SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3396
ECONOMY IN BUILDING CONSTRUCTION SYSTEMS OF PREFABRICATED
STRUCTURES
Eshetu Mathewos Juta
1Assistiant Professor, Head of Department, Department of civil Engineering, Woliata Sodo University, Ethiopia
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Prefabrication means investing in preparation,
so that things proceed smoothly. Planning and organization
must be intensified, interaction issues for an optimizationand
Co-operation in a multi-trades context has to be defined Cost
studies of Buildings is about the understanding and
application of costs to buildings and other structures. One of
its aim is to ensure that scarce and limited resources are used
to best advantage. It is about ensuring that clients receive the
best value for money for the projects that they construct. In
this paper I have considered Economy in the Construction
system through “Pre Fabricated Structure” Building.
Prefabrication is an advanced and up-to-date method of
Reinforced Cement Concrete construction. The following are
the detailed items dealt with this journal paper.
,Key Words: Load bearing wall, Cross walls,
Longitudinal walls, Two Way Span Systems,
Prefabricated, Construction
1. INTRODUCTION
Prefabrication must come to be seen as separate from the
concept of mass production. In future, industrial
prefabrication must face the challenges of accepting
individuality as a quality indicator and taking account of
user’s needs and wishes. We cannot build at the cost of the
individuality of future residents by inflexible modular
building systems. The interchange abilityofcomponents, for
example, in systems that can later be modernized, allowsfor
flexibility of use. The degree of industrial prefabrication
must be increased in order for prices to be competitive. A
higher degree of prefabrication, however, requires more
work on the part of planners, which means that more time
must be invested in planning processes. There is a necessity
of making precise commitments in certain instances in the
planning process. Optimization should be aimed for so as to
transcend the trades’ boundaries.
1.1 Load bearing wall type buildings
In this type, as the name indicates, the loads are carried by
the walls themselves. This type can be further classified into
two categories, namely, the open and the closed system.
In the open system, the components needed for a complete
building are standardized, manufactured to specified
tolerance and catalogued. With the use of these products,
there is scope for several planning arrangements, subject to
certain constraints. On the other hand, in the closed system
the elements are manufactured to specific requirements for
use in a known operation. For example, a wall of a room can
be precast in a single piece, often referred to as large panel,
instead ofassemblingthesamefromseveralprecaststandard
components as in open systems. Structurally, load bearing
wall type of schemes may be classified as follows:(a)Cross
wallsasload bearingandfaçade wallsasnon-loadbearing.In
this scheme, it is preferable to locate the openings, shelves,
etc, in long walls as far as possible.(b)Longitudinal walls as
load bearing andcross walls as non-load bearing. In this case
the openings, cupboards, etc, may preferably be located in
cross walls.
1.2 Frame type buildings
In the frame type of construction bearing and curtain wall
elements can be clearly distinguished.Therearetwotypes of
frames: complete frames and incomplete frames. In the
buildings with complete frames, the outer enclosure takes
the form of a non-bearing curtain wall with the floor loads
transmitted downwards via exteriorandinteriorcolumns.In
buildings, where the frame is incomplete, there are no
exterior columns and the outer enclosure is built in theform
of a bearing wall. There are two fundamental systems of
structural layout of a multi-storeyedframe buildingaimed at
achieving skeletal rigidity, namely, the rigid frame and the
diaphragm braced frame, that is, with shear walls. In the
rigid joint frame both vertical and thehorizontal windthrust
are taken up by a frame whose joints are rigid. In the
diaphragm braced frame the vertical loads are taken up by a
frame, but the joints may be either hinged or rigid, while the
horizontal thrust from the wind or other sources is taken
jointly by a vertical bracing diaphragm and the frame.
1.3 Buildings with load bearing walls
Precast wall panels are also used to form shear walls at the
perimeter of cast-in place or precast frame structures. This
“perimeter wall system” serves to resist lateral forces either
alone or in combination with a cast –in place core shaft.
1.4 The Long – Wall System Buildings
In the long wall system, the main beams or load bearing
walls are placed longitudinally, or parallel tothemainaxis of
the building. One way slabs span transversely between the
load bearing walls. The long-wall system applied to a
building with large prefabricates has much in common with
traditional brickwork techniques. Longitudinal external
walls, which carry floor loads, mustpossessnotonlythermal
properties, but also sufficientloadbearingcapacity.Thus the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3397
structural requirements influence the ratio of the widths of
windows to the widths of the load-carrying bands.
Longitudinal wall systems are suitableforlowrisebuildings.
Fig -1: Long-wall system
The long – wall system of construction is typical of the
“classic” large-block buildings which were the first large
precast-component buildings to be erected in Poland. The
special pier blocks between windows, which carry loads
from lintels and from the walls abovearecharacteristichere.
The horizontal sill blocks are not loaded. When the crane
used in erection is of small capacity, the pier consists of two
or three smaller blocks laid one upon the other.
Fig - 2 Diagrammatic view of a “classic” long wall
construction in a prefabricated building
1.5 Cross – Wall System Buildings
The load bearing walls in the cross-wall structures are
perpendicular to the longitudinal axis of the building. One-
way floor and roof slabs span between the bearing walls . In
the cross-wall system the external long walls do not
distribute floor loads. If these walls are required to carry
their own weight down to the foundations, the elevational
treatment will not differ much from that of a long-wall
building. However, whennormal non-structural façade walls
are supported at each level, the width of windows is
unrestricted. Cross wall systems are more suitable for high
rise buildings.
Fig -3: Cross-wall system
Fig – 4: Foamed concrete block building
In cross-wall buildings there is a clear distinction between
the structural and the thermal insulation functions of walls,
which permits the full utilization of the structural properties
of ordinary concrete in the internal load bearing walls, and
of the thermal properties of light concrete in the outside
walls. Because of this, and of the ease with which new
