S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and
                       Applications (IJERA) ISSN: 2248-9622 www.ijera.com
                        Vol. 2, Issue 5, September- October 2012, pp.1806-1809
    A Survey Study Of Supplier Selection Issues In Construction
                         Supply Chain
                               S. Patil*, Prof. Mrs. P. R. Adavi**
                           *P.G. Student – M.E. (Construction & Management)
                                    ** Prof., Civil Engineering Dept.
                          MAEER’S Maharashtra Institute of Technology, Pune-38


ABSTRACT
          It is undeniable fact that construction      schedule prepared will be more precise as the
industry is a very important product of Gross          subcontractors and suppliers will be present to
Domestic Product (GDP) of our country. It is           tell the times and the buffer that they would
almost 11% of the GDP of our country. It is the        require to complete a certain activity; at same
second most employment providing sector after          time they can tell us about the cost related to the
agriculture. In spite of its importance,               activity based on the material, man-power and
construction industry has not made necessary           equipment required.
managerial advancements in formation of Supply                  One other advantage of integrating the
Chain       to    augment     productivity      and    suppliers and subcontractors is that they know
responsiveness in the Industry. In this research,      about the work to be carried out before hand and
we have made an attempt to explore and                 can arrange for the same in terms of material,
understand the nature of supply chain in Indian        man-power and equipments leading to reduction
construction Industry with special attention to        in time for starting an activity and at the same
supplier selection issues.                             time reducing the cost and time wasted in
          As we all know that construction             making last minute arrangements.
industry is an unorganised sector where a lot of                In this paper ‘A survey study of supplier
individual parties in Construction Supply Chain        selection issue in construction supply chain’, we
come together to complete one project.                 have tried to find out the factors on which
Sometimes many Supply Chain players in the             suppliers are selected in construction industry in
construction industry come together for only one       today’s scenario. We think that the supplier
project and on completion of the project they go       selection is a prerequisite for integrating them in
their separate ways. In such a scenario it is          the supply chain. A client would prefer to select a
difficult to form and understand the nature and        supplier who is trusted and who can be capable
necessity of formation of supply chain fit for use     to maintain good quality and consistent supply of
for the given project. In construction industry all    materials throughout the life of the project and
the SC players involved look to safe guard their       also the supplier should be open for long term
own profits and want their needs to be attended        relationship. In our study we collected the
first. With such divided interests and lack of         primary data relevant to our study through
coordination between the participating members         questionnaire. On the basis of the responses that
it is difficult to complete the project with           were collected Relative Importance Index (RII)
minimum time and cost variance.                        for each option for all the questions were
          Many studies have taken place to             calculated. Based on the RII values we have
improve the coordination between the various SC        concluded about the various factors that play an
players of the project. Earlier researchers have       important role in selection of suppliers in
already put forth their view of upstream               construction industry.
integration in the Construction Supply Chain to                 In this regard, we endeavour this study
reduce cost and time overrun. We argue that the        to integrate the suppliers/subcontractors in
key role of downstream integration has paucity         formation of supply chain. We argue that for the
in earlier research work. We believe that the          downstream integration in construction supply
suppliers and subcontractors are the key players       chain, integration of suppliers/subcontractors is
in downstream of construction supply chain,            the crucial link. Thus, this study has undertaken
because they are the players who actually get the      the research on supplier selection as the pre-
work done at the construction site. We think that      requisite for downstream integration in
if suppliers and subcontractors are integrated at      construction supply chain. The result of the
an early stage of a project then reduction in time     questionnaire survey has resulted into a list of
and cost variation is possible. This means that is     factors that will ensure integration in
inputs from suppliers and subcontractors are           downstream, keeping in mind supplier selection
taken during design stage itself, then the project     issue.


