SlideShare a Scribd company logo
1 of 3
Charles M. Roberts
12032 Brushy Creek Rd. Lucedale MS 39452
matt_tonie@yahoo.com Tel: 601 394 3448
Certified CWI # 15090881
OBJECTIVE I am an American citizen. I am a very committed individual with greatpeople skills.Ihave
worked as a structural welder,boiler maker,pipe fitter, and rigger. I am now looking to
start and further my career as a Certified Welding Inspector.
SKILLS & ABILITIES  I have experience in gas construction and maintenance construction
 5 years as a structural welder
 Experience in blue prints both pipe and iron
EXPERIENCE September 2015-Present – Performance Contractors, Kemper County, Mississippi
I am currently employed with Performance Contractors as a CWI at Kemper County
MS Southern CompanyIGCC Project.
 Perform NDE test.(PMI, UT, PT, RT, BHN)
 Walk down ISOs.
 Inspectwelds on pipe and structure
August 2015-September 2015 – Early Construction, Demopolis, Alabama
I was a Boiler Maker in Demopolis,Al. Demopolis is a new Rock-Tenn coal powered
boiler for its paper mill.My duties include:
 Rigging ductwork and coal conveyers
 Demoing and replacing waterwall and nozark tube panels
 Fitting structural steel
June 2015-August 2015 – Mdl Contractors, Mobile, Alabama
I was a Boiler Maker/Iron Worker at Evonik Inc. My duties included:
 Replacing iron
 Set new conveyers for Aerosil warehouse
March 2015-April 2015 – Early Construction, Trimble, Kentucky
I was a Boiler Maker at Kentucky Utilities Trimble CountyPlant. My duties included:
 Rig to the main ring header around the waterwall panels
 Replace tubes connecting the ring header to the waterwall panels
 Fit tubes that connectthe main ring header to the waterwall
January 2015-March2015 – Early Construction, Carrolton, Georgia
I was a Boiler Maker at Southern CompanyPlantTyler. My duties included:
PAGE 2
 Perform structural welds with both FCAW and SMAW
 Replace hanger rods on main duct
 Rig to and lift duct to proper elevation
 Replace buck stay clips
 Replace braces inside ofduct
August 2014-December 2014 – Pic Boiler Inc, Ghent, Kentucky
I was a Boiler Maker/Structural Welder at Kentucky Utilities PlantGhent. My duties
included:
 Perform proper rigging techniques on burners
 Demo and replace burners
 Demo and replace coal piping
 Weld new valves in coal piping
 Weld new burners to boiler wind box
February 2014-August 2014 – Performance Contractors, Kemper County,
Mississippi
I was a Boiler Maker/Rigger at Southern CompanyPlant Kemper County. My duties
included:
 Perform hydro’s on completed sections ofpiping
 Insertblinds between flanges to separate hydro’s or to prevent water in wrong
sections ofpiping
 Rig blinds depending on size
September 2013-December 2013 – Pic Boiler Inc, Petersburg, Indiana
I was a Rigger/Boiler Maker/Structural Welder at Indiana Power and Lighting Petersburg
Plant. My duties included:
 Rigging nozark and superheatpanels
 Weld pipe supports
 Fit superheatand nozark panels
June 2013-September 2013 – Southeast Boiler and Rigging, Stevenson, Alabama
I was a Rigger/Boiler Maker/Structural Welder at Rock-Tenn Paper Mill Stevenson Plant.
My duties included:
 Assemble a compactboiler
 Rig and hang iron for supportand platforms
 Weld clips for iron and handrails
 Weld pipe supports
 Rig duct work
 Weld duct work
March 2013-May2013 – Mdl Contractors, McIntosh, Alabama
I worked as a Boiler Maker at Olin Chemical Plant.My duties included:
 Tying rebar
 Forming for concrete
 Finishing concrete
January 2013-March2013 – Southeast Boiler and Rigging, Roxboro, North Carolina
I worked as a Boiler Maker at Duke Energy Mayo Plant. My duties included:
 Replace waterwall panels
 Rig new and old waterwall panels
September 2012-November 2012 – Tei Boiler Inc, Roxboro, North Carolina
PAGE 3
I worked as a Boiler Maker/Structural Welder at Duke Energy Mayo Plant. My duties
included:
 Replace ash hoppers on the boiler
 Weld ash hoppers
 Rig ash hoppers
June 2012-September 2012 – Southeast Boiler and Rigging, Hattiesburg,
Mississippi
I worked as a Boiler Maker/Structural Welders at Resinall Plantin Hattiesburg.My duties
included:
 Install pipe and valves
 Torque flanges using high torque machines
 Weld pipe supports
September 2011-May 2012 – Performance Contractors, McIntosh, Alabama
I worked as a Boiler Maker/Pipe Welder/Structural Welder/Iron Worker at Olin Chemical
Plant. My duties included:
 Weld and fit HDPE pipe
 Weld pipe supports and iron
 Hang iron for platforms and support
 Tie rebar
 Form for concrete
 Finish concrete
May 2010-July 2011 – Mdl Contractors, McIntosh, Alabama
I worked as a Civil Worker/Helper at Olin Chemical Plant.My duties included:
 Tie rebar
 Form for concrete
 Finish concrete
 Tear down forms
 Dirt work
PERSONALL INTEREST
Interest: Football, baseball,and hunting
Fitness: Very good health
References: Available upon request

