05/31/13Tempus Telcosys 1
ADA CELLWORKS PVT LTD
INTRODUCTION
 The global system for mobile communications (GSM)
is a set of recommendations and specifications for a
digital cellular telephone network (known as a Public
Land Mobile Network, or PLMN). These
recommendations ensure the compatibility of equipment
from different GSM manufacturers, and interconnectivity
between different administrations, including operations
across international boundaries.
05/31/13Tempus Telcosys 2
THE GSM NETWORK
 The GSM network is comprised of the following components:
 Network Elements
 The GSM network incorporates a number of network elements to
support mobile equipment. They are listed and described in the GSM
network elements section of this chapter.
 GSM subsystems
 In addition, the network includes subsystems that are not formally
recognized as network elements but are necessary for network
operation. These are described in the GSM subsystems (non-network
elements) section of this chapter.
 Standardized Interfaces
 GSM specifies standards for interfaces between network elements,
which ensure the connectivity of GSM equipment from different
manufacturers. These are listed in the Standardized interfaces section of
this chapter.
05/31/13Tempus Telcosys 3
THE GSM NETWORK - CONTINUED
 Network Protocols
 For most of the network communications on these interfaces,
internationally recognized communications protocols have been used
 These are identified in the Network protocols section of this chapter.
 GSM Frequencies
 The frequency allocations for GSM 900, Extended GSM and Digital
Communications Systems are identified in the GSM frequencies section
of this chapter.
05/31/13Tempus Telcosys 4
DIGITAL NETWORKS
 GSM networks are digital and can cater for
high system capacities. They are consistent
with the world wide digitization of the
telephone network, and are an extension of
the Integrated Services Digital Network
(ISDN), using a digital radio interface
between the cellular network and the mobile
subscriber equipment.
05/31/13Tempus Telcosys 5
INCREASED CAPACITY
 The GSM system provides a greater subscriber capacity than
analogue systems. GSM allows 25 kHz. Per user, that is, eight
conversations per 200kHz. Channel pair (a pair comprising one
transmit channel and one receive channel). Digital channel coding
and the modulation used makes the signal resistant to interference
from the cells where the same frequencies are re-used (co-channel
interference); a Carrier to Interference Ratio (C/I) level of 9 dB is
achieved, as opposed to the 18 dB typical with analogue cellular.
This allows increased geographic reuse by permitting a reduction in
the number of cells in the reuse pattern. Since this number is directly
controlled by the amount of interference, the radio transmission
design can deliver acceptable performance.
05/31/13Tempus Telcosys 6
CGI : CELL GLOBAL IDENTITY
05/31/13Tempus Telcosys 7
MCC MNC LAC CI
LAI
CGI
MCC = Mobile Country Code
MNC = Mobile Network Code
LAC = Location Area Code
CI = Cell Identity
MSISDN
05/31/13Tempus Telcosys 8
CC NDC SN
98 XXX 12345
CC = Country Code
NDC = National Destination Code
SN = Subscriber Number
MSISDN
 The Mobile Subscriber ISDN (MSISDN)
number is the telephone number of the MS.
This is the number a calling party dials to
reach the subscriber. It is used by the land
network to route calls towards the MSC.
05/31/13Tempus Telcosys 9
IMSI
 IMSI (International Mobile Subscriber
Identity) Network Identity Unique To A Sim.
05/31/13Tempus Telcosys 10
MCC MNC MSIN
404 XX 12345..10
SIM = Subscriber Identity Module
MCC = Mobile Country Code
MNC = Mobile Network Code
MSIN = Mobile Subscriber Identity Number
IMEI
 IMEI : Serial number unique to each mobile
05/31/13Tempus Telcosys 11
TAC FAC SNR SP
6 2 6 1
IMEI = International Mobile Equipment Identity
TAC = Type Approval Code
FAC = Final Assembly Code
SNR = Serial Number
SP = Spare
SUBSCRIBER IDENTIFICATION
 International Mobile Subscriber Identity (IMSI)
 Just the IMEI identifies the mobile equipment, other numbers are
used to identify the mobile subscriber. Different subscriber identities
are used in different phases of call setup. The International Mobile
Subscriber Identity (IMSI) is the primary identity of the subscriber
within the mobile network and is permanently assigned to that
subscriber.
