The Fire Chief is requesting that City Council accept a bid from Paloma Blanca Enterprises, Inc. to perform renovations to the Alamo Heights Swimming Pool to comply with ADA requirements. The renovations include updating access ramps, changing rooms, and restrooms. Paloma Blanca's bid was $42,965 and additional work by the Public Works Department and Clearsite Construction would total $49,792 to complete the project. Staff is recommending awarding the contract to Paloma Blanca to complete the restroom renovations.
AAB complaint submitted in 2010. AAB sends First Notice approximately 1 year later, after reminder by FOIA. CAPS re-surveys portions of complaint in September 2011 and amends complaint to reflect certain corrections made by owner as a result of the complaint. As of 9/28/2013, no further correspondence from AAB on this docket.
Before and after photos of 4348 Tompkins Avenue, Oakland. Slideshow showcases the transformation of the property for marketing and sale, September 2008.
A-1 Concrete Leveling Western New York Division (Buffalo, NY) Driveway Leveli...Peter Easton
This flyer shows the benefits of concrete leveling. A-1 Concrete Leveling has raised over 5000 slabs and completed over 1200 projects by raising driveways, sidewalks, pool decks, patios, steps and more.
AAB complaint submitted in 2010. AAB sends First Notice approximately 1 year later, after reminder by FOIA. CAPS re-surveys portions of complaint in September 2011 and amends complaint to reflect certain corrections made by owner as a result of the complaint. As of 9/28/2013, no further correspondence from AAB on this docket.
Before and after photos of 4348 Tompkins Avenue, Oakland. Slideshow showcases the transformation of the property for marketing and sale, September 2008.
A-1 Concrete Leveling Western New York Division (Buffalo, NY) Driveway Leveli...Peter Easton
This flyer shows the benefits of concrete leveling. A-1 Concrete Leveling has raised over 5000 slabs and completed over 1200 projects by raising driveways, sidewalks, pool decks, patios, steps and more.
Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control ProjectFairfax County
The Scotts Run and Carderock Sluice Gate Rehabilitation and Odor Control Project replaced existing equipment at the Scotts Run Diversion Chamber and the Carderock Terminal Chamber. This included new sluice gates, access hatches, and safety ladders. Rehabilitation of the interior chamber lining and installation of a passive odor control system was also completed at the Scotts Run Diversion Chamber.
An annual update presentation to the City Council by Jason Yarborough, Public Utilities Director, about the State of the City's water and wastewater utility system.
Reconstruction And Remodeling Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Reconstruction And Remodeling Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. http://bit.ly/2VqZlMz
House Revamp Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a House Revamp Proposal PowerPoint Presentation Slides look no further.Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. http://bit.ly/3bvyjcc
House Transformation Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a House Transformation Proposal PowerPoint Presentation Slides look no further.Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. http://bit.ly/39pTkTQ
Concrete Driveway Construction Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Concrete Driveway Construction Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/2L3mNJ6
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Donate to charity during this holiday seasonSERUDS INDIA
For people who have money and are philanthropic, there are infinite opportunities to gift a needy person or child a Merry Christmas. Even if you are living on a shoestring budget, you will be surprised at how much you can do.
Donate Us
https://serudsindia.org/how-to-donate-to-charity-during-this-holiday-season/
#charityforchildren, #donateforchildren, #donateclothesforchildren, #donatebooksforchildren, #donatetoysforchildren, #sponsorforchildren, #sponsorclothesforchildren, #sponsorbooksforchildren, #sponsortoysforchildren, #seruds, #kurnool
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
2024: The FAR - Federal Acquisition Regulations, Part 38
Item # 9 - Award ADA Swimming Pool Renovations
1. CITY OF ALAMO HEIGHTS
FIRE DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council
FROM: Michael Gdovin, Fire Chief
SUBJECT: Accepting and awarding the bid to Paloma Blanca Enterprises, Inc., to perform
renovations to the Alamo Heights Swimming Pool related to ADA compliance
DATE: November 09, 2020
SUMMARY
The presentation is to provide Mayor and City Council with information regarding the renovations
to the Alamo Heights Swimming Pool, located at 250 Viesca, to obtain ADA compliance.
BACKGROUND INFORMATION
The project accepted bids during August 19, 2020 through September 4, 2020. Per the Finance
policy, HUB vendors were emailed with a request to bid on the project. Paloma Blanca
Enterprises, Inc. submitted a proposal for locker room and restroom renovations in the amount of
$42,965.00.
The renovations to the Alamo Heights Swimming Pool include several areas of consideration to
obtain ADA compliance. These areas include renovations to the existing sidewalk, access ramps,
changing room facilities and restrooms. The scope of work pertaining to the access ramps
includes the demolition of existing access ramps and rebuilding these to ADA compliant
standards. This includes the access ramp from the office to the pool deck area as well as the ramp
from the parking area to the sidewalk leading to the entry doors. Sidewalk repairs will also be
made during the ramp renovations. The scope of work pertaining to the restrooms includes
renovations to the men’s and women’s changing room facilities as well as the men’s and
women’s poolside facilities to obtain ADA compliance.
