A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION
PROJECTS
1Dr. S Kanchana, Ms. Sneha P2
1Head of the Department, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India
2PG Student, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India
----------------------------------------------------------------------***---------------------------------------------------------------------
Abstract:- The construction industry is generally
characterized with low productivity, high fragmentation, cost
and time overruns, and conflicts compared with other
manufacturing industries. Supply chain management as an
innovative management mode which provides a new solution
for resolving these problems from systems perspective. The
main objective of this study is to find critical factors affecting
supply chain managementin construction industries. Focusing
on the questionnaire survey, factors are to be collected and
using fuzzy logic based assessment ranking is to be done. The
present trend in the market is not only the competitionamong
the enterprises, also but the supply chain. Supplier selection is
the most critical decision for the whole procuringdepartment.
Selection of supplier is a complicated decision involving many
criteria to be taken into consideration. Ranking is to be done
using SPSS software & analysis is to be carried out using fuzzy
logic toolbox of MATLAB software rank. Questionnaire survey
of supply chain management is to be carried out in several
construction industries randomly selected among Kerala’s
construction industries. Supply chain management
coordinates and integrate these flows within and among
companies. The ultimate goal of any effective supply chain
management system is to reduce the inventory.
Key Words: Supply chain management, SPSS, MATLAB.
1. INTRODUCTION
Recently supply chain has become a major subject of
management research and manufacturing theory. Supply
chain has been defined as the network of organizations
which are involved through upstream and downstream
linkages, in the different processes and activities that
produce value in the form of services and products in the
hands of the ultimate customer. The readiness of supply
chain in integrated material procurement is one of the
important indicators to define the performance of
contractors. Contractor will be called competent if they can
order the material and build without any delays. Supply
chain management (SCM) has been widely regarded as an
effective and efficient management measure and strategy to
improve the performance of the construction industry,
which has suffered from high fragmentation, large waste,
poor productivity, cost and time overruns, and conflicts and
disputes for many years. Currently supply chain
management is in its developing stage. In this current
scenario to avoid the conflicts and competition among the
suppliers a proper supply chain management system is
needed. It mainly consists of number of participants and are
complex in their nature. The construction sector players
including engineers, contractors, suppliers and clients. They
have major roles in establishing and developing SCM and
collaboration. There are many challenges that are faced by
construction industry in India, and the important challenge
among them is improper material supply chain in
construction. Each and every product that reaches an end
user is the cumulative effort of multipleorganizations.These
organizations refer collectively as a supply chain. Supply
chain Network of organizations and business process for
procuring materials, transforming raw materials into
finished products and distributing the finished products to
the customers. Supply chainmanagementisanintegrationof
suppliers, distributors and customer logistics into one
cohesive process.
2. LITERATURE REVIEW
Ana Beatriz Lopes de Sousa Jabbour et.al., (2011), they
conducted studies on the topic “Factors affecting the
adoption of supply chain management practices: Evidence
from the Brazilian electro-electronic sector” and tests them
using survey data of Brazilian electro-electronic firms. The
results reveal the big picture of the SCM practices in the
sector and suggest that contextual factors such as size,
position and bargaining power affect the adoption of SCM
practices, which are also more customersoriented.Contrary
to the findings of literature, the relationship between
competitive priorities and SCM practices was not supported
statistically .After analysis of the 69 randomly selected
research publications, it is quite evident that no study has
been found in the Indian context with respect to supply
chain collaboration .The major focus of the papers is on
manufacturing and a retailer organization has been
observed. Based on analysis of the reviewed papers, 28
factors are identified.
Anders Segerstedt et.al., (2010), “Supply chains in the
construction industry” The purpose of this paper is to
introduce a special issueabouttheconstructionindustryand
the management of its supply chains. It aims to discuss and
point to some differences and possible similarities with
traditional manufacturing anditssupplychains.Theproduct
specification process before the customer order arrives
shows different degrees of specifications: engineer to order,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 994
modify to order, configure to order, select a variant. A
construction company only executes a small part of the
project by its own personnel and capacity. This is a way of
risk spreading and risk mitigation and to compensate for an
unstable market. If a construction company wants to
establish a new concept, from “engineer to order”, itmustbe
engaged earlier in the business process and with other than
usual customers, which might complicate the process.
Anna Duboi et.al., (2000), “Supply strategy and network
elects purchasing behaviorintheconstructionindustry” This
paper explores the occurrence of network elects in the
construction industry. The study finds such elects to be
unusual in the construction industry. The main reasons for
the absence of adaptation are found to be the current focus
on the efficiency of individual projects and the competitive
tendering procedures used. It is concluded that these
characteristics are having a hampering effect on both
efficiency and innovation in the industry today.
M. Agung Wibowo, et.al., (2015), “The analysis of supply
chain performance measurement at construction project”.
The aim of the study is to analyze supply chain performance
in road projects. The impact of various supply chain
management practices on project performance has been
measured through a combination of a survey and the
development of simulation models. Performance
measurement using the Supply ChainOperationsReferences
(SCOR) will analyze the supply chain management of
