Linking international
standards to REDD+ projects
                                     Manuel Estrada, CIFOR
      Latin American MRV Workshop, Petropolis, March 8, 2012
International standards and methods for
REDD+

         Voluntary market
          Standards and            UNFCCC
          methodologies
                                Results-based
                VCS,               REDD+
                ACR,
                 etc            National level –
                                 (Subnational
           Project level –           level)
         Jurisdictional level


            IPCC GL 2006 + IPCC LULUCF GPG
REDD+ project types

 REDD:
   Avoided Planned Deforestation (APD)
   Avoided Unplanned Deforestation and Degradation (AUDD)

 Improved Forest Management (IFM)

 Afforestation, Reforestation and Revegetation (?)
VCS Approved methodologies applicable to
  AUDD REDD projects as of March 2012


VM0006 - Methodology for Carbon Accounting in Project Activities that Reduce Emissions from
         Mosaic Deforestation and Degradation, v1.0

VM0007 - REDD Methodology Modules (REDD-MF), v1.1

VM0009 - Methodology for Avoided Mosaic Deforestation of Tropical Forests, v1.1

VM0015 - Methodology for Avoided Unplanned Deforestation, v1.0
Basic elements and steps for AUDD baselines

• REDD+ baselines are comprised of 2 main elements: a land use and land
 cover (LU/LC) change component and the associated carbon stock change
 component.

• General steps for the estimation of REDD+ baselines:
       Step 1. Definition of the project type
       Step 2. Definition of the project boundary
       Step 3. Projection of LU/LC in the baseline
       Step 4. Estimation of baseline carbon stock changes
       Step 5. Estimation of baseline GHG emissions
       Step 6. Estimation of the baseline net GHG emissions and removals
Project boundaries
The project boundary is defined by:

 The geographical boundary within which the project will be implemented.
 Only land qualifying as ‘forest’ for a minimum of 10 years prior to the
 project start date can be included in the project boundary.
     Additionally, other geographical boundaries need to be established for AUDD
     projects: A Reference Region, a Leakage Belt and, if applicable, Leakage
     Prevention areas

 The project crediting period. The project crediting period for REDD projects
 shall be between 20 and 100 years.

 The sources and sinks, and associated types of GHGs (i.e. CO2, N2O and
 CH4), the project will affect.

 The carbon pools that the project will consider.
Source: “Project Developer’s Guidebook to VCS REDD Methodologies”.
Version 1.0, November 2011, developed by TerraCarbon for Conservation
international
                                                                        AUDD methodologies
                                                                        Characteristics of the RR in different
Leakage belts in different AUDD
methodologies




Source: “Project Developer’s Guidebook to VCS REDD Methodologies”. Version 1.0, November 2011, developed by
TerraCarbon for Conservation international
Projection of LU/LC in the baseline


Identify where deforestation would likely occur using spatial analysis and
projections based on historical factors over at least the previous 10 years that
explain past patterns and can be used to make future projections of deforestation.

The criteria and procedures for identifying alternative baseline scenarios shall take
into account such factors as historical deforestation and/or degradation rates and
require the development of a baseline by determining and analyzing a reference
that shall be similar to the project area in terms of drivers and agents of
deforestation and/or degradation, landscape configuration, and socio-economic
and cultural conditions
Source: “Project Developer’s Guidebook to VCS REDD Methodologies”.
Version 1.0, November 2011, developed by TerraCarbon for Conservation
international
                                                                        the LU/LC projection
                                                                        RS required by AUDD methodologies for
Estimation of baseline C stock changes


The calculation of emission factors from carbon stock changes comprises 2 steps:

   Step 1. Estimation of the carbon stocks of the forests and each post-deforestation
   LU/LC category identified in the project area

   Step 2. Determination of emission factors of all LU/LC change categories
   expected in the project area:
           The emission factors due to the transition from forest to other LU/LC
           categories are estimated by obtaining the difference between the carbon
           stocks in the forest and in the post-deforestation LU/LC category.
Source: “Project Developer’s Guidebook to VCS REDD Methodologies”.
Version 1.0, November 2011, developed by TerraCarbon for Conservation
international

                                                                        methodologies
                                                                        C stock estimates in AUDD
Simplified example – Estimating an AUD Baseline

1. Definition of boundaries

2. Analysis of historical LU/LC change

3. Analysis of agents, drivers and causes of
  D and chain of events leading to D

4. Projection of annual areas and location
  of D in the RR in the baseline

5. Identification of forest classes in areas




                                                                Based on the VCS approved methodology VM0015
  that would be D in the baseline and post
  D LU classes in the project area