POLICY ANALYSIS
Staff recommends to award the bid contract to Paloma Blanca Enterprises, Inc. to perform the work
to the restrooms as well as having the Alamo Heights Public Works Department completing
exterior parking area/ flatwork and to supervise the work of Clearsite Construction regarding the
additional contracted flat work. The project has been coordinated with the City Manager and City
Attorney with no issues reported.
FISCAL IMPACT
The Alamo Heights Public Works Department received a subcontractor bid for exterior flatwork
from Clearsite Construction in the amount of $6,827.00. The sum of the bids totals $49,792.00.
ATTACHMENTS
Attachment A - Paloma-Revised Proposal- COAH Pool ADA
Attachment B - Clearsite Construction Proposal Alamo Heights Pool Flatwork
3. PROPOSAL
Men's Changing Room
Demo existing partition walls
Relocate/ or Remove wall mounted bench in Men's changing room to accomadate new partition walls
Patch floors and walls as needed after demo
Supply and install new, one (1) ADA compliant toilet
Supply and install new toilet partition walls per ADA requirements
Supply and install new grab bars in ADA toilet stall to meet ADA requirements
Relocate the existing sink in the men's changing room to ADA height requirements
Supply and install new faucet for sink to meet ADA requirements
Touch-up paint areas patched as needed
Women's Changing Room
Demo existing partition walls
Remove middle toilet from Womens Changing Room and cap off plumbing
Patch floors and walls as needed after demo
Supply and install new one (1) ADA compliant toilet
Supply and install new toilet partition walls per ADA requirements
Supply and install new grab bars in ADA toilet stall
Relocate the existing sink in the women's changing room to ADA height requirements
Supply and install new faucet for sink to meet ADA requirements
Touch-up paint areas patched as needed
Move mirror, soap dispenser, towel dispenser to proper location to meet ADA requirements
Women's Poolside Restroom
Remove partition walls and (1) toilet from womens room and cap off plumbing
Remove existing door jamb
Modify existing door opening
Patch floors and walls as needed
Relocate existing towel and soap dispensers to meet ADA requirements
Touch-up paint areas patched as as needed
Supply and install one (1) new toilet to meet ADA requirements
Supply and install one (1) new door jamb and door to meet ADA requirements
Supply and install new grab bars to meet ADA requirments
Remove/brace-up brick wall outside of existing womens room to allow for ADA compliant access
Extend concrete slab to allow for ADA compliant access
Relocate existing sink to meet ADA height requirements
Supply and install new faucet for sink to meet ADA requirements
Relocate existing towel and soap dispenser to meet ADA requirements
Supply and install one (1) new Unisex ADA Bathroom Sign
Men's Poolside Restroom
Patch floors and walls as needed
Remove existing tile from hall to mens restroom and patch concrete
Supply and Install one (1) new Unisex Bathroom Sign
NOTE: EXISTING MEN'S POOLSIDE RESTROOM WILL NOT MEET ADA REQUIREMENTS
Lump Sum $42,965.00
Proposal Amount Specifically Excludes the Following:
Bond fees
Permit/ Inspection fees
Architectural or engineering designs
Temporary construction fencing
Dumpster Rental
Portable Restroom Facilities
Paloma Blanca Enterprises, Inc.
City of Alamo Heights
4901 McCullough
TO: Paloma Blanca Enterprises, Inc.FROM:
Project Scope: AH Pool Bathroom and Changing Rooms Modifications to Meet ADA Compliance
San Antonio, Texas 78212
Attachment A
4. Attachment B
Clearsite Construction
P.O. Box 15948
San Antonio, Texas 78212
(210) 889-3576 Mobile
Revised Proposal
10/20/20
City of Alamo Heights
Atten: jrodriguez@alamoheightstx.gov
Job Name/Location: Alamo Heights Pool
Flatwork Demo and Re-Pour
We hereby submit specifications and estimate for work including but limited to the
following:
Demo existing concrete flatwork 509 SF $1527.00
Sawcut $500.00
Haul-Off 1 load $400.00
New 4’x4’ ramp 16 SF $400.00
New 15’x5’ ramp 75 SF $1500.00
New sidewalk 418 SF $2500.00
Total Price: $6827.00
We hereby propose to furnish labor, materials and equipment complete in accordance
with the above specifications for the sum above. All work is completed in a workmanlike
manner according to standard practices. Any alteration or deviation from above
specifications involving extra costs, will be executed only upon written orders, and will
become an extra charge over and above this estimate. All agreements are contingent
upon strikes, accidents or delays beyond our control. This proposal subject to acceptance
within 30 days and is void thereafter at the option of the undersigned. Payment is to be
made in full upon job completion.
Thank you for the opportunity of this quote.
Clearsite Construction
By: J. Anthony Guajardo, Jr.
ACCEPTANCE OF PROPOSAL
The above prices, specifications, and conditions are hereby accepted. You are authorized
to do the work as specified.
Accepted Date: _______________________ Signature: ____________________