insulating materialscanbeintroduced,thecross-wall system
is very often adopted in buildings with prefabricated load
bearing wall components. The external walls consists oftwo
basic block units: pier block and sill block. Both blocks areof
similar weights, which is of advantage both in transport and
during erection.
2. TWO WAY SPAN SYSTEMS
In ring or two-way span system, the supporting members
run both longitudinally and transversely. In buildings with
the ring system of support, the floors are normally
supported on all four edges, and span two directions. In
buildings based on the ring system only part ofthefloorload
is carried by the outside walls. Because of the close
cooperation of all walls in load distribution,itissaidthat,the
ring system of all walls, with the floors spanning in two
directions Fig 8, is ideal for large-panel buildings.
Fig -5: Two-way span system
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3398
When the overall width of the building is more than 10 m it
is normally necessary to design it as a three-bay structure,
which increases the number of wall components and rather
restricts the flat layout. The load carrying function of the
external wall restricts freedom in the design of wall
prefabricates, just as in the case of the long-wall system.
Fig-6: Diagram of the “classic” arrangement in a large-
panel two-way span system building
Two–way span system allows the best utilization of the
structural materials and the finished buildings areveryrigid
in both directions. The greatest economy of steel is obtained
when the floor panels are nearly square.
2.1 Skeleton Construction
In skeleton constructions based on this systemtheslabunits
may rest directly on columns, completely eliminating beams
as structural components. In a skeletonstructuretheoutside
walls may consist of panels or blocks. The orientation of
floor slabs, i.e. the structural system, is less significant in
skeleton construction. These may be classified as:-
Prefabricated column and beam structures, eamless
structures, in which floor panels bear directly on columns ,
and precast frames. All the walls in skeleton structures may
consist of large prefabricated units, or may alternatively be
laid by hand using smaller precast units.
2.2 Prefabricated Columns and Beams
A diagrammatic view of a skeleton structure consisting of
prefabricated columns and beams is shown in Fig 7. This
scheme employs the same structural elements asareusedin
a monolithic in-situ cross-frame building. One essential
difference is that there are no longitudinal edge beams to
support the external walls. These walls are fixed directly to
the column members.
Fig -7: Diagram of a skeleton structure consisting of
prefabricated columns and beams
Prefabricated skeleton members as in Fig 7 are of simple
shape and easy to transport. Often, to expedite erection,
beams and columns are assembled into larger units, frames,
or even three dimensional units before erection.The type of
construction shown in Fig 7 has been applied to many
buildings erected in Moscow and other towns of the Soviet
Union. Precast skeleton constructions may also be based on
the long wall system as shown in Fig 8 .
Fig -8: An erection view of a skeleton building
Fig-9:A skeleton building with one – piece precast
spun concrete columns, views of the building in
various stages of erection
3. PRECAST SKELETON STRUCTURE
A diagrammatic view of a structure consisting of
prefabricated portal frames is given in Fig16. Several
versions of this type of construction have been widely used
in many countries.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3399
Fig -10: A Skeleton construction
A prefabricated skeleton construction was used in Poland in
the erection of the new 11 storey university library in Lodz.
The structural skeleton (Fig 11) consists of prefabricated
double – cantilever H – frames and hinge – connectedbeams
in the central span. The legs of the frames are welded
together to form columns. The external wall panels rest on
frame cantilevers.
Fig - 11: The structural scheme of the university library
at Lodz
3.1 Advantages of Skeleton Construction
 Prefabricated skeleton members are of simple shape
and easy to transport.
 To expedite erection, beams andcolumnsareassembled
into larger units, frames or even three- dimensional
units before erection.
 Panels in conjunction with precast beams and columns
are much more often used, as they are more suitable for
industrialized production and long distance transport
 It may be advantageous to use materials other than
concrete in the construction of light external walls in
skeleton structures.
4. ERECTION OF BUILDINGS
Before commencing erection, the setting – out at the level
concerned must be carefully checked with surveying
instruments. At the same time, the working of the crane and
the correct layout of the crane track must be checked. Any
unevenness of the ground often makes it difficult to lay a
horizontal crane track. With fairly steep slopes,a ratherhigh
embankment is required, and this is both costly and
technically difficult. In such cases, dry staging is built out of
large prefabricated blocks specially made for this purpose.
Prefabricated buildings are erected in convenient sections,
which, when correctly fixed, should be sufficientlyrigidin all
directions.The normal sequence of erection is:
(a) structural wall units;
(b) Non-structural wall units (partitions.);
(c) floor panels , balconies , stair units;
(d) Specialized prefabricates (chimney flues, ventilation
ducts, sanitary installations).
If the external walls are hand – laid from small blocks or
bricks, all necessary materials should be hoisted by crane
and stacked on the floor near to their ultimate position. The
masonry work is begun after the floor immediately above is
laid. The erection schedules oftwoprefabricatedbuildings in
Warsaw are shown in Fig 12 and Fig 13.
Fig 12 Erection schedule of a large-block
Numbers in circles give the sequence of
prefabricate erection , R = stays
Fig 13 Erection schedule of a PBU type large-
panel building, numbers in circles denote the
sequence of assembly, R = stays
5. TYPES OF PREFABRICATION
With regard to the place where the work is done, two types
of prefabrication can be distinguished: Plant prefabrication
and site prefabrication.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3400
5.1 Plant Prefabrication
This kind of prefabrication is done in permanent plants or
factories, established particularly for this purpose. Its
advantage is that the work can be performed in covered
rooms irrespective of the hardships of weather and outer
temperature, with a constant team of workmen, and the
work itself can be organized factory-like. The plant can be
furnished to the highest degree with mechanization and
automation. The permanent laboratory allows continual
control; and so the materials to be used always have similar
properties. Owing to these advantageous conditions
prefabrication plants or factories produce in serial