6. Estimation of baseline C stock changes
  and non-CO2 from fires (if any)

   Non-forest
   Forest
   Historical deforestation (e.g. 2002-2011)
   Projected deforestation (e.g. 2012-2021)
   Reference Region                  Forest          100tC/ha
   Project boundary                  Agriculture       5tC/ha
   Leakage prevention areas          C stock change: -95tC/ha
   Leakage belt
Combined projects
 Project developers may implement multiple activities across a
 landscape in connection with a REDD project, for example, carrying out
 forest protection in one area with complementary improved
 agricultural management activities in another. Project developers may
 either:
    Develop the project as a stand-alone REDD activity, being sure to
    account for any increases in emissions resulting from activities
    implemented outside the project area, unless deemed de minimis, or
    Combine multiple activities under a single VCS Project Description (PD),
    each delineated as a separate VCS project activity.

 When combining multiple activities under a single VCS project,
 different activities must be segregated spatially (i.e. no overlap) to
 facilitate accounting by activity type using an activity-specific
 methodology, or a methodology that covers multiple activities
 (currently none exists).
Results-based REDD+ under the UNFCCC


 Parties need to establish REDD+strategies, MRV and
 baselines

 Subnational allowed as an “interim” measure

 Subnational results-based actions require national monitorin

 Methodological guidance and modalities and procedures are
 still being negotiated.
UNFCCC
                                                   Review body
                                        MRV reports        Approval




                                        MRV reports        “REDD+ units”


                                                       National
                                                      government
Incentives at the national level
  Reference levels, MRV and




                                                                        Subnational       Policies and
                                   Aggregator
                                                                       governments         programs




                                                                                      Rest of the country´s
                                                Successful REDD+ activities
                                                                                          forest areas
VCS Jurisdictional & Nested REDD Initiative
 • Jurisdictional and Nested REDD Initiative
       Developing guidance and criteria for jurisdictional REDD
       programs to enable crediting at multiple scales (project,
       state/province and national)
           Create a pathway for projects to “nest” within larger scale
           jurisdictional programs (both sub-national and national)
           Develop best practice nested accounting and crediting at
           jurisdictional scales
        Frameworks may serve multiple markets (voluntary,
        bilateral, pre-compliance, potentially compliance)
           Interest and participation from a number of countries and
           donors seeking to set up jurisdictional and/or nested project
           crediting schemes

                                                                         9 March 2012
Current thinking


 Multiple accounting and crediting pathways to give
 flexibility
   Scenario 1: Project crediting only (with jurisdictional baseline)
   Scenario 2: Jurisdictional and project crediting
   Scenario 3: Jurisdictional crediting only


 “Nesting” can occur at multiple scales
   Project within jurisdiction
   Subnational jurisdiction within national jurisdiction

                                                                       9 March 2012
Simplified visual representation….
            VCS                                             VCS                                               VCS
          Registry                                        Registry                                          Registry

                                Buffer                                        Buffer                                              Buffer




                                                                                                                            ?

                                                                                                        ?

Scenario 1: Jurisdictional                      Scenario 2: Jurisdictional                           Scenario 3: Jurisdictional
baseline with stand alone                     crediting scheme with direct                            crediting scheme with
    project crediting                         crediting to nested activities                       internal allocation program

Note: Only 1 jurisdictional scale is shown. Grandfathering is not depicted

     = jurisdictional BL only        = VCS credited project           = jurisdictional BL & crediting         = jurisdiction “credited” project
9 March 2012
Developing a nested system
Requires addressing technical issues such as:
   Defining boundaries
   Developing and nesting baselines (inc. scope, pools, additionality,
   updating)
   Grandfathering
   Leakage
   MRV
   Crediting (inc. timing, distribution, double counting)
   Reversals and force majeure (inc. crediting implications in nesting)

Requires addressing other issues such as:
   Legal issues
   Safeguards
   Approvals
                                                                          9 March 2012
Process and Timeline

    Advisory and Technical Committees convened in
    Q1 2011
    Technical Recommendations released Oct 2011,
    peer and Advisory Committee review Oct-Nov
    2011, currently under revision
    Draft guidance and requirements to be issued
    for public comment by end of 1st quarter of
    2012
    Final release in mid-2012
    Phase Two: Pilots, 2012-