contractor. This measurement using the SCOR model as a
Key Performance Indicator (KPI) is calculated using the
weighted criteria Analytical Hierarchy Process (AHP).
Weighting and measurement results were analyzed using
Objectives Matrix (OMAX) and traffic light. The resultsofthe
analysis and the measurement of supply chain performance
are medium score or good enough for road projects. The
factors that lead to the success of this supply chain are the
readiness of the contractor, supplier partners, supply chain
strategy, and the ability of labors.
Mohammed Saad et.al., (2002), “A review of the progress
towards the adoption of supply chain management (SCM)
relationships in construction” This paperexaminesthe early
progress towards the adoption of supply chainmanagement
(SCM) relationships in construction. It is based on a
literature review and survey of the views of construction
practitioners. This paper has shown that there is significant
awareness of the importance of SCM and its main benefits in
construction. It is seen as a multi-factor innovation, which
can help construction overcome its fragmentation and
adversarial culture, improve its relationships and better
integrate its processes. Its effective implementation is also
perceived as dependent upon continuous and shared
learning and strong commitment.
Rajen B. Mistry et.al., (2003), “Evaluation of factor
affecting for supply chain in construction project”. The main
objective of this study is to find critical factors affecting
supply chain. A survey was carried out in south Gujarat
region city, on architects, contractors, consultants, site
engineers, retailers,distributors,developers.Total 38factors
identified from the literature review. Total 148 feedbacks
were analyzed through the Relative Importance Index (RII)
techniques. Five most crucial factors in descending order
from RII Technique are late deliveries, Complexity
management/ rationalization, Product changes batch
ordering, inaccurate demand forecasting, Price fluctuations
and discounts. Contractors shall act on these factors to
improve material supply chain in construction projects.
Rajesh K. Singh (2011), “Developing the framework for
coordination in supply chain of SMEs” SCMisoneofthemost
important areas for competitiveness and growth of
industries. Small and medium enterprises (SMEs) in India
and other developing countries face problems in
coordinating their supply chain due to lack of resources and
improper directions. The purpose of this paper is to develop
a framework for improving the coordination in supplychain
and development of an index for coordination. It isobserved
that all of these factors have strong mutual linkage and top
management commitment is a major driver for improving
the coordination among these factors.
Ruben Vrijhoef et.al., (1998), “The four roles of supply
chain management in construction” The present status of
construction supply chains is investigated by means of case
studies and a comparison with previous research. Previous
initiatives to advance the construction supply chain have
been somewhat partial Three main conclusions are drawn
regarding the present status. Firstly, even in normal
situations the construction supply chain has a largequantity
of waste and problems. Secondly, most ofthesearecausedin
another stage of the construction supply chain than when
detected. Thirdly, waste and problems are largely caused by
obsolete, myopic control of the construction supply chain.
These results concur with the "findings made on make-to-
order supply chains in general. The generic methodology
offered by SCM contributes to better understanding and
resolution of basic problems in construction supply chains,
and gives directions for construction supply chain
development. The practical solutions offered by SCM,
however, have to be developed in construction practice
itself, taking into account the specific Characteristics and
local conditions of construction supply chains.
S. Mukesh Balwani et.al., (2015), “Supply chain
management in construction” (SCM) is a concept that has
flourished in Manufacturing, originating from Just-In-Time
(JIT) Production andLogistics.SCMendeavorstoobserve the
entire scope of the supply chain. SCM offers a methodology
to relieve the myopic control in the supply chain that has
reinforcing waste and problems. The generic methodology
offered by SCM contributes to better understanding and
resolution of basic problems in construction supply chains,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 995
and gives directions for construction supply chain
development. In this paper applicationofLeanprinciples are
carried out to optimize the concreting operation. The
application and Fundamentals of VSM are applied into the
case study for improvisation of concreting operation.
Se-Hak Chun et.al., (2015), “Green supply chain
management in the construction industry: case of Korean
construction companies” Enterprises have started
considering Green SCM for the purpose of securing a
competitive advantage over other enterprisesbecauseof the
increase of international conventions related to the recent
climate change, the strengthening of global regulations for
environment protection, the demand for environmental
suitability by stockholders and investors of enterprises, and
the consumer’s preference for environmental friendly
products. Green SCM is emerging as the strategy to
preemptively cope with environmental regulations. This
study investigates green businessactivitiesofsmall-medium
enterprises and examines differences acrossSCMprocesses.
Shahram Gilaninia et.al., (2013), “Studying the factors
affecting supply chain management and provide proper
strategies for improving it” (Case Study Poultry Farming
Industry) Understanding the principles of supply chain
management and proper utilization of it during poultry
industry chain, is the subject of current study. To assess
research hypotheses questionnaires were distributed to
active companies in the poultry industry inRashtcityand70
senior managers, middle managers and industry experts
participated in the study. The results indicated that among
characteristics of supply chain strategy, relationships with
supplier strategy, has the maximum relationships with
organizational performance of companies operating in
poultry industry. The results showed that there is a
significant relationship between characteristics and
performance of enterprise supply chain strategies and
manager believes that supply chain strategy provide
progress in the organization. Among the features of supply
chain strategy, supplier relationshipsstrategyhasmaximum
relationship with organizational performance companies
operating in the poultry industry.
Tae Hong Shin et.al.,(2011),“Aservice-orientedintegrated
information framework for RFID/WSN-based intelligent
