International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1312
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP
INDUSTRY
A.NAGARAJ1, M.SARAVANAKUMAR2, A.HARDY KELVIN 3, V.KUMARESAN 4, S.MADHAVASELVAN 5,
S.VISHAL 6
1,2 Lecturer, Dept. of Mechanical Engineering, PSG Polytechnic College, Tamil Nadu, India
3,4,5,6 Students, Dept. of Mechanical Engineering, PSG Polytechnic College, Tamil Nadu, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - In its most basic form, lean manufacturing is
the systematic elimination of waste from all aspects of an
organization's operations, where waste is viewed as any use
or loss of resources that does not lead directly to creating
the product or service a customer wants when they want it.
In many industrial processes, such non-value-added activity
can comprise more than 90 percent of a factory's total
activity. Nationwide, numerous companies of varying size
across multiple industry sectors, primarily in the
manufacturing and service sectors are implementing such
lean production systems, and experts report that the rate of
lean adoption is accelerating. Companies primarily choose
to engage in lean manufacturing for three reasons: to
reduce production resource requirements and costs; to
increase customer responsiveness; and to improve product
quality, all which combine to boost company profits and
competitiveness.
Key Words: Waste, Industry sector, Productivity
improvement
1.INTRODUCTION
The Toyota Production System (TPS), pioneered by a
Japanese automobile corporation, Toyota, has been
adopted by practically every country in the world due to
its global superiority in cost, quality, flexibility, and quick
response. Lean is a manufacturing practise that tries to
reduce waste across whole value streams in order to
provide greater value to consumers. It is a customer-
centric strategy that focuses on the value stream and its
optimisation. The utilisation of resources that do not
provide customer value is a target for reform or
elimination under lean principles.
The primary goal of implementing lean manufacturing is
to increase production, reduce lead time and cost, and
improve quality in order to provide the maximum value to
customers. There are numerous descriptions regrading
lean manufacturing in the industries.
1.1 Implementation of lean manufacturing steps
1. Waste identification in the system:Many
organisations must be aware that their systems contain
several hidden and unhidden wastes.
2. Wastes in the organisation might be of various
types: The types of trash and their causes must be
identified. Lean manufacturing believes in addressing the
root causes of problems and permanently resolving them.
There are numerous tools and techniques that can be used
to reduce or eliminate this form of waste.
3. The next stage is to identify and address the
underlying causes:- Stick to core lean concepts and look
for root reasons. Looking at causes may not be sufficient,
hence it is necessary to discover the effects of the causes
solution on the entire system..
4. The final step in the lean implementation process is
to identify and test solutions:- After testing, solutions
should be implemented. Training and follow-up are critical
in each of the steps outlined above. It is necessary to be
patient because the implementation process may take
some time.
1.2 Waste Types
The following are the seven types of waste:
(1) Overproduction: It is unnecessary to manufacture
more than the consumer requires, or to make it too soon
before it is required. This increases the chances of
obsolescence and creating the wrong thing. It frequently
results in high lead and storage durations.
(2) Defects: In addition to physical flaws that directly
contribute to the Costs of goods sold, which may include
documentation errors, late delivery, production to
inaccurate specifications, the use of excessive raw
materials, or the development of unneeded scrap. Rework
may be required if a flaw arises; otherwise, the product
would be discarded. Defects not only waste material and
human resources, but they also cause material shortages,
interfere with achieving deadlines, create idle time at
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1313
succeeding workstations, and lengthen the manufacturing
lead time.
(3) Inventory: Having excessive levels of raw materials,
works-in-process, and finished products. Extra inventory
increases inventory finance costs, storage costs, and
failure rates. It tends to lengthen lead times, prevents
early problem identification, and increases space
requirements. It is especially important to remove
inventory due to inaccurate lead times in order to
undertake successful purchasing.
(4) Transportation: This covers any material movement
that adds no value to the product, such as moving supplies
between workstations. Transportation between
processing stages lengthens production cycle times and
makes wasteful use of labour and space. Any movement
within the firms could be considered waste. With the
distance of communication between processes, double
handling and excessive motions are likely to cause damage
and deterioration.