                                               9 March 2012
Thank you.




             mporruacop9@gmail.com

More Related Content

What's hot

'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
Global CCS Institute
 
4.1.3 properties of coals
4.1.3 properties of coals4.1.3 properties of coals
4.1.3 properties of coalsrajdeepjain
 
Coal bed methane and underground coal gasification
Coal bed methane and underground coal gasificationCoal bed methane and underground coal gasification
Coal bed methane and underground coal gasification
Dan Wilson
 
Strategy to Reduce Methane Emissions
Strategy to Reduce Methane EmissionsStrategy to Reduce Methane Emissions
Strategy to Reduce Methane Emissions
Dr Dev Kambhampati
 
Seminar graphene ppt
Seminar  graphene pptSeminar  graphene ppt
Seminar graphene ppt
Ankitesh Maithil
 
CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview
Dr. VIJAYKUMAR MARAKATTI
 
CARBON FOOTPRINT
CARBON FOOTPRINTCARBON FOOTPRINT
CARBON FOOTPRINT
PriyankaPriyadarshne
 
Biomass Gasification presentation
Biomass Gasification presentationBiomass Gasification presentation
Biomass Gasification presentationPritish Shardul
 
Pyrolysis ppt
Pyrolysis pptPyrolysis ppt
Pyrolysis ppt
RuchikaZalpouri
 
CCUS-2021 FactBook.pdf
CCUS-2021 FactBook.pdfCCUS-2021 FactBook.pdf
CCUS-2021 FactBook.pdf
fdgfdgfdsgdfg
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
Zin Eddine Dadach
 
Mangrove emission factors: Navigating chapter 4-Coastal wetlands
Mangrove emission factors: Navigating chapter 4-Coastal wetlands Mangrove emission factors: Navigating chapter 4-Coastal wetlands
Mangrove emission factors: Navigating chapter 4-Coastal wetlands
CIFOR-ICRAF
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage
The Climate Institute
 
Coal gasification
Coal gasification Coal gasification
Coal gasification
sima sabat
 
Plastic material building
Plastic material building Plastic material building
Plastic material building
Heba Al-DJ
 
Coal Oxidation And Losses
Coal Oxidation And LossesCoal Oxidation And Losses
Coal Oxidation And Losses
Hashim Khan
 
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
IAEME Publication
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
Global CCS Institute
 

What's hot (20)

'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
4.1.3 properties of coals
4.1.3 properties of coals4.1.3 properties of coals
4.1.3 properties of coals
 
Coal bed methane and underground coal gasification
Coal bed methane and underground coal gasificationCoal bed methane and underground coal gasification
Coal bed methane and underground coal gasification
 
Strategy to Reduce Methane Emissions
Strategy to Reduce Methane EmissionsStrategy to Reduce Methane Emissions
Strategy to Reduce Methane Emissions
 
Seminar graphene ppt
Seminar  graphene pptSeminar  graphene ppt
Seminar graphene ppt
 
CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview CO2 to Chemicals : An Overview
CO2 to Chemicals : An Overview
 
CARBON FOOTPRINT
CARBON FOOTPRINTCARBON FOOTPRINT
CARBON FOOTPRINT
 
Biomass Gasification presentation
Biomass Gasification presentationBiomass Gasification presentation
Biomass Gasification presentation
 
Pyrolysis ppt
Pyrolysis pptPyrolysis ppt
Pyrolysis ppt
 
CCUS-2021 FactBook.pdf
CCUS-2021 FactBook.pdfCCUS-2021 FactBook.pdf
CCUS-2021 FactBook.pdf
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
Mangrove emission factors: Navigating chapter 4-Coastal wetlands
Mangrove emission factors: Navigating chapter 4-Coastal wetlands Mangrove emission factors: Navigating chapter 4-Coastal wetlands
Mangrove emission factors: Navigating chapter 4-Coastal wetlands
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage
 
Coal gasification
Coal gasification Coal gasification
Coal gasification
 
N ox reduction kick-off meeting presentation
N ox reduction kick-off meeting presentationN ox reduction kick-off meeting presentation
N ox reduction kick-off meeting presentation
 
Plastic material building
Plastic material building Plastic material building
Plastic material building
 
Coal Oxidation And Losses
Coal Oxidation And LossesCoal Oxidation And Losses
Coal Oxidation And Losses
 
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
STUDY THE CORRELATION OF CLINKER QUALITY, RESIDE, PSD ON THE PERFORMANCE OF P...
 