 Temporary Mobile Subscriber Identity (TMSI)
 The GSM system can also assign a Temporary Mobile Subscriber
Identity (TMSI). After the subscriber’s IMSI has been initialized on the
system, the TMSI can be used for sending backward and forward across
the network to identify the subscriber. The system automatically
changes the TMSI at regular intervals, thus protecting the subscriber
from being identified by someone attempting to monitor the radio
channels. The TMSI is a local number and is always transmitted with
the Local numbers and is always transmitted with the Location Area
Identification (LAI) to avoid ambiguities.
05/31/13Tempus Telcosys 12
SUBSCRIBER IDENTIFICATION MODULE
(SIM)
 By making a distinction between the subscriber identity and the
mobile equipment identity, a GSM PLMN can route calls and
perform billing based on the identity of the subscriber rather than
the mobile equipment being used. This can be done using a
removable Subscriber Information Module (SIM). A ”smart card” is
one possible implementation of a SIM module.
 IMSI. This is transmitted at initialization of the mobile equipment.
 TMSI This is updated periodically by the PLMN
 MSISDN This is made up of a country code, a national code and a
subscriber number.
 Location Area Identity (LAI) This identified the current location of
the subscriber.
 Subscriber Authentication Key (KI) This is used to authenticate
the SIM.
05/31/13Tempus Telcosys 13
EQUIPMENT IDENTITY NUMBER
 International Mobile station Equipment Identity (IMEI)
 Each MS is identified by an International Mobile station Equipment
Identity (IMEI) number which is permanently stored in the mobile
equipment. On request, the MS sends this number over the
signalling channel to the MSC. The IMEI can be used to identify MS,s
that are reported stolen or operating incorrectly.
 Equipment Identity Register ( EIR )
 A listing of the allowed IMEI is maintained by the PLMN’s in the
Equipment Identity Register (EIR) to validate the mobile equipment.
05/31/13Tempus Telcosys 14
Frequency Bands
Uplink 890 – 915 MHz 25 MHz
05/31/13Tempus Telcosys 15
Downlink 935 – 960 MHz 25 MHz
100 KHz 200 KHz 100 KHz
1 43 1242 …………….
A 200 KHz carrier spacing has been chosen. Excluding 2x100 KHz edges of
the band, this gives 124 possible carriers for the uplink and downlink. The
use of carrier 1 and 124 are optional for operators.
GSM Network Architecture
05/31/13Tempus Telcosys 16
BTS
BTS
BTS
BTS
BTS
BSC
BSC
TRAU
MSC
HLR
AUC
VLR
EIR
PSTN
SMSC
MS – Mobile Station
 Mobile station provides user access to GSM network
for voice and data
 All GSM mobiles comply to GSM standards
 Subscriber data is read from a SIM card that plugs
into ME
05/31/13Tempus Telcosys 17
SIM ME
MS
MS (cont..)
 Each MS has a unique number called as IMEI
number, which is stored in EIR for
authentication purposes
 Mobile camps on to the GSM network
through the BTS serving the cell
 Mobile also scans neighboring cells and
reports signal strengths
 Mobile transmits and receives voice at 13 kb/s
over the air interface
05/31/13Tempus Telcosys 18
Mobile Station Output Power
 CLASS 1 20 watts Vehicle and Portable
 CLASS 2 8 watts Portable and Vehicle
 CLASS 3 5 watts Hand-Held
 CLASS 4 2 watts Hand-Held (GSM)
 CLASS 5 0.8 watts Hand-Held (DCS
1800)
 Output power determines:
 Accessibility in areas of coverage
 Talk Time and Standby time
05/31/13Tempus Telcosys 19
Mobile Station Identities
 CC – Country Code
 NDC – National Destination Code
 SN – Serial Number
05/31/13Tempus Telcosys 20
MSISDN : Mobile Station ISDN Number
It is the human identity used to call a Mobile
Station
CC SNNDC MSISDN
98 250 00134
IMSI (International Mobile
Subscriber Identity)
 MCC – Mobile Country Code
 MNC – Mobile Network Code
 MSIN – Mobile Subscriber Identity Number
05/31/13Tempus Telcosys 21
MCC MSINMNC IMSI
3 2 or 3
Not more than 15
NMSI
IMEI (International Mobile
Equipment Identity)
 TAC – Type Approval Code