More Related Content

What's hot

Mary buel resume 1
Mary buel resume 1Mary buel resume 1
Mary buel resume 1snowball75
 
Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Crosstown TO
 
Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Crosstown TO
 
Rehab work & costing
Rehab work & costingRehab work & costing
Rehab work & costingHHSCapital
 
Cedarvale & Forest Hill Construction Update (November 25, 2020)
Cedarvale & Forest Hill Construction Update (November 25, 2020)Cedarvale & Forest Hill Construction Update (November 25, 2020)
Cedarvale & Forest Hill Construction Update (November 25, 2020)Crosstown TO
 
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Brittany Maxwell
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich
 
Side Yard Notice 06.07.16
Side Yard Notice 06.07.16Side Yard Notice 06.07.16
Side Yard Notice 06.07.16Jennifer Wright
 
MEB RESUME FINAL_2.21.16
MEB RESUME FINAL_2.21.16MEB RESUME FINAL_2.21.16
MEB RESUME FINAL_2.21.16Mark Brokaw
 
Kitchen Presentation
Kitchen PresentationKitchen Presentation
Kitchen Presentationkeller1226
 

What's hot (18)

Mary buel resume 1
Mary buel resume 1Mary buel resume 1
Mary buel resume 1
 
Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams Resume 2016
Ben Williams Resume 2016
 
Portfolio 2000-2009
Portfolio 2000-2009Portfolio 2000-2009
Portfolio 2000-2009
 
Chris' Resume - R1
Chris' Resume - R1Chris' Resume - R1
Chris' Resume - R1
 
resume 6.0
resume 6.0resume 6.0
resume 6.0
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020
 
Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020
 
Rehab work & costing
Rehab work & costingRehab work & costing
Rehab work & costing
 
Cedarvale & Forest Hill Construction Update (November 25, 2020)
Cedarvale & Forest Hill Construction Update (November 25, 2020)Cedarvale & Forest Hill Construction Update (November 25, 2020)
Cedarvale & Forest Hill Construction Update (November 25, 2020)
 
Linkeden files
Linkeden filesLinkeden files
Linkeden files
 
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016
 
ResumeExport
ResumeExportResumeExport
ResumeExport
 
Side Yard Notice 06.07.16
Side Yard Notice 06.07.16Side Yard Notice 06.07.16
Side Yard Notice 06.07.16
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
MEB RESUME FINAL_2.21.16
MEB RESUME FINAL_2.21.16MEB RESUME FINAL_2.21.16
MEB RESUME FINAL_2.21.16
 
Kitchen Presentation
Kitchen PresentationKitchen Presentation
Kitchen Presentation
 

Similar to ATT_1442257750728_matt resume

Similar to ATT_1442257750728_matt resume (20)

LONNIE J
LONNIE JLONNIE J
LONNIE J
 
Wills resume (01)
Wills resume (01)Wills resume (01)
Wills resume (01)
 
Daniel-Brady
Daniel-BradyDaniel-Brady
Daniel-Brady
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
 
Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017
 
Resume C Brewer
Resume C BrewerResume C Brewer
Resume C Brewer
 
Lynn's Resume 1
Lynn's Resume 1Lynn's Resume 1
Lynn's Resume 1
 
FLORA resume 2
FLORA resume 2FLORA resume 2
FLORA resume 2
 
Thomas Adair updated resume- Feb., 2014
Thomas Adair updated resume- Feb., 2014Thomas Adair updated resume- Feb., 2014
Thomas Adair updated resume- Feb., 2014
 
RESUME__PIPE_FITTER__JOB HISTORY
RESUME__PIPE_FITTER__JOB HISTORYRESUME__PIPE_FITTER__JOB HISTORY
RESUME__PIPE_FITTER__JOB HISTORY
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
 
codys resume final
codys resume finalcodys resume final
codys resume final
 
codys resume final
codys resume finalcodys resume final
codys resume final
 
itzcoatl
itzcoatlitzcoatl
itzcoatl
 
Stephen_LeeAlmond
Stephen_LeeAlmondStephen_LeeAlmond
Stephen_LeeAlmond
 
2015 resume
2015 resume2015 resume
2015 resume
 
russell resume
russell resumerussell resume
russell resume
 
Shawn resume in word 2
Shawn resume in word 2Shawn resume in word 2
Shawn resume in word 2
 