manufacturing, in general, cheap and reliable structures of
good quality. But a drawback of plant prefabrication is that
the members must be transported to places where they are
to be used. The transportation cost of a precast member to
the site amounts, in general, to about 10 – 15 % of the total
cost required for the production and assembly of same. For
the sake of transportability the dimensions of the members
must be held within certain limits so increasing the number
of joints in the structures.The above mentioned limitationof
the dimensions of the members entails a certain restraint on
design , as well as on the further development of
prefabrication.Plant prefabrication is appropriate for mass
production, chiefly for the manufacture of standardized
members. Plant prefabrication might be performedeitherin
a large building component factory of country-wide
character or in smaller prefabricationplantsoperatedby the
individual building firms. In the field of industrial structures
the development markedly point towards the production of
precast members in centralized prefabrication plants set up
and run by the individual building firms.
5.2 Site Prefabrication
When using this kind of prefabrication , the reinforced –
concrete members are produced on the site , chiefly in the
open air, and most members of smaller size are precast in
temporary covered sheds established for this purpose.
Difficulties occurring in construction work, in general ,
cannot be avoided here either .Each new buildingsiteentails
,in most cases, the employment of new labourers , and the
use of different building materials ,the properties of which
are often not sufficiently known . Mechanization cannot be
such a high degree as in a permanent plant , because of the
temporary nature of the work, its duration being generally
short, at most one or two years; so a high degree of
mechanization similar to that applied in the permanent
workshop would not be profitable.The laboratories on sites
are , in general not so well equipped as in a permanent
factory for building members.
6. IMPROPER DESIGN AND DETAILING OF
DUCTILE ELEMENTS
For low-rise precast concrete structures thecolumnsor wall
panels are the ductile elements, with the floor and /or roof
elements designed to be stronger than these ductile energy-
dissipating elements in accordance with accepted capacity
design principles. It is ofinterestthatoldermomentresisting
frames and structural walls incorporating precast concrete
often have been observed to perform badly during
earthquakes. The observed failures have been mainly due to
brittle (non-brittle) behaviour of poor connection details
between the precast elements , poor detailing of the
elements and poor design concepts. Fig14 show examples of
major damage to precast concrete structures as a result of
severe earthquakes. As a result the use of precast concrete
was shunned in some countries in seismic zones for many
years.
Fig 14 Collapse of precast buildings
Fig - 15: Failure of poorly detailed precast concrete
column
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3401
Fig -16: Close-up of poor column details
A close – up of the region of distress shown in Fig 16
indicates that twelve 15 mm diameter bars werecontinuous
over the height of the column while four 20 mm diameter
bars were cut-off at the region of distress. The transverse
reinforcement consisted of 6 mm diameter plain bars at a
spacing of 175 mm. Bond and shear failure occurred at this
critical section where the vertical bars were curtailed.
7. CONCLUSION
Prefabrication is an advanced and up-to-date method of
reinforced-concrete construction. Various prefabrication
construction methods, its advantages and disadvantages
have been discussed in this project report. The desire of the
construction industry to minimize on-site labor and reduce
construction time has resulted in the prefabrication of
building components.
“Prefabrication” is the practice of manufacturing thepartsof
an assembly in one location, ready for them to be assembled
in another place. Industrialization,suchastheprefabrication
of building deliver a better product because building isdone
in a quality controlled, sheltered environment. Thus
Economy of the Construction system through Prefabricated
Structure is attained by the various factors in which the
following are the important aspects,
• Increased site productivity
• Improved quality of installation
• Reduced site waste.
• Use of lesser Labour at site
• Timely completion of construction
• Space required for construction activity / stacking of
materials will be lesser compared to conventional type.
Builders will have to develop new constructionmethodsand
adopt existing methods from other industries andcountries.
An awareness of the current trends and latest innovationsin
prefabrication and industrialized construction is essential.
New building systems and construction methods are also
appearing in the move towards prefabrication.
REFERENCES
[1] Bohdan Lewicki, “Building with Large Prefabricates”,
Elsevier publishing Company
[2] Laszlo Mokk, “Prefabricated concrete for industrial and
public structures” Akademiai Kiado Publishing
house of the Hungarian Academy of sciences
Budapest 2001
[3] National Building code of Ethiopia 2000
[4] Seismic design of precast concrete building structures
“CEB – FIP”
[5] Henrik Nissen “Industrialized building and modular
design”, Shenvel Press, London and Harlow
[6] “PCI Manual For Structural Design Of Architectural
Precast Concrete .” Prestressed Concrete Institute ,
Chicago ,1998.
[7] ”Design considerations for a Precast Prestressed
Apartment Building “ George Nasser, Editor ,
Prestressed concrete Institute, 1975.
[8] Becker, J. and Llorente , C., “ Seismic Design of Precast
Concrete Panel Buildings” , “ Proceedings of a
workshop on Earthquake – Resistant Reinforced
Concrete Building Construction, University of
California , Berkeley , CA, 1977, pp. 1753- 1798.
[9] Degenkolb, H.J., “Reducing Building failures during
earthquakes” , civil Engineering – ASCE , Aug.2005,
pp.56 -59.
[10] “PCI Design Handbook,” (sec.4.8.6) , Prestressed
Concrete Institute, Chicago , 2011.
[11 ]Camba, J.L. and Meli,R.,1993 , “Case Study of the
performance of Prestressed Concrete Buildings
During the 1985 Mexico Earthquake : , PCI Journal ,
V38 , N2 , March / April , pp. 58 -71
[12] EERI , 1989, “ Armenia Earthquake Reconnaissance
report”, Earthquake Spectra , Earthquake
Engineering Research Institute,Special Supplement
, August 1989 , 175p.
[13] EERI, 1994 , “ Northridge Earthquake January 17 ,
1994”, Preliminary Reconnaissance Report ,
Earthquake Engineering Research Institute ,
Oakland , CA,March 2015 , pp. 104 .
[14] EERI , 2000 , “ Kocaeli, Turkey , Earthquake of August
17 ,2007 Reconaissance Report” , Earthquake
Spectra ,EarthquakeEngineeringResearchInstitute,
Supplement to Volume16,December,2000,pp.461
[15] Park , R. and Paulay , T ., 1975 , “ Reinforced Concrete
Structures” , John Wiley & Sons , Newyork 1975 ,
pp.769