                                                                                          1806 | P a g e
S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and
                    Applications (IJERA) ISSN: 2248-9622 www.ijera.com
                     Vol. 2, Issue 5, September- October 2012, pp.1806-1809
Keywords - Supplier Selection, Downstream          construction businesses with business-to-business
Integration,     Construction      Supply      Chain     relationships but a network of multiple
Management.                                              organizations and relationships, which includes the
                                                         flow of information the flow of materials, services
I. INTRODUCTION                                          or products, and the flow funds between client,
         Facing with the new challenges, today’s         designer, contractor and supplier.
construction companies are striving to become
better organized, increase capital base, acquire high    III. SUPPLIER  SELECTION                           IN
tech equipment and material to compete with the          CONSRUCTION SUPPLY CHAIN
foreign companies which are more experienced.                      For many organizations effective supplier
Many companies are making the beeline for ISO:           evaluation and purchasing processes are of vital
9000 certificate. Many organizations are trying to       importance. As the pace of market globalization
implement Business Process Re-engineering (BPR),         quickens, the number of potential suppliers and the
Total Quality Management (TQM), and Information          number of factors to consider when selecting
Technology (IT). Some of the organization had even       suppliers increases. In this paper we present the
tried to implement the Enterprise level business         critical success factors (CSFs) for supplier selection.
process (ERP) software and Construction Supply           Increased competition and globalization of markets
Chain Management (CSCM).                                 facilitated by Internet-based technologies have
                                                         combined to dramatically change the ranking of
         Construction supply chain management            factors while introducing new criteria to the supplier
(CSCM) is an emerging area to be studied. Though         selection process.
it is substantially different from Manufacturing
supply chain, it is being inspired by it. In                      Based on the results of this study, we
manufacturing supply chain management, emphasis          conclude that supplier selection criteria will
is more on modelling volume production, whereas          continue to change based on an expanded definition
in CSCM is concerned with the coordination of            of excellence to include traditional aspects of
discrete quantities of material (and associated          performance (quality, delivery, price, service) in
speciality engineering services) delivered to specific   addition to non-traditional, evolving ones (just-in-
construction projects. The organization and sourcing     time communication, process improvement, supply
of material is becoming increasingly complex across      chain management).
the global construction industry. So, CSCM in terms
of supplier selection is very important in today’s       IV. SUPPLIER               SCORING              AND
world.                                                   ASSESSMENT
                                                         When scoring and assessing suppliers, the following
          Supplier selection is the vital decision in    factors other than quoted price must be considered:
construction supply chain. The supply chain of
construction industry is primarily fragmented and                 • Replenishment of lead time
needs through integration in the downstream. The                  • On time performance
extent of integration in downstream depends on the                • Supply flexibility
supplier selection practices of the supply chain. This            • Delivery frequency/minimum lot size
study put forwards the argument that the supplier                 • Supply quality
selection is the pre requisite for downstream                     • Inbound transportation cost
integration in construction supply chain.                         • Pricing terms
                                                                  • Information coordination capability
II. CONSTRUCTION SUPPLY CHAIN                                     • Design collaboration capability
         Construction is a multi-organization                     • Exchange rates, taxes and duties
process, which involves client/owner, designer,                   • Supplier viability
contractor, supplier, consultant, etc. It also is a
multi-stage process, which includes conceptual,          V. SUPPLIER EVALUATION SYSTEM
design, construction, maintenance, replacement, and      The three general types of supplier evaluation
decommission. From this perspective, CSC can be          systems used today are:
defined as flowing:
         CSC consists of all the construction                     • Categorical method,
business processes, from the demands by the client,               • Cost-Ration method,
conceptual, design and construction to maintenance,               • Linear averaging method.
replacement and eventual decommission of
building, and organizations, which are involved in       The guiding factor in deciding which system is best
the construction process, such as client/owner,          is:
designer, general contractor (GC), subcontractor,                • Ease of implementation &
supplier, consultant, etc. CSC is not a chain of                 • Overall reliability of system.