(5) Waiting: Idle time for workers or machines as a result
of on the factory floor, there are bottlenecks or inefficient
production flows. It includes minor delays in unit
processing. The waste of waiting happens when time is
employed inefficiently. This waste occurs while things are
not being moved or worked on. This waste affects both
commodities and workers, who both waste time waiting.
Waiting time for workers can be employed for training or
maintenance purposes, but it should not lead to
overproduction.
(6) Motion: Any needless physical motions or walking by
workers that diverts them from genuine processing work
is included in this category. This could include walking
around the manufacturing floor looking for a tool, or it
could be superfluous or uncomfortable physical
movements caused by poorly designed ergonomics that
slow down the workers. It entails inadequate production
ergonomics, in which operators must extend, bend, and
pick up when such activities may be avoided.
(7) Over processing: It is conducting more processing
work than the consumer requires in terms of product
quality or features such as polishing or putting finishing in
regions of the product that the customer will not see.
Over-processing happens when unnecessarily complicated
solutions to simple tasks are discovered.
1.3 The Objective of the Paper
 To study the current state of the pump
manufacturing industry and the causes of lean
wastes.
 Identification of Lean tools that can be used in the
industry to assist reduce defects and waste.
 Observing productivity increases as a result of
tool implementation.
 Validation using previous information
2. LITERATURE REVIEW
In recent years, the Indian manufacturing industry has
seen unrelenting rivalry in terms of cheap costs, higher
quality, and various goods with greater performance. To
confront the challenges given by the competitive climate,
Indian entrepreneurs have realised that manufacturing
organisations must incorporate quality and maintenance
improvement programmes into all elements of their
processes in order to improve their competitiveness.
Lean is a manufacturing concept that believes that any
activity that uses resources but does not provide value for
the end consumer is wasteful and should be removed.
Antony, 2011; Shah and Ward, 2007)
lean production eliminates unnecessary processes, align
processes in continuous flow and solve problems through
continuous improvements. At operational level lean
manufacturing is carried out through a set of lean
practices. By implementing these tools and techniques
lean manufacturing targets to identify and eliminate
numerous wastes exist inside the factory or along the
supply chain Sohal (1996),
Apply the lean tool by method time measurement and line
balance efficiency and reduce the cycle time in a truck
body assembly line and improve efficiency in that product
line. Also says that lean manufacturing is a business
philosophy that continuously improves the process
involve in manufacturing. Santosh kumar et, al.(2014)
Companies recognize that consistent and disciplined
application of lean manufacturing strategies with the
emphasis on waste elimination and process streamlining
can lead to business excellence (Mejabi, 2003; Taj. 2008;
Rahman et al., 2010).
Lean is a manufacturing paradigm based on the
fundamental goals of Toyota Production System (TPS),
which is aimed at continuously minimizing waste to
maximize flow (Vinodhet al., 2010),
Applied VSM in a biscuit manufacturing plant and found
that application of lean manufacturing resulted in increase
in quality, decrease in inventory,increase in timely
deliveries better utilization of space and equipments and
reduction in lead time. Upadhye et al. [2010][24]
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1314
3. METHODOLOGY
The intended technique was used to create the future state
value stream map from the present state value stream
map. By adopting kaizen, many tools and techniques from
the Lean Production System were applied to generate a
continuous flow in the line. Several continuous
improvements have been achieved to reduce cycle time,
lead time, worker count, work in progress inventory, and
nonvalue added time.
4. TAKT TIME
Takt time is the maximum amount of time required to
develop a product in order to meet client demand. The
word "aks" is derived from the German word "pure." Takt,
which is determined by consumer demand, establishes the
pulse throughout all processes in a firm to maintain
continuous flow and capacity unification. The takt time is
the amount of time that must elapse between two
consecutive unit completions in order to meet demand if a
product is manufactured one unit at a time at a constant
rate within the net available work time. The amount of
time available for work is referred to as net available time.
Example The takt time for the following this to be
calculated.
 The month has 22 working days with 2 shifts per
day
 8 hours per shift.
 Breaks add up to 1 hour per shift.
 The OEE is 78%
 Expected customer demand 20.000 parts.
Workable production Hours
Takt Time = ___________________________________