construction supply chain management” The main objective
of this research is to develop a seamlessly integrated
information management framework that can provide
logistics information to project stakeholders for their
decision making. The pilot test of the framework developed
in this research showed that it can improve time efficiency
by about 32% compared to the traditional supply chain
management. The result of this research is expected to be
utilized effectively as a basic framework to manage
information in RFID/WSN based construction supply chain
management (CSCM) environments. The objective of this
research is to develop an information management
framework that can seamlesslyintegrateheterogeneous and
dynamic supply chain environments of a construction
project in order to support effective management of supply
chain information among project participantswhileutilizing
SOA, RFID, and WSN technologies. This research adopts
intelligent equipment that incorporates RFID/WSN
technology to collect and communicate information on the
supply chain.
Xiaolong Xue et.al.,(2005), “Anagent-basedframework for
supply chain coordination in construction” The research
analyses the problems in construction supplychain.Inorder
to resolve these problems andimprovingtheperformanceof
construction, an agent-based framework for construction
supply chain coordination is designed based on the agent
technology and multi attribute negotiation and multi
attribute utility theory (MAUT). The framework, which
integrates the construction organizations in construction
supply chain and multi attribute negotiation model into a
multi agent system (MAS), provides a solution for supply
chain coordination in construction through multi attribute
negotiation mechanism on the Internet. Finally, the
prototype of the framework is developedandtentativelyrun
based on an imaginary construction project. The trial run
reveals the feasibility to implement the agent-based
framework for coordination in construction.
Xiaolong Xue et.al., (2007), “Coordination mechanismsfor
construction supply chain management in the Internet
environment” In this paper; the concepts of CSC and CSC
management are defined. Furthermore, the inter-
organization problems that effect CSC coordination are
identified. Considering the Internetfosterstheintegration of
construction processesandprovidesanefficientplatformfor
CSC coordination, this paper presents two types of Internet-
enabled coordination mechanisms:market mechanism,such
as auction and contracting, and coordination flow, including
information hub and electronic marketplace, for improving
construction performance and to accelerate the innovations
in the construction industry.
3. CONCLUSIONS
Studies and discussions were done on supply chain
management at various fields based on the journals
collected. Supply chain management is a challenging task in
the construction industry and are complexintheirstructure.
It is composed of large number of participants who work
together in the project in a temporary manner. Different
factors affecting supply chain in construction fields areto be
identified and the conceptual remedial measures for each
study are going to be suggested according toitsconvenience.
The details regarding the topic are to be collected by
questionnaire survey with the help of internal and external
personalities involved in the system. Different methods are
suggested by the authors for the ranking of the factors in the
management system like RII technique, Fussy logic method
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 996
for maximization and minimization techniques, etc. Most
effective questionnaire was the Likertscalemethodin which
each and every one can respond according to his/her will.
REFERENCES
[1] Ana Beatriz Lopes de Sousa Jabbour , AlceuGomesAlves
Filho ,Adriana Backx Noronha Viana , Charbel Jos
Chiappetta Jabbour (2011), ‘Factors affecting the
adoption of supply chain management practices:
Evidence from the Brazilian electro-electronic sector’,
IIMB Management Review 23, (2011)pp.208 -222 .
[2] Anders Segerstedt, Thomas Olofsson (2010), ‘Supply
chains in the construction industry’, Supply Chain
Management: An International Journal, Vol. 15, Issue 5,
pp. 347 – 353.
[3] Anna Duboi, Lars-Erik Gadde (2000), ‘Supply strategy
and network elects purchasing behavior in the
construction industry’, European Journal of Purchasing
& Supply Management 6, pp. 207-215.
[4] M. Agung Wibowo, MohNurSholeh (2015), ‘Theanalysis
of supply chain performance measurement at
construction project” Procedia Engineering125,pp.25 –
31.
[5] Mohammed Saad, Martyn Jones, Peter James (2002), ‘A
review of the progress towards the adoption of supply
chain management (SCM) relationshipsinconstruction’,
European Journal of Purchasing & Supply Management
8, PP. 173–183.
[6] Rajen B. Mistry, Vishal R Gajera, Hiren A. Rathod(2003),
‘Evaluation of factor affecting for supply chain in
construction project’,International JournalsofAdvanced
Research in Engineering Science &Management. ISSN :
2394-1766.
[7] Rajesh K. Singh (2011) , ‘Developing the framework for
coordination in supply chain of SMEs’, Business Process
Management Journal Vol. 17 issue. 4.
[8] Ruben Vrijhoef, Lauri Koskela (2000), ‘The four roles of
supply chain management in construction’, European
Journal of Purchasing & Supply Management 6,
(2000),PP. 169-178.
[9] S. Mukesh Balwani, S.A. Hussain, Aquib Ansari,
Naseeruddin Haris (2010), ‘Supply Chain Management
in Construction’, International Journal on Recent and
Innovation Trends in Computing and Communication
(2010)pp Volume: 3, Issue: 2.
[10] Se-Hak Chun, HoJoong Hwang and Yong-Hwan Byun
(2015), ‘Green Supply Chain Management in the
Construction Industry: Case of Korean Construction
Companies’ Procedia - Social and Behavioral Sciences
186, ( 2015 )pp. 507 – 512.
[11] Shahram Gilaninia, Hossein Ganjinia, Omidreza
Alihosseini (2013), ‘Studying the Factors Affecting
Supply Chain Management and Provide proper
Strategies for Improving it (Case Study Poultry Farming
Industry)’, International Journal of Innovative Research
in Science, Engineering and Technology, Vol. 2, Issue11,
November 2013.
[12] Tae-Hong Shin,Sangyoon Chin, Su-Won Yoon, Soon-
Wook Kwon(2011), ‘A service-oriented integrated
information framework forRFID/WSN-basedintelligent
construction supply chain management’, Automation in
Construction 20, 706–715.
[13] Xiaolong Xue, Yaowu Wan, Qiping Shen, Xiaoguo
Yu(2007), ‘Coordination mechanisms for construction
supply chain management in the Internet environment’.
International Journal of Project Management 25, PP.
150–157.
[14] Xiaolong Xue, Xiaodong Li, Qiping Shen, Yaowu Wang
(2005), ‘An agent-based framework for supply chain
coordination in construction’, Automation in
Construction 14, pp. 413– 430.

