CAE CONFERENCE 2013
Lazise (VR) 21÷22 october 2013

DESIGN AND CONSTRUCTION OF THE “FIERA MILANO BUILDING”
Ing. Luca ROMANO – I QUADRO INGEGNERIA – GENOVA
LOCATION OF THE “FIERA MILANO BUILDING”

PLAN VIEW

AERIAL VIEW
INTERNATIONAL TENDER
The design of this building followed from an international tender, in which different groups of architects, engineers and constructioncompanies proposed their ideas for the new offices of the “Fiera Milano building”.
The winning proposal was conceived as a golden, horizontal tower at the east entrance of the “Fiera di Milano”.
Here you can see some early images of the winning idea for the tender:
DESCRIPTION OF THE BUILDING

During the competition phase various solutions were studied in order to match construction time and costs. This resulted in a mixed
steel-concrete structure that allowed to complete the building in less than two years and to respect tender costs.

Design consists of a 132.5 m long building of 15.60 m depth and about 60 m height.
The Building is divided in two by a joint: building “A” is composed by 12 floors while building “B” is composed by 13 floors.
They are separated but connected by the foyer with staircases and footbridges.
In order to provide an helicopter landing pad, an important cantilever steel structure was built on the roof of building “B”.

Side of the building in the actual destination

Rear of the building with view of the landing pad
Here are some views of the finished building:

Side of the building with view of the cantilever landing pad

View of the rear of the building
The building is composed by two parts connected by a foyer and footbridges at different floors.

BUILDING “A”

FOYER

Plan view of the building, with the landing pad on the right

BUILDING “B”
STRUCTURE

Structural Strategy And Description

The structure was very long, so it was divided in two structures separated by a joint. Here you can see the typical floor plan:
joint
BUILDING “B”

BUILDING “A”

plan view of the typical floor

Longitudinally the structure is a repetition of 6.25 m spaced columns; they are aligned along the perimeter and on an internal position.
Transversely two precast, prestressed slabs - 4.25 m and 10.7 m long - connect the longitudinal steel beams.
These beams are made with welded plates, to reduce thickness.
STRUCTURE
Each building is a core supported structure, with shear walls, to resist lateral forces from wind and earthquakes.
In this way steel columns are pinned at the base and resist only to vertical loads.

This classical strategy was adopted to realize the structure in few months, with respect of tender costs:
steel structures was produced on workshop, while on construction site we realized reinforced concrete core structures.

Core structures of the two buildings - floors in construction
Concrete core structures were realized with climbing form-works.
In the picture you can see also the steel boxes provided in the walls for the connection of steel beams:

Climbing form-works for the shear walls of stair cases
In this way the steel structure was a simple assembly of pinned columns and hinged beams:

Pinned connections of the steel columns
Steel beams were composed with welded plates, hinged and dimensioned to support precast slabs:
To reduce thickness, slabs were supported on bottom flange:

Prestressed slabs are placed on the wide bottom flanges of the steel beams and casted in situ.
Slabs were 30 cm thick, 10.25 metres long, with a layer of 5 cm of concrete cast in situ.

In the following details you can see the intersection beam-slab:
Here are some pictures of the construction phases of the floors:

Positioning of precast slab of floors

Detail of the intersection between slab and steel beams (view from above and from below)
FOOTBRIDGES

The connecting foyer has footbridges 12 metres long, at various floors. These structures are free to move to absorb lateral movements
due to wind, earthquakes and thermal effects.
They are composed by IPE 500 steel beams with a composite slab on cold-formed steel decking.

Main steel beams of the two footbridges connecting the two buildings: fixed on one side and free to move on the other.
FOYER
The foyer is an hollow structure with staircases and footbridges connecting people at each floor.
Windows in front of the foyer have a complicate pinned systems that permits movements of translation and rotation of the two
buildings. These windows are linked to a steel tree-structure, pinned to building “B” and free to move in the connection of building “A”.
Cinematic was important to prevent window crashes and all calculated displacements were given to the facade developers to take
care of relative movements.

view of the foyer connecting the two buildings

view of the finished foyer from below, in the entrance
Here you can see the structural detail of the hinges of the tree-structure of the foyer:

General and detailed view of the Pinned and slipping connections of the facade of the foyer

STRUCTURE “A”

STRUCTURE “B”

Plan view detail of the foyer
Construction phases were important.
Before finishing the roof, the wall at the rear of the foyer was 54 metres high, 40 cm thick, separated by joint and free at the top.
Because of stability check, you can see some provisional beams positioned.
You can also see the joint which separates the two structures.

joint
HELICOPTER LANDING PAD:
On the roof of building “B” an helicopter landing pad was realized.
The structure is made with cantilever “I” beams, 10 metres apart from the facade, connected by damping supports to the steel columns
of the building, not to transmit vibrations.
The deck was formed by aluminium box section supported by the beams.

General view of the structure of the landing pad

detail of the structure extremity
Here you can see the design of the steel structure:

the plan view on the left and the cross section of the cantilever on the right.

Only extremity columns were used as support, to prevent traction.

