Mark Brock has over 20 years of experience as a project manager, superintendent, and estimator for commercial construction projects in Washington and Colorado. He has managed projects ranging from $100,000 renovations to multi-million dollar ground-up buildings, from industrial facilities and medical offices to schools, fire stations, and residential homes. Brock excels at navigating the construction process within tight schedules and operational constraints.
Since our New Jersey group first started in 2002, we've worked on hundreds of projects in the state. This is a selection of a few that we are most proud of.
Simon Design Engineering is a professional engineering services company focused on providing the latest in client-based concepts and solutions to owners, developers, public agencies, architects, and builders throughout the United States.
Since our New Jersey group first started in 2002, we've worked on hundreds of projects in the state. This is a selection of a few that we are most proud of.
Simon Design Engineering is a professional engineering services company focused on providing the latest in client-based concepts and solutions to owners, developers, public agencies, architects, and builders throughout the United States.
With many years of New York City project experience, Anthony Pagnotta brings a high level of technical knowledge not often found in NJ offices. Areas of expertise include:
· Civil and Structural Engineering for new and existing structures
· Structural Investigations
· Forensic Engineering
· Façade Evaluations
· Roof Evaluations
· Feasibility Studies
· Construction Coordination and Supervision
· Contract Administration
· Due Diligence Studies
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
This is a PDF found on the City of Chicago Web site homepage on February 25, 2009 under the link, "Know about Current City Construction Projects". There are tons of specific locations and addresses for various projects all over the city controlled by many different departments.
This document was meant to serve as a current status for Mayor Daley and his staff, so that he knew what was up ("MONTHLY MAYORAL INFRASTRUCTURE PRESENTATION"). Certainly much may have changed in the ensuing months. It would be cool if people could provide their own updates on what's going on at these locations.
Thanks to Tensar's SierraScape System, the owners of a Canadian Tire store in Ontario were able to build the new store they wanted – where they wanted – and still save more than $1 million (CDN).
A Covered Lagoon Digester at Burrows Hall Swine Farm, South Carolina, Ricardo Hamdan, Environmental Fabrics Inc.
Development of a Heated Mixed Anaerobic Digester in South Carolina.
Job Order Contracting and Efficient Construction Project Delivery for Infrastructure Renovation, Repair, Maintenance, Sustainability, and Minor New Construction
With many years of New York City project experience, Anthony Pagnotta brings a high level of technical knowledge not often found in NJ offices. Areas of expertise include:
· Civil and Structural Engineering for new and existing structures
· Structural Investigations
· Forensic Engineering
· Façade Evaluations
· Roof Evaluations
· Feasibility Studies
· Construction Coordination and Supervision
· Contract Administration
· Due Diligence Studies
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
This is a PDF found on the City of Chicago Web site homepage on February 25, 2009 under the link, "Know about Current City Construction Projects". There are tons of specific locations and addresses for various projects all over the city controlled by many different departments.
This document was meant to serve as a current status for Mayor Daley and his staff, so that he knew what was up ("MONTHLY MAYORAL INFRASTRUCTURE PRESENTATION"). Certainly much may have changed in the ensuing months. It would be cool if people could provide their own updates on what's going on at these locations.
Thanks to Tensar's SierraScape System, the owners of a Canadian Tire store in Ontario were able to build the new store they wanted – where they wanted – and still save more than $1 million (CDN).
A Covered Lagoon Digester at Burrows Hall Swine Farm, South Carolina, Ricardo Hamdan, Environmental Fabrics Inc.
Development of a Heated Mixed Anaerobic Digester in South Carolina.
Job Order Contracting and Efficient Construction Project Delivery for Infrastructure Renovation, Repair, Maintenance, Sustainability, and Minor New Construction
Project Delivery Method: Logic and Tool to Make an Informed Choice / Bill Hale and Bill O’Brien. Presented at the 2016 CTR Symposium: http://ctr.utexas.edu/ctr-symp/
There is no “one size fits all” method to construction delivery. Each project faces a unique and often complex set of circumstances. That’s why McCarthy provides public owners with flexible and creative alternative delivery methods. Learn more about Design-Build-Finance, Public-Private Partnership, Job Order Contracting, Integrated Project Delivery, Design-Assist and Construction Management-at-Risk.
Click here for even more on construction delivery methods: www.mccarthy.com/work/delivery-methods
1. Mark T. Brock
3515 135th
Street Court N.W.
Gig Harbor, WA 98332
Buildermark@hotmail.com
Cell (253) 858-9177
#
Project
Name/ Location
Type of project
(structure,
scope of work,
etc.)
Delivery
Method
Role
Size Time Frame
Notes (skills used / developed, major challenges, accomplishments,
anecdotes)in $
in sq.
ft.