Unit Required (customer demand)
720
= ______________
1000
= 44 min/day
5. OVERALL EFFICIENCY OF EQUIPMENT
Overall Equipment Effectiveness (OEE) is a method of
measuring and improving manufacturing process
efficiency. OEE has gained acceptance as a management
technique for measuring and evaluating machine
productivity.
Before
A= Run time/Total time = 78.09%
P = Total components divided by target count = 78.09%
Q = 98.47% of good components/total parts
OEE=A*P*Q=60.04%
After
A = Run time/Total time = 89.28%
P = Total parts divided by target count = 89.28%
Q = Good parts divided by total parts = 98.66%
OEE=A*P*Q=78.64%
6. SMED (Single Minute Exchange of Die)
SMED( Single Minute Exchange of Die) is a system used to
dissect and reduce setup times. The innovator of the SMED
system is the Japanese mastermind Shigeo Shingo. He
showed that setups that took hours could be reduced to
twinkles. SMED methodology operation consists of four
distinct stages primary Stage Internal and external setup
not discerned;
• Stage 1 – Separate internal and external setup.
• Stage 2 – Convert internal into external setup.
• Stage 3 – explain the internal and external setup.
In this we have created a nylon 3D printed jig, because the
old metal jig was heavy and high time consuming.
Fig -1: SMED designed model jig and manufacturing of
nylon jig (3D printing)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1315
7. FISH BONE
A fishbone diagram is a cause-and-effect discovery tool
that aids in determining the causes of flaws, variances, or
failures in a process. In other words, it aids in the
breakdown. Root factors that may contribute to an effect
are identified in successive layers. A fishbone diagram,
also known as an anlshikawa diagram or cause-and-effect
analysis, is one of the primary techniques used in root
cause analysis. A fishbone diagram, as the name implies, is
a representation of a fish skeleton. The underlying
problem is represented by the fish's head, and the causes
are represented by the skeleton's bones to the left: the ribs
branch off the back and represent major causes, while sub-
branches branch off of the cause and represent root
causes. These causes resemble the fish skeleton's bones.
Fig -2: Fish Bone
8. CONCLUSION
The following are some of the salient conclusions that are
drawn based on the present studies: It was observed from
the current state map that the total lead time for the
product is more than value added time. After the
improvements been made, Process lead time reduces from
24.4 days to 16.14 days
 Inventory reduces to 8.26 days
 Continuous flow been created wherever possible
 Operators reduced from 7 to 3 in the machine
shop by
 Balancing the work content.
 Achieved single piece flow in sub assembly
 Productivity improves to 7.7%.
For practitioners in the pump manufacturing industries,
this case study provides us with the privilege to learn a lot
from the specific case study problem and it also provides a
scope for further research.
9. REFERENCES
[1]. Ramesh V, Sreenivasa Prasad KV, Srinivas TR
(2011) Implementation of a lean model for
carrying out value stream mapping in a
manufacturing industry. J Ind Syst Eng 2(3):180–
196.
[2]. Aniket B. Pawar, C. A. Waghmare. Improving
Productivity By Reducing Cycle Time Through
Value Stream Mapping In Pump Manufacturing
Industry, Proceedings of 7th IRF International
Conference, 27th April-2014, Pune, India,ISBN:
978-93-84209-09-4.
[3]. Mulla M. L.,Bhatwadekar S.G, PanditS.V,2014,
―Implementation of Lean Manufacturing Through
The Technique of Single Minute Exchange Of Die
(SMED) to Reduce Change Over Time‖
.International Journal of Innovative Research in
Science, Engineering and Technology, ISSN: 2319-
8753.
[4]. Prof.Rahul.R.Joshi1, Mr.Rahul, Patil, Prof.G.R.Naik,
Prof.M.V.Kharade.―Through Put Time Reduction
Lean Manufacturing‖, IOSR Journal of Mechanical
and Civil Engineering (IOSR-JMCE) ISSN: 2278-
1684, PP: 40-45.
[5]. Hudli Mohd, Rameez, K.H.Inamdar. ―Areas of
Lean Manufacturing for Productivity
Improvement in a Manufacturing Unit‖, World
Academy of Science, Engineering and Technology,
Vol: 4 2010-09-20.
[6]. Bharath R, Dr G S Prakash, ―Lead time Reduction
Using Lean Manufacturing Principles For Delivery
Valve Production‖,Global Journal of Finance and
Management. ISSN 0975-6477 Volume 6, Number
1 (2014), pp. 35-40.
[7]. Ramamoorthy.C. Dr. V. Selladurai Dr.
S.Venkatachalam (2008),―Efficiency
Enhancement of Centrifugal Monoblock Pump
through Lean Manufacturing System using Kaizen
Techniques.,‖ IJAEA, Volume 1,Issue 2, pp 38-44.
[8]. Martín Tanco , Javier Santos Jose Luis Rodriguez
:Applying lean techniques to nougat fabrication: a
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1316
seasonal case study, Int J Adv Manuf Technol
(2013) 68:1639–1654.
[9]. Karthik .T, Senthilkumar.M, ―Improvisation of
Productivity Through Layout Optimization In
Pump Industry‖, International Journal of Lean
Thinking Volume 3, Issue 2(December 2012).
[10]. Rahani AR, Muhammad al - Ashraf, ―Production
Flow Analysis through Value Stream Mapping: A
Lean Manufacturing Process Case Study‖,
Procedia Engineering, 41 ( 2012 ) 1727 – 1734.