More Related Content

What's hot

Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing OrganizationsDeterminants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing OrganizationsWaqas Tariq
 
Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewA Makwana
 
IRJET-Survey on Identification of Top-K Competitors using Data Mining
IRJET-Survey on Identification of Top-K Competitors using Data MiningIRJET-Survey on Identification of Top-K Competitors using Data Mining
IRJET-Survey on Identification of Top-K Competitors using Data MiningIRJET Journal
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectseSAT Journals
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Developing the Tool for Vendor Selection in Power Sector using Cost of Quality
Developing the Tool for Vendor Selection in Power Sector using Cost of QualityDeveloping the Tool for Vendor Selection in Power Sector using Cost of Quality
Developing the Tool for Vendor Selection in Power Sector using Cost of QualityIRJET Journal
 
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...The Simulation of the Supply Chain in an Investment Company by Genetic Algori...
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...Mohammad Ali Arjamfekr
 
An effective way to optimize key performance factors of supply chain
An effective way to optimize key performance factors of supply chainAn effective way to optimize key performance factors of supply chain
An effective way to optimize key performance factors of supply chainIAEME Publication
 
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...ijmvsc
 
Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19vivatechijri
 
Information System Success Framework based on Interpersonal Conflict Factors
Information System Success Framework based on Interpersonal Conflict Factors Information System Success Framework based on Interpersonal Conflict Factors
Information System Success Framework based on Interpersonal Conflict Factors IJECEIAES
 
ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...
 ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM... ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...
ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...muo charles
 
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...csandit
 
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD Editor
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...IJERA Editor
 
4 model productivity improvement msme
4 model productivity  improvement msme4 model productivity  improvement msme
4 model productivity improvement msmeskdass23
 
IRJET- Identifying the Conflicts in the Software Requirement Engineering:...
IRJET-  	  Identifying the Conflicts in the Software Requirement Engineering:...IRJET-  	  Identifying the Conflicts in the Software Requirement Engineering:...
IRJET- Identifying the Conflicts in the Software Requirement Engineering:...IRJET Journal
 

What's hot (19)

Determinants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing OrganizationsDeterminants of Supply Chain Performance of Indian Manufacturing Organizations
Determinants of Supply Chain Performance of Indian Manufacturing Organizations
 
Attributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a reviewAttributes affecting success of the residential projects – a review
Attributes affecting success of the residential projects – a review
 
IRJET-Survey on Identification of Top-K Competitors using Data Mining
IRJET-Survey on Identification of Top-K Competitors using Data MiningIRJET-Survey on Identification of Top-K Competitors using Data Mining
IRJET-Survey on Identification of Top-K Competitors using Data Mining
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
A review paper
A review paperA review paper
A review paper
 
Developing the Tool for Vendor Selection in Power Sector using Cost of Quality
Developing the Tool for Vendor Selection in Power Sector using Cost of QualityDeveloping the Tool for Vendor Selection in Power Sector using Cost of Quality
Developing the Tool for Vendor Selection in Power Sector using Cost of Quality
 
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...The Simulation of the Supply Chain in an Investment Company by Genetic Algori...
The Simulation of the Supply Chain in an Investment Company by Genetic Algori...
 