More Related Content

What's hot

MODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
MODULAR CONSTRUCTION USING LIGHT STEEL FRAMINGMODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
MODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
Mohamed Sahl
 
kkr 2
kkr 2kkr 2
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Jagmohan Garg
 
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADSRESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
Ijripublishers Ijri
 
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Jamal Ali
 
Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...
eSAT Publishing House
 
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET Journal
 
Diagrid structural system strategies to reduce lateral forces on high rise bu...
Diagrid structural system strategies to reduce lateral forces on high rise bu...Diagrid structural system strategies to reduce lateral forces on high rise bu...
Diagrid structural system strategies to reduce lateral forces on high rise bu...
eSAT Publishing House
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildings
IAEME Publication
 
Performance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without BracingsPerformance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without Bracings
IJERA Editor
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
Manoj Navneeth
 
IRJET-Lateral Stability of High Rise Steel Buildings using E TABS
IRJET-Lateral Stability of High Rise Steel Buildings using E TABSIRJET-Lateral Stability of High Rise Steel Buildings using E TABS
IRJET-Lateral Stability of High Rise Steel Buildings using E TABS
IRJET Journal
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
Muftah Aljoat
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquake
Smee Kaem Chann
 
Parametric Study on Diagrid Structural System with and without Shear Walls
Parametric Study on Diagrid Structural System with and without Shear WallsParametric Study on Diagrid Structural System with and without Shear Walls
Parametric Study on Diagrid Structural System with and without Shear Walls
AI Publications
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frames
karan prabhakar
 
Structural buildings system and steel bracing
 Structural buildings system and steel bracing Structural buildings system and steel bracing
Structural buildings system and steel bracing
abdulhakim mawas
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
DP NITHIN
 
ACE special structures
ACE special structuresACE special structures

What's hot (20)

MODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
MODULAR CONSTRUCTION USING LIGHT STEEL FRAMINGMODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
MODULAR CONSTRUCTION USING LIGHT STEEL FRAMING
 
kkr 2
kkr 2kkr 2
kkr 2
 
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
Diagrid Systems : Future of Tall buildings, Technical Paper by Jagmohan Garg ...
 
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADSRESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
RESPONSE OF LATERAL SYSTEM IN HIGH RISE BUILDING UNDER SEISMIC LOADS
 
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...Linear Dynamic Analysis of Different Structural Systems for  Medium Rise Buil...
Linear Dynamic Analysis of Different Structural Systems for Medium Rise Buil...
 
Guida ARBED edifici alti
Guida ARBED edifici altiGuida ARBED edifici alti
Guida ARBED edifici alti
 
Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...
 
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
 
Diagrid structural system strategies to reduce lateral forces on high rise bu...
Diagrid structural system strategies to reduce lateral forces on high rise bu...Diagrid structural system strategies to reduce lateral forces on high rise bu...
Diagrid structural system strategies to reduce lateral forces on high rise bu...
 
Topology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildingsTopology optimisation of braced frames for high rise buildings
Topology optimisation of braced frames for high rise buildings
 
Performance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without BracingsPerformance of High-Rise Steel Building With and Without Bracings
Performance of High-Rise Steel Building With and Without Bracings
 
Design of Multi-storey car parking
Design of Multi-storey car parkingDesign of Multi-storey car parking
Design of Multi-storey car parking
 
IRJET-Lateral Stability of High Rise Steel Buildings using E TABS
IRJET-Lateral Stability of High Rise Steel Buildings using E TABSIRJET-Lateral Stability of High Rise Steel Buildings using E TABS
IRJET-Lateral Stability of High Rise Steel Buildings using E TABS
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
The technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquakeThe technologies of building resists the wind load and earthquake
The technologies of building resists the wind load and earthquake
 