More Related Content

Similar to PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY

IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET Journal
 
Paper id 24201491
Paper id 24201491Paper id 24201491
Paper id 24201491IJRAT
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...ijsrd.com
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
Implementation of Lean Manufacturing Tools in Footwear Industry of Bangladesh
Implementation of Lean Manufacturing Tools in  Footwear Industry of BangladeshImplementation of Lean Manufacturing Tools in  Footwear Industry of Bangladesh
Implementation of Lean Manufacturing Tools in Footwear Industry of BangladeshCrimsonPublishersAMMS
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET Journal
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mappingijsrd.com
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...IJERA Editor
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workloadeSAT Publishing House
 
A036501014
A036501014A036501014
A036501014theijes
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...IAEME Publication
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Reviewvivatechijri
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...IRJET Journal
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyIRJET Journal
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET Journal
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six SigmaIRJET Journal
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...IRJET Journal
 

Similar to PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY (20)

IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
 
Paper id 24201491
Paper id 24201491Paper id 24201491
Paper id 24201491
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
Implementation of Lean Manufacturing Tools in Footwear Industry of Bangladesh
Implementation of Lean Manufacturing Tools in  Footwear Industry of BangladeshImplementation of Lean Manufacturing Tools in  Footwear Industry of Bangladesh
Implementation of Lean Manufacturing Tools in Footwear Industry of Bangladesh
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mapping
 
Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...Implementation of Lean Manufacturing System for Successful Production System ...
Implementation of Lean Manufacturing System for Successful Production System ...
 
5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload5 s implementation and its effect on physical workload
5 s implementation and its effect on physical workload
 
A036501014
A036501014A036501014
A036501014
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
MANUFACTURING LEAD TIME REDUCTION IN A SCAFFOLD MAKING INDUSTRY USING LEAN MA...
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
 
Just in Time System: A Study and Review
Just in Time System: A Study and ReviewJust in Time System: A Study and Review
Just in Time System: A Study and Review
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case StudyImplementation of 5S Methodology in a Food & Beverage Industry: A Case Study
Implementation of 5S Methodology in a Food & Beverage Industry: A Case Study
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
IRJET- Applications of Lean Six Sigma
IRJET-  	  Applications of Lean Six SigmaIRJET-  	  Applications of Lean Six Sigma
IRJET- Applications of Lean Six Sigma
 