An effective way to optimize key performance factors of supply chain
An effective way to optimize key performance factors of supply chainAn effective way to optimize key performance factors of supply chain
An effective way to optimize key performance factors of supply chain
 
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...
A new fuzzy dematel todim hybrid method for evaluation criteria of knowledge ...
 
Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19
 
Information System Success Framework based on Interpersonal Conflict Factors
Information System Success Framework based on Interpersonal Conflict Factors Information System Success Framework based on Interpersonal Conflict Factors
Information System Success Framework based on Interpersonal Conflict Factors
 
ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...
 ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM... ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...
ROLE OF SUPPLIER MANAGEMENT PRACTICES IN OPTIMIZATION OF OPERATIONAL PERFORM...
 
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
Selection of Best Alternative in Manufacturing and Service Sector Using Multi...
 
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
IJERD (www.ijerd.com) International Journal of Engineering Research and Devel...
 
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
Supplier Selection and Order Allocation Models in Supply Chain Management: A ...
 
4 model productivity improvement msme
4 model productivity  improvement msme4 model productivity  improvement msme
4 model productivity improvement msme
 
Swayam assignment
Swayam assignmentSwayam assignment
Swayam assignment
 
IRJET- Identifying the Conflicts in the Software Requirement Engineering:...
IRJET-  	  Identifying the Conflicts in the Software Requirement Engineering:...IRJET-  	  Identifying the Conflicts in the Software Requirement Engineering:...
IRJET- Identifying the Conflicts in the Software Requirement Engineering:...
 

Similar to IRJET- A Study on Supply Chain Management in Construction Projects

IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...IRJET Journal
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesIRJET Journal
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET Journal
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET Journal
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...IRJET Journal
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction SitesIRJET Journal
 
A study of supply chain management
A study of supply chain managementA study of supply chain management
A study of supply chain managementchiragkolambe
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSAmy Roman
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...IRJET Journal
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewIRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET Journal
 
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...IRJET Journal
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYIRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 

Similar to IRJET- A Study on Supply Chain Management in Construction Projects (20)

IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction Companies
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of Windshield
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
 
A study of supply chain management
A study of supply chain managementA study of supply chain management
A study of supply chain management
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
 
Kh2518061809
Kh2518061809Kh2518061809
Kh2518061809
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
IRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction ProjectsIRJET- An Assessment of Role of Material Management in Construction Projects
IRJET- An Assessment of Role of Material Management in Construction Projects
 
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...Critical Success Factors and Strategies for Sub-contractor Management in Infr...
Critical Success Factors and Strategies for Sub-contractor Management in Infr...
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
IRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction ProjectIRJET-Influence of Material Management on Construction Project
IRJET-Influence of Material Management on Construction Project
 
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
 
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRYA REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
A REVIEW ON FACTORS AFFECTING MATERIAL MANAGEMENT ON CONSTRUCTION INDUSTRY
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 

