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavement
SUSMITAMAITY4
 
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdfMETHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
Er Adil Khan
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
Malay Talaviya
 
Hill road construction
Hill road constructionHill road construction
Hill road construction
Geet KH
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
GAURAV. H .TANDON
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
AJINKYA THAKRE
 
Failures in flexible pavement
Failures in flexible pavementFailures in flexible pavement
Failures in flexible pavement
Randhir Kumar
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
GLA University
 
Highway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptxHighway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptx
johnjohn497573
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
kumawat123
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
Aavani Thampi
 

What's hot (20)

HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Types of pavements
Types of pavementsTypes of pavements
Types of pavements
 
Highway failure and their maintenance
Highway failure and their maintenanceHighway failure and their maintenance
Highway failure and their maintenance
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
ppt on construction and design of flexible pavement
ppt on construction and design of flexible pavementppt on construction and design of flexible pavement
ppt on construction and design of flexible pavement
 
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdfMETHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
METHODS OF TUNNELLING IN SOFT & HARD GROUND.pdf
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Hill road construction
Hill road constructionHill road construction
Hill road construction
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Construction of flexible pavement in brief.
Construction of flexible pavement in brief.Construction of flexible pavement in brief.
Construction of flexible pavement in brief.
 
Failures in flexible pavement
Failures in flexible pavementFailures in flexible pavement
Failures in flexible pavement
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Highway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptxHighway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptx
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 

Similar to Maintenence of road

highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation
Senthamizhan M
 
Presentation distress of rigid pavement.pptx
Presentationdistress of rigid pavement.pptxPresentationdistress of rigid pavement.pptx
Presentation distress of rigid pavement.pptx
university of technology
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
chiranjeevulu chinthala
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
JaySinghchib1
 
Building crack,types,causes & its repairing
Building crack,types,causes & its repairingBuilding crack,types,causes & its repairing
Building crack,types,causes & its repairing
GAUTAMSWALA
 
Seminar Presentation "Pavements failures and their maintenance"
Seminar Presentation "Pavements failures and their maintenance"Seminar Presentation "Pavements failures and their maintenance"
Seminar Presentation "Pavements failures and their maintenance"
ctakshaykumar1
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
sfQyoom
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
Senthamizhan M
 
damages during construction
damages during constructiondamages during construction
damages during constructionKris Kiran
 
Types of Flexible Pavements
Types of Flexible PavementsTypes of Flexible Pavements
Types of Flexible Pavements
ArnabKarmakar18
 
Methodes of reparing cracks
Methodes of reparing cracksMethodes of reparing cracks
Methodes of reparing cracks
Evergreen Cad Technologies Coimbatore
 
Visual assessment of pavement condition
Visual assessment of pavement conditionVisual assessment of pavement condition
Visual assessment of pavement condition
Sulav Sigdel
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
jay Rathod
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Purna Mallick
 
Distress in Pavement Full.pptx
Distress in Pavement Full.pptxDistress in Pavement Full.pptx
Distress in Pavement Full.pptx
ssuser461a51
 
Distress in Pavement.pptx
Distress in Pavement.pptxDistress in Pavement.pptx
Distress in Pavement.pptx
RomharshOli1
 
The Research on the Cracks of the Asphalt Pavement
The Research on the Cracks of the Asphalt PavementThe Research on the Cracks of the Asphalt Pavement
The Research on the Cracks of the Asphalt Pavement
IJERA Editor
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
haroldtaylor1113
 
Pavements and paths
Pavements and pathsPavements and paths
Pavements and paths
Amr Samir Shaban
 
Flexible pavement failure
Flexible pavement failureFlexible pavement failure
Flexible pavement failure
Nabaraj Poudel
 

Similar to Maintenence of road (20)

highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation
 
Presentation distress of rigid pavement.pptx
Presentationdistress of rigid pavement.pptxPresentationdistress of rigid pavement.pptx
Presentation distress of rigid pavement.pptx
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Building crack,types,causes & its repairing
Building crack,types,causes & its repairingBuilding crack,types,causes & its repairing
Building crack,types,causes & its repairing
 
