Bank of the Southwest Helmut Jahn and Wm LeMessurier  Houston, Texas  1982 Comparison of types of building structures based on the  bending rigidity index  (BRI).  See Ch.2 Tower and Office p.80
 
 
 
 
 
 
 
 
 
 
 
 
 
M.L.C. Center Harry Seidler / P. L. Nervi Sydney, Aus. 1978
 
 
Dharmala Headquarters Paul Rudolph  Jakarta, Indonesia 1982
 
Atlanta Marriot Marquis Hotel John Portman Atlanta, GA ca. 1977
 
Petronas Towers Cesar Pelli / Thornton-Tomasetti Kuala Lumpur, Malaysia 1997
Structure of the Petronas Tower has an outer ring of 16 cylindrical r/c columns of high strength concrete (up to Grade 80). Charles Thornton, structural engineer, refers to it as a “soft tube”. In-situ concrete construction was chosen because of local practice and because of the stiffness against wind sway provided by concrete. The tower resists lateral forces with both a perimeter “tube” of columns and an inner r/c core.
 
 
 
 
 
 
Mega or Super frame concept Commerzbank  Norman Foster Associates
 
 
 
 
 
 
 
 
[object Object],[object Object],[object Object],[object Object],[object Object]
Johnson Wax Headquarters Tower Charter Bank
 
PSFS Tower  First Wisconsin Center
Standard Bank of Johannesburg, South Africa 1970 Example of tall building with a core tree structure: floors are suspended from cantilevered arms in groups of ten floors.
Overseas Chinese Banking Corporation Centre I. M. Pei Singapore 1976 Example of a multi-tier compression frame transfer structure.
 
Grovesnor Place  Sydney Luk Yeung Sun Chuen Estate  Hong Kong
 
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
Note the middle upper chord of the trusses in the photograph (not shown in the drawing at left). This upper truss chord is omitted on the exterior trusses because the floors are set back from the plane of the truss. On the interior trusses it supports floor framing.
 
The important “butterfly” connections at the middle of the lower chords of the trusses. The ‘butterfly’ joint contains three single pin connections each requiring a tolerance of 0.3mm. This causes the collar to fit ‘tight as a glove’ around the inserted pins.
 
Large X-bracing at the truss levels provide lateral stiffness to the building in the north-south direction (perpendicular to the façade).
 
 
 
 
 
Envelope details
 
 
 
Raised floor. The HSBC Building had the first raised floor used in a commercial building. The floor system was developed by Foster Associates working with special contractors in the aircraft industry. The size of the panel (1200mm x 1200mm) is determined by maintenance requirements (weight limit for two men to lift) and stiffness.
 
 
 
 
Two views of the central atrium which “replaces” the memorable main banking hall of the former bank building. Public entry to the hall (and the building) is provided by the angled escalators (feng shui inspired) that pierce the suspended glass enclosure (the former vaulted ceiling turned upside down) bringing visitors to the double height main bank floor.
 

More Related Content

What's hot

Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
Karthik Suresh
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
iftekhar rafat
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
Rifquthsb1
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure system
Archistudent Portal
 
SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)
Rajan Gupta
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
Mazin Elbashkatib
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
VISHAKA BOTHRA
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Jagmohan Garg
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
High righ presentation
High righ presentationHigh righ presentation
High righ presentation
Khondokar Anayet
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
Dishant Rautela
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
Krishnagnr
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
Joji Mathew
 
Space frames
Space framesSpace frames
Space frames
Bnv Aditya
 
L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2
chuhonsan
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
Kaiserin Tania
 
Hearst Tower, Manhattan, Dubai.
Hearst Tower, Manhattan, Dubai.Hearst Tower, Manhattan, Dubai.
Hearst Tower, Manhattan, Dubai.
Mayur Waghulde
 
Zifeng tower
Zifeng towerZifeng tower
Zifeng tower
Elinda Fariz
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
Meer Musabber ali (joyous)
 
Tall Buildings - Core Design
Tall Buildings - Core DesignTall Buildings - Core Design
Tall Buildings - Core Design
Yasser Mahgoub
 

What's hot (20)

Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure system
 
SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)SURFACE ACTIVE STRUCTURES(structure systems)
SURFACE ACTIVE STRUCTURES(structure systems)
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
High righ presentation
High righ presentationHigh righ presentation
High righ presentation
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Space frames
Space framesSpace frames
Space frames
 
L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2
 
High-rise Presentation
High-rise PresentationHigh-rise Presentation
High-rise Presentation
 
Hearst Tower, Manhattan, Dubai.
Hearst Tower, Manhattan, Dubai.Hearst Tower, Manhattan, Dubai.
Hearst Tower, Manhattan, Dubai.
 