IRJET- A Study on Supply Chain Management in Construction Projects

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 993 A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS 1Dr. S Kanchana, Ms. Sneha P2 1Head of the Department, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India 2PG Student, Department of Civil Engineering, RVS Technical Campus, Coimbatore-641402, India ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract:- The construction industry is generally characterized with low productivity, high fragmentation, cost and time overruns, and conflicts compared with other manufacturing industries. Supply chain management as an innovative management mode which provides a new solution for resolving these problems from systems perspective. The main objective of this study is to find critical factors affecting supply chain managementin construction industries. Focusing on the questionnaire survey, factors are to be collected and using fuzzy logic based assessment ranking is to be done. The present trend in the market is not only the competitionamong the enterprises, also but the supply chain. Supplier selection is the most critical decision for the whole procuringdepartment. Selection of supplier is a complicated decision involving many criteria to be taken into consideration. Ranking is to be done using SPSS software & analysis is to be carried out using fuzzy logic toolbox of MATLAB software rank. Questionnaire survey of supply chain management is to be carried out in several construction industries randomly selected among Kerala’s construction industries. Supply chain management coordinates and integrate these flows within and among companies. The ultimate goal of any effective supply chain management system is to reduce the inventory. Key Words: Supply chain management, SPSS, MATLAB. 1. INTRODUCTION Recently supply chain has become a major subject of management research and manufacturing theory. Supply chain has been defined as the network of organizations which are involved through upstream and downstream linkages, in the different processes and activities that produce value in the form of services and products in the hands of the ultimate customer. The readiness of supply chain in integrated material procurement is one of the important indicators to define the performance of contractors. Contractor will be called competent if they can order the material and build without any delays. Supply chain management (SCM) has been widely regarded as an effective and efficient management measure and strategy to improve the performance of the construction industry, which has suffered from high fragmentation, large waste, poor productivity, cost and time overruns, and conflicts and disputes for many years. Currently supply chain management is in its developing stage. In this current scenario to avoid the conflicts and competition among the suppliers a proper supply chain management system is needed. It mainly consists of number of participants and are complex in their nature. The construction sector players including engineers, contractors, suppliers and clients. They have major roles in establishing and developing SCM and collaboration. There are many challenges that are faced by construction industry in India, and the important challenge among them is improper material supply chain in construction. Each and every product that reaches an end user is the cumulative effort of multipleorganizations.These organizations refer collectively as a supply chain. Supply chain Network of organizations and business process for procuring materials, transforming raw materials into finished products and distributing the finished products to the customers. Supply chainmanagementisanintegrationof suppliers, distributors and customer logistics into one cohesive process. 2. LITERATURE REVIEW Ana Beatriz Lopes de Sousa Jabbour et.al., (2011), they conducted studies on the topic “Factors affecting the adoption of supply chain management practices: Evidence from the Brazilian electro-electronic sector” and tests them using survey data of Brazilian electro-electronic firms. The results reveal the big picture of the SCM practices in the sector and suggest that contextual factors such as size, position and bargaining power affect the adoption of SCM practices, which are also more customersoriented.Contrary to the findings of literature, the relationship between competitive priorities and SCM practices was not supported statistically .After analysis of the 69 randomly selected research publications, it is quite evident that no study has been found in the Indian context with respect to supply chain collaboration .The major focus of the papers is on manufacturing and a retailer organization has been observed. Based on analysis of the reviewed papers, 28 factors are identified. Anders Segerstedt et.al., (2010), “Supply chains in the construction industry” The purpose of this paper is to introduce a special issueabouttheconstructionindustryand the management of its supply chains. It aims to discuss and point to some differences and possible similarities with traditional manufacturing anditssupplychains.Theproduct specification process before the customer order arrives shows different degrees of specifications: engineer to order,
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 994 modify to order, configure to order, select a variant. A construction company only executes a small part of the project by its own personnel and capacity. This is a way of risk spreading and risk mitigation and to compensate for an unstable market. If a construction company wants to establish a new concept, from “engineer to order”, itmustbe engaged earlier in the business process and with other than usual customers, which might complicate the process. Anna Duboi et.al., (2000), “Supply strategy and network elects purchasing behaviorintheconstructionindustry” This paper explores the occurrence of network elects in the construction industry. The study finds such elects to be unusual in the construction industry. The main reasons for the absence of adaptation are found to be the current focus on the efficiency of individual projects and the competitive tendering procedures used. It is concluded that these characteristics are having a hampering effect on both efficiency and innovation in the industry today. M. Agung Wibowo, et.al., (2015), “The analysis of supply chain performance measurement at construction project”. The aim of the study is to analyze supply chain performance in road projects. The impact of various supply chain management practices on project performance has been measured through a combination of a survey and the development of simulation models. Performance measurement using the Supply ChainOperationsReferences (SCOR) will analyze the supply chain