                                                                                               1807 | P a g e
S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and
                     Applications (IJERA) ISSN: 2248-9622 www.ijera.com
                      Vol. 2, Issue 5, September- October 2012, pp.1806-1809
VI. RESEARCH METHODOLOGY                            were working professionals with engineering
         The methodology is qualitative, which            background. To analyze the responses given by the
explores the "insider’s view" of the process, and         respondents and to get the criteria on which
provides independent analysis of suppliers and            suppliers are selected in construction industry.
subcontractors selection process in construction          Relative Importance Index method was used.
projects. The objective is to gain access to the
participant’s experiential insights on supplier                   Relative Importance Index (RII) is the
selection process.                                        process where weight is given to each type of
                                                          response as per the judgment of the user. In this
          The data presented in this research is          case;
primarily qualitative. The principal objective is to us
the participant’s experiences to find the criteria on              • Strongly Disagree = 1
which they select the suppliers. Specific research                 • Disagree = 2
questions were developed for use in conducting the                 • Undecided = 3
qualitative analysis through survey. These questions               • Agree = 4
were designed to address the measures used to seek                 • Strongly Agree = 5
the basis on which suppliers are selected for
construction projects.                                    Once the weights are decided then the total numbers
                                                          of responses for each option of each question are
The questionnaire was compiled on the basis of the        found out.
following factors:
• Selection procedure for vendors                         Then RII for each option is calculated using the
• Selection criteria considered for the selection of      equation;
  sub- contractor and suppliers
• Phase in which involvement of the suppliers and         RII = (W1*n1 + W2*n2 + ….) / A*N
  sub- contractors would significantly influence the
  project effectiveness                                   Where W = Weight of the option as decided by user,
• Impact of technical expertise on project work           n = Number of responses under each option,
• Testing capability of the supplier                      A = Highest weight given and
• Relationship with the supplier                          N = Total number of respondents.
• Method to encourage subcontractor towards waste
  elimination process                                     The option with the highest RII for a question is the
• Supplier’s geographical reach                           preferred option for that question
• How resourceful the supplier is
• Transparency and openness of supplier                   VIII. CONCLUSION
• Expectations from suppliers to ensure quality and                 This study was carried out to find the
  timely work                                             criterion that governs the selection of suppliers and
• Extent to which the client briefing affected            subcontractors in the construction industry.
  decision regarding supplier and sub-contractor
  selection                                                        Based on the review of literature on
• Attitude of client towards supplier selection           formation of supply chain in construction industry,
• Minimum skill requirement of subcontractors to          we found that construction industry is too
  Execute the work                                        fragmented and too adversarial to adopt supply
• Method which would ensure proper coordination           chain management practices. We believe that a
  on project work                                         Supply chain initiative in Construction industry is
• Cooperation of suppliers in situations to cope up       the way forward to reduce delays and cost and time
  With frequent design changes                            overrun.
• Impact on material availability due to frequent
  design changes                                                    In this regard, we endeavour this study to
• The incentives provided by the client for on time       integrate the suppliers/subcontractors in formation
  delivery of the project                                 of supply chain. We argue that for the downstream
• Methods of preventing complacency on part of            integration in construction supply chain, integration
  suppliers and sub contractors                           of suppliers/subcontractors is the crucial link. Thus,
• Impact due to early participation of supplier and       this study has undertaken the research on supplier
  subcontractors in projects                              selection as the pre-requisite for downstream
                                                          integration in construction supply chain.
VII. ANALYSIS OF RESULTS
        After     preparing    the     questionnaire,     REFERENCES
responses to the questions were collected by sending        1.     Barker R., Hong-Minh S. and Naim M.M.,
the questionnaire through e-mail. The respondents                  [2000]. The terrain scanning methodology.

                                                                                               1808 | P a g e
S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and
                     Applications (IJERA) ISSN: 2248-9622 www.ijera.com
                      Vol. 2, Issue 5, September- October 2012, pp.1806-1809
      Accessing and improving construction
      supply chain. “European Journal of
      Purchasing and Supply Management”, 2,
      pp 179-193.
2.    Vrijhoef Ruben & Koskela Lauri., [1999].
      Role of “Supply Chain Management In
      Construction.” Research Paper. University
      of California.
3.    Chopra Sunil and Meindl Peter., [2004].
      “Supply Chain Management: Strategy,
      Planning, and Operation.” 2nd ed. New
      Jersey: Prentice-Hall (Pearson education).
4.    Kothari     C R.,       [2002].   Research
      Methodology Methods and Techniques.2nd
      ed. New Delhi: Wishwa Prakashan.
5.    O’Brein William.J., Formoso Carlos T.,
      Vrijhoef Ruben and London Kerry A.,
      [2009]. “Construction Supply Chain
      Management Handbook.” New York:
      Taylor and Francis Group.
6.    Benton W C, Jr & Linda F. McHenry.,
      [2010]. “Construction Purchasing and
      Supply Chain Management.” New Delhi:
      Tata McGraw Hill.