10 m

building
FOUNDATIONS
In order to prevent ground displacements and subsidence, we realized a steel sheet-pile bulkhead, 10 metres long, installed by
vibratory hammer.
In the picture one can see this earth retaining wall without dead space near existing buildings:

Positioning of steel sheet piles before digging
Another problem was the presence of the Underground of Milan, that didn’t accept any pressure against its existing walls. That’s why
we had to dig till the bottom of the tube, realize a joint and replace the ground with casting concrete, able to resist to the pressure of
the new building transmitting forces only to the bottom of the foundation.

Steel sheet piles and base of the mat foundation. On the left the existing Underground

Concrete casting near the Underground, to prevent earth pressure against existing walls
Underground of Milan asked the simulation of the construction phases.
Here you can see the vertical section, with the Tube on the left, the mat foundations on the right and the concrete layer in the middle:

The simulation analysis was performed in 5 steps with a bi-dimensional model, to answer the Underground of Milan in terms of
subsidence:
Mat Foundation

Due to the good soil characteristic, we designed a mat foundation, continuous under the entire building.
Instead, the building itself was divided in two structures, which were separated by a joint.
The thickness of the mat was 1 metre under the steel columns and 1.5 metres under the core structures. It was reduced to 40 cm near
the steel sheet piles, in order to reduce the cantilever.
In the following plan view you can see the foundation: 137 metres long and 30 metres wide:
In the next picture you can see the positioning of reinforcement in the mat:

Reinforcement of the mat foundation before casting
ANALYSIS
The structure had many particularities, but is was not so unusual.
So we decided to realize models for design purpose, easy to handle and to understand.

Here you can see the finite element model of the structure, performed with Straus 7.

The model simulate the exact structural stiffness by mean of:
2084 element beam
12427 element plate
for a total of 46994 degrees of freedom

View of the model
Mat foundations are modelled with plate elements on ground support:

Modulus of Subgrade Reaction

These plates have either membrane or bending properties, calculated through their thickness.

Earth retaining walls are modelled with plate elements.

Columns and beams are modelled with beam elements, hinged at the end.

shear walls forming the box shaped cores around stairs and elevators, are modelled with plate elements, which have either membrane
or bending properties, calculated through their thickness.
This is a spatial system capable of resisting all types of loads: vertical forces, shear forces and bending moments in all directions, as
well as torsion.
In this way we realized an efficient lateral load resistance structure for the two buildings.
Slabs are modelled with load patch elements and rigid floor links.

This plate element does not have any property attributes. It is used solely as a way of transferring distributed area loads and nonstructural mass to beams that may be connected around the perimeter of the plate:

In this way you don’t influence the stiffness of beams and you consider the rigid link of each floor.

The software Straus 7 allows the definition of different non structural mass for various load condition and to any of them one can
associate a dynamic factor that define the mass to be considered in dynamic analysis. In this way you have the maximum of
possibilities of simulating seismic conditions.
Analysis performed during design were of three types:

-

Static:

load conditions – SLS and ULS combinations - envelopes

-

Dynamic:

natural frequencies – mode shapes

-

Spectral response:

seismic base excitation

During construction phases we performed also various static analysis on partial models, to help the construction company to reduce
construction time.
Static analysis are performed considering various load conditions:

-

Self weight is automatically determined by Straus 7

-

Either permanent or live loads were introduced through non structural mass in different load cases

-

Wind was introduced through forces acting on facade load patch elements. These forces change of intensity with height

Solutions were combined to maximize effects on beams and columns.
Various combinations were performed, in order to obtain Service and Ultimate Limit State conditions.
For example next figure represent maxima axial forces at ULS for the columns:
In next image we see the values of axial forces in columns and stresses in shear walls of a single floor.
They are used for resistance and stability check required by Code:
The natural frequency solver was used to calculate free vibration frequencies and corresponding mode shapes of the undamped
structure.
It is possible to determine the participation factors for all directions to be sure to involve more than 85% of the global mass of the
structure:

100 mode shapes were necessary.

In next figure you see the first mode shape of structure “A”:

first bending mode shape in the transverse direction: 0.61 Hz of frequency
In next figure you see the first six mode shapes of structure “A”:

First six mode shapes of structure “A”
Seismic design

The Spectral Response solver calculates the response of a structure subjected to a random dynamic loading.
In this spectral response analysis, the random dynamic loads applied are base excitation (earthquake)
The spectrum input used is Response Spectrum, defined by seismic Italian code: a spectral curve as a function of period.

