arc5410  Advanced Structure and Construction
4.0  Horizontal Structural Systems  Pt. 2
Lloyds Insurance Building   Richard Rogers Partnership London   1978-1986
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Long-span steel beams and trusses illustrating comparative depths and profile variation (designed for a 15m X 6m floor grid).
Commerzbank steel framing. Isometric of floor framing (above left), view of floor framing under construction (above  right), elevation of end-tapered steel girders with various openings for services. Note the steel studs on the top flange  (above) to create composite action between the slab and girder.
Typical floor framing section of Commerzbank. Note the tapered ends of main spanning beams. This resolves conflict with lower flange of outside spandrel beam making the connection easier to make. Exterior wind bracing structure of the atrium glazing set in approximately 2 meters providing a balcony but also allowing connection to full depth of the floor beams
Fabricating lightweight steel beams by increasing the depth and removing un-needed steel from the web area of the beam.
Metro station in Genoa, Italy by Renzo Piano Building Workshop.

More Related Content

What's hot

What's hot (19)

High rise building study & report
High rise building study & reportHigh rise building study & report
High rise building study & report
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structures
 
Structural System in High Rise building
Structural System in High Rise buildingStructural System in High Rise building
Structural System in High Rise building
 
Long span structure
Long span structureLong span structure
Long span structure
 
Sears tower
Sears towerSears tower
Sears tower
 
Steel in Highrise building : Application
Steel in Highrise building : Application Steel in Highrise building : Application
Steel in Highrise building : Application
 
Technology materials of tall buildings highrise
Technology materials of tall buildings highriseTechnology materials of tall buildings highrise
Technology materials of tall buildings highrise
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquake
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
kkr 2
kkr 2kkr 2
kkr 2
 
The cable in building structures
The cable in building structuresThe cable in building structures
The cable in building structures
 
rahul
rahulrahul
rahul
 
High rise buildings for architects by Dr.-Eng. Moaid subh
High rise buildings for architects   by Dr.-Eng. Moaid subhHigh rise buildings for architects   by Dr.-Eng. Moaid subh
High rise buildings for architects by Dr.-Eng. Moaid subh
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Tube structures
Tube structuresTube structures
Tube structures
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Highrise lecture
Highrise lectureHighrise lecture
Highrise lecture
 

Viewers also liked (7)

L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1
 
L10 envelope pt2
L10  envelope pt2L10  envelope pt2
L10 envelope pt2
 
L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2
 
L9 envelope pt.1
L9 envelope pt.1L9 envelope pt.1
L9 envelope pt.1
 
good
goodgood
good
 
good
goodgood
good
 
Detlev Dietz Commerzbank
Detlev Dietz CommerzbankDetlev Dietz Commerzbank
Detlev Dietz Commerzbank
 

Similar to L8 horiz struc pt.2

BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
ong93
 
W 1 single-storey steel-frames_structures
W 1  single-storey steel-frames_structuresW 1  single-storey steel-frames_structures
W 1 single-storey steel-frames_structures
Mihai Pancu
 

Similar to L8 horiz struc pt.2 (20)

Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
 
CAE Conference Luca Romano - 21 october 2013
CAE Conference Luca Romano - 21 october 2013CAE Conference Luca Romano - 21 october 2013
CAE Conference Luca Romano - 21 october 2013
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildings
 
Profiled deck composite floors
Profiled deck composite floorsProfiled deck composite floors
Profiled deck composite floors
 
BUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptxBUILDING TECH 5_04.pptx
BUILDING TECH 5_04.pptx
 
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
PEB Shed, PEB Contractors, PEB Shed Manufacturers in Bangalore, Mysore, Karna...
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Ferrocement roof
Ferrocement roofFerrocement roof
Ferrocement roof
 
Guida ARBED edifici alti
Guida ARBED edifici altiGuida ARBED edifici alti
Guida ARBED edifici alti
 
Composite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAOComposite construction by Er. SURESH RAO
Composite construction by Er. SURESH RAO
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Pre Bid Conference
Pre Bid ConferencePre Bid Conference
Pre Bid Conference
 
W 1 single-storey steel-frames_structures
W 1  single-storey steel-frames_structuresW 1  single-storey steel-frames_structures
W 1 single-storey steel-frames_structures
 
Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
 
CFT
CFTCFT
CFT
 
Detail introduction of metal building kits
Detail introduction of metal building kitsDetail introduction of metal building kits
Detail introduction of metal building kits
 

Recently uploaded

678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
YibeltalNibretu
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 

Recently uploaded (20)

B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Accounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdfAccounting and finance exit exam 2016 E.C.pdf
Accounting and finance exit exam 2016 E.C.pdf
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptxSolid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
Solid waste management & Types of Basic civil Engineering notes by DJ Sir.pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 

L8 horiz struc pt.2

  • 1. arc5410 Advanced Structure and Construction
  • 2. 4.0 Horizontal Structural Systems Pt. 2
  • 3. Lloyds Insurance Building Richard Rogers Partnership London 1978-1986
  • 4.  
  • 5.  
  • 6.  
  • 7.  
  • 8.  
  • 9.  
  • 10.  
  • 11.  
  • 12.  
  • 13.  
  • 14.  
  • 15.  
  • 16.  
  • 17.  
  • 18.  
  • 19.  
  • 20. Long-span steel beams and trusses illustrating comparative depths and profile variation (designed for a 15m X 6m floor grid).
  • 21. Commerzbank steel framing. Isometric of floor framing (above left), view of floor framing under construction (above right), elevation of end-tapered steel girders with various openings for services. Note the steel studs on the top flange (above) to create composite action between the slab and girder.
  • 22. Typical floor framing section of Commerzbank. Note the tapered ends of main spanning beams. This resolves conflict with lower flange of outside spandrel beam making the connection easier to make. Exterior wind bracing structure of the atrium glazing set in approximately 2 meters providing a balcony but also allowing connection to full depth of the floor beams
  • 23. Fabricating lightweight steel beams by increasing the depth and removing un-needed steel from the web area of the beam.
  • 24. Metro station in Genoa, Italy by Renzo Piano Building Workshop.