Zifeng tower
Zifeng towerZifeng tower
Zifeng tower
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Tall Buildings - Core Design
Tall Buildings - Core DesignTall Buildings - Core Design
Tall Buildings - Core Design
 

Similar to L6 Vert Struc Pt 4

L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
chuhonsan
 
tall%20bldg%20structures.pptx
tall%20bldg%20structures.pptxtall%20bldg%20structures.pptx
tall%20bldg%20structures.pptx
Thirumeni Madavan
 
Numerical Optimization of Shoring Towers for Slab Formwork Systems
Numerical Optimization of Shoring Towers for Slab Formwork SystemsNumerical Optimization of Shoring Towers for Slab Formwork Systems
Numerical Optimization of Shoring Towers for Slab Formwork Systems
IJTET Journal
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
World Of Engineers Consultant.
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
World Of Engineers Consultant.
 
Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
eSAT Publishing House
 
Tube structures
Tube structuresTube structures
Tube structures
Aglaia Connect
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
Alexis Wei
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
DP NITHIN
 
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
IJERA Editor
 
IRJET- Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
IRJET-  	  Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...IRJET-  	  Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
IRJET- Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
IRJET Journal
 
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET Journal
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
Zabihullah Nasiri
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
ijsrd.com
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
Mohammed Naeem Darwish
 
Pragati towers
Pragati towersPragati towers
Pragati towers
Rajat Nainwal
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
hlksd
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure Shrikant
ShriKant49
 
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
International Journal of Science and Research (IJSR)
 
ACE special structures
ACE special structuresACE special structures

Similar to L6 Vert Struc Pt 4 (20)

L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
tall%20bldg%20structures.pptx
tall%20bldg%20structures.pptxtall%20bldg%20structures.pptx
tall%20bldg%20structures.pptx
 
Numerical Optimization of Shoring Towers for Slab Formwork Systems
Numerical Optimization of Shoring Towers for Slab Formwork SystemsNumerical Optimization of Shoring Towers for Slab Formwork Systems
Numerical Optimization of Shoring Towers for Slab Formwork Systems
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
 
Tube structures
Tube structuresTube structures
Tube structures
 
Bcon final.compressed
Bcon final.compressedBcon final.compressed
Bcon final.compressed
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
Highly Deformable Energy-Dissipating Reinforced Concrete Elements in Seismic ...
 
IRJET- Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
IRJET-  	  Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...IRJET-  	  Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
IRJET- Dynamic Wind Analysis of RC Bundled Tube in Tube Structure using E...
 
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
IRJET- Post Peak Response of Reinforced Concrete Frames with and without in F...
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Pragati towers
Pragati towersPragati towers
Pragati towers
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure Shrikant
 
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
Parametric Study of Double Layer Steel Dome with Reference to Span to Height ...
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 

More from chuhonsan

L10 envelope pt2
L10  envelope pt2L10  envelope pt2
L10 envelope pt2
chuhonsan
 
L9 envelope pt.1
L9 envelope pt.1L9 envelope pt.1
L9 envelope pt.1
chuhonsan
 
L8 horiz struc pt.2
L8 horiz struc pt.2L8 horiz struc pt.2
L8 horiz struc pt.2
chuhonsan
 
L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1
chuhonsan
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
chuhonsan
 
L3 Vertical Structure Pt1 1
L3  Vertical  Structure  Pt1 1L3  Vertical  Structure  Pt1 1
L3 Vertical Structure Pt1 1
chuhonsan
 
good
goodgood
good
chuhonsan
 
good
goodgood
good
chuhonsan
 

More from chuhonsan (8)

L10 envelope pt2
L10  envelope pt2L10  envelope pt2
L10 envelope pt2
 
L9 envelope pt.1
L9 envelope pt.1L9 envelope pt.1
L9 envelope pt.1
 
L8 horiz struc pt.2
L8 horiz struc pt.2L8 horiz struc pt.2
L8 horiz struc pt.2
 
L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1L7 Horiz Struc Pt 1
L7 Horiz Struc Pt 1
 
L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3L5 Vertical Structure Pt 3
L5 Vertical Structure Pt 3
 
L3 Vertical Structure Pt1 1
L3  Vertical  Structure  Pt1 1L3  Vertical  Structure  Pt1 1
L3 Vertical Structure Pt1 1
 
good
goodgood
good
 
good
goodgood
good
 

Recently uploaded

Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
AnnySerafinaLove
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
46adnanshahzad
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Neil Horowitz
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
Any kyc Account
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
MJ Global
 