Combustion
CombustionCombustion
Combustion
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
 

Viewers also liked

Finance vs. Verification?: Key issues in REDD+ verification
Finance vs. Verification?: Key issues in REDD+ verificationFinance vs. Verification?: Key issues in REDD+ verification
Finance vs. Verification?: Key issues in REDD+ verification
CIFOR-ICRAF
 
Linking REDD+ and ape conservation in Africa: opportunities and constraints
Linking REDD+ and ape conservation in Africa: opportunities and constraintsLinking REDD+ and ape conservation in Africa: opportunities and constraints
Linking REDD+ and ape conservation in Africa: opportunities and constraints
CIFOR-ICRAF
 
Options for REDD+
Options for REDD+Options for REDD+
Options for REDD+
CIFOR-ICRAF
 
What are the barriers and opportunities to conditional incentives in REDD+ pr...
What are the barriers and opportunities to conditional incentives in REDD+ pr...What are the barriers and opportunities to conditional incentives in REDD+ pr...
What are the barriers and opportunities to conditional incentives in REDD+ pr...
CIFOR-ICRAF
 
REDD in Asia - Challenges and Opportunities
REDD in Asia - Challenges and OpportunitiesREDD in Asia - Challenges and Opportunities
REDD in Asia - Challenges and Opportunities
CIFOR-ICRAF
 
Social and political dimensions of REDD+ financing, MRV and benefit distribut...
Social and political dimensions of REDD+ financing, MRV and benefit distribut...Social and political dimensions of REDD+ financing, MRV and benefit distribut...
Social and political dimensions of REDD+ financing, MRV and benefit distribut...
CIFOR-ICRAF
 
REDD+ and Biodiversity Conservation
REDD+ and Biodiversity ConservationREDD+ and Biodiversity Conservation
REDD+ and Biodiversity Conservation
CIFOR-ICRAF
 

Viewers also liked (7)

Finance vs. Verification?: Key issues in REDD+ verification
Finance vs. Verification?: Key issues in REDD+ verificationFinance vs. Verification?: Key issues in REDD+ verification
Finance vs. Verification?: Key issues in REDD+ verification
 
Linking REDD+ and ape conservation in Africa: opportunities and constraints
Linking REDD+ and ape conservation in Africa: opportunities and constraintsLinking REDD+ and ape conservation in Africa: opportunities and constraints
Linking REDD+ and ape conservation in Africa: opportunities and constraints
 
Options for REDD+
Options for REDD+Options for REDD+
Options for REDD+
 
What are the barriers and opportunities to conditional incentives in REDD+ pr...
What are the barriers and opportunities to conditional incentives in REDD+ pr...What are the barriers and opportunities to conditional incentives in REDD+ pr...
What are the barriers and opportunities to conditional incentives in REDD+ pr...
 
REDD in Asia - Challenges and Opportunities
REDD in Asia - Challenges and OpportunitiesREDD in Asia - Challenges and Opportunities
REDD in Asia - Challenges and Opportunities
 
Social and political dimensions of REDD+ financing, MRV and benefit distribut...
Social and political dimensions of REDD+ financing, MRV and benefit distribut...Social and political dimensions of REDD+ financing, MRV and benefit distribut...
Social and political dimensions of REDD+ financing, MRV and benefit distribut...
 
REDD+ and Biodiversity Conservation
REDD+ and Biodiversity ConservationREDD+ and Biodiversity Conservation
REDD+ and Biodiversity Conservation
 

Similar to Linking international standards to REDD+ projects

Pdf final reference levels slide deck bonn sbsta meeting june 2011
Pdf final reference levels slide deck bonn sbsta meeting june 2011Pdf final reference levels slide deck bonn sbsta meeting june 2011
Pdf final reference levels slide deck bonn sbsta meeting june 2011theREDDdesk
 
Integration of the social and environmental considerations of REDD+ in Democr...
Integration of the social and environmental considerations of REDD+ in Democr...Integration of the social and environmental considerations of REDD+ in Democr...
Integration of the social and environmental considerations of REDD+ in Democr...
IIED
 
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
zubeditufail
 
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
CIFOR-ICRAF
 
Verra’s Consolidated REDD methodology for high-integrity forest carbon projects
Verra’s Consolidated REDD methodology for  high-integrity forest carbon projectsVerra’s Consolidated REDD methodology for  high-integrity forest carbon projects
Verra’s Consolidated REDD methodology for high-integrity forest carbon projects
CIFOR-ICRAF
 