The site is considered as low seismic and Code provide a ground acceleration of 0.05 g

Considering the building braced by concrete core structures, irregular and low ductile, a structural factor of 1.68 was adopted.
In this way we can calculate spectral acceleration for SLD and SLV conditions, to be used in spectral analysis:

SLV spectral curve

Seismic forces were combined with vertical and gravity forces as in Code requirements:

γEE+ γGGk + γPPk + Σ i (ψ2i γQQki)
Control of seismic displacement for the two structures and dimension of joint:

Displacement in x direction of structure “A”

Displacement in x direction of structure “B”

To determine the entity of the joint we adopted a safety factor gF = 1.4 for the displacements calculated (sum of displacements of
building “A” plus “B”):
wind:

Δx = (0.41+0.12)•gF = 0.53 •1.4 = 0.75 cm

seismic displacements:

Δx = (3.75+3.22)•gF = 6.97 •1.4 = 9.76 cm

A joint of 10 cm was realized between the two buildings.
Foundations

The model was supported by plates on ground support, of thickness corresponding to the mat foundation.
In this way you can have a response on the soil and structure interaction, calculating subsidence and pressure on ground.
In the following image you can see the example of pressure calculated under building “A”:

Max pressure on ground for building “A” (kg/cm2)
In the same way you can obtain the envelope of the maximum Bending moment in the x and y direction, to dimension reinforcement
and check Service and Ultimate limit states:

Plate moment Mxx max envelope in x direction
It is possible to create an envelope combined to obtain the percentage of rebars to be positioned every metre.
In the following image it is possible to see the maximum envelope, produced to estimate the percentage of top rebar in the mat
foundation, for x direction:

We decided to position a net of ø20mm rebars every 20 cm either on the bottom or on the top of the mat, so you can obtain an image
of the place where we have to integrate rebars in the x direction:
Serviceability Limit State: deflection control

Calculation of deformations under SLS combinations were used to control limitations given by Code.
Deflection of the building under wind loads were useful to dimension facades and window elements.

In the following figure the displacements due to wind on the long direction:

2.83 cm < H/500
Serviceability Limit State: stress control

Calculation of stress under SLS combinations were used to control limitations given by Code.

Serviceability limit states: envelope stress in all members
Lateral bracing system
Calculation of stress under ULS combinations were used to check resistance
Here we can see the vertical stress in shear walls forming the box shaped cores around stairs and elevators, modelled with plate
elements.
We can see the stress distribution on all the core and the integration of stresses on a wall, to obtain the forces needed to evaluate
Ultimate Limit State Resistance:

distribution of stresses in the core

Integration of stresses in the shear wall

Ultimate Limit State Resistance
Helicopter landing pad
Live load were given for the helicopter with dynamic action in landing and emergency conditions.
We can see the cantilever landing pad from the global model:

And a global view of the results in terms of stress in ULS conditions:

Cantilever landing pad: envelope stresses in members
In next image there is the simulation of vertical displacements of the cantilever beams, calculated for testing of the structures:
they were compared with experimental results.

Vertical displacements
CONCLUSIONS

The simulations here performed are design-oriented.

They were necessary to give a quick response to structural problems either for the final solutions or for construction problems.
In fact it was usual to be on yard with various models and take decision analysing the partial model in construction phases.
This is a correct way to optimize construction time safely.

With simulation analysis for such a particular structure we could check:

-

displacements to correctly dimension window-facades and guaranty serviceability for the whole structure

-

resistance and stability for all members

DESIGN AND CONSTRUCTION OF THE “FIERA MILANO BUILDING”
Ing. Luca ROMANO – I QUADRO INGEGNERIA – GENOVA

More Related Content

What's hot

SHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, ChinaSHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, ChinaJASHU JASWANTH
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Bookletleejanett3
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportWilden How
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
report on high riseee
report on high riseeereport on high riseee
report on high riseeeAditya Sanyal
 
Steel in Highrise building : Application
Steel in Highrise building : Application Steel in Highrise building : Application
Steel in Highrise building : Application Onal Kothari
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйЦ. Алтангэрэл
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3chuhonsan
 
High rise structure
High rise structureHigh rise structure
High rise structureAnuj Singhal
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3chuhonsan
 
A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'Abheek Khajuria
 

What's hot (19)

SHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, ChinaSHANGHAI TOWER - Shanghai, China
SHANGHAI TOWER - Shanghai, China
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Booklet
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
Turning torso
Turning torsoTurning torso
Turning torso
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
report on high riseee
report on high riseeereport on high riseee
report on high riseee
 
Steel in Highrise building : Application
Steel in Highrise building : Application Steel in Highrise building : Application
Steel in Highrise building : Application
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Shard tower
Shard towerShard tower
Shard tower
 
Structural System in High Rise building
Structural System in High Rise buildingStructural System in High Rise building
Structural System in High Rise building
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'A building with a difference 'Taipei 101'
A building with a difference 'Taipei 101'
 
Sears tower
Sears towerSears tower
Sears tower
 
Bcon
BconBcon
Bcon
 

Viewers also liked

CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013Franco Bontempi
 
Arangio sapienza-may2015
Arangio sapienza-may2015Arangio sapienza-may2015
Arangio sapienza-may2015StroNGER2012
 
Uso delle fibre di basalto nel risanamento degli edifici storici
Uso delle fibre di basalto nel risanamento degli edifici storiciUso delle fibre di basalto nel risanamento degli edifici storici
Uso delle fibre di basalto nel risanamento degli edifici storiciStroNGER2012
 
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - Bontempi
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - BontempiApplicazione dal Corso di dottorato: Ottimizzazione Strutturale - Bontempi
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - BontempiFranco Bontempi Org Didattica
 
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...Franco Bontempi Org Didattica
 