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
A Broad Study on Lead Time Reduction using Value Stream Mapping Techniques in...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1312 PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY A.NAGARAJ1, M.SARAVANAKUMAR2, A.HARDY KELVIN 3, V.KUMARESAN 4, S.MADHAVASELVAN 5, S.VISHAL 6 1,2 Lecturer, Dept. of Mechanical Engineering, PSG Polytechnic College, Tamil Nadu, India 3,4,5,6 Students, Dept. of Mechanical Engineering, PSG Polytechnic College, Tamil Nadu, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - In its most basic form, lean manufacturing is the systematic elimination of waste from all aspects of an organization's operations, where waste is viewed as any use or loss of resources that does not lead directly to creating the product or service a customer wants when they want it. In many industrial processes, such non-value-added activity can comprise more than 90 percent of a factory's total activity. Nationwide, numerous companies of varying size across multiple industry sectors, primarily in the manufacturing and service sectors are implementing such lean production systems, and experts report that the rate of lean adoption is accelerating. Companies primarily choose to engage in lean manufacturing for three reasons: to reduce production resource requirements and costs; to increase customer responsiveness; and to improve product quality, all which combine to boost company profits and competitiveness. Key Words: Waste, Industry sector, Productivity improvement 1.INTRODUCTION The Toyota Production System (TPS), pioneered by a Japanese automobile corporation, Toyota, has been adopted by practically every country in the world due to its global superiority in cost, quality, flexibility, and quick response. Lean is a manufacturing practise that tries to reduce waste across whole value streams in order to provide greater value to consumers. It is a customer- centric strategy that focuses on the value stream and its optimisation. The utilisation of resources that do not provide customer value is a target for reform or elimination under lean principles. The primary goal of implementing lean manufacturing is to increase production, reduce lead time and cost, and improve quality in order to provide the maximum value to customers. There are numerous descriptions regrading lean manufacturing in the industries. 1.1 Implementation of lean manufacturing steps 1. Waste identification in the system:Many organisations must be aware that their systems contain several hidden and unhidden wastes. 2. Wastes in the organisation might be of various types: The types of trash and their causes must be identified. Lean manufacturing believes in addressing the root causes of problems and permanently resolving them. There are numerous tools and techniques that can be used to reduce or eliminate this form of waste. 3. The next stage is to identify and address the underlying causes:- Stick to core lean concepts and look for root reasons. Looking at causes may not be sufficient, hence it is necessary to discover the effects of the causes solution on the entire system.. 4. The final step in the lean implementation process is to identify and test solutions:- After testing, solutions should be implemented. Training and follow-up are critical in each of the steps outlined above. It is necessary to be patient because the implementation process may take some time. 1.2 Waste Types The following are the seven types of waste: (1) Overproduction: It is unnecessary to manufacture more than the consumer requires, or to make it too soon before it is required. This increases the chances of obsolescence and creating the wrong thing. It frequently results in high lead and storage durations. (2) Defects: In addition to physical flaws that directly contribute to the Costs of goods sold, which may include documentation errors, late delivery, production to inaccurate specifications, the use of excessive raw materials, or the development of unneeded scrap. Rework may be required if a flaw arises; otherwise, the product would be discarded. Defects not only waste material and human resources, but they also cause material shortages, interfere with achieving deadlines, create idle time at
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1313 succeeding workstations, and lengthen the manufacturing lead time. (3) Inventory: Having excessive levels of raw materials, works-in-process, and finished products. Extra inventory increases inventory finance costs, storage costs, and failure rates. It tends to lengthen lead times, prevents early problem identification, and increases space requirements. It is especially important to remove inventory due to inaccurate lead times in order to undertake successful purchasing. (4) Transportation: This covers any material movement that adds no value to the product, such as moving supplies between workstations. Transportation between processing stages lengthens production cycle times and makes wasteful use of labour and space. Any movement within the firms could be considered waste. With the distance of communication