Forest Carbon Partnership Facility
Forest Carbon Partnership FacilityForest Carbon Partnership Facility
Forest Carbon Partnership Facility
CIFOR-ICRAF
 
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
CIFOR-ICRAF
 
CF speaker 1.pdf
CF speaker 1.pdfCF speaker 1.pdf
CF speaker 1.pdf
jannatmysum
 
Realizing the promise of high-integrity REDD at scale
Realizing the promise of high-integrity REDD at scaleRealizing the promise of high-integrity REDD at scale
Realizing the promise of high-integrity REDD at scale
CIFOR-ICRAF
 
Step-wise progress for REDD+ monitoring
Step-wise progress for REDD+ monitoringStep-wise progress for REDD+ monitoring
Step-wise progress for REDD+ monitoring
CIFOR-ICRAF
 
The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...
CIFOR-ICRAF
 
LCCC Program and Investment Opportunities
LCCC Program and Investment OpportunitiesLCCC Program and Investment Opportunities
LCCC Program and Investment Opportunities
Global Infrastructure Basel Foundation
 
Climate change: Global state of play and climate finance vis-à-vis regional a...
Climate change: Global state of play and climate finance vis-à-vis regional a...Climate change: Global state of play and climate finance vis-à-vis regional a...
Climate change: Global state of play and climate finance vis-à-vis regional a...
International Water Management Institute (IWMI)
 
The global landscape of projects to reduce emissions from deforestation and f...
The global landscape of projects to reduce emissions from deforestation and f...The global landscape of projects to reduce emissions from deforestation and f...
The global landscape of projects to reduce emissions from deforestation and f...
CIFOR-ICRAF
 
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
CDSB
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdf
OECD Environment
 
CCE Network: Progress & Outlook
CCE Network: Progress & Outlook CCE Network: Progress & Outlook
CCE Network: Progress & Outlook ccef2f
 
Progress & outlook cce network
Progress & outlook cce network Progress & outlook cce network
Progress & outlook cce network ccef2f
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Just Energy Transition in Coal Regions Knowledge Hub
 
CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...
OECD Environment
 

Similar to Linking international standards to REDD+ projects (20)

Pdf final reference levels slide deck bonn sbsta meeting june 2011
Pdf final reference levels slide deck bonn sbsta meeting june 2011Pdf final reference levels slide deck bonn sbsta meeting june 2011
Pdf final reference levels slide deck bonn sbsta meeting june 2011
 
Integration of the social and environmental considerations of REDD+ in Democr...
Integration of the social and environmental considerations of REDD+ in Democr...Integration of the social and environmental considerations of REDD+ in Democr...
Integration of the social and environmental considerations of REDD+ in Democr...
 
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
A guide to Intended Nationally Determined Contributions (INDCs) by Least Deve...
 
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...Realizing the promise of REDD: New approaches in voluntary carbon standards f...
Realizing the promise of REDD: New approaches in voluntary carbon standards f...
 
Verra’s Consolidated REDD methodology for high-integrity forest carbon projects
Verra’s Consolidated REDD methodology for  high-integrity forest carbon projectsVerra’s Consolidated REDD methodology for  high-integrity forest carbon projects
Verra’s Consolidated REDD methodology for high-integrity forest carbon projects
 
Forest Carbon Partnership Facility
Forest Carbon Partnership FacilityForest Carbon Partnership Facility
Forest Carbon Partnership Facility
 
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
Opportunities and challenges to developing REDD+ benefit sharing mechanisms i...
 
CF speaker 1.pdf
CF speaker 1.pdfCF speaker 1.pdf
CF speaker 1.pdf
 
Realizing the promise of high-integrity REDD at scale
Realizing the promise of high-integrity REDD at scaleRealizing the promise of high-integrity REDD at scale
Realizing the promise of high-integrity REDD at scale
 
Step-wise progress for REDD+ monitoring
Step-wise progress for REDD+ monitoringStep-wise progress for REDD+ monitoring
Step-wise progress for REDD+ monitoring
 
The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...
 
LCCC Program and Investment Opportunities
LCCC Program and Investment OpportunitiesLCCC Program and Investment Opportunities
LCCC Program and Investment Opportunities
 
Climate change: Global state of play and climate finance vis-à-vis regional a...
Climate change: Global state of play and climate finance vis-à-vis regional a...Climate change: Global state of play and climate finance vis-à-vis regional a...
Climate change: Global state of play and climate finance vis-à-vis regional a...
 