                                                                                 1809 | P a g e

More Related Content

Viewers also liked (20)

Gy2512651271
Gy2512651271Gy2512651271
Gy2512651271
 
Fs2510501055
Fs2510501055Fs2510501055
Fs2510501055
 
Gv2512441247
Gv2512441247Gv2512441247
Gv2512441247
 
Gl2511741181
Gl2511741181Gl2511741181
Gl2511741181
 
Fy2510831089
Fy2510831089Fy2510831089
Fy2510831089
 
Fu2510631066
Fu2510631066Fu2510631066
Fu2510631066
 
Gb2511071110
Gb2511071110Gb2511071110
Gb2511071110
 
Ek25835845
Ek25835845Ek25835845
Ek25835845
 
Ko2518481855
Ko2518481855Ko2518481855
Ko2518481855
 
Go2511931200
Go2511931200Go2511931200
Go2511931200
 
Iu2515661573
Iu2515661573Iu2515661573
Iu2515661573
 
Gs2512261235
Gs2512261235Gs2512261235
Gs2512261235
 
F25023026
F25023026F25023026
F25023026
 
Ep31931940
Ep31931940Ep31931940
Ep31931940
 
Anastasia Presentacion Disney
Anastasia Presentacion DisneyAnastasia Presentacion Disney
Anastasia Presentacion Disney
 
1ª división provincial alevín
1ª división provincial alevín1ª división provincial alevín
1ª división provincial alevín
 
Competencias para la vida
Competencias para la vidaCompetencias para la vida
Competencias para la vida
 
Nicos
NicosNicos
Nicos
 
3. relieve terrestre
3. relieve terrestre3. relieve terrestre
3. relieve terrestre
 
Pres3
Pres3Pres3
Pres3
 

Similar to Kh2518061809

IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...IRJET Journal
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET Journal
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...IRJET Journal
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesIRJET Journal
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET Journal
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET Journal
 
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSTina Gabel
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
Selection of supplier in b2b e commerce using work flow petri net
Selection of supplier in b2b e commerce using work flow petri netSelection of supplier in b2b e commerce using work flow petri net
Selection of supplier in b2b e commerce using work flow petri netijmvsc
 
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...IRJET Journal
 
IRJET- Study of Procurement Models in the Construction Industry
IRJET- 	  Study of Procurement Models in the Construction IndustryIRJET- 	  Study of Procurement Models in the Construction Industry
IRJET- Study of Procurement Models in the Construction IndustryIRJET Journal
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachIRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
Supply chain-network-optimization-services
Supply chain-network-optimization-servicesSupply chain-network-optimization-services
Supply chain-network-optimization-servicesITC Infotech
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain ManagementIRJET Journal
 
Infrastrcture project management
Infrastrcture project managementInfrastrcture project management
Infrastrcture project managementSanjeev Deshmukh
 
IRJET- Integration of Information Technology With Supply Chain Management for...
IRJET- Integration of Information Technology With Supply Chain Management for...IRJET- Integration of Information Technology With Supply Chain Management for...
IRJET- Integration of Information Technology With Supply Chain Management for...IRJET Journal
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...IJECEIAES
 

Similar to Kh2518061809 (20)

IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
 
Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction Companies
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction Projects
 
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
Selection of supplier in b2b e commerce using work flow petri net
Selection of supplier in b2b e commerce using work flow petri netSelection of supplier in b2b e commerce using work flow petri net
Selection of supplier in b2b e commerce using work flow petri net
 
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...
GREEN SUPPLIER SELECTION OF SEVERAL COMPONENT’S IN AUTOMOBILE INDUSTORY FOR M...
 