management of contractor. This measurement using the SCOR model as a Key Performance Indicator (KPI) is calculated using the weighted criteria Analytical Hierarchy Process (AHP). Weighting and measurement results were analyzed using Objectives Matrix (OMAX) and traffic light. The resultsofthe analysis and the measurement of supply chain performance are medium score or good enough for road projects. The factors that lead to the success of this supply chain are the readiness of the contractor, supplier partners, supply chain strategy, and the ability of labors. Mohammed Saad et.al., (2002), “A review of the progress towards the adoption of supply chain management (SCM) relationships in construction” This paperexaminesthe early progress towards the adoption of supply chainmanagement (SCM) relationships in construction. It is based on a literature review and survey of the views of construction practitioners. This paper has shown that there is significant awareness of the importance of SCM and its main benefits in construction. It is seen as a multi-factor innovation, which can help construction overcome its fragmentation and adversarial culture, improve its relationships and better integrate its processes. Its effective implementation is also perceived as dependent upon continuous and shared learning and strong commitment. Rajen B. Mistry et.al., (2003), “Evaluation of factor affecting for supply chain in construction project”. The main objective of this study is to find critical factors affecting supply chain. A survey was carried out in south Gujarat region city, on architects, contractors, consultants, site engineers, retailers,distributors,developers.Total 38factors identified from the literature review. Total 148 feedbacks were analyzed through the Relative Importance Index (RII) techniques. Five most crucial factors in descending order from RII Technique are late deliveries, Complexity management/ rationalization, Product changes batch ordering, inaccurate demand forecasting, Price fluctuations and discounts. Contractors shall act on these factors to improve material supply chain in construction projects. Rajesh K. Singh (2011), “Developing the framework for coordination in supply chain of SMEs” SCMisoneofthemost important areas for competitiveness and growth of industries. Small and medium enterprises (SMEs) in India and other developing countries face problems in coordinating their supply chain due to lack of resources and improper directions. The purpose of this paper is to develop a framework for improving the coordination in supplychain and development of an index for coordination. It isobserved that all of these factors have strong mutual linkage and top management commitment is a major driver for improving the coordination among these factors. Ruben Vrijhoef et.al., (1998), “The four roles of supply chain management in construction” The present status of construction supply chains is investigated by means of case studies and a comparison with previous research. Previous initiatives to advance the construction supply chain have been somewhat partial Three main conclusions are drawn regarding the present status. Firstly, even in normal situations the construction supply chain has a largequantity of waste and problems. Secondly, most ofthesearecausedin another stage of the construction supply chain than when detected. Thirdly, waste and problems are largely caused by obsolete, myopic control of the construction supply chain. These results concur with the "findings made on make-to- order supply chains in general. The generic methodology offered by SCM contributes to better understanding and resolution of basic problems in construction supply chains, and gives directions for construction supply chain development. The practical solutions offered by SCM, however, have to be developed in construction practice itself, taking into account the specific Characteristics and local conditions of construction supply chains. S. Mukesh Balwani et.al., (2015), “Supply chain management in construction” (SCM) is a concept that has flourished in Manufacturing, originating from Just-In-Time (JIT) Production andLogistics.SCMendeavorstoobserve the entire scope of the supply chain. SCM offers a methodology to relieve the myopic control in the supply chain that has reinforcing waste and problems. The generic methodology offered by SCM contributes to better understanding and resolution of basic problems in construction supply chains,
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 995 and gives directions for construction supply chain development. In this paper applicationofLeanprinciples are carried out to optimize the concreting operation. The application and Fundamentals of VSM are applied into the case study for improvisation of concreting operation. Se-Hak Chun et.al., (2015), “Green supply chain management in the construction industry: case of Korean construction companies” Enterprises have started considering Green SCM for the purpose of securing a competitive advantage over other enterprisesbecauseof the increase of international conventions related to the recent climate change, the strengthening of global regulations for environment protection, the demand for environmental suitability by stockholders and investors of enterprises, and the consumer’s preference for environmental friendly products. Green SCM is emerging as the strategy to preemptively cope with environmental regulations. This study investigates green businessactivitiesofsmall-medium enterprises and examines differences acrossSCMprocesses. Shahram Gilaninia et.al., (2013), “Studying the factors affecting supply chain management and provide proper strategies for improving it” (Case Study Poultry Farming Industry) Understanding the principles of supply chain management and proper utilization of it during poultry industry chain, is the subject of current study. To assess research hypotheses questionnaires were distributed to active companies in the poultry industry inRashtcityand70 senior managers, middle managers and industry experts participated in the study. The results indicated that among characteristics of supply chain strategy, relationships with supplier strategy, has the maximum relationships with organizational performance of companies operating in poultry industry. The results showed that there is a significant relationship between characteristics and performance of enterprise supply chain strategies and manager believes that supply chain strategy provide progress in the organization. Among the features of supply chain strategy, supplier relationshipsstrategyhasmaximum relationship with organizational performance companies operating in the poultry industry. Tae Hong Shin et.al.,(2011),“Aservice-orientedintegrated information framework for RFID/WSN-based