The global landscape of projects to reduce emissions from deforestation and f...
The global landscape of projects to reduce emissions from deforestation and f...The global landscape of projects to reduce emissions from deforestation and f...
The global landscape of projects to reduce emissions from deforestation and f...
 
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdf
 
CCE Network: Progress & Outlook
CCE Network: Progress & Outlook CCE Network: Progress & Outlook
CCE Network: Progress & Outlook
 
Progress & outlook cce network
Progress & outlook cce network Progress & outlook cce network
Progress & outlook cce network
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...CCXG Global Forum March 2018, Transparency of reporting in technology support...
CCXG Global Forum March 2018, Transparency of reporting in technology support...
 

More from CIFOR-ICRAF

Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
CIFOR-ICRAF
 
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruana
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruanaLecciones para el monitoreo transparente Experiencias de la Amazonía peruana
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruana
CIFOR-ICRAF
 
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
CIFOR-ICRAF
 
Contexto de TransMoni
Contexto de TransMoniContexto de TransMoni
Contexto de TransMoni
CIFOR-ICRAF
 
Avances de Perú con relación al marco de transparencia del Acuerdo de París
Avances de Perú con relación al marco de transparencia del Acuerdo de ParísAvances de Perú con relación al marco de transparencia del Acuerdo de París
Avances de Perú con relación al marco de transparencia del Acuerdo de París
CIFOR-ICRAF
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Land tenure and forest landscape restoration in Cameroon and Madagascar
Land tenure and forest landscape  restoration in Cameroon and  MadagascarLand tenure and forest landscape  restoration in Cameroon and  Madagascar
Land tenure and forest landscape restoration in Cameroon and Madagascar
CIFOR-ICRAF
 
ReSI-NoC - Strategie de mise en oeuvre.pdf
ReSI-NoC - Strategie de mise en oeuvre.pdfReSI-NoC - Strategie de mise en oeuvre.pdf
ReSI-NoC - Strategie de mise en oeuvre.pdf
CIFOR-ICRAF
 
ReSI-NoC: Introduction au contexte du projet
ReSI-NoC: Introduction au contexte du projetReSI-NoC: Introduction au contexte du projet
ReSI-NoC: Introduction au contexte du projet
CIFOR-ICRAF
 
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
CIFOR-ICRAF
 
Introductions aux termes clés du projet ReSi-NoC - Approche Innovations
Introductions aux termes clés du projet ReSi-NoC - Approche InnovationsIntroductions aux termes clés du projet ReSi-NoC - Approche Innovations
Introductions aux termes clés du projet ReSi-NoC - Approche Innovations
CIFOR-ICRAF
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
CIFOR-ICRAF
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
CIFOR-ICRAF
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
CIFOR-ICRAF
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
CIFOR-ICRAF
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
CIFOR-ICRAF
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
CIFOR-ICRAF
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
CIFOR-ICRAF
 
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
CIFOR-ICRAF
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
CIFOR-ICRAF
 

More from CIFOR-ICRAF (20)

Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
Mejorando la estimación de emisiones GEI conversión bosque degradado a planta...
 
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruana
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruanaLecciones para el monitoreo transparente Experiencias de la Amazonía peruana
Lecciones para el monitoreo transparente Experiencias de la Amazonía peruana
 
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
Inclusión y transparencia como clave del éxito para el mecanismo de transfere...
 
Contexto de TransMoni
Contexto de TransMoniContexto de TransMoni
Contexto de TransMoni
 
Avances de Perú con relación al marco de transparencia del Acuerdo de París
Avances de Perú con relación al marco de transparencia del Acuerdo de ParísAvances de Perú con relación al marco de transparencia del Acuerdo de París
Avances de Perú con relación al marco de transparencia del Acuerdo de París
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Land tenure and forest landscape restoration in Cameroon and Madagascar
Land tenure and forest landscape  restoration in Cameroon and  MadagascarLand tenure and forest landscape  restoration in Cameroon and  Madagascar
Land tenure and forest landscape restoration in Cameroon and Madagascar
 
ReSI-NoC - Strategie de mise en oeuvre.pdf
ReSI-NoC - Strategie de mise en oeuvre.pdfReSI-NoC - Strategie de mise en oeuvre.pdf
ReSI-NoC - Strategie de mise en oeuvre.pdf
 
ReSI-NoC: Introduction au contexte du projet
ReSI-NoC: Introduction au contexte du projetReSI-NoC: Introduction au contexte du projet
ReSI-NoC: Introduction au contexte du projet
 
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
Renforcer les Systèmes d’Innovations agrosylvopastorales économiquement renta...
 