IRJET- Study of Procurement Models in the Construction Industry
IRJET- 	  Study of Procurement Models in the Construction IndustryIRJET- 	  Study of Procurement Models in the Construction Industry
IRJET- Study of Procurement Models in the Construction Industry
 
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria ApproachBuilding a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
Building a Proposed Model for Suppliers' Selection using Multi-Criteria Approach
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
Supply chain-network-optimization-services
Supply chain-network-optimization-servicesSupply chain-network-optimization-services
Supply chain-network-optimization-services
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain Management
 
Infrastrcture project management
Infrastrcture project managementInfrastrcture project management
Infrastrcture project management
 
IRJET- Integration of Information Technology With Supply Chain Management for...
IRJET- Integration of Information Technology With Supply Chain Management for...IRJET- Integration of Information Technology With Supply Chain Management for...
IRJET- Integration of Information Technology With Supply Chain Management for...
 
Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...Web-based material requisition system in the supply chain of construction bus...
Web-based material requisition system in the supply chain of construction bus...
 

Kh2518061809

  • 1. S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 5, September- October 2012, pp.1806-1809 A Survey Study Of Supplier Selection Issues In Construction Supply Chain S. Patil*, Prof. Mrs. P. R. Adavi** *P.G. Student – M.E. (Construction & Management) ** Prof., Civil Engineering Dept. MAEER’S Maharashtra Institute of Technology, Pune-38 ABSTRACT It is undeniable fact that construction schedule prepared will be more precise as the industry is a very important product of Gross subcontractors and suppliers will be present to Domestic Product (GDP) of our country. It is tell the times and the buffer that they would almost 11% of the GDP of our country. It is the require to complete a certain activity; at same second most employment providing sector after time they can tell us about the cost related to the agriculture. In spite of its importance, activity based on the material, man-power and construction industry has not made necessary equipment required. managerial advancements in formation of Supply One other advantage of integrating the Chain to augment productivity and suppliers and subcontractors is that they know responsiveness in the Industry. In this research, about the work to be carried out before hand and we have made an attempt to explore and can arrange for the same in terms of material, understand the nature of supply chain in Indian man-power and equipments leading to reduction construction Industry with special attention to in time for starting an activity and at the same supplier selection issues. time reducing the cost and time wasted in As we all know that construction making last minute arrangements. industry is an unorganised sector where a lot of In this paper ‘A survey study of supplier individual parties in Construction Supply Chain selection issue in construction supply chain’, we come together to complete one project. have tried to find out the factors on which Sometimes many Supply Chain players in the suppliers are selected in construction industry in construction industry come together for only one today’s scenario. We think that the supplier project and on completion of the project they go selection is a prerequisite for integrating them in their separate ways. In such a scenario it is the supply chain. A client would prefer to select a difficult to form and understand the nature and supplier who is trusted and who can be capable necessity of formation of supply chain fit for use to maintain good quality and consistent supply of for the given project. In construction industry all materials throughout the life of the project and the SC players involved look to safe guard their also the supplier should be open for long term own profits and want their needs to be attended relationship. In our study we collected the first. With such divided interests and lack of primary data relevant to our study through coordination between the participating members questionnaire. On the basis of the responses that it is difficult to complete the project with were collected Relative Importance Index (RII) minimum time and cost variance. for each option for all the questions were Many studies have taken place to calculated. Based on the RII values we have improve the coordination between the various SC concluded about the various factors that play an players of the project. Earlier researchers have important role in selection of suppliers in already put forth their view of upstream construction industry. integration in the Construction Supply Chain to In this regard, we endeavour this study reduce cost and time overrun. We argue that the to integrate the suppliers/subcontractors in key role of downstream integration has paucity formation of supply chain. We argue that for the in earlier research work. We believe that the downstream integration in construction supply suppliers