Una visione ampia dei sistemi: robustezza e resilienza.
Una visione ampia dei sistemi: robustezza e resilienza.Una visione ampia dei sistemi: robustezza e resilienza.
Una visione ampia dei sistemi: robustezza e resilienza.StroNGER2012
 
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUPStroNGER2012
 
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte II
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte IIVULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte II
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte IIStroNGER2012
 
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013Franco Bontempi Org Didattica
 
Erdogmus sapienza-may2015
Erdogmus sapienza-may2015Erdogmus sapienza-may2015
Erdogmus sapienza-may2015StroNGER2012
 
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)Franco Bontempi Org Didattica
 
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...Franco Bontempi Org Didattica
 
Avila sapienza-may2015
Avila sapienza-may2015Avila sapienza-may2015
Avila sapienza-may2015StroNGER2012
 
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...StroNGER2012
 
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - Cagliari
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - CagliariBontempi - Laboratorio "Azioni eccezionali sulle strutture" - Cagliari
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - CagliariStroNGER2012
 
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...Franco Bontempi Org Didattica
 
L'analisi strutturale a supporto della progettazione prestazionale
L'analisi strutturale a supporto della progettazione prestazionaleL'analisi strutturale a supporto della progettazione prestazionale
L'analisi strutturale a supporto della progettazione prestazionaleFranco Bontempi Org Didattica
 
Approccio sistemico per la sicurezza delle gallerie in caso di incendio
Approccio sistemico per la sicurezza delle gallerie in caso di incendio Approccio sistemico per la sicurezza delle gallerie in caso di incendio
Approccio sistemico per la sicurezza delle gallerie in caso di incendio Franco Bontempi Org Didattica
 

Viewers also liked (20)

CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
 
Arangio sapienza-may2015
Arangio sapienza-may2015Arangio sapienza-may2015
Arangio sapienza-may2015
 
Uso delle fibre di basalto nel risanamento degli edifici storici
Uso delle fibre di basalto nel risanamento degli edifici storiciUso delle fibre di basalto nel risanamento degli edifici storici
Uso delle fibre di basalto nel risanamento degli edifici storici
 
Two years 2
Two years 2Two years 2
Two years 2
 
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - Bontempi
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - BontempiApplicazione dal Corso di dottorato: Ottimizzazione Strutturale - Bontempi
Applicazione dal Corso di dottorato: Ottimizzazione Strutturale - Bontempi
 
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...
Applications of Structural Optimization: Corso di dottorato INTRODUZIONE ALL'...
 
Una visione ampia dei sistemi: robustezza e resilienza.
Una visione ampia dei sistemi: robustezza e resilienza.Una visione ampia dei sistemi: robustezza e resilienza.
Una visione ampia dei sistemi: robustezza e resilienza.
 
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP
2° WORKSHOP GRUPPO ITALIANO IABMAS - IABMAS ITALIAN GROUP
 
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte II
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte IIVULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte II
VULNERABILITA’ DELLE COSTRUZIONI AI FENOMENI GEOLOGICI E IDROGEOLOGICI Parte II
 
CM - robustezza resilienza CTA 2013
CM - robustezza resilienza CTA 2013CM - robustezza resilienza CTA 2013
CM - robustezza resilienza CTA 2013
 
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013
CM - Petrini - Fatica nelle strutture metalliche - 21/11/2013
 
Erdogmus sapienza-may2015
Erdogmus sapienza-may2015Erdogmus sapienza-may2015
Erdogmus sapienza-may2015
 
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)
CM - Jauregui - Sapienza University of Rome (60 min, part i, members modified)
 
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...
LA STATICA DEGLI ALLESTIMENTI TEMPORANEI PER EVENTI: Quadro normativo e verif...
 
Avila sapienza-may2015
Avila sapienza-may2015Avila sapienza-may2015
Avila sapienza-may2015
 
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...
Analisi strutturale dei meccanismi di collasso di barriere stradali tipo New-...
 
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - Cagliari
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - CagliariBontempi - Laboratorio "Azioni eccezionali sulle strutture" - Cagliari
Bontempi - Laboratorio "Azioni eccezionali sulle strutture" - Cagliari
 
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...
Presentazione della Relazione sulle Opinioni degli Studenti - Facolta' di Ing...
 
L'analisi strutturale a supporto della progettazione prestazionale
L'analisi strutturale a supporto della progettazione prestazionaleL'analisi strutturale a supporto della progettazione prestazionale
L'analisi strutturale a supporto della progettazione prestazionale
 
Approccio sistemico per la sicurezza delle gallerie in caso di incendio
Approccio sistemico per la sicurezza delle gallerie in caso di incendio Approccio sistemico per la sicurezza delle gallerie in caso di incendio
Approccio sistemico per la sicurezza delle gallerie in caso di incendio
 

Similar to CAE Conference Luca Romano - 21 october 2013

Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreTanisha Agarwal
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptxPrituJadhav1
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Ow Cong
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameAbdul Rahman
 
Building construction ii (1)
Building construction ii (1)Building construction ii (1)
Building construction ii (1)杉 江紫
 
Building construction 02
Building construction 02Building construction 02
Building construction 02Sarah Esa
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)Lek Yuen
 