 FAC – Factory Assembly Code
 SNR – Serial Number
 SP – Spare digit (usually used to specify
software version)
05/31/13Tempus Telcosys 22
TAC SPFAC IMEISNR
6 162 15
SIM ( Subscriber Identity
Module)
 Removable module inserted when the
subscriber wants to use the ME
 Two sizes: credit card size and stamp size
 SIM features and contents are personalized by
the Service Activator
 ROM – 6kb to 16 kb
 RAM – 128 bytes to 256 bytes
 EEPROM – 3kb to 8 kb
05/31/13Tempus Telcosys 23
Space to insert SIM photo
Contents of SIM
 Serial Number
 IMSI, Subscriber Key Ki, Ciphering Key Kc
 Algorithms for authentication and ciphering
 Network Code
 PIN, PUK
 Charging Information
 Abbreviated Dialling
 Supplementary Features (e.g. Call barring)
05/31/13Tempus Telcosys 24
SIM Security
 Two level protection
 When mobile is turned on, it will ask for user
to enter PIN (Personal Id Number)
 3 tries for PIN, after that PIN locked
 To unblock PIN, there is PUK (Pin Unblock
Key)
 10 attempts of PUK allowed
 After that SIM is blocked
05/31/13Tempus Telcosys 25
BTS (Base Transceiver Station)
 BTS has a set of Transceivers (TRXs) to communicate
with mobiles in its area
 One BTS covers one or more than one cell
 The capacity of a cell depends on number of
transceivers in the cell
 BTS is connected to the BSC through Abis Interface
which is 2Mbps
 BTS transmits and receives voice at 13kbps over air
interface to the mobiles.
 BTS commands mobiles to set Tx. Power, timing
advance and Handovers
05/31/13Tempus Telcosys 26
BTS
05/31/13Tempus Telcosys 27
BSC – Base Station Controller
 Several BTSs are connected to the BSC
 BSC Manages channel allocation, handovers and
release of channels at connected BTSs
 BSC connects to the BTS via the Abis interface
and to the MSC on A interface
 BSC has the entire database of cell parameters
associated with the BTSs.
 No mobile data is stored in the BSC
 Less connections for MSC as intelligence is made
common to all BTSs by the BSC
05/31/13Tempus Telcosys 28
BSC
05/31/13Tempus Telcosys 29
TRAU – Transcoder Rate
Adaptation Unit
05/31/13Tempus Telcosys 30
BTS
BSC PSTN
13 kbps 16 kbps 16 kbps 64 kbps
MSC and TRAU
TRAU (cont..)
 The MSC is based on ISDN switching. The
Fixed Network is also ISDN based.
 ISDN has speech rate of 64 kbps. Mobile
communicates at 13 kbps.
 TRAU converts the data rates between
13kbps GSM rate to 64kbps Standard ISDN
rate
 TRAU can be collocated with the BTS, BSC
or MSC or it can be a separate unit.
05/31/13Tempus Telcosys 31
Location of Transcoder
 Collocated with MSC, BSC, BTS
 Separate Unit
05/31/13Tempus Telcosys 32
MSC
Transco
der
BSC
MSC – Mobile Switching
Centre
05/31/13Tempus Telcosys 33
BSC
BSC
BSC
BTSs PSTN
HLR
VLR
MSC (cont..)
 Exchange where calls are established, maintained and
released
 Database for all subscribers and their associated
features.
 Communicates with the BSCs on the A interface and
with PSTN on fixed line.
 MSC is weighted on the number of subscribers it can
support. E.g. an MSC of 1 lac subscribers means one
MSC is enough till subscriber base increases upto 1 lac,
beyond which another MSC is required.
05/31/13Tempus Telcosys 34
Multiple MSCs
 When there is more capacity, there are more than
one MSCs.
 All MSCs have to communicate with one another
and to the outside world.
 Very complicated to connect each MSC to each
other and each MSC to PSTN
 So there is a concept of GMSC (Gateway MSC)
05/31/13Tempus Telcosys 35
BSC
BSC
MSC
MSC
GMSC PSTN
HLR – Home Location Register
 MSC has all subscriber database stored
in HLR
 HLR has all permanent subscriber
database
 HLR has a database which describes the
subscriber’s profile i.e. basic features
and supplementary services
 MSC communicates with the HLR to get
data for subscribers on call
05/31/13Tempus Telcosys 36
VLR – Visiting Location Register
 A subscription when activated is registered in
VLR
 VLR has all the subscriber numbers which are
active.