From To
1 Boeingplant 777Xupgrades, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 600,000 NA 10/2015 3/2016 This was multiple individual contracts thatwhere issued and ran separate but
concurrently,the projects under my managementwherethe “lowerator” crane control
modifications, skin robotic sander & 6 drum vacuumseparator.Thisworkrequired
work to take place in an operating manufacturing facility.
2 Building 24-60 Spare rectifier, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 705,000 NA 2/2015 3/2016 Installation of a new 20,000Amp /18V DC rectifier in an operating chemicaltank line
3 Building 17-06 Redundant rectifier, Auburn Industrial building
upgrades
Negotiated ProjectManager 765,000 12,000 2/2015 2/2016 Installation of a new 18,000Amp /15V DC rectifier in an operating chemicaltank line
4 Moonshine shoprelocation, Fredrickson Industrial building
upgrades
Negotiated ProjectManager 280,000 NA 12/2014 4/2015 Relocate tool making equipmentand install foundations and controls for 2 industrial
robots.
5 Stacker / loweratorcrane, Fredrickson Industrial building
upgrades
Design build ProjectManager 4,710,000 NA 2/2014 3/2015 Design and install 2 new 48,000lb industrial cranesincluding new 140ftrails in an
operating facility. Thesecranesare purpose build one offcranes with unique one ofa
kind anti sway mechanisms.
6 Tahoma Medical Clinic, Tukwila TI, Lab & MOB Design build ProjectManager 2,475,000 30,000 3/2012 8/2013 Convertoffice space into examrooms,Labs,retail spaceand research facilities. The
owner had limited knowledge ofconstruction and needed extensive advice to
complete design and constructthe desired finish project.
7 Cinema One Renovations @ NBK Bangor Interior
renovation
Negotiated ProjectManager /
Safety
250,000 5,000 10/2012 1/2013 Renovate the cinema with smallestimpactpossible to the operation.
8 Building 1101 OfficeRenovations @ NBK,
Bangor
Office interior
renovation
Negotiated ProjectManager /
Safety
108,000 <1000 3/2013 4/2013 Renovate office space in an operational office.
9 MOR & APU Upgrades @ Naval Hospital,
Bremerton
MOB interior
renovation
Negotiated ProjectManager /
Safety
145,000 <1000 1/2013 2/2013 This projecttook place throughoutthe hospital and consisted oflevels1, 2, & 4 ICRA
containment.
10 Childcare Development Center @ NBK,
Bremerton
Ground up
building w/
infrastructure
Design build ProjectManager 9,000,000 10,000 10/2009 11/2011 This was a modular building, made up of11 separate units. The projectwas
interrupted do to the discovery ofsoil contaminates thatneeded to be remediated
before the projectcould be completed.
11 George & Kimi Medical Clinic, Tacoma Ground up MOB
w/ infrastructure
Team Build ProjectManager 7,500,000 37,000 2008 2009 This structural steel multi story medical office space consisted ofexamrooms,
administrative offices,and Dental space constructed for a nonprofitorigination.
12 Gig Harbor MultiCareLinerAccelerator,
Gig Harbor
Medical
treatment/
radiation
shielding
Team Build ProjectManager 3,000,000 <1000 8/2008 11/2008 This included providing radioactive shielding for cancer treatmentand expansion of
the oncology sweetrequiring level 4 ICRAcontainment. The extreme pace ofthis
projectdid notallow for the completion ofdesign so changes were made thatrequired
the expediting ofrare materials.
13 YMCA ParkingExpansion,GigHarbor infrastructure Design Build ProjectManager /
Superintendent
145,000 NA 2008 2008 Design build expansionofparking lot
14 Verizon VHO #13 Everett Critical space TI Selectbidder ProjectManager 2,500,000 2,500 2008 2008 This was a fastpace critical space environmentrequire multiple safety and energy
backups.
15 MultiCare Medical Center,YMCA, Gig
Harbor
MOB TI Team Build ProjectManager 75,000 1,500 2006 2007 This is medical office space Ti thattook place concurrently as the finishes atthe
YMCA building.
16 YMCA, Gig Harbor Ground up
building w/
infrastructure
Team Build ProjectManager/
APM
13.5 M 78,000 2006 2007 Ground up construction including site developmentofthe YMCA started before
access to the site has in place (i.e. Nopower to the site), this projectalso took place
during one of the wettestyears in the pastcentury.
17 Grass Lake ElementarySeismic Upgrades,
Kent
interior
renovation
Hard Bid ProjectManager/
Estimator
400,000 NA 2006 2006 Perform seismic upgrades to multiple schools, all work needed to be performed in a
shorttimeframe.
2. Mark T. Brock
3515 135th
Street Court N.W.
Gig Harbor, WA 98332
Buildermark@hotmail.com
Cell (253) 858-9177
#
Project
Name/ Location
Type of project
(structure,
scope of work,
etc.)
Delivery
Method
Role
Size Time Frame
Notes (skills used / developed, major challenges, accomplishments,
anecdotes)in $
in sq.
ft.
From To
18 Black Lake Fire Department HQ Station,
Olympia
Ground up
building w/
infrastructure
Hard Bid ProjectManager/
Estimator
3,000,000 17,000 4/2005 4/2006 Constructa new fire station, with apparatus bay, 30,000 Gal water tank and 40,000
gal underground detention tanks.
19 Washington State OBIISeismic Upgrades,
Olympia
Office interior
renovation
Hard Bid Estimator 1,500,000 5,000 2005 2005 Perform seismic upgrades in Washington State Governmentslargestoffice building.
20 Sand Hill Ball Field, Belfair infrastructure Hard Bid Estimator 1,000,000 NA 2005 2006 Clear land and construct4 new ball fields.
21 Western State Hospital Building7
Upgrades, Steilacoom
interior
renovation
Hard Bid Estimator 700,000 NN 2005 2005 Removal ofplaster in stairwell and installation ofcarbon fiber reinforcement.
22 Pearson Elementary Asbestos Abatement
AndUpgrades, Poulsbo
interior
renovation
Hard Bid ProjectManager/
Estimator
2,100,000 10,000 5/2004 9/2004 This projectthad a very fastpassed scheduled including substantial time taken to
perform asbestos abatement.
23 National GuardArmory Remodel,Port
Orchard
interior
renovation
Hard Bid ProjectManager/
Estimator /
Superintendent
750,000 10,000 2003 2003 This was a complete renovation ofthe armory building thattook place whenthe guard
unit was preparing to deploy for Operation Enduring freedom.
24 Mason CountyPUD SubstationControl
Building, Belfair
Ground up
building w/
infrastructure
Hard Bid ProjectManager/
Estimator
135,000 <1000 2003 2003 This was a small CMUbuilding designed to house a generator,itwasa hard bid and
there was less than 1% lefton the table.
25 New Market Skills Center Remodel,
Tumwater
interior
renovation
Hard Bid ProjectManager 400,000 <1000 2002 2003 This projectconsisted ofupgrades throughoutthe entire campus with school in
session.
26 Mutual Materials,Port Orchard, WA Ground up
building w/
infrastructure
Negotiated Superintendent 1,500,000 2,000 2001 2002 Construction ofan approx. 2000 sfbrick sales building and 3 additional pre-
engineered building totaling 40,000 sf, the entire yard is paved with brickpavers.
27 Kitsap Bank Structural Upgrades,
Bainbridge Island, WA
Structural
Retrofits
Negotiated Superintendent 150,000 NA 2001 2001 Remove the tile roofand upgrade the roofstructure whale the bank still operate.The
existing roofstructure was failing al shoring needed to be placed around the entire
structure.
28 Multi-Phase Signal Family Residential
HousingCommunity,Milton, WA
Single Family Negotiated ProjectManager/
Superintendent
200,000 –
275,000
1,200
–
2,300
2000 2001 Semi-custom homes on a fastpace schedule
29 Bear Creek ElementaryUpgrades, Boulder,
CO
interior
renovation
Hard Bid ProjectManager/
Superintendent
1,500,000 NA 1999 2000 ADA upgrades to multiple elementary schoolsincluding installation of5 lifts
30 Municipal Office TI At Pearl Street Parking
Garage, Boulder, CO
Office space TI Hard Bid Superintendent 750,000 5,000 1999 1999 This was a high profile projectbuilton Boulders Pearl streetmall
31 Pearl Street Police Substation,Boulder, CO Office space TI Hard Bid Superintendent 125,000 1,200 1999 1999 Shortschedule, projecthad limited access
32 Multi-Phase Signal Family Residential
HousingCommunity,Multiple
Locations CO
Single Family Negotiated ProjectManager/
Superintendent
127,000 –
375,000
1,200
–
3,100
1997 1999 Semi-custom homes on a fastpace schedule
33 Rugger Residence, Wellington, CO Custom Home Negotiated Superintendent 14 M 15,000 1996 1997 A 15,000 sfhome on 120 acres with 36,000 sfriding arena,barns, trainers residents
and over 20 miles offence
34 Cash Residence, Fort Collins, CO Custom Home Negotiated Superintendent 7,000,000 7,500 1995 1996 This custom home hademany changes throughoutconstruction including the raising
of the roof 4ft after installed. The trim carpentry wasvery detailed and tootover 6