Seminar Presentation "Pavements failures and their maintenance"
Seminar Presentation "Pavements failures and their maintenance"Seminar Presentation "Pavements failures and their maintenance"
Seminar Presentation "Pavements failures and their maintenance"
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
damages during construction
damages during constructiondamages during construction
damages during construction
 
Types of Flexible Pavements
Types of Flexible PavementsTypes of Flexible Pavements
Types of Flexible Pavements
 
Methodes of reparing cracks
Methodes of reparing cracksMethodes of reparing cracks
Methodes of reparing cracks
 
Visual assessment of pavement condition
Visual assessment of pavement conditionVisual assessment of pavement condition
Visual assessment of pavement condition
 
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
DIFFERENT TYPE OF CRACKS AND PREVENTIVE MEASURE ON CRACKS
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
 
Distress in Pavement Full.pptx
Distress in Pavement Full.pptxDistress in Pavement Full.pptx
Distress in Pavement Full.pptx
 
Distress in Pavement.pptx
Distress in Pavement.pptxDistress in Pavement.pptx
Distress in Pavement.pptx
 
The Research on the Cracks of the Asphalt Pavement
The Research on the Cracks of the Asphalt PavementThe Research on the Cracks of the Asphalt Pavement
The Research on the Cracks of the Asphalt Pavement
 
Rigid pavement in Magallanes Interchange
Rigid pavement in Magallanes InterchangeRigid pavement in Magallanes Interchange
Rigid pavement in Magallanes Interchange
 
Pavements and paths
Pavements and pathsPavements and paths
Pavements and paths
 
Flexible pavement failure
Flexible pavement failureFlexible pavement failure
Flexible pavement failure
 

More from holegajendra

PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
holegajendra
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
holegajendra
 
Introduction to Hydrology
Introduction to HydrologyIntroduction to Hydrology
Introduction to Hydrology
holegajendra
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
holegajendra
 
Introduction to irrigation engineering 19 07 1 (1)
Introduction to irrigation engineering 19 07 1 (1)Introduction to irrigation engineering 19 07 1 (1)
Introduction to irrigation engineering 19 07 1 (1)
holegajendra
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineering
holegajendra
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Management
holegajendra
 
Dam engineering
Dam engineeringDam engineering
Dam engineering
holegajendra
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gates
holegajendra
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
holegajendra
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work
holegajendra
 

More from holegajendra (11)

PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
 
Introduction to Hydrology
Introduction to HydrologyIntroduction to Hydrology
Introduction to Hydrology
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Introduction to irrigation engineering 19 07 1 (1)
Introduction to irrigation engineering 19 07 1 (1)Introduction to irrigation engineering 19 07 1 (1)
Introduction to irrigation engineering 19 07 1 (1)
 
1.introduction to highway engineering
1.introduction to highway engineering1.introduction to highway engineering
1.introduction to highway engineering
 
Application of GIS and RS in Watershed Management
Application of GIS and RS in Watershed ManagementApplication of GIS and RS in Watershed Management
Application of GIS and RS in Watershed Management
 
Dam engineering
Dam engineeringDam engineering
Dam engineering
 
Spillway and gates
Spillway and gatesSpillway and gates
Spillway and gates
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 