Parametric Study on Diagrid Structural System with and without Shear Walls
Parametric Study on Diagrid Structural System with and without Shear WallsParametric Study on Diagrid Structural System with and without Shear Walls
Parametric Study on Diagrid Structural System with and without Shear Walls
 
Detailed design of portal frames
Detailed design of portal framesDetailed design of portal frames
Detailed design of portal frames
 
Structural buildings system and steel bracing
 Structural buildings system and steel bracing Structural buildings system and steel bracing
Structural buildings system and steel bracing
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 

Similar to IRJET - Economy in Building Construction Systems of Prefabricated Structures

STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
IAEME Publication
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
IAEME Publication
 
Pushover Analysis of High Rise Building and Outrigger System With or Without ...
Pushover Analysis of High Rise Building and Outrigger System With or Without ...Pushover Analysis of High Rise Building and Outrigger System With or Without ...
Pushover Analysis of High Rise Building and Outrigger System With or Without ...
IRJET Journal
 
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET Journal
 
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
IRJET Journal
 
IJSRED-V2I4P17
IJSRED-V2I4P17IJSRED-V2I4P17
IJSRED-V2I4P17
IJSRED
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
jamali husain
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
BiswaKeshanPanda1
 
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
IRJET Journal
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technology
GedalaJairam
 
Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...
eSAT Journals
 
IRJET - Review on Behavior of Outrigger System in High Rise Building
IRJET - Review on Behavior of Outrigger System in High Rise BuildingIRJET - Review on Behavior of Outrigger System in High Rise Building
IRJET - Review on Behavior of Outrigger System in High Rise Building
IRJET Journal
 
A Comparitive study on Regular and Irregular configuration of multistorey bui...
A Comparitive study on Regular and Irregular configuration of multistorey bui...A Comparitive study on Regular and Irregular configuration of multistorey bui...
A Comparitive study on Regular and Irregular configuration of multistorey bui...
IRJET Journal
 
Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
eSAT Publishing House
 
Pragati towers
Pragati towersPragati towers
Pragati towers
Rajat Nainwal
 
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
IRJET Journal
 
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET Journal
 
Seismic Response of Structure with Single Core
Seismic Response of Structure with Single CoreSeismic Response of Structure with Single Core
Seismic Response of Structure with Single Core
ijtsrd
 
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET Journal
 

Similar to IRJET - Economy in Building Construction Systems of Prefabricated Structures (20)

STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
Pushover Analysis of High Rise Building and Outrigger System With or Without ...
Pushover Analysis of High Rise Building and Outrigger System With or Without ...Pushover Analysis of High Rise Building and Outrigger System With or Without ...
Pushover Analysis of High Rise Building and Outrigger System With or Without ...
 
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
IRJET- Study on Shear Wall and Bracing in Irregular Structure and Regular Str...
 
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
 
IJSRED-V2I4P17
IJSRED-V2I4P17IJSRED-V2I4P17
IJSRED-V2I4P17
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
 
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
ANALYSIS OF EFFECT OF WIND & SEISMIC FORCE ON MULTISTORIED BUILDING WITH OUTR...
 
Precast Construction technology
Precast Construction technologyPrecast Construction technology
Precast Construction technology
 
Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...Study of lateral load resisting systems of variable heights in all soil types...
Study of lateral load resisting systems of variable heights in all soil types...
 
IRJET - Review on Behavior of Outrigger System in High Rise Building
IRJET - Review on Behavior of Outrigger System in High Rise BuildingIRJET - Review on Behavior of Outrigger System in High Rise Building
IRJET - Review on Behavior of Outrigger System in High Rise Building
 
A Comparitive study on Regular and Irregular configuration of multistorey bui...
A Comparitive study on Regular and Irregular configuration of multistorey bui...A Comparitive study on Regular and Irregular configuration of multistorey bui...
A Comparitive study on Regular and Irregular configuration of multistorey bui...
 
40 analysis
40 analysis40 analysis
40 analysis
 
Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
 
Pragati towers
Pragati towersPragati towers
Pragati towers
 
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
IRJET- Effective Location of Shear Wall, its Significance and Displacement An...
 
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
IRJET- Analysis of Various Effects on Multistory Building (G+27) by Staad Pro...
 
Seismic Response of Structure with Single Core
Seismic Response of Structure with Single CoreSeismic Response of Structure with Single Core
Seismic Response of Structure with Single Core
 
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
IRJET- Comparative Study of Seismic Analysis of Multi Storied Building with a...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 

Recently uploaded (20)