res 2
res 2res 2
res 2
 

ATT_1442257750728_matt resume

  • 1. Charles M. Roberts 12032 Brushy Creek Rd. Lucedale MS 39452 matt_tonie@yahoo.com Tel: 601 394 3448 Certified CWI # 15090881 OBJECTIVE I am an American citizen. I am a very committed individual with greatpeople skills.Ihave worked as a structural welder,boiler maker,pipe fitter, and rigger. I am now looking to start and further my career as a Certified Welding Inspector. SKILLS & ABILITIES  I have experience in gas construction and maintenance construction  5 years as a structural welder  Experience in blue prints both pipe and iron EXPERIENCE September 2015-Present – Performance Contractors, Kemper County, Mississippi I am currently employed with Performance Contractors as a CWI at Kemper County MS Southern CompanyIGCC Project.  Perform NDE test.(PMI, UT, PT, RT, BHN)  Walk down ISOs.  Inspectwelds on pipe and structure August 2015-September 2015 – Early Construction, Demopolis, Alabama I was a Boiler Maker in Demopolis,Al. Demopolis is a new Rock-Tenn coal powered boiler for its paper mill.My duties include:  Rigging ductwork and coal conveyers  Demoing and replacing waterwall and nozark tube panels  Fitting structural steel June 2015-August 2015 – Mdl Contractors, Mobile, Alabama I was a Boiler Maker/Iron Worker at Evonik Inc. My duties included:  Replacing iron  Set new conveyers for Aerosil warehouse March 2015-April 2015 – Early Construction, Trimble, Kentucky I was a Boiler Maker at Kentucky Utilities Trimble CountyPlant. My duties included:  Rig to the main ring header around the waterwall panels  Replace tubes connecting the ring header to the waterwall panels  Fit tubes that connectthe main ring header to the waterwall January 2015-March2015 – Early Construction, Carrolton, Georgia I was a Boiler Maker at Southern CompanyPlantTyler. My duties included:
  • 2. PAGE 2  Perform structural welds with both FCAW and SMAW  Replace hanger rods on main duct  Rig to and lift duct to proper elevation  Replace buck stay clips  Replace braces inside ofduct August 2014-December 2014 – Pic Boiler Inc, Ghent, Kentucky I was a Boiler Maker/Structural Welder at Kentucky Utilities PlantGhent. My duties included:  Perform proper rigging techniques on burners  Demo and replace burners  Demo and replace coal piping  Weld new valves in coal piping  Weld new burners to boiler wind box February 2014-August 2014 – Performance Contractors, Kemper County, Mississippi I was a Boiler Maker/Rigger at Southern CompanyPlant Kemper County. My duties included:  Perform hydro’s on completed sections ofpiping  Insertblinds between flanges to separate hydro’s or to prevent water in wrong sections ofpiping  Rig blinds depending on size September 2013-December 2013 – Pic Boiler Inc, Petersburg, Indiana I was a Rigger/Boiler Maker/Structural Welder at Indiana Power and Lighting Petersburg Plant. My duties included:  Rigging nozark and superheatpanels  Weld pipe supports  Fit superheatand nozark panels June 2013-September 2013 – Southeast Boiler and Rigging, Stevenson, Alabama I was a Rigger/Boiler Maker/Structural Welder at Rock-Tenn Paper Mill Stevenson Plant. My duties included:  Assemble a compactboiler  Rig and hang iron for supportand platforms  Weld clips for iron and handrails  Weld pipe supports  Rig duct work  Weld duct work March 2013-May2013 – Mdl Contractors, McIntosh, Alabama I worked as a Boiler Maker at Olin Chemical Plant.My duties included:  Tying rebar  Forming for concrete  Finishing concrete January 2013-March2013 – Southeast Boiler and Rigging, Roxboro, North Carolina I worked as a Boiler Maker at Duke Energy Mayo Plant. My duties included:  Replace waterwall panels  Rig new and old waterwall panels September 2012-November 2012 – Tei Boiler Inc, Roxboro, North Carolina
  • 3. PAGE 3 I worked as a Boiler Maker/Structural Welder at Duke Energy Mayo Plant. My duties included:  Replace ash hoppers on the boiler  Weld ash hoppers  Rig ash hoppers June 2012-September 2012 – Southeast Boiler and Rigging, Hattiesburg, Mississippi I worked as a Boiler Maker/Structural Welders at Resinall Plantin Hattiesburg.My duties included:  Install pipe and valves  Torque flanges using high torque machines  Weld pipe supports September 2011-May 2012 – Performance Contractors, McIntosh, Alabama I worked as a Boiler Maker/Pipe Welder/Structural Welder/Iron Worker at Olin Chemical Plant. My duties included:  Weld and fit HDPE pipe  Weld pipe supports and iron  Hang iron for platforms and support  Tie rebar  Form for concrete  Finish concrete May 2010-July 2011 – Mdl Contractors, McIntosh, Alabama I worked as a Civil Worker/Helper at Olin Chemical Plant.My duties included:  Tie rebar  Form for concrete  Finish concrete  Tear down forms  Dirt work PERSONALL INTEREST Interest: Football, baseball,and hunting Fitness: Very good health References: Available upon request