Denver Art Museum
Denver Art MuseumDenver Art Museum
Denver Art MuseumNour Salo
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildingsRajat Rana
 
Masonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnsMasonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnshsaam hsaam
 
Lecture 8 THigh Rise structures.pdf
Lecture 8 THigh Rise structures.pdfLecture 8 THigh Rise structures.pdf
Lecture 8 THigh Rise structures.pdfSALONIKAAHUJA1
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsSasanSafar
 
Case Study: Catenary Structures
Case Study: Catenary StructuresCase Study: Catenary Structures
Case Study: Catenary StructuresPrasad Thanthratey
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...Ursachi Răzvan
 

Similar to CAE Conference Luca Romano - 21 october 2013 (20)

Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
MDC.pptx
MDC.pptxMDC.pptx
MDC.pptx
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
Building construction ii (1)
Building construction ii (1)Building construction ii (1)
Building construction ii (1)
 
Building construction 02
Building construction 02Building construction 02
Building construction 02
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
 
Denver Art Museum
Denver Art MuseumDenver Art Museum
Denver Art Museum
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildings
 
Masonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnsMasonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumns
 
B con 2
B con 2B con 2
B con 2
 
Lecture 8 THigh Rise structures.pdf
Lecture 8 THigh Rise structures.pdfLecture 8 THigh Rise structures.pdf
Lecture 8 THigh Rise structures.pdf
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
Case Study: Catenary Structures
Case Study: Catenary StructuresCase Study: Catenary Structures
Case Study: Catenary Structures
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Cube tower mexico
Cube tower mexicoCube tower mexico
Cube tower mexico
 
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
Lecture 2 s.s. iii continuare Design of Steel Structures - Faculty of Civil E...
 
Matkon_S.06.a_-_Portal_MKLW.pdf
Matkon_S.06.a_-_Portal_MKLW.pdfMatkon_S.06.a_-_Portal_MKLW.pdf
Matkon_S.06.a_-_Portal_MKLW.pdf
 
Detail introduction of metal building kits
Detail introduction of metal building kitsDetail introduction of metal building kits
Detail introduction of metal building kits
 

More from Franco Bontempi Org Didattica

II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdf
II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdfII evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdf
II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdfFranco Bontempi Org Didattica
 
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdf
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdfICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdf
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdfFranco Bontempi Org Didattica
 
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...Franco Bontempi Org Didattica
 
Soft computing based multilevel strategy for bridge integrity monitoring
Soft computing based multilevel strategy for bridge integrity monitoringSoft computing based multilevel strategy for bridge integrity monitoring
Soft computing based multilevel strategy for bridge integrity monitoringFranco Bontempi Org Didattica
 
Systemic approach for the maintenance of complex structural systems
Systemic approach for the maintenance of complex structural systemsSystemic approach for the maintenance of complex structural systems
Systemic approach for the maintenance of complex structural systemsFranco Bontempi Org Didattica
 
The role of softening in the numerical analysis of R.C. framed structures
The role of softening in the numerical analysis of R.C. framed structuresThe role of softening in the numerical analysis of R.C. framed structures
The role of softening in the numerical analysis of R.C. framed structuresFranco Bontempi Org Didattica
 
Reliability of material and geometrically non-linear reinforced and prestress...
Reliability of material and geometrically non-linear reinforced and prestress...Reliability of material and geometrically non-linear reinforced and prestress...
Reliability of material and geometrically non-linear reinforced and prestress...Franco Bontempi Org Didattica
 
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...Franco Bontempi Org Didattica
 
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...Cellular Automata Approach to Durability Analysis of Concrete Structures in A...
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...Franco Bontempi Org Didattica
 
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...Franco Bontempi Org Didattica
 

More from Franco Bontempi Org Didattica (20)

50 anni.Image.Marked.pdf
50 anni.Image.Marked.pdf50 anni.Image.Marked.pdf
50 anni.Image.Marked.pdf
 
4. Comportamento di elementi inflessi.pdf
4. Comportamento di elementi inflessi.pdf4. Comportamento di elementi inflessi.pdf
4. Comportamento di elementi inflessi.pdf
 
Calcolo della precompressione: DOMINI e STRAUS7
Calcolo della precompressione: DOMINI e STRAUS7Calcolo della precompressione: DOMINI e STRAUS7
Calcolo della precompressione: DOMINI e STRAUS7
 
II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdf
II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdfII evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdf
II evento didattica 5 aprile 2022 TECNICA DELLE COSTRUZIONI.pdf
 
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdf
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdfICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdf
ICAR 09_incontro del 5 aprile 2022_secondo annuncio.pdf
 
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...
Structural health monitoring of a cable-stayed bridge with Bayesian neural ne...
 
Soft computing based multilevel strategy for bridge integrity monitoring
Soft computing based multilevel strategy for bridge integrity monitoringSoft computing based multilevel strategy for bridge integrity monitoring
Soft computing based multilevel strategy for bridge integrity monitoring
 
Systemic approach for the maintenance of complex structural systems
Systemic approach for the maintenance of complex structural systemsSystemic approach for the maintenance of complex structural systems
Systemic approach for the maintenance of complex structural systems
 
Elenco studenti esaminandi
Elenco studenti esaminandiElenco studenti esaminandi
Elenco studenti esaminandi
 
Costruzione di ponti in cemento armato.
Costruzione di ponti in cemento armato.Costruzione di ponti in cemento armato.
Costruzione di ponti in cemento armato.
 