intelligent construction supply chain management” The main objective of this research is to develop a seamlessly integrated information management framework that can provide logistics information to project stakeholders for their decision making. The pilot test of the framework developed in this research showed that it can improve time efficiency by about 32% compared to the traditional supply chain management. The result of this research is expected to be utilized effectively as a basic framework to manage information in RFID/WSN based construction supply chain management (CSCM) environments. The objective of this research is to develop an information management framework that can seamlesslyintegrateheterogeneous and dynamic supply chain environments of a construction project in order to support effective management of supply chain information among project participantswhileutilizing SOA, RFID, and WSN technologies. This research adopts intelligent equipment that incorporates RFID/WSN technology to collect and communicate information on the supply chain. Xiaolong Xue et.al.,(2005), “Anagent-basedframework for supply chain coordination in construction” The research analyses the problems in construction supplychain.Inorder to resolve these problems andimprovingtheperformanceof construction, an agent-based framework for construction supply chain coordination is designed based on the agent technology and multi attribute negotiation and multi attribute utility theory (MAUT). The framework, which integrates the construction organizations in construction supply chain and multi attribute negotiation model into a multi agent system (MAS), provides a solution for supply chain coordination in construction through multi attribute negotiation mechanism on the Internet. Finally, the prototype of the framework is developedandtentativelyrun based on an imaginary construction project. The trial run reveals the feasibility to implement the agent-based framework for coordination in construction. Xiaolong Xue et.al., (2007), “Coordination mechanismsfor construction supply chain management in the Internet environment” In this paper; the concepts of CSC and CSC management are defined. Furthermore, the inter- organization problems that effect CSC coordination are identified. Considering the Internetfosterstheintegration of construction processesandprovidesanefficientplatformfor CSC coordination, this paper presents two types of Internet- enabled coordination mechanisms:market mechanism,such as auction and contracting, and coordination flow, including information hub and electronic marketplace, for improving construction performance and to accelerate the innovations in the construction industry. 3. CONCLUSIONS Studies and discussions were done on supply chain management at various fields based on the journals collected. Supply chain management is a challenging task in the construction industry and are complexintheirstructure. It is composed of large number of participants who work together in the project in a temporary manner. Different factors affecting supply chain in construction fields areto be identified and the conceptual remedial measures for each study are going to be suggested according toitsconvenience. The details regarding the topic are to be collected by questionnaire survey with the help of internal and external personalities involved in the system. Different methods are suggested by the authors for the ranking of the factors in the management system like RII technique, Fussy logic method
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 11 | Nov 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 996 for maximization and minimization techniques, etc. Most effective questionnaire was the Likertscalemethodin which each and every one can respond according to his/her will. REFERENCES [1] Ana Beatriz Lopes de Sousa Jabbour , AlceuGomesAlves Filho ,Adriana Backx Noronha Viana , Charbel Jos Chiappetta Jabbour (2011), ‘Factors affecting the adoption of supply chain management practices: Evidence from the Brazilian electro-electronic sector’, IIMB Management Review 23, (2011)pp.208 -222 . [2] Anders Segerstedt, Thomas Olofsson (2010), ‘Supply chains in the construction industry’, Supply Chain Management: An International Journal, Vol. 15, Issue 5, pp. 347 – 353. [3] Anna Duboi, Lars-Erik Gadde (2000), ‘Supply strategy and network elects purchasing behavior in the construction industry’, European Journal of Purchasing & Supply Management 6, pp. 207-215. [4] M. Agung Wibowo, MohNurSholeh (2015), ‘Theanalysis of supply chain performance measurement at construction project” Procedia Engineering125,pp.25 – 31. [5] Mohammed Saad, Martyn Jones, Peter James (2002), ‘A review of the progress towards the adoption of supply chain management (SCM) relationshipsinconstruction’, European Journal of Purchasing & Supply Management 8, PP. 173–183. [6] Rajen B. Mistry, Vishal R Gajera, Hiren A. Rathod(2003), ‘Evaluation of factor affecting for supply chain in construction project’,International JournalsofAdvanced Research in Engineering Science &Management. ISSN : 2394-1766. [7] Rajesh K. Singh (2011) , ‘Developing the framework for coordination in supply chain of SMEs’, Business Process Management Journal Vol. 17 issue. 4. [8] Ruben Vrijhoef, Lauri Koskela (2000), ‘The four roles of supply chain management in construction’, European Journal of Purchasing & Supply Management 6, (2000),PP. 169-178. [9] S. Mukesh Balwani, S.A. Hussain, Aquib Ansari, Naseeruddin Haris (2010), ‘Supply Chain Management in Construction’, International Journal on Recent and Innovation Trends in Computing and Communication (2010)pp Volume: 3, Issue: 2. [10] Se-Hak Chun, HoJoong Hwang and Yong-Hwan Byun (2015), ‘Green Supply Chain Management in the Construction Industry: Case of Korean Construction Companies’ Procedia - Social and Behavioral Sciences 186, ( 2015 )pp. 507 – 512. [11] Shahram Gilaninia, Hossein Ganjinia, Omidreza Alihosseini (2013), ‘Studying the Factors Affecting Supply Chain Management and Provide proper Strategies for Improving it (Case Study Poultry Farming Industry)’, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 2, Issue11, November 2013. [12] Tae-Hong Shin,Sangyoon Chin, Su-Won Yoon, Soon- Wook Kwon(2011), ‘A service-oriented integrated information framework forRFID/WSN-basedintelligent construction supply chain management’, Automation in Construction 20, 706–715. [13] Xiaolong Xue, Yaowu Wan, Qiping Shen, Xiaoguo Yu(2007), ‘Coordination mechanisms for construction supply chain management in the Internet environment’. International Journal of Project Management 25, PP. 150–157. [14] Xiaolong Xue, Xiaodong Li, Qiping Shen, Yaowu Wang (2005), ‘An agent-based framework for supply chain coordination in construction’, Automation in Construction 14, pp. 413– 430.