Maintenence of road

  • 1. Maintenance and Road Repairs Prof. Hole G.R. Civil Engineering Department J.S.Polytchnic, Hadapsar.
  • 2.  Maintenance of road reduces petrol consumption and wear and tear of vehicles.  Also provide comfort to passenger. Introduction
  • 3.  Sufficient thickness to distribute the wheel load stresses to a safe value on the sub-grade soil.  Structurally strong to withstand all types of stresses imposed upon it.  Adequate coefficient of friction to prevent skidding of vehicles.  Smooth surface to provide comfort to road users even at high speed  Produce least noise from moving vehicles.  Dust proof surface so that traffic safety is not impaired by reducing visibility.  Impervious surface, so that sub-grade soil is well protected, and Long design life with low maintenance cost. Requirement of Good Pavement
  • 4. To prevent accidents. To maintain all the components of road in better working condition ex. Pavement,shoulder,drains etc. To provide safe and convenient movement of passenger. To maintain road in best possible condition for smooth driving. To increase life of road. To keep safety for road users. Necessity of Maintenance Of Highway
  • 5. Flexible pavements Flexible pavements will transmit wheel load stresses to the lower layers by grain-to-grain transfer through the points of contact in the granular structure (see Figure 1). Figure 1: Load transfer in granular structure. Causes of Failure Flexible Pavement
  • 6.  Excessive load application.  Inadequate stability.  Loss of course materials.  Loss of binding action between highway materials.  Use of low quality material in different layers.  Inadequate wearing course.  Inadequate Strength of material.  Inadequate drainage of rainwater from different layers.  Improper compaction of layers of flexible pavement.  Environmental factors like heavy rain, frost action etc. Failure of Flexible Pavement can be caused by following reason:
  • 7. A. Subgrade Failure of flexible Pavements: • Failure of subgrade soil is due to : 1.Improper compaction of subgrade soli. 2.Improper drainage in subgrade or inadequate camber to subgrade layer. Types of Failure of Flexible Pavement
  • 8.  Failure of wearing course is due to: 1.Improper bonding between top course highway material. 2.Less quantity of binding material is used during construction. 3. Aggregates used in wearing course is not clean which affects binding . B.Wearing Course Failure:
  • 9.  Failure of Base Course Due to: 1.Improper Drainage. 2.Heavy Load. 3.Improper Compaction. 4.Material used is of low quality in base course. C. Failure of Base Course:
  • 10. a) Cracks b) Rutting and Shoving c) Pot Holes and Patching Types Of Defects Of Flexible Pavement
  • 11. Following are types of cracks observed in flexible pavement alligator Cracking Longitudinal Cracking Block Cracking Edge Cracking Centre Cracking A.Cracks:
  • 12. General Description:  Series of interconnected cracks.  Many sided, sharp angled, usually longest side < 1 feet.  Initially appears a longitudinal crack. Causes:  Ageing of binder or initial over heating leads to brittleness of binder.  Inadequate pavement thickness or excessive overloading or both.  Unstable subgrade or lower layers. Treatment:  cracks should be filled with low viscosity binder.  Slurry seal or sand bituminous premix patching can be used to fill wide cracks.  cut back or an emulsified bitumen or fog seal can be broomed into the cracks and lightly filled with sand to prevent the picking up of the binder by the traffic. 1. Alligator Cracking
  • 13. General Description:  These cracks are relatively parallel to pavement center line, may appear either at the joint between the pavement and the shoulder or at the joint between two paving lanes. Causes:  variation in temperature.  week joint between adjoining layers of the pavement. Treatment: Treatment depends on whether pavement remains structurally sound or not, if structurally sound then treatment is done as follow:  Fill cracks with bituminous binder.  A slurry seal or sand  bituminous premix patching for wide cracks. 2. Longitudinal Cracking
  • 14. General Description:  These cracks appear as interconnected cracks forming blocks of square or rectangular shape on pavement Surface.  The size of the block cracking varies from 1000 sq.cm to 10000 sq.cm Causes: The possible causes are summarized as below:  Inadequate pavement thickness and unstable condition of subgrade and lower layers.  Shrinkage of bituminous layer itself with age.  Ageing and brittleness of binding material. Treatment: The block cracking should be repaired by laying a interface treatment followed by giving surface layer as per original existing surface 3. Block Cracking
  • 15. General Description: These are fairly continuous cracks, parallel to and usually up to 0.5m from the edge of pavement. Edge cracks if not repaired in time lead to edge breaking and lane to shoulder drop off and separation occurs. Causes:  Lack of lateral support from shoulder.  Poor drainage and frost heavy condition.  Settlement or yielding of the underlying materials.  Non provision of extra width of pavement on curve. Treatment:  Improve the shoulder condition and give lateral support to pavement.  Seal the cracks with either of these depending on severity level and width of cracks as follows: 1.Low viscosity binder. 2.A slurry seal. 4. Edge Cracking.
