This document discusses scheduling and labor management for a residential building project in Mysore, India using Primavera P6 project management software. It describes developing a schedule for construction activities over 4 months, assigning different types of labor to activities, and monitoring and tracking progress against the baseline schedule. The results show Gantt charts displaying the structured work schedule and resource sheet assigning laborers. Tracking compares planned versus actual work, helping control the project to finish on time. In conclusion, Primavera software effectively plans, schedules, and monitors construction projects for optimized labor management and productivity.
Large Planning is a general term that sets a clear road map that should be followed to reach a destination. The term, therefore, has been used at different levels to mean different things. Planning involves the breakdown of the project into definable, measurable, and identifiable tasks activities, and then establishes the logical interdependences among them. These plans involve four main steps Performing breakdown of work items involved in the project into activities. Identifying the proper sequence by which the activities should be executed. Activities representation. Estimating the resources, time, and cost of individual activities. Planning requires a rigorous effort by the planning team. A planner should know the different categories of work and be familiar with the terminology and knowledge used in general practice. Also, the planning tem should seek the opinion of experts including actual construction experience. This helps produce a realistic plan and avoids problems later on site. P. B. Sudha | Dr. K. Vidhya "Project Planning & Scheduling" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-5 , August 2020, URL: https://www.ijtsrd.com/papers/ijtsrd31775.pdf Paper Url :https://www.ijtsrd.com/engineering/civil-engineering/31775/project-planning-and-scheduling/p-b-sudha
Review on Planning and Scheduling of Construction Project by Management Tool ...ijtsrd
Modern construction system has shown great potential in the field of the conventional construction system. The advantage of using new construction techniques for any type of construction is that the process takes no longer. The modern method of construction is defined as a way of working more effectively to achieve more while using less. The description lends itself heavily to offsite or modular construction techniques the method of prefabricating parts of building offsite before transporting and assembling them at their final location. Unlike traditional methods of construction is defined as a way of working more effectively. Poor construction management will cause the delay. Delay in the contracted project can result in penalties and adversely affect the reputation of the company. It is essential to manage the work within time. If construction time increases, construction cost also increases. It is necessary proper planning and management for construction work. Primavera p6 is a management tool. In this study primavera software help in the planning and scheduling of the project. Primavera gives better quality of project management process and easily understanding results. Shashwat Dubey | Prof. M. C. Paliwal "Review on Planning and Scheduling of Construction Project by Management Tool Primavera P6" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38641.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38641/review-on-planning-and-scheduling-of-construction-project-by-management-tool-primavera-p6/shashwat-dubey
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
Objective: The research aims an empirical study on the application of MSP in every
single aspect of a project from planning and scheduling phase. Irrespective of nature of
work, location or norms in an organization, all the members work on tasks that are varied
and involve people who do not usually work together but for the same objective. Methods:
A project may have a simple goal that may not require many people or a great amount of
capital or it may be complex to a certain extent, calling for various skills and excess of
resources. But, the common line is that every human can manage projects. Due to this, the
purpose of dealing with the project should not be only execution but the effective and
efficient execution of a project is essential which is needed to be emphasized. Construction
companies in India executes the project in a traditional way, this sometimes leads
uneconomical and tedious too. The traditional method is time-consuming and bit confusion
in execution. Findings: This paper will provide how to do planning and scheduling for a
building which is a multi-storied (G+8) with Microsoft Project (MSP) software by
observing the site conditions, labour productivity, and available resources with proper
utilization of time and resources. Application: This approach can be projected to similar
projects of the same size.