6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 

IRJET - Economy in Building Construction Systems of Prefabricated Structures

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3396 ECONOMY IN BUILDING CONSTRUCTION SYSTEMS OF PREFABRICATED STRUCTURES Eshetu Mathewos Juta 1Assistiant Professor, Head of Department, Department of civil Engineering, Woliata Sodo University, Ethiopia ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Prefabrication means investing in preparation, so that things proceed smoothly. Planning and organization must be intensified, interaction issues for an optimizationand Co-operation in a multi-trades context has to be defined Cost studies of Buildings is about the understanding and application of costs to buildings and other structures. One of its aim is to ensure that scarce and limited resources are used to best advantage. It is about ensuring that clients receive the best value for money for the projects that they construct. In this paper I have considered Economy in the Construction system through “Pre Fabricated Structure” Building. Prefabrication is an advanced and up-to-date method of Reinforced Cement Concrete construction. The following are the detailed items dealt with this journal paper. ,Key Words: Load bearing wall, Cross walls, Longitudinal walls, Two Way Span Systems, Prefabricated, Construction 1. INTRODUCTION Prefabrication must come to be seen as separate from the concept of mass production. In future, industrial prefabrication must face the challenges of accepting individuality as a quality indicator and taking account of user’s needs and wishes. We cannot build at the cost of the individuality of future residents by inflexible modular building systems. The interchange abilityofcomponents, for example, in systems that can later be modernized, allowsfor flexibility of use. The degree of industrial prefabrication must be increased in order for prices to be competitive. A higher degree of prefabrication, however, requires more work on the part of planners, which means that more time must be invested in planning processes. There is a necessity of making precise commitments in certain instances in the planning process. Optimization should be aimed for so as to transcend the trades’ boundaries. 1.1 Load bearing wall type buildings In this type, as the name indicates, the loads are carried by the walls themselves. This type can be further classified into two categories, namely, the open and the closed system. In the open system, the components needed for a complete building are standardized, manufactured to specified tolerance and catalogued. With the use of these products, there is scope for several planning arrangements, subject to certain constraints. On the other hand, in the closed system the elements are manufactured to specific requirements for use in a known operation. For example, a wall of a room can be precast in a single piece, often referred to as large panel, instead ofassemblingthesamefromseveralprecaststandard components as in open systems. Structurally, load bearing wall type of schemes may be classified as follows:(a)Cross wallsasload bearingandfaçade wallsasnon-loadbearing.In this scheme, it is preferable to locate the openings, shelves, etc, in long walls as far as possible.(b)Longitudinal walls as load bearing andcross walls as non-load bearing. In this case the openings, cupboards, etc, may preferably be located in cross walls. 1.2 Frame type buildings In the frame type of construction bearing and curtain wall elements can be clearly distinguished.Therearetwotypes of frames: complete frames and incomplete frames. In the buildings with complete frames, the outer enclosure takes the form of a non-bearing curtain wall with the floor loads transmitted downwards via exteriorandinteriorcolumns.In buildings, where the frame is incomplete, there are no exterior columns and the outer enclosure is built in theform of a bearing wall. There are two fundamental systems of structural layout of a multi-storeyedframe buildingaimed at achieving skeletal rigidity, namely, the rigid frame and the diaphragm braced frame, that is, with shear walls. In the rigid joint frame both vertical and thehorizontal windthrust are taken up by a frame whose joints are rigid. In the diaphragm braced frame the vertical loads are taken up by a frame, but the joints may be either hinged or rigid, while the horizontal thrust from the wind or other sources is taken jointly by a vertical bracing diaphragm and the frame. 1.3 Buildings with load bearing walls Precast wall panels are also used to form shear walls at the perimeter of cast-in place or precast frame structures. This “perimeter wall system” serves to resist lateral forces either alone or in combination with a cast –in place core shaft. 1.4 The Long – Wall System Buildings In the long wall system, the main beams or load bearing walls are placed longitudinally, or parallel tothemainaxis of the building. One way slabs span transversely between the load bearing walls. The long-wall system applied to a building with large prefabricates has much in common with traditional brickwork techniques. Longitudinal external walls, which carry floor loads, mustpossessnotonlythermal properties, but also sufficientloadbearingcapacity.Thus the
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3397 structural requirements influence the ratio of the widths of windows to the widths of the load-carrying bands. Longitudinal wall systems are suitableforlowrisebuildings. Fig -1: Long-wall system The long – wall system of construction is typical of the “classic” large-block buildings which were the first large precast-component buildings to be erected in Poland. The special pier blocks between windows, which carry loads from lintels and from the walls abovearecharacteristichere. The horizontal sill blocks are not loaded. When the crane used in erection is of small capacity, the pier consists of two or three smaller blocks laid one upon the other. Fig - 2 Diagrammatic view of a “classic” long wall construction in a prefabricated building 1.5 Cross – Wall System Buildings The load bearing walls in the cross-wall structures are perpendicular to the longitudinal axis of the building. One- way floor and roof slabs span between the bearing walls . In the cross-wall system the external long walls do not distribute floor loads. If these walls are required to carry their own weight down to the foundations, the elevational treatment will not differ much from that of a long-wall building. However, whennormal non-structural façade walls are supported at each level, the width of windows is unrestricted. Cross wall systems are more suitable for high rise buildings. Fig -3: Cross-wall system Fig – 4: Foamed concrete block building In cross-wall buildings there is a clear distinction between the structural and the thermal insulation functions of walls, which permits the full utilization of the structural properties of ordinary concrete in the internal load bearing walls, and of the thermal properties of light concrete in the outside walls. Because of this, and of the ease with which new insulating materialscanbeintroduced,thecross-wall system is very often adopted in buildings with prefabricated load bearing wall components. The external walls consists oftwo basic block units: pier block and sill block. Both blocks areof similar weights, which is of advantage both in transport and during erection. 2. TWO WAY SPAN SYSTEMS In ring or two-way span system, the supporting members run both longitudinally and transversely. In buildings with the ring system of support, the floors are normally supported on all four edges, and span two directions. In buildings based on the ring system only part ofthefloorload is carried by the outside walls. Because of the close cooperation of all walls in load distribution,itissaidthat,the ring system of all walls, with the floors spanning in two directions Fig 8, is ideal for large-panel buildings. Fig -5: Two-way span system