Costruzione di ponti in acciaio
Costruzione di ponti in acciaioCostruzione di ponti in acciaio
Costruzione di ponti in acciaio
 
Costruzione di Ponti - Ceradini
Costruzione di Ponti - CeradiniCostruzione di Ponti - Ceradini
Costruzione di Ponti - Ceradini
 
The role of softening in the numerical analysis of R.C. framed structures
The role of softening in the numerical analysis of R.C. framed structuresThe role of softening in the numerical analysis of R.C. framed structures
The role of softening in the numerical analysis of R.C. framed structures
 
Reliability of material and geometrically non-linear reinforced and prestress...
Reliability of material and geometrically non-linear reinforced and prestress...Reliability of material and geometrically non-linear reinforced and prestress...
Reliability of material and geometrically non-linear reinforced and prestress...
 
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...
Probabilistic Service Life Assessment and Maintenance Planning of Concrete St...
 
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...Cellular Automata Approach to Durability Analysis of Concrete Structures in A...
Cellular Automata Approach to Durability Analysis of Concrete Structures in A...
 
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...
UNA FORMULAZIONE DEL DEGRADO DELLA RISPOSTA DI STRUTTURE INTELAIATE IN C.A./C...
 
Esami a distanza. Severgnini. Corriere della sera.
Esami a distanza. Severgnini. Corriere della sera.Esami a distanza. Severgnini. Corriere della sera.
Esami a distanza. Severgnini. Corriere della sera.
 
Tdc prova 2022 01-26
Tdc prova 2022 01-26Tdc prova 2022 01-26
Tdc prova 2022 01-26
 
Risultati
RisultatiRisultati
Risultati
 

Recently uploaded

KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 

Recently uploaded (20)

KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 

CAE Conference Luca Romano - 21 october 2013

  • 1. CAE CONFERENCE 2013 Lazise (VR) 21÷22 october 2013 DESIGN AND CONSTRUCTION OF THE “FIERA MILANO BUILDING” Ing. Luca ROMANO – I QUADRO INGEGNERIA – GENOVA
  • 2. LOCATION OF THE “FIERA MILANO BUILDING” PLAN VIEW AERIAL VIEW
  • 3. INTERNATIONAL TENDER The design of this building followed from an international tender, in which different groups of architects, engineers and constructioncompanies proposed their ideas for the new offices of the “Fiera Milano building”. The winning proposal was conceived as a golden, horizontal tower at the east entrance of the “Fiera di Milano”. Here you can see some early images of the winning idea for the tender:
  • 4. DESCRIPTION OF THE BUILDING During the competition phase various solutions were studied in order to match construction time and costs. This resulted in a mixed steel-concrete structure that allowed to complete the building in less than two years and to respect tender costs. Design consists of a 132.5 m long building of 15.60 m depth and about 60 m height. The Building is divided in two by a joint: building “A” is composed by 12 floors while building “B” is composed by 13 floors. They are separated but connected by the foyer with staircases and footbridges. In order to provide an helicopter landing pad, an important cantilever steel structure was built on the roof of building “B”. Side of the building in the actual destination Rear of the building with view of the landing pad
  • 5. Here are some views of the finished building: Side of the building with view of the cantilever landing pad View of the rear of the building
  • 6. The building is composed by two parts connected by a foyer and footbridges at different floors. BUILDING “A” FOYER Plan view of the building, with the landing pad on the right BUILDING “B”
  • 7. STRUCTURE Structural Strategy And Description The structure was very long, so it was divided in two structures separated by a joint. Here you can see the typical floor plan: joint BUILDING “B” BUILDING “A” plan view of the typical floor Longitudinally the structure is a repetition of 6.25 m spaced columns; they are aligned along the perimeter and on an internal position. Transversely two precast, prestressed slabs - 4.25 m and 10.7 m long - connect the longitudinal steel beams. These beams are made with welded plates, to reduce thickness.
  • 8. STRUCTURE Each building is a core supported structure, with shear walls, to resist lateral forces from wind and earthquakes. In this way steel columns are pinned at the base and resist only to vertical loads. This classical strategy was adopted to realize the structure in few months, with respect of tender costs: steel structures was produced on workshop, while on construction site we realized reinforced concrete core structures. Core structures of the two buildings - floors in construction
  • 9. Concrete core structures were realized with climbing form-works. In the picture you can see also the steel boxes provided in the walls for the connection of steel beams: Climbing form-works for the shear walls of stair cases
  • 10. In this way the steel structure was a simple assembly of pinned columns and hinged beams: Pinned connections of the steel columns
  • 11. Steel beams were composed with welded plates, hinged and dimensioned to support precast slabs: To reduce thickness, slabs were supported on bottom flange: Prestressed slabs are placed on the wide bottom flanges of the steel beams and casted in situ. Slabs were 30 cm thick, 10.25 metres long, with a layer of 5 cm of concrete cast in situ. In the following details you can see the intersection beam-slab:
  • 12. Here are some pictures of the construction phases of the floors: Positioning of precast slab of floors Detail of the intersection between slab and steel beams (view from above and from below)
  • 13. FOOTBRIDGES The connecting foyer has footbridges 12 metres long, at various floors. These structures are free to move to absorb lateral movements due to wind, earthquakes and thermal effects. They are composed by IPE 500 steel beams with a composite slab on cold-formed steel decking. Main steel beams of the two footbridges connecting the two buildings: fixed on one side and free to move on the other.
  • 14. FOYER The foyer is an hollow structure with staircases and footbridges connecting people at each floor. Windows in front of the foyer have a complicate pinned systems that permits movements of translation and rotation of the two buildings. These windows are linked to a steel tree-structure, pinned to building “B” and free to move in the connection of building “A”. Cinematic was important to prevent window crashes and all calculated displacements were given to the facade developers to take care of relative movements. view of the foyer connecting the two buildings view of the finished foyer from below, in the entrance
  • 15. Here you can see the structural detail of the hinges of the tree-structure of the foyer: General and detailed view of the Pinned and slipping connections of the facade of the foyer STRUCTURE “A” STRUCTURE “B” Plan view detail of the foyer
  • 16. Construction phases were important. Before finishing the roof, the wall at the rear of the foyer was 54 metres high, 40 cm thick, separated by joint and free at the top. Because of stability check, you can see some provisional beams positioned. You can also see the joint which separates the two structures. joint
  • 17. HELICOPTER LANDING PAD: On the roof of building “B” an helicopter landing pad was realized. The structure is made with cantilever “I” beams, 10 metres apart from the facade, connected by damping supports to the steel columns of the building, not to transmit vibrations. The deck was formed by aluminium box section supported by the beams. General view of the structure of the landing pad detail of the structure extremity
  • 18. Here you can see the design of the steel structure: the plan view on the left and the cross section of the cantilever on the right. Only extremity columns were used as support, to prevent traction. 10 m building
  • 19. FOUNDATIONS In order to prevent ground displacements and subsidence, we realized a steel sheet-pile bulkhead, 10 metres long, installed by vibratory hammer. In the picture one can see this earth retaining wall without dead space near existing buildings: Positioning of steel sheet piles before digging
  • 20. Another problem was the presence of the Underground of Milan, that didn’t accept any pressure against its existing walls. That’s why we had to dig till the bottom of the tube, realize a joint and replace the ground with casting concrete, able to resist to the pressure of the new building transmitting forces only to the bottom of the foundation. Steel sheet piles and base of the mat foundation. On the left the existing Underground Concrete casting near the Underground, to prevent earth pressure against existing walls
  • 21. Underground of Milan asked the simulation of the construction phases. Here you can see the vertical section, with the Tube on the left, the mat foundations on the right and the concrete layer in the middle: The simulation analysis was performed in 5 steps with a bi-dimensional model, to answer the Underground of Milan in terms of subsidence:
  • 22. Mat Foundation Due to the good soil characteristic, we designed a mat foundation, continuous under the entire building. Instead, the building itself was divided in two structures, which were separated by a joint. The thickness of the mat was 1 metre under the steel columns and 1.5 metres under the core structures. It was reduced to 40 cm near the steel sheet piles, in order to reduce the cantilever. In the following plan view you can see the foundation: 137 metres long and 30 metres wide:
  • 23. In the next picture you can see the positioning of reinforcement in the mat: Reinforcement of the mat foundation before casting