  • 16. General Description:-  The cracking pattern appears all along the center line of pavement. Causes:  Improper or weak joint between adjoining, spreads all along the center line of the pavement.  Different moisture conditions on both sides of the pavement.  Improper design of pavement with reference to camber. Treatment:  It is better to take full precautions while constructing a pavement.  This can be rectified by sealing the cracks with slurry seal and or fog seal depending on width of the cracks. 5. Center Cracking.
  • 17. a.Rutting: Rutting is a longitudinal surface depression or groove in the wheel path Causes:  Weak pavement and heavy channelized traffic.  Improper mix design and lack of stability.  Inadequate compaction of underlying layers during construction. Treatment:  Fill with premix open/dense graded material and compact to the desired levels after applying a tack coat.  rutting is due to subgrade failure then excavation and rectification of subgrade is done B. Rutting and shoving
  • 18. b.Shoving: It is a form of plastic movement resulting into localized bulging of surface. Causes:  Lack of stability in mix (excessive binder, high proportion of fines, too soft binder) of surface or base course.  Pushing action by wheels of heavy traffic at time of acceleration and de- acceleration Treatment:  Filling the depression with premix materials after applying suitable tack coat.  Remove the material in the affected area down to a firm base and laying a suitable premix patch.
  • 19. These are bowl shaped holes of various sizes in the surface layer or extending into the base course. Causes:  Localized disintegration of materials.  Ingress of water in the pavement through cracks in surface course.  Poor bond between surface and base course layers.  Less bitumen content in localized areas or too thin bituminous surface Treatment:  Treatment is done by patch work or patch repairs.  To fill pot holes (after cleaning) with the premix open/dense graded patching or even penetration patching and followed by compaction C.Pot Holes:
  • 20. 1. Shrinkage crack 2. Scaling of cement concrete. 3. Mud pumping 4. Warping of cracks. Shrinkage crack:  These are longitudinal and transverse crack developed due to heat of hydration and less curing. Types of Failure in Rigid Pavement:
  • 21. Scaling of cement concrete: Scaling is nothing but formation of layer of cement slurry on surface Of road. It is caused due to 1. Deficiency in mix 2. Presence of chemical impurities. 3. Excessive vibration
  • 22. Mud pumpimng:  When soil slurry comes out through the joints and cracks of rigid pavement due to heavy wheel load then it is called mud pumping.  Following are the various factors which responsible for mud pumping: 1.Amount of free water. 2. Slab Deflection. 3.Subgrade Soil Type. 4.Lack of support from subgrade which develops cracks in pavements.
  • 23. Warping Cracks:  Improper design of joints makes warping of slab at edge.  Due to this there is development of excess stresses producing cracks at edges.  Warping cracks are prevented by providing Hing joints
  • 24. 1. Patching pot holes 2. Patching ruts. 3. Patching corrugation. 4. Base repairs. 5. Surface treatment. 6. Re-surfacing. 1.Patching pot holes:  Pot holes are caused due to heavy load, variation in climatic condition and improper quality material.  In this process pot holes are first cut square or rectangular in shape up to required depth  Then holes are cleaned and suitable bitumen coat is applied.  Then placing of premixed patching mix in hole and compact it well.  In cold weather, cutback or bitumen emulsion is used as refilling material under traffic. Maintenance of Flexible Pavement:
  • 25. 2.Patching Ruts:  Ruts are the formation of depression along the length of road below the wheel path .  In the process of patching ruts,continous trenches are duged along the ruts.  Then trenches are cleaned .  Then Application of bitumen coat for bonding with old surface.  Placing of premixed bitumen mix in duged trenches and compaction is carried out. 3.Patching Shoving (Corrugatuon):  Corrugation are nothing but bulging or formation of undulating surface  It caused due to increase in temperature.  This can be prepared by cutting the crest or high ridge of corrugation. up to small depth .  These cutting portion is then filled with premixed bitumen and compacted .
  • 26. 4.Base Patching:  this defect observed due to insufficient thickness of base course.  It is repaired by providing additional thickness in base course.  The old loose material of base course is removed and then new base course is prepared by using good material.  New layer of base course should not be more than 75 mm. 5.Surface treatment:  Surface treatment is carried out in two stages- 1.correcting bleeding 2.Applying renewal coat or seal coat.  It is carried out when cracks are formed on road surface.
  • 27. 6.Re-Surfacing:  It is the process of renewal or surface dressing of the pavement which damaged after its useful life known as re-surfacing.  When existing road pavement is completely out of use due to wear and tear then re-surfacing is carried out.  In this process existing surface is repaired by patching and suitable tack coat is applied over surface .  After that surface dressing is done.