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3398 When the overall width of the building is more than 10 m it is normally necessary to design it as a three-bay structure, which increases the number of wall components and rather restricts the flat layout. The load carrying function of the external wall restricts freedom in the design of wall prefabricates, just as in the case of the long-wall system. Fig-6: Diagram of the “classic” arrangement in a large- panel two-way span system building Two–way span system allows the best utilization of the structural materials and the finished buildings areveryrigid in both directions. The greatest economy of steel is obtained when the floor panels are nearly square. 2.1 Skeleton Construction In skeleton constructions based on this systemtheslabunits may rest directly on columns, completely eliminating beams as structural components. In a skeletonstructuretheoutside walls may consist of panels or blocks. The orientation of floor slabs, i.e. the structural system, is less significant in skeleton construction. These may be classified as:- Prefabricated column and beam structures, eamless structures, in which floor panels bear directly on columns , and precast frames. All the walls in skeleton structures may consist of large prefabricated units, or may alternatively be laid by hand using smaller precast units. 2.2 Prefabricated Columns and Beams A diagrammatic view of a skeleton structure consisting of prefabricated columns and beams is shown in Fig 7. This scheme employs the same structural elements asareusedin a monolithic in-situ cross-frame building. One essential difference is that there are no longitudinal edge beams to support the external walls. These walls are fixed directly to the column members. Fig -7: Diagram of a skeleton structure consisting of prefabricated columns and beams Prefabricated skeleton members as in Fig 7 are of simple shape and easy to transport. Often, to expedite erection, beams and columns are assembled into larger units, frames, or even three dimensional units before erection.The type of construction shown in Fig 7 has been applied to many buildings erected in Moscow and other towns of the Soviet Union. Precast skeleton constructions may also be based on the long wall system as shown in Fig 8 . Fig -8: An erection view of a skeleton building Fig-9:A skeleton building with one – piece precast spun concrete columns, views of the building in various stages of erection 3. PRECAST SKELETON STRUCTURE A diagrammatic view of a structure consisting of prefabricated portal frames is given in Fig16. Several versions of this type of construction have been widely used in many countries.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3399 Fig -10: A Skeleton construction A prefabricated skeleton construction was used in Poland in the erection of the new 11 storey university library in Lodz. The structural skeleton (Fig 11) consists of prefabricated double – cantilever H – frames and hinge – connectedbeams in the central span. The legs of the frames are welded together to form columns. The external wall panels rest on frame cantilevers. Fig - 11: The structural scheme of the university library at Lodz 3.1 Advantages of Skeleton Construction  Prefabricated skeleton members are of simple shape and easy to transport.  To expedite erection, beams andcolumnsareassembled into larger units, frames or even three- dimensional units before erection.  Panels in conjunction with precast beams and columns are much more often used, as they are more suitable for industrialized production and long distance transport  It may be advantageous to use materials other than concrete in the construction of light external walls in skeleton structures. 4. ERECTION OF BUILDINGS Before commencing erection, the setting – out at the level concerned must be carefully checked with surveying instruments. At the same time, the working of the crane and the correct layout of the crane track must be checked. Any unevenness of the ground often makes it difficult to lay a horizontal crane track. With fairly steep slopes,a ratherhigh embankment is required, and this is both costly and technically difficult. In such cases, dry staging is built out of large prefabricated blocks specially made for this purpose. Prefabricated buildings are erected in convenient sections, which, when correctly fixed, should be sufficientlyrigidin all directions.The normal sequence of erection is: (a) structural wall units; (b) Non-structural wall units (partitions.); (c) floor panels , balconies , stair units; (d) Specialized prefabricates (chimney flues, ventilation ducts, sanitary installations). If the external walls are hand – laid from small blocks or bricks, all necessary materials should be hoisted by crane and stacked on the floor near to their ultimate position. The masonry work is begun after the floor immediately above is laid. The erection schedules oftwoprefabricatedbuildings in Warsaw are shown in Fig 12 and Fig 13. Fig 12 Erection schedule of a large-block Numbers in circles give the sequence of prefabricate erection , R = stays Fig 13 Erection schedule of a PBU type large- panel building, numbers in circles denote the sequence of assembly, R = stays 5. TYPES OF PREFABRICATION With regard to the place where the work is done, two types of prefabrication can be distinguished: Plant prefabrication and site prefabrication.