 VLR has a temporary database of all active
subscribers (on/off, location information)
05/31/13Tempus Telcosys 37
MSC VLRVLR
HLR
VLR (cont..)
 MSC communicates with HLR for subscribers
coming from different MSCs. If the subscriber is
found valid, then it registers the subscriber in
the VLR
05/31/13Tempus Telcosys 38
MSC MSCVLRVLR
HLR
VLR
AUC – Authentication Centre
 Authentication is a process by which a SIM is
verified
 Secret data and the verification process
algorithm are stored in AUC
 AUC is the element which carries out the
verification of the SIM
 AUC is associated with the HLR
05/31/13Tempus Telcosys 39
MS MSC HLR AUC
EIR (Equipment Identity Register)
 EIR is the Mobile Equipment Database
which has a series of IMEIs
 MSC asks the Mobile to send its IMEI
 MSC then checks the validity of IMEI with
the EIR
 All IMEIs are stored in EIR with relevant
classifications
05/31/13Tempus Telcosys 40
EIR
MSC
Classification of IMEIs
05/31/13Tempus Telcosys 41
White list: This contains the IMEI of
type approved mobiles
Black List: List of IMEIs which should be
barred because either they are stolen or
are not functioning properly
Grey list: List of IMEIs which are to be
evaluated before they are put in black list
Billing Centre (BC)
 BC Generates the billing statement for each
subscriber
 BC may be directly connected to the MSC or
through a mediation device
 MSC sends CDRs (Call Detail Records) to the BC
 According to the template of pulse rates and
units set, BC creates a bill according to the
destination called and the call duration
05/31/13Tempus Telcosys 42
Billing Centre (BC) (cont..)
05/31/13Tempus Telcosys 43
CDRs
Templates for unit costs
OMC – Operations and
Maintenance Centre
 Also called the NOC (Network Operations
centre)
 It is the central monitoring and remote
maintenance centre for all network elements
 OMC has links to BSCs and MSCs
05/31/13Tempus Telcosys 44
OMC – Operations and
Maintenance Centre
 Also called the NOC (Network Operations
centre)
 It is the central monitoring and remote
maintenance centre for all network elements
 OMC has links to BSCs and MSCs
05/31/13Tempus Telcosys 45
OMC
05/31/13Tempus Telcosys 46
OMC System
BSC
BSC
BSC
BTSs
BTSs
BTSs
OMC Terminals
05/31/13Tempus Telcosys 47
GSM Channels
GSM Channels
 Physical Channel
 One time slot on one carrier is called physical
channel.
 Logical Channel
 Information carried by physical channels is called
logical Channels.
 Logical channels are mapped on physical
channels.
05/31/13Tempus Telcosys 48
Logical Channels
 Traffic channels: Used for speech and data
 Full Rate(TCH/F)
 Half Rate(TCH/H)
 Control channels: Used for signaling .i.e.
setting up a radio connection, call or controlling
an MS during conversation
 BCH(Broadcast channels)
 CCCH(common control channels)
 DCCH(dedicated control channels)
05/31/13Tempus Telcosys 49
Traffic Channels(TCH)
05/31/13Tempus Telcosys 50
TCH/F
(full Rate)
TCH/H
(half Rate)
Traffic Channels(TCH)
Control Channels(CCH)
05/31/13Tempus Telcosys 51
CCH(Control Channel)
BCH CCCH DCCH
CCH RACH CBCH SDCCH ACCHSynch.
Chanels
SACCHFACCH
PCH/
AGCHFCCHSCH
BCH(Broadcast Channels)
 BCCH(Broadcast Control Channels)
 Downlink Only.
 Broadcast information of the serving cell (System
Information).
 Transmitted on timeslot zero of BCCH carrier.
 Reads only by idle mobile at least once every 30
secs.
05/31/13Tempus Telcosys 52
BCH(Broadcast Channels) cont’d
 SCH(Synchronisation Channels)
 Downlink Only
 Carries information for frame synchronisation.
 Contains frame number and BSIC(Base Station
Identity Code).
05/31/13Tempus Telcosys 53
BCH(Broadcast Channels) cont’d
 FCCH(Frequency Correction Channels)
 Downlink Only.
 Enable MS to synchronies to