Introductions aux termes clés du projet ReSi-NoC - Approche Innovations
Introductions aux termes clés du projet ReSi-NoC - Approche InnovationsIntroductions aux termes clés du projet ReSi-NoC - Approche Innovations
Introductions aux termes clés du projet ReSi-NoC - Approche Innovations
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 
Data analysis and findings
Data analysis and findingsData analysis and findings
Data analysis and findings
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, IndonesiaCarbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
Carbon Stock Assessment in Banten Province and Demak, Central Java, Indonesia
 
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and PerspectivesCooperative Mangrove Project: Introduction, Scope, and Perspectives
Cooperative Mangrove Project: Introduction, Scope, and Perspectives
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 

Recently uploaded

Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 

Recently uploaded (20)

Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 

Linking international standards to REDD+ projects

  • 1. Linking international standards to REDD+ projects Manuel Estrada, CIFOR Latin American MRV Workshop, Petropolis, March 8, 2012
  • 2. International standards and methods for REDD+ Voluntary market Standards and UNFCCC methodologies Results-based VCS, REDD+ ACR, etc National level – (Subnational Project level – level) Jurisdictional level IPCC GL 2006 + IPCC LULUCF GPG
  • 3. REDD+ project types REDD: Avoided Planned Deforestation (APD) Avoided Unplanned Deforestation and Degradation (AUDD) Improved Forest Management (IFM) Afforestation, Reforestation and Revegetation (?)
  • 4. VCS Approved methodologies applicable to AUDD REDD projects as of March 2012 VM0006 - Methodology for Carbon Accounting in Project Activities that Reduce Emissions from Mosaic Deforestation and Degradation, v1.0 VM0007 - REDD Methodology Modules (REDD-MF), v1.1 VM0009 - Methodology for Avoided Mosaic Deforestation of Tropical Forests, v1.1 VM0015 - Methodology for Avoided Unplanned Deforestation, v1.0
  • 5. Basic elements and steps for AUDD baselines • REDD+ baselines are comprised of 2 main elements: a land use and land cover (LU/LC) change component and the associated carbon stock change component. • General steps for the estimation of REDD+ baselines: Step 1. Definition of the project type Step 2. Definition of the project boundary Step 3. Projection of LU/LC in the baseline Step 4. Estimation of baseline carbon stock changes Step 5. Estimation of baseline GHG emissions Step 6. Estimation of the baseline net GHG emissions and removals
  • 6. Project boundaries The project boundary is defined by: The geographical boundary within which the project will be implemented. Only land qualifying as ‘forest’ for a minimum of 10 years prior to the project start date can be included in the project boundary. Additionally, other geographical boundaries need to be established for AUDD projects: A Reference Region, a Leakage Belt and, if applicable, Leakage Prevention areas The project crediting period. The project crediting period for REDD projects shall be between 20 and 100 years. The sources and sinks, and associated types of GHGs (i.e. CO2, N2O and CH4), the project will affect. The carbon pools that the project will consider.
  • 7. Source: “Project Developer’s Guidebook to VCS REDD Methodologies”. Version 1.0, November 2011, developed by TerraCarbon for Conservation international AUDD methodologies Characteristics of the RR in different
  • 8. Leakage belts in different AUDD methodologies Source: “Project Developer’s Guidebook to VCS REDD Methodologies”. Version 1.0, November 2011, developed by TerraCarbon for Conservation international
  • 9. Projection of LU/LC in the baseline Identify where deforestation would likely occur using spatial analysis and projections based on historical factors over at least the previous 10 years that explain past patterns and can be used to make future projections of deforestation. The criteria and procedures for identifying alternative baseline scenarios shall take into account such factors as historical deforestation and/or degradation rates and require the development of a baseline by determining and analyzing a reference that shall be similar to the project area in terms of drivers and agents of deforestation and/or degradation, landscape configuration, and socio-economic and cultural conditions
  • 10. Source: “Project Developer’s Guidebook to VCS REDD Methodologies”. Version 1.0, November 2011, developed by TerraCarbon for Conservation international the LU/LC projection RS required by AUDD methodologies for
  • 11. Estimation of baseline C stock changes The calculation of emission factors from carbon stock changes comprises 2 steps: Step 1. Estimation of the carbon stocks of the forests and each post-deforestation LU/LC category identified in the project area Step 2. Determination of emission factors of all LU/LC change categories expected in the project area: The emission factors due to the transition from forest to other LU/LC categories are estimated by obtaining the difference between the carbon stocks in the forest and in the post-deforestation LU/LC category.