between processes, double handling and excessive motions are likely to cause damage and deterioration. (5) Waiting: Idle time for workers or machines as a result of on the factory floor, there are bottlenecks or inefficient production flows. It includes minor delays in unit processing. The waste of waiting happens when time is employed inefficiently. This waste occurs while things are not being moved or worked on. This waste affects both commodities and workers, who both waste time waiting. Waiting time for workers can be employed for training or maintenance purposes, but it should not lead to overproduction. (6) Motion: Any needless physical motions or walking by workers that diverts them from genuine processing work is included in this category. This could include walking around the manufacturing floor looking for a tool, or it could be superfluous or uncomfortable physical movements caused by poorly designed ergonomics that slow down the workers. It entails inadequate production ergonomics, in which operators must extend, bend, and pick up when such activities may be avoided. (7) Over processing: It is conducting more processing work than the consumer requires in terms of product quality or features such as polishing or putting finishing in regions of the product that the customer will not see. Over-processing happens when unnecessarily complicated solutions to simple tasks are discovered. 1.3 The Objective of the Paper  To study the current state of the pump manufacturing industry and the causes of lean wastes.  Identification of Lean tools that can be used in the industry to assist reduce defects and waste.  Observing productivity increases as a result of tool implementation.  Validation using previous information 2. LITERATURE REVIEW In recent years, the Indian manufacturing industry has seen unrelenting rivalry in terms of cheap costs, higher quality, and various goods with greater performance. To confront the challenges given by the competitive climate, Indian entrepreneurs have realised that manufacturing organisations must incorporate quality and maintenance improvement programmes into all elements of their processes in order to improve their competitiveness. Lean is a manufacturing concept that believes that any activity that uses resources but does not provide value for the end consumer is wasteful and should be removed. Antony, 2011; Shah and Ward, 2007) lean production eliminates unnecessary processes, align processes in continuous flow and solve problems through continuous improvements. At operational level lean manufacturing is carried out through a set of lean practices. By implementing these tools and techniques lean manufacturing targets to identify and eliminate numerous wastes exist inside the factory or along the supply chain Sohal (1996), Apply the lean tool by method time measurement and line balance efficiency and reduce the cycle time in a truck body assembly line and improve efficiency in that product line. Also says that lean manufacturing is a business philosophy that continuously improves the process involve in manufacturing. Santosh kumar et, al.(2014) Companies recognize that consistent and disciplined application of lean manufacturing strategies with the emphasis on waste elimination and process streamlining can lead to business excellence (Mejabi, 2003; Taj. 2008; Rahman et al., 2010). Lean is a manufacturing paradigm based on the fundamental goals of Toyota Production System (TPS), which is aimed at continuously minimizing waste to maximize flow (Vinodhet al., 2010), Applied VSM in a biscuit manufacturing plant and found that application of lean manufacturing resulted in increase in quality, decrease in inventory,increase in timely deliveries better utilization of space and equipments and reduction in lead time. Upadhye et al. [2010][24]
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1314 3. METHODOLOGY The intended technique was used to create the future state value stream map from the present state value stream map. By adopting kaizen, many tools and techniques from the Lean Production System were applied to generate a continuous flow in the line. Several continuous improvements have been achieved to reduce cycle time, lead time, worker count, work in progress inventory, and nonvalue added time. 4. TAKT TIME Takt time is the maximum amount of time required to develop a product in order to meet client demand. The word "aks" is derived from the German word "pure." Takt, which is determined by consumer demand, establishes the pulse throughout all processes in a firm to maintain continuous flow and capacity unification. The takt time is the amount of time that must elapse between two consecutive unit completions in order to meet demand if a product is manufactured one unit at a time at a constant rate within the net available work time. The amount of time available for work is referred to as net available time. Example The takt time for the following this to be calculated.  The month has 22 working days with 2 shifts per day  8 hours per shift.  Breaks add up to 1 hour per shift.  