Submit Search
Upload
Productivity Enhancement Using Method Study
•
0 likes
•
8 views
IRJET Journal
Follow
https://www.irjet.net/archives/V10/i12/IRJET-V10I1224.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 4
Download now
Download to read offline
Recommended
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET Journal
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
IRJET Journal
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
IRJET Journal
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET Journal
Recommended
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET Journal
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET Journal
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
IRJET Journal
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET Journal
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
IRJET Journal
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
IRJET Journal
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET Journal
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
eSAT Journals
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
IRJET Journal
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IJECSJournal
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET Journal
International Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
Iss 9
Iss 9
ijmvsc
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
Amanuzzaman Aman
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET Journal
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
ijtsrd
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET Journal
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
IRJET Journal
Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...
eSAT Publishing House
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET Journal
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET Journal
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET Journal
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
More Related Content
Similar to Productivity Enhancement Using Method Study
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
eSAT Journals
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
IRJET Journal
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IJECSJournal
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET Journal
International Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor
Iss 9
Iss 9
ijmvsc
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
Amanuzzaman Aman
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET Journal
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
ijtsrd
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET Journal
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
IRJET Journal
Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...
eSAT Publishing House
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET Journal
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET Journal
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET Journal
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET Journal
Similar to Productivity Enhancement Using Method Study
(20)
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
International Journal of Engineering Research and Development
International Journal of Engineering Research and Development
Iss 9
Iss 9
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
Time Study and Method Study Application in Machining Plant for Improvement in...
Time Study and Method Study Application in Machining Plant for Improvement in...
Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Six Axis Pneumatic Materials Handling Robotic Arm
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
misbanausheenparvam
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Suhani Kapoor
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
purnimasatapathy1234
microprocessor 8085 and its interfacing
microprocessor 8085 and its interfacing
jaychoudhary37
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
null - The Open Security Community
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
ssuser7cb4ff
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
power system scada applications and uses
power system scada applications and uses
DevarapalliHaritha
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
ranjana rawat
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
eptoze12
Internship report on mechanical engineering
Internship report on mechanical engineering
malavadedarshan25
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
abhishek36461
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
RajaP95
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
wendy cai
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
João Esperancinha
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Recently uploaded
(20)
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
microprocessor 8085 and its interfacing
microprocessor 8085 and its interfacing
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
power system scada applications and uses
power system scada applications and uses
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
Internship report on mechanical engineering
Internship report on mechanical engineering
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Productivity Enhancement Using Method Study
1.
© 2023, IRJET
| Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 170 Productivity Enhancement Using Method Study Sahil Rajendra Bavdhankar1, Rushikesh Yuvraj Patil2, Pramod Suresh Patangaray3 1,2,3U.G. Student, Department of Mechanical Engineering, KIT’s College of Engineering, Kolhapur, Maharashtra, India --------------------------------------------------------------***--------------------------------------------------------------- Abstract - This research paper emphasizes on the method study technique and its importance in organization for increasing productivity. Method study helps the organization to achieve competitive edge. The motion analysis was done using two-handed process chart and the new improved way utilizing both hands effectively was identified .This project throws light on the concept that by utilizing the capacity within your organization, you can increase the profit. The capacity was increased from 5928 components to 6200 components by optimum utilization of available resources. This increased the profit of the company by 1,01,728Rs per month. Key Words: Method study, Productivity, Two-Handed Chart, Capacity, Profit, Recording, Optimum 1.INTRODUCTION : Work study involves time study and method study. Method study is a very much preferred approach for improving the productivity of any company. Any organization runs for profit so, identifying the improvements and implementing it at the lowest cost possible is very important. Any method of doing the work which will improve the quality of the product or reduce the cycle time will place the organization to another level. To achieve competitive edge, it is necessary to evolve continuously and improve the quality of the product at the same cost or reduce the cost for same quality. Many parameters hamper the quality of the final product being produced. Proper and critical analyses of the parameters which are increasing the cycle time, reducing the quality of product should be done. All the non-value added activities can be eliminated by innovation of new techniques. Many organizations are lagging behind because of not following proper methodology for quality control and reducing rejection rate. The organization can excel and earn more profit by making the loading and unloading time to zero and thus enhancing the capacity of the particular organization. Capacity can be enhanced by using the available resources within the organization effectively .There are numerous factors which affect productivity like economic, human. Human factors affect largely, so it is necessary to design the work system such that it will be comfortable for human and will result in minimal fatigue of an employee. Many people need to study and understand the principles of motion economy and thus apply those principles which will lead to smooth flow of materials within different work centers and it will eliminate the delays between the different operations The method study technique helps to achieve all the factors affecting the productivity and make you understand the root cause for your problem easily. 1.1 Problem Identification: The monthly order for the company to machine the components is 6000. Operations 10 , 20, 30 to machine the component on both the sides are carried out separately on two VMC machines . This reduces the number of components machined as well as it leads to increase in cycle time. This method of doing the work leads to underutilization of available resources within the organization. 1.2 Objectives : 1. To study the existing method of doing the work. 2. To understand why this method is only employed for doing the work. 3. To understand and implement possible alternative. 4. To improve the productivity of organization by developing and installing improved method of doing work. 5. To increase the profit of the organization by optimum utilization of available resources. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072 Fig.1 Engine Bracket (Top view) Fig.2 Engine Bracket (Bottom view)
2.
© 2023, IRJET
| Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 171 1.3 Future Scope : 6. To eliminate the non-valueadded activities. 1. To simplify the operations. 1. To make the effective utilization of men ,material and equipment’s. 2. Method Study : The main aim of doing method study is to study and understand the existing method of doing the work and developingmoreefficientandeffectivemethodleading to more profit , reduced cycle time , minimal material handling , improved workplace design, better working conditions ,lesser worker fatigue. The method study technique involves following steps: 1. Selection of job : 2. Recording Techniques : Table 1. TWO HANDED CHART ( BEFORE ) : Description Symbol Symbol Description IDLE Reach for the cast component IDLE Grasp the component IDLE Reach to fixture IDLE Place it on the fixture Hold the cast component Reach for the spanner IDLE Grasp the spanner IDLE Carry to fixture IDLE Tighten the component to the fixture IDLE Spanner to table Table 2. Summary : Symbol Frequency (LEFT HAND) 5 4 - Frequency(RIGHT HAND) - - 1 Table 3. TWO HANDED CHART (AFTER ) : Description Symbol Symbol Description Reach for spanner Reach for the cast component Grasp the spanner Grasp the component To machine Carry the cast component Hold the spanner Place the component to fixture Transfer the spanner to right hand Grasp the spanner Hold the component Tighten thecomponent using spanner to the fixture Spanner to table Table 4. Summary : Symbol Frequency (LEFT HAND) 3 4 - Frequency(RIGHT HAND) 3 1 2 3. Critical Examination : The critical examination of all recorded information is carried out. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072 As any activity demands the human effort , time as well as money , so one should be thoughtful before selecting any job for method analysis. Selection of proper job will give higher profit to organization and the time and efforts invested by the workers will be justified. Table 5. Multiple Activity Chart Table 6. Summary 3.1 Present Method The worker used to initially use only right hand for lifting of the job as well as lifting and carrying the spanner to fixture keeping the left hand idle for most of the time.
3.