and subcontractors are the key players chain, integration of suppliers/subcontractors is in downstream of construction supply chain, the crucial link. Thus, this study has undertaken because they are the players who actually get the the research on supplier selection as the pre- work done at the construction site. We think that requisite for downstream integration in if suppliers and subcontractors are integrated at construction supply chain. The result of the an early stage of a project then reduction in time questionnaire survey has resulted into a list of and cost variation is possible. This means that is factors that will ensure integration in inputs from suppliers and subcontractors are downstream, keeping in mind supplier selection taken during design stage itself, then the project issue. 1806 | P a g e
  • 2. S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 5, September- October 2012, pp.1806-1809 Keywords - Supplier Selection, Downstream construction businesses with business-to-business Integration, Construction Supply Chain relationships but a network of multiple Management. organizations and relationships, which includes the flow of information the flow of materials, services I. INTRODUCTION or products, and the flow funds between client, Facing with the new challenges, today’s designer, contractor and supplier. construction companies are striving to become better organized, increase capital base, acquire high III. SUPPLIER SELECTION IN tech equipment and material to compete with the CONSRUCTION SUPPLY CHAIN foreign companies which are more experienced. For many organizations effective supplier Many companies are making the beeline for ISO: evaluation and purchasing processes are of vital 9000 certificate. Many organizations are trying to importance. As the pace of market globalization implement Business Process Re-engineering (BPR), quickens, the number of potential suppliers and the Total Quality Management (TQM), and Information number of factors to consider when selecting Technology (IT). Some of the organization had even suppliers increases. In this paper we present the tried to implement the Enterprise level business critical success factors (CSFs) for supplier selection. process (ERP) software and Construction Supply Increased competition and globalization of markets Chain Management (CSCM). facilitated by Internet-based technologies have combined to dramatically change the ranking of Construction supply chain management factors while introducing new criteria to the supplier (CSCM) is an emerging area to be studied. Though selection process. it is substantially different from Manufacturing supply chain, it is being inspired by it. In Based on the results of this study, we manufacturing supply chain management, emphasis conclude that supplier selection criteria will is more on modelling volume production, whereas continue to change based on an expanded definition in CSCM is concerned with the coordination of of excellence to include traditional aspects of discrete quantities of material (and associated performance (quality, delivery, price, service) in speciality engineering services) delivered to specific addition to non-traditional, evolving ones (just-in- construction projects. The organization and sourcing time communication, process improvement, supply of material is becoming increasingly complex across chain management). the global construction industry. So, CSCM in terms of supplier selection is very important in today’s IV. SUPPLIER SCORING AND world. ASSESSMENT When scoring and assessing suppliers, the following Supplier selection is the vital decision in factors other than quoted price must be considered: construction supply chain. The supply chain of construction industry is primarily fragmented and • Replenishment of lead time needs through integration in the downstream. The • On time performance extent of integration in downstream depends on the • Supply flexibility supplier selection practices of the supply chain. This • Delivery frequency/minimum lot size study put forwards the argument that the supplier • Supply quality selection is the pre requisite for downstream • Inbound transportation cost integration in construction supply chain. • Pricing terms • Information coordination capability II. CONSTRUCTION SUPPLY CHAIN • Design collaboration capability Construction is a multi-organization • Exchange rates, taxes and duties process, which involves client/owner, designer, • Supplier viability contractor, supplier, consultant, etc. It also is a multi-stage process, which includes conceptual, V. SUPPLIER EVALUATION SYSTEM design, construction, maintenance, replacement, and The three general types of supplier evaluation decommission. From this perspective, CSC can be systems used today are: defined as flowing: CSC consists of all the construction • Categorical method, business processes, from the demands by the client, • Cost-Ration method, conceptual, design and construction to maintenance, • Linear averaging method. replacement and eventual decommission of building, and organizations, which are involved in The guiding factor in deciding which system is best the construction process, such as client/owner, is: designer, general contractor (GC), subcontractor, • Ease of implementation & supplier, consultant, etc. CSC is not a chain of • Overall reliability of system. 1807 | P a g e