Recently uploaded (20)

Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdfHOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
HOW TO START UP A COMPANY A STEP-BY-STEP GUIDE.pdf
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
Brian Fitzsimmons on the Business Strategy and Content Flywheel of Barstool S...
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Easily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYCEasily Verify Compliance and Security with Binance KYC
Easily Verify Compliance and Security with Binance KYC
 
How MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdfHow MJ Global Leads the Packaging Industry.pdf
How MJ Global Leads the Packaging Industry.pdf
 

L6 Vert Struc Pt 4

  • 1. arc5410 Advanced Structure and Construction
  • 2. 3.0 Vertical Structural Systems Pt. 4
  • 3.
  • 4. Bank of the Southwest Helmut Jahn and Wm LeMessurier Houston, Texas 1982 Comparison of types of building structures based on the bending rigidity index (BRI). See Ch.2 Tower and Office p.80
  • 5.  
  • 6.  
  • 7.  
  • 8.  
  • 9.  
  • 10.  
  • 11.  
  • 12.  
  • 13.  
  • 14.  
  • 15.  
  • 16.  
  • 17.  
  • 18. M.L.C. Center Harry Seidler / P. L. Nervi Sydney, Aus. 1978
  • 19.  
  • 20.  
  • 21. Dharmala Headquarters Paul Rudolph Jakarta, Indonesia 1982
  • 22.  
  • 23. Atlanta Marriot Marquis Hotel John Portman Atlanta, GA ca. 1977
  • 24.  
  • 25. Petronas Towers Cesar Pelli / Thornton-Tomasetti Kuala Lumpur, Malaysia 1997
  • 26. Structure of the Petronas Tower has an outer ring of 16 cylindrical r/c columns of high strength concrete (up to Grade 80). Charles Thornton, structural engineer, refers to it as a “soft tube”. In-situ concrete construction was chosen because of local practice and because of the stiffness against wind sway provided by concrete. The tower resists lateral forces with both a perimeter “tube” of columns and an inner r/c core.
  • 27.  
  • 28.  
  • 29.  
  • 30.  
  • 31.  
  • 32.  
  • 33. Mega or Super frame concept Commerzbank Norman Foster Associates
  • 34.  
  • 35.  
  • 36.  
  • 37.  
  • 38.  
  • 39.  
  • 40.  
  • 41.  
  • 42.
  • 43. Johnson Wax Headquarters Tower Charter Bank
  • 44.  
  • 45. PSFS Tower First Wisconsin Center
  • 46. Standard Bank of Johannesburg, South Africa 1970 Example of tall building with a core tree structure: floors are suspended from cantilevered arms in groups of ten floors.
  • 47. Overseas Chinese Banking Corporation Centre I. M. Pei Singapore 1976 Example of a multi-tier compression frame transfer structure.
  • 48.  
  • 49. Grovesnor Place Sydney Luk Yeung Sun Chuen Estate Hong Kong
  • 50.  
  • 51.
  • 52.  
  • 53.  
  • 54. Note the middle upper chord of the trusses in the photograph (not shown in the drawing at left). This upper truss chord is omitted on the exterior trusses because the floors are set back from the plane of the truss. On the interior trusses it supports floor framing.
  • 55.  
  • 56. The important “butterfly” connections at the middle of the lower chords of the trusses. The ‘butterfly’ joint contains three single pin connections each requiring a tolerance of 0.3mm. This causes the collar to fit ‘tight as a glove’ around the inserted pins.
  • 57.  
  • 58. Large X-bracing at the truss levels provide lateral stiffness to the building in the north-south direction (perpendicular to the façade).
  • 59.  
  • 60.  
  • 61.  
  • 62.  
  • 63.  
  • 65.  
  • 66.  
  • 67.  
  • 68. Raised floor. The HSBC Building had the first raised floor used in a commercial building. The floor system was developed by Foster Associates working with special contractors in the aircraft industry. The size of the panel (1200mm x 1200mm) is determined by maintenance requirements (weight limit for two men to lift) and stiffness.
  • 69.  
  • 70.  
  • 71.  
  • 72.  
  • 73. Two views of the central atrium which “replaces” the memorable main banking hall of the former bank building. Public entry to the hall (and the building) is provided by the angled escalators (feng shui inspired) that pierce the suspended glass enclosure (the former vaulted ceiling turned upside down) bringing visitors to the double height main bank floor.
  • 74.