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3400 5.1 Plant Prefabrication This kind of prefabrication is done in permanent plants or factories, established particularly for this purpose. Its advantage is that the work can be performed in covered rooms irrespective of the hardships of weather and outer temperature, with a constant team of workmen, and the work itself can be organized factory-like. The plant can be furnished to the highest degree with mechanization and automation. The permanent laboratory allows continual control; and so the materials to be used always have similar properties. Owing to these advantageous conditions prefabrication plants or factories produce in serial manufacturing, in general, cheap and reliable structures of good quality. But a drawback of plant prefabrication is that the members must be transported to places where they are to be used. The transportation cost of a precast member to the site amounts, in general, to about 10 – 15 % of the total cost required for the production and assembly of same. For the sake of transportability the dimensions of the members must be held within certain limits so increasing the number of joints in the structures.The above mentioned limitationof the dimensions of the members entails a certain restraint on design , as well as on the further development of prefabrication.Plant prefabrication is appropriate for mass production, chiefly for the manufacture of standardized members. Plant prefabrication might be performedeitherin a large building component factory of country-wide character or in smaller prefabricationplantsoperatedby the individual building firms. In the field of industrial structures the development markedly point towards the production of precast members in centralized prefabrication plants set up and run by the individual building firms. 5.2 Site Prefabrication When using this kind of prefabrication , the reinforced – concrete members are produced on the site , chiefly in the open air, and most members of smaller size are precast in temporary covered sheds established for this purpose. Difficulties occurring in construction work, in general , cannot be avoided here either .Each new buildingsiteentails ,in most cases, the employment of new labourers , and the use of different building materials ,the properties of which are often not sufficiently known . Mechanization cannot be such a high degree as in a permanent plant , because of the temporary nature of the work, its duration being generally short, at most one or two years; so a high degree of mechanization similar to that applied in the permanent workshop would not be profitable.The laboratories on sites are , in general not so well equipped as in a permanent factory for building members. 6. IMPROPER DESIGN AND DETAILING OF DUCTILE ELEMENTS For low-rise precast concrete structures thecolumnsor wall panels are the ductile elements, with the floor and /or roof elements designed to be stronger than these ductile energy- dissipating elements in accordance with accepted capacity design principles. It is ofinterestthatoldermomentresisting frames and structural walls incorporating precast concrete often have been observed to perform badly during earthquakes. The observed failures have been mainly due to brittle (non-brittle) behaviour of poor connection details between the precast elements , poor detailing of the elements and poor design concepts. Fig14 show examples of major damage to precast concrete structures as a result of severe earthquakes. As a result the use of precast concrete was shunned in some countries in seismic zones for many years. Fig 14 Collapse of precast buildings Fig - 15: Failure of poorly detailed precast concrete column
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 07 Issue: 03 | Mar 2020 www.irjet.net p-ISSN: 2395-0072 © 2020, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3401 Fig -16: Close-up of poor column details A close – up of the region of distress shown in Fig 16 indicates that twelve 15 mm diameter bars werecontinuous over the height of the column while four 20 mm diameter bars were cut-off at the region of distress. The transverse reinforcement consisted of 6 mm diameter plain bars at a spacing of 175 mm. Bond and shear failure occurred at this critical section where the vertical bars were curtailed. 7. CONCLUSION Prefabrication is an advanced and up-to-date method of reinforced-concrete construction. Various prefabrication construction methods, its advantages and disadvantages have been discussed in this project report. The desire of the construction industry to minimize on-site labor and reduce construction time has resulted in the prefabrication of building components. “Prefabrication” is the practice of manufacturing thepartsof an assembly in one location, ready for them to be assembled in another place. Industrialization,suchastheprefabrication of building deliver a better product because building isdone in a quality controlled, sheltered environment. Thus Economy of the Construction system through Prefabricated Structure is attained by the various factors in which the following are the important aspects, • Increased site productivity • Improved quality of installation • Reduced site waste. • Use of lesser Labour at site • Timely completion of construction • Space required for construction activity / stacking of materials will be lesser compared to conventional type. Builders will have to develop new constructionmethodsand adopt existing methods from other industries andcountries. An awareness of the current trends and latest innovationsin prefabrication and industrialized construction is essential. New building systems and construction methods are also appearing in the move towards prefabrication. REFERENCES [1] Bohdan Lewicki, “Building with Large Prefabricates”, Elsevier publishing Company [2] Laszlo Mokk, “Prefabricated concrete for industrial and public structures” Akademiai Kiado Publishing house of the Hungarian Academy of sciences Budapest 2001 [3] National Building code of Ethiopia 2000 [4] Seismic design of precast concrete building structures “CEB – FIP” [5] Henrik Nissen “Industrialized building and modular design”, Shenvel Press, London and Harlow [6] “PCI Manual For Structural Design Of Architectural Precast Concrete .” Prestressed Concrete Institute , Chicago ,1998. [7] ”Design considerations for a Precast Prestressed Apartment Building “ George Nasser, Editor , Prestressed concrete Institute, 1975. [8] Becker, J. and Llorente , C., “ Seismic Design of Precast Concrete Panel Buildings” , “ Proceedings of a workshop on Earthquake – Resistant Reinforced Concrete Building Construction, University of California , Berkeley , CA, 1977, pp. 1753- 1798. [9] Degenkolb, H.J., “Reducing Building failures during earthquakes” , civil Engineering – ASCE , Aug.2005, pp.56 -59. [10] “PCI Design Handbook,” (sec.4.8.6) , Prestressed Concrete Institute, Chicago , 2011. [11 ]Camba, J.L. and Meli,R.,1993 , “Case Study of the performance of Prestressed Concrete Buildings During the 1985 Mexico Earthquake : , PCI Journal , V38 , N2 , March / April , pp. 58 -71 [12] EERI , 1989, “ Armenia Earthquake Reconnaissance report”, Earthquake Spectra , Earthquake Engineering Research Institute,Special Supplement , August 1989 , 175p. [13] EERI, 1994 , “ Northridge Earthquake January 17 , 1994”, Preliminary Reconnaissance Report , Earthquake Engineering Research Institute , Oakland , CA,March 2015 , pp. 104 . [14] EERI , 2000 , “ Kocaeli, Turkey , Earthquake of August 17 ,2007 Reconaissance Report” , Earthquake Spectra ,EarthquakeEngineeringResearchInstitute, Supplement to Volume16,December,2000,pp.461 [15] Park , R. and Paulay , T ., 1975 , “ Reinforced Concrete Structures” , John Wiley & Sons , Newyork 1975 , pp.769