  • 24. ANALYSIS The structure had many particularities, but is was not so unusual. So we decided to realize models for design purpose, easy to handle and to understand. Here you can see the finite element model of the structure, performed with Straus 7. The model simulate the exact structural stiffness by mean of: 2084 element beam 12427 element plate for a total of 46994 degrees of freedom View of the model
  • 25. Mat foundations are modelled with plate elements on ground support: Modulus of Subgrade Reaction These plates have either membrane or bending properties, calculated through their thickness. Earth retaining walls are modelled with plate elements. Columns and beams are modelled with beam elements, hinged at the end. shear walls forming the box shaped cores around stairs and elevators, are modelled with plate elements, which have either membrane or bending properties, calculated through their thickness. This is a spatial system capable of resisting all types of loads: vertical forces, shear forces and bending moments in all directions, as well as torsion. In this way we realized an efficient lateral load resistance structure for the two buildings.
  • 26. Slabs are modelled with load patch elements and rigid floor links. This plate element does not have any property attributes. It is used solely as a way of transferring distributed area loads and nonstructural mass to beams that may be connected around the perimeter of the plate: In this way you don’t influence the stiffness of beams and you consider the rigid link of each floor. The software Straus 7 allows the definition of different non structural mass for various load condition and to any of them one can associate a dynamic factor that define the mass to be considered in dynamic analysis. In this way you have the maximum of possibilities of simulating seismic conditions.
  • 27. Analysis performed during design were of three types: - Static: load conditions – SLS and ULS combinations - envelopes - Dynamic: natural frequencies – mode shapes - Spectral response: seismic base excitation During construction phases we performed also various static analysis on partial models, to help the construction company to reduce construction time.
  • 28. Static analysis are performed considering various load conditions: - Self weight is automatically determined by Straus 7 - Either permanent or live loads were introduced through non structural mass in different load cases - Wind was introduced through forces acting on facade load patch elements. These forces change of intensity with height Solutions were combined to maximize effects on beams and columns. Various combinations were performed, in order to obtain Service and Ultimate Limit State conditions. For example next figure represent maxima axial forces at ULS for the columns:
  • 29. In next image we see the values of axial forces in columns and stresses in shear walls of a single floor. They are used for resistance and stability check required by Code:
  • 30. The natural frequency solver was used to calculate free vibration frequencies and corresponding mode shapes of the undamped structure. It is possible to determine the participation factors for all directions to be sure to involve more than 85% of the global mass of the structure: 100 mode shapes were necessary. In next figure you see the first mode shape of structure “A”: first bending mode shape in the transverse direction: 0.61 Hz of frequency
  • 31. In next figure you see the first six mode shapes of structure “A”: First six mode shapes of structure “A”
  • 32. Seismic design The Spectral Response solver calculates the response of a structure subjected to a random dynamic loading. In this spectral response analysis, the random dynamic loads applied are base excitation (earthquake) The spectrum input used is Response Spectrum, defined by seismic Italian code: a spectral curve as a function of period. The site is considered as low seismic and Code provide a ground acceleration of 0.05 g Considering the building braced by concrete core structures, irregular and low ductile, a structural factor of 1.68 was adopted. In this way we can calculate spectral acceleration for SLD and SLV conditions, to be used in spectral analysis: SLV spectral curve Seismic forces were combined with vertical and gravity forces as in Code requirements: γEE+ γGGk + γPPk + Σ i (ψ2i γQQki)
  • 33. Control of seismic displacement for the two structures and dimension of joint: Displacement in x direction of structure “A” Displacement in x direction of structure “B” To determine the entity of the joint we adopted a safety factor gF = 1.4 for the displacements calculated (sum of displacements of building “A” plus “B”): wind: Δx = (0.41+0.12)•gF = 0.53 •1.4 = 0.75 cm seismic displacements: Δx = (3.75+3.22)•gF = 6.97 •1.4 = 9.76 cm A joint of 10 cm was realized between the two buildings.
  • 34. Foundations The model was supported by plates on ground support, of thickness corresponding to the mat foundation. In this way you can have a response on the soil and structure interaction, calculating subsidence and pressure on ground. In the following image you can see the example of pressure calculated under building “A”: Max pressure on ground for building “A” (kg/cm2)
  • 35. In the same way you can obtain the envelope of the maximum Bending moment in the x and y direction, to dimension reinforcement and check Service and Ultimate limit states: Plate moment Mxx max envelope in x direction
  • 36. It is possible to create an envelope combined to obtain the percentage of rebars to be positioned every metre. In the following image it is possible to see the maximum envelope, produced to estimate the percentage of top rebar in the mat foundation, for x direction: We decided to position a net of ø20mm rebars every 20 cm either on the bottom or on the top of the mat, so you can obtain an image of the place where we have to integrate rebars in the x direction:
  • 37. Serviceability Limit State: deflection control Calculation of deformations under SLS combinations were used to control limitations given by Code. Deflection of the building under wind loads were useful to dimension facades and window elements. In the following figure the displacements due to wind on the long direction: 2.83 cm < H/500
  • 38. Serviceability Limit State: stress control Calculation of stress under SLS combinations were used to control limitations given by Code. Serviceability limit states: envelope stress in all members
  • 39. Lateral bracing system Calculation of stress under ULS combinations were used to check resistance Here we can see the vertical stress in shear walls forming the box shaped cores around stairs and elevators, modelled with plate elements.
  • 40. We can see the stress distribution on all the core and the integration of stresses on a wall, to obtain the forces needed to evaluate Ultimate Limit State Resistance: distribution of stresses in the core Integration of stresses in the shear wall Ultimate Limit State Resistance
  • 41. Helicopter landing pad Live load were given for the helicopter with dynamic action in landing and emergency conditions. We can see the cantilever landing pad from the global model: And a global view of the results in terms of stress in ULS conditions: Cantilever landing pad: envelope stresses in members
  • 42. In next image there is the simulation of vertical displacements of the cantilever beams, calculated for testing of the structures: they were compared with experimental results. Vertical displacements
  • 43. CONCLUSIONS The simulations here performed are design-oriented. They were necessary to give a quick response to structural problems either for the final solutions or for construction problems. In fact it was usual to be on yard with various models and take decision analysing the partial model in construction phases. This is a correct way to optimize construction time safely. With simulation analysis for such a particular structure we could check: - displacements to correctly dimension window-facades and guaranty serviceability for the whole structure - resistance and stability for all members DESIGN AND CONSTRUCTION OF THE “FIERA MILANO BUILDING” Ing. Luca ROMANO – I QUADRO INGEGNERIA – GENOVA