The OEE is 78%  Expected customer demand 20.000 parts. Workable production Hours Takt Time = ___________________________________ Unit Required (customer demand) 720 = ______________ 1000 = 44 min/day 5. OVERALL EFFICIENCY OF EQUIPMENT Overall Equipment Effectiveness (OEE) is a method of measuring and improving manufacturing process efficiency. OEE has gained acceptance as a management technique for measuring and evaluating machine productivity. Before A= Run time/Total time = 78.09% P = Total components divided by target count = 78.09% Q = 98.47% of good components/total parts OEE=A*P*Q=60.04% After A = Run time/Total time = 89.28% P = Total parts divided by target count = 89.28% Q = Good parts divided by total parts = 98.66% OEE=A*P*Q=78.64% 6. SMED (Single Minute Exchange of Die) SMED( Single Minute Exchange of Die) is a system used to dissect and reduce setup times. The innovator of the SMED system is the Japanese mastermind Shigeo Shingo. He showed that setups that took hours could be reduced to twinkles. SMED methodology operation consists of four distinct stages primary Stage Internal and external setup not discerned; • Stage 1 – Separate internal and external setup. • Stage 2 – Convert internal into external setup. • Stage 3 – explain the internal and external setup. In this we have created a nylon 3D printed jig, because the old metal jig was heavy and high time consuming. Fig -1: SMED designed model jig and manufacturing of nylon jig (3D printing)
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1315 7. FISH BONE A fishbone diagram is a cause-and-effect discovery tool that aids in determining the causes of flaws, variances, or failures in a process. In other words, it aids in the breakdown. Root factors that may contribute to an effect are identified in successive layers. A fishbone diagram, also known as an anlshikawa diagram or cause-and-effect analysis, is one of the primary techniques used in root cause analysis. A fishbone diagram, as the name implies, is a representation of a fish skeleton. The underlying problem is represented by the fish's head, and the causes are represented by the skeleton's bones to the left: the ribs branch off the back and represent major causes, while sub- branches branch off of the cause and represent root causes. These causes resemble the fish skeleton's bones. Fig -2: Fish Bone 8. CONCLUSION The following are some of the salient conclusions that are drawn based on the present studies: It was observed from the current state map that the total lead time for the product is more than value added time. After the improvements been made, Process lead time reduces from 24.4 days to 16.14 days  Inventory reduces to 8.26 days  Continuous flow been created wherever possible  Operators reduced from 7 to 3 in the machine shop by  Balancing the work content.  Achieved single piece flow in sub assembly  Productivity improves to 7.7%. For practitioners in the pump manufacturing industries, this case study provides us with the privilege to learn a lot from the specific case study problem and it also provides a scope for further research. 9. REFERENCES [1]. Ramesh V, Sreenivasa Prasad KV, Srinivas TR (2011) Implementation of a lean model for carrying out value stream mapping in a manufacturing industry. J Ind Syst Eng 2(3):180– 196. [2]. Aniket B. Pawar, C. A. Waghmare. Improving Productivity By Reducing Cycle Time Through Value Stream Mapping In Pump Manufacturing Industry, Proceedings of 7th IRF International Conference, 27th April-2014, Pune, India,ISBN: 978-93-84209-09-4. [3]. Mulla M. L.,Bhatwadekar S.G, PanditS.V,2014, ―Implementation of Lean Manufacturing Through The Technique of Single Minute Exchange Of Die (SMED) to Reduce Change Over Time‖ .International Journal of Innovative Research in Science, Engineering and Technology, ISSN: 2319- 8753. [4]. Prof.Rahul.R.Joshi1, Mr.Rahul, Patil, Prof.G.R.Naik, Prof.M.V.Kharade.―Through Put Time Reduction Lean Manufacturing‖, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278- 1684, PP: 40-45. [5]. Hudli Mohd, Rameez, K.H.Inamdar. ―Areas of Lean Manufacturing for Productivity Improvement in a Manufacturing Unit‖, World Academy of Science, Engineering and Technology, Vol: 4 2010-09-20. [6]. Bharath R, Dr G S Prakash, ―Lead time Reduction Using Lean Manufacturing Principles For Delivery Valve Production‖,Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 1 (2014), pp. 35-40. [7]. Ramamoorthy.C. Dr. V. Selladurai Dr. S.Venkatachalam (2008),―Efficiency Enhancement of Centrifugal Monoblock Pump through Lean Manufacturing System using Kaizen Techniques.,‖ IJAEA, Volume 1,Issue 2, pp 38-44. [8]. Martín Tanco , Javier Santos Jose Luis Rodriguez :Applying lean techniques to nougat fabrication: a
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1316 seasonal case study, Int J Adv Manuf Technol (2013) 68:1639–1654. [9]. Karthik .T, Senthilkumar.M, ―Improvisation of Productivity Through Layout Optimization In Pump Industry‖, International Journal of Lean Thinking Volume 3, Issue 2(December 2012). [10]. Rahani AR, Muhammad al - Ashraf, ―Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study‖, Procedia Engineering, 41 ( 2012 ) 1727 – 1734.