© 2023, IRJET
| Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 172 OP 10 OP OP 20 30 Operation Time = 4+5.5+2 = 11.5 minutes For One Shift of 8 hrs : 8 hours = 440 min(working time) + 40 min (break) Therefore, Total Components Machined =440/11.5 = 38.26 = 38 components 3.2 Proposed Method The workers both hands were effectively utilized by using left hand for grasping and holding the spanner while the right hand was utilized for handling of component. 4. Develop By studying all the operations, working pattern anew method of machining the component is found. When operation 10, 20, 30 are carried on single VMC machine . Table 7. Traditional Method For 3 Shifts: 38 components*3=114 components For a month: 114*26 = 2964 components As the company utilizes 2 machines and the operations 10, 20, 30 are carried separately on both the VMC machines the total components machined per month will be 5928 components. But, the company is having the demand for around 60000 components which can’t be fulfilled. So, the proposed solution is that by carrying the OP 10 on one VMC and the OP 20 and 0P 30 on another machine , the number of components machined can be increased. For 1 shift : 440/5.5= 80 components For 3 shifts = 240 components per day For a month = 240*26 =6240 components OP OP OP 10 20 30 International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-005 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072 5. Results and Discussions: Table 8. Comparison of present method and Proposed method Two VMC machine are used simultaneously and both of them operate all the operations 10, 20,30 Two VMC machines are used simultaneously, utilizing effectively by splitting the operation 10 on one VMC and Operation 20, 30 on the other VMC. This method used to machine only 5928 components per month. This method machined 6200 components per month This method machined only 98% of the total components required. Split operation method machines 103% of the total components required. The two VMC machines were under-utilized because of traditional method Split operation method utilizes both the VMC machines to the best of their capacity. The available resources like machine, manpower were not utilized effectively. The available were resources were utilized optimally and the machining demand of the component was fulfilled by split operation method Present Method Proposed Method
4.
© 2023, IRJET
| Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 173 Components machined by split operation Method – Components machined by traditional method =6200-5928 =272 components 272 components more were machined using Split operation method. 5.2 Increased Profit: Table 9. Profit comparison Profit gained by traditional method Profit gained by proposed method Cost per job*total components machined =374*5928 =22,17,072 Rs Cost per job*total components machined = 374*6200 =23,18,800 Rs 6. CONCLUSIONS : 1. The optimum utilization of resources available within the organization can lead to increased profit which will ultimately increase the productivity. 2. This study emphasizes that the method study technique can replace the method of doing the work by more efficient, effective method 3. The capacity of organization can be enhanced by focusing efforts in right direction. 4. There is always a scope of improvement in any process or method ,so all the parameters should be critically examined. REFERENCES : [1] Martand Telsang “Industrial Engineering and Production Management” S Chand, New Delhi. [2] V.Das, Harikrishna T K, “Productivity Enhancementthrough Design and Development of Milling Fixture” , International Journal of Engineering and Innovative Technology, Vol 9, Issue 3, September 2019, pp 25-32. [3] A.Rajiwate , H.Mirza ,S.Kazi, “ Productivity Improvement by Time Study and Motion Study” , International Research Journal of Engineering and Technology, Vol 7, pp. 5308-5312, March 2020. 5.1 Increased Productivity: International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072 BIOGRAPHIES : [4] Hyun-Jong Kim, Ho-Young Hwang and Jung- Wan Hong “A Study on the Method of Task Management Using Motion Analysis”, International Journal of Pure and Applied Mathematics, Vol 117, pp. 389- 396, 2017 [5] S.Yadav and P.Chahal, “Micro-Motion of Worker”, International Journal of Research Publication and Reviews, Vol 3, pp 3123- 3129, July 2022. [6] C.Duran, A.Centindere, Y.Aksu, “Productivity Improvement by Work and Time study technique for Earth Energy-glass Manufacturing company”, Elsevier, 2015. Mr. Sahil Rajendra Bavdhankar. Under Graduate Student, Department of Mechanical Engineering, KIT's College of Engineering, Kolhapur. Mr. Rushikesh Yuvraj Patil. Under Graduate Student, Department of Mechanical Engineering, KIT's College of Engineering, Kolhapur. Mr. Pramod Patangaray. Under Graduate Student, Department of Mechanical Engineering, KIT's College of Engineering, Kolhapur.