  • 3. S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 5, September- October 2012, pp.1806-1809 VI. RESEARCH METHODOLOGY were working professionals with engineering The methodology is qualitative, which background. To analyze the responses given by the explores the "insider’s view" of the process, and respondents and to get the criteria on which provides independent analysis of suppliers and suppliers are selected in construction industry. subcontractors selection process in construction Relative Importance Index method was used. projects. The objective is to gain access to the participant’s experiential insights on supplier Relative Importance Index (RII) is the selection process. process where weight is given to each type of response as per the judgment of the user. In this The data presented in this research is case; primarily qualitative. The principal objective is to us the participant’s experiences to find the criteria on • Strongly Disagree = 1 which they select the suppliers. Specific research • Disagree = 2 questions were developed for use in conducting the • Undecided = 3 qualitative analysis through survey. These questions • Agree = 4 were designed to address the measures used to seek • Strongly Agree = 5 the basis on which suppliers are selected for construction projects. Once the weights are decided then the total numbers of responses for each option of each question are The questionnaire was compiled on the basis of the found out. following factors: • Selection procedure for vendors Then RII for each option is calculated using the • Selection criteria considered for the selection of equation; sub- contractor and suppliers • Phase in which involvement of the suppliers and RII = (W1*n1 + W2*n2 + ….) / A*N sub- contractors would significantly influence the project effectiveness Where W = Weight of the option as decided by user, • Impact of technical expertise on project work n = Number of responses under each option, • Testing capability of the supplier A = Highest weight given and • Relationship with the supplier N = Total number of respondents. • Method to encourage subcontractor towards waste elimination process The option with the highest RII for a question is the • Supplier’s geographical reach preferred option for that question • How resourceful the supplier is • Transparency and openness of supplier VIII. CONCLUSION • Expectations from suppliers to ensure quality and This study was carried out to find the timely work criterion that governs the selection of suppliers and • Extent to which the client briefing affected subcontractors in the construction industry. decision regarding supplier and sub-contractor selection Based on the review of literature on • Attitude of client towards supplier selection formation of supply chain in construction industry, • Minimum skill requirement of subcontractors to we found that construction industry is too Execute the work fragmented and too adversarial to adopt supply • Method which would ensure proper coordination chain management practices. We believe that a on project work Supply chain initiative in Construction industry is • Cooperation of suppliers in situations to cope up the way forward to reduce delays and cost and time With frequent design changes overrun. • Impact on material availability due to frequent design changes In this regard, we endeavour this study to • The incentives provided by the client for on time integrate the suppliers/subcontractors in formation delivery of the project of supply chain. We argue that for the downstream • Methods of preventing complacency on part of integration in construction supply chain, integration suppliers and sub contractors of suppliers/subcontractors is the crucial link. Thus, • Impact due to early participation of supplier and this study has undertaken the research on supplier subcontractors in projects selection as the pre-requisite for downstream integration in construction supply chain. VII. ANALYSIS OF RESULTS After preparing the questionnaire, REFERENCES responses to the questions were collected by sending 1. Barker R., Hong-Minh S. and Naim M.M., the questionnaire through e-mail. The respondents [2000]. The terrain scanning methodology. 1808 | P a g e
  • 4. S. Patil, Prof. Mrs. P. R. Adavi / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 5, September- October 2012, pp.1806-1809 Accessing and improving construction supply chain. “European Journal of Purchasing and Supply Management”, 2, pp 179-193. 2. Vrijhoef Ruben & Koskela Lauri., [1999]. Role of “Supply Chain Management In Construction.” Research Paper. University of California. 3. Chopra Sunil and Meindl Peter., [2004]. “Supply Chain Management: Strategy, Planning, and Operation.” 2nd ed. New Jersey: Prentice-Hall (Pearson education). 4. Kothari C R., [2002]. Research Methodology Methods and Techniques.2nd ed. New Delhi: Wishwa Prakashan. 5. O’Brein William.J., Formoso Carlos T., Vrijhoef Ruben and London Kerry A., [2009]. “Construction Supply Chain Management Handbook.” New York: Taylor and Francis Group. 6. Benton W C, Jr & Linda F. McHenry., [2010]. “Construction Purchasing and Supply Chain Management.” New Delhi: Tata McGraw Hill. 1809 | P a g e