  • 12. Source: “Project Developer’s Guidebook to VCS REDD Methodologies”. Version 1.0, November 2011, developed by TerraCarbon for Conservation international methodologies C stock estimates in AUDD
  • 13. Simplified example – Estimating an AUD Baseline 1. Definition of boundaries 2. Analysis of historical LU/LC change 3. Analysis of agents, drivers and causes of D and chain of events leading to D 4. Projection of annual areas and location of D in the RR in the baseline 5. Identification of forest classes in areas Based on the VCS approved methodology VM0015 that would be D in the baseline and post D LU classes in the project area 6. Estimation of baseline C stock changes and non-CO2 from fires (if any) Non-forest Forest Historical deforestation (e.g. 2002-2011) Projected deforestation (e.g. 2012-2021) Reference Region Forest 100tC/ha Project boundary Agriculture 5tC/ha Leakage prevention areas C stock change: -95tC/ha Leakage belt
  • 14. Combined projects Project developers may implement multiple activities across a landscape in connection with a REDD project, for example, carrying out forest protection in one area with complementary improved agricultural management activities in another. Project developers may either: Develop the project as a stand-alone REDD activity, being sure to account for any increases in emissions resulting from activities implemented outside the project area, unless deemed de minimis, or Combine multiple activities under a single VCS Project Description (PD), each delineated as a separate VCS project activity. When combining multiple activities under a single VCS project, different activities must be segregated spatially (i.e. no overlap) to facilitate accounting by activity type using an activity-specific methodology, or a methodology that covers multiple activities (currently none exists).
  • 15. Results-based REDD+ under the UNFCCC Parties need to establish REDD+strategies, MRV and baselines Subnational allowed as an “interim” measure Subnational results-based actions require national monitorin Methodological guidance and modalities and procedures are still being negotiated.
  • 16. UNFCCC Review body MRV reports Approval MRV reports “REDD+ units” National government Incentives at the national level Reference levels, MRV and Subnational Policies and Aggregator governments programs Rest of the country´s Successful REDD+ activities forest areas
  • 17. VCS Jurisdictional & Nested REDD Initiative • Jurisdictional and Nested REDD Initiative Developing guidance and criteria for jurisdictional REDD programs to enable crediting at multiple scales (project, state/province and national) Create a pathway for projects to “nest” within larger scale jurisdictional programs (both sub-national and national) Develop best practice nested accounting and crediting at jurisdictional scales Frameworks may serve multiple markets (voluntary, bilateral, pre-compliance, potentially compliance) Interest and participation from a number of countries and donors seeking to set up jurisdictional and/or nested project crediting schemes 9 March 2012
  • 18. Current thinking Multiple accounting and crediting pathways to give flexibility Scenario 1: Project crediting only (with jurisdictional baseline) Scenario 2: Jurisdictional and project crediting Scenario 3: Jurisdictional crediting only “Nesting” can occur at multiple scales Project within jurisdiction Subnational jurisdiction within national jurisdiction 9 March 2012
  • 19. Simplified visual representation…. VCS VCS VCS Registry Registry Registry Buffer Buffer Buffer ? ? Scenario 1: Jurisdictional Scenario 2: Jurisdictional Scenario 3: Jurisdictional baseline with stand alone crediting scheme with direct crediting scheme with project crediting crediting to nested activities internal allocation program Note: Only 1 jurisdictional scale is shown. Grandfathering is not depicted = jurisdictional BL only = VCS credited project = jurisdictional BL & crediting = jurisdiction “credited” project
  • 21. Developing a nested system Requires addressing technical issues such as: Defining boundaries Developing and nesting baselines (inc. scope, pools, additionality, updating) Grandfathering Leakage MRV Crediting (inc. timing, distribution, double counting) Reversals and force majeure (inc. crediting implications in nesting) Requires addressing other issues such as: Legal issues Safeguards Approvals 9 March 2012
  • 22. Process and Timeline Advisory and Technical Committees convened in Q1 2011 Technical Recommendations released Oct 2011, peer and Advisory Committee review Oct-Nov 2011, currently under revision Draft guidance and requirements to be issued for public comment by end of 1st quarter of 2012 Final release in mid-2012 Phase Two: Pilots, 2012- 9 March 2012
  • 23. Thank you. mporruacop9@gmail.com