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
Planning and Scheduling are very essential in the large infrastructure projects like road and bridge construction. These projects have numerous stakeholders and large amount of money, resources are invested. Improper planning and scheduling leads to loss of resources, increase in project cost and unpleasant delays. But with computer and software evolution, it is now possible to plan these projects using software like Primavera P6 and Microsoft office project. This paper deals with presentation of AwasYojna project in New Market Bhopal comparing the two different blocks namely Block A and Block B. The project framed stated the advantage and added benefits of web based primavera P6 for planning and scheduling of structures under construction under the government scheme of “AwasYojna” framing the issues and complications faced in the time frame of construction and availability of resources. Nidhi Raghuwanshi | Prof. M. C. Paliwal "Planning and Scheduling Construction Projects using Primavera Software: A Case Study" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38447.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38447/planning-and-scheduling-construction-projects-using-primavera-software-a-case-study/nidhi-raghuwanshi
Large Planning is a general term that sets a clear road map that should be followed to reach a destination. The term, therefore, has been used at different levels to mean different things. Planning involves the breakdown of the project into definable, measurable, and identifiable tasks activities, and then establishes the logical interdependences among them. These plans involve four main steps Performing breakdown of work items involved in the project into activities. Identifying the proper sequence by which the activities should be executed. Activities representation. Estimating the resources, time, and cost of individual activities. Planning requires a rigorous effort by the planning team. A planner should know the different categories of work and be familiar with the terminology and knowledge used in general practice. Also, the planning tem should seek the opinion of experts including actual construction experience. This helps produce a realistic plan and avoids problems later on site. P. B. Sudha | Dr. K. Vidhya "Project Planning & Scheduling" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-5 , August 2020, URL: https://www.ijtsrd.com/papers/ijtsrd31775.pdf Paper Url :https://www.ijtsrd.com/engineering/civil-engineering/31775/project-planning-and-scheduling/p-b-sudha
Review on Planning and Scheduling of Construction Project by Management Tool ...ijtsrd
Modern construction system has shown great potential in the field of the conventional construction system. The advantage of using new construction techniques for any type of construction is that the process takes no longer. The modern method of construction is defined as a way of working more effectively to achieve more while using less. The description lends itself heavily to offsite or modular construction techniques the method of prefabricating parts of building offsite before transporting and assembling them at their final location. Unlike traditional methods of construction is defined as a way of working more effectively. Poor construction management will cause the delay. Delay in the contracted project can result in penalties and adversely affect the reputation of the company. It is essential to manage the work within time. If construction time increases, construction cost also increases. It is necessary proper planning and management for construction work. Primavera p6 is a management tool. In this study primavera software help in the planning and scheduling of the project. Primavera gives better quality of project management process and easily understanding results. Shashwat Dubey | Prof. M. C. Paliwal "Review on Planning and Scheduling of Construction Project by Management Tool Primavera P6" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38641.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38641/review-on-planning-and-scheduling-of-construction-project-by-management-tool-primavera-p6/shashwat-dubey
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSIAEME Publication
Objective: The research aims an empirical study on the application of MSP in every
single aspect of a project from planning and scheduling phase. Irrespective of nature of
work, location or norms in an organization, all the members work on tasks that are varied
and involve people who do not usually work together but for the same objective. Methods:
A project may have a simple goal that may not require many people or a great amount of
capital or it may be complex to a certain extent, calling for various skills and excess of
resources. But, the common line is that every human can manage projects. Due to this, the
purpose of dealing with the project should not be only execution but the effective and
efficient execution of a project is essential which is needed to be emphasized. Construction
companies in India executes the project in a traditional way, this sometimes leads
uneconomical and tedious too. The traditional method is time-consuming and bit confusion
in execution. Findings: This paper will provide how to do planning and scheduling for a
building which is a multi-storied (G+8) with Microsoft Project (MSP) software by
observing the site conditions, labour productivity, and available resources with proper
utilization of time and resources. Application: This approach can be projected to similar
projects of the same size.
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
Planning and Scheduling are very essential in the large infrastructure projects like road and bridge construction. These projects have numerous stakeholders and large amount of money, resources are invested. Improper planning and scheduling leads to loss of resources, increase in project cost and unpleasant delays. But with computer and software evolution, it is now possible to plan these projects using software like Primavera P6 and Microsoft office project. This paper deals with presentation of AwasYojna project in New Market Bhopal comparing the two different blocks namely Block A and Block B. The project framed stated the advantage and added benefits of web based primavera P6 for planning and scheduling of structures under construction under the government scheme of “AwasYojna” framing the issues and complications faced in the time frame of construction and availability of resources. Nidhi Raghuwanshi | Prof. M. C. Paliwal "Planning and Scheduling Construction Projects using Primavera Software: A Case Study" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38447.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38447/planning-and-scheduling-construction-projects-using-primavera-software-a-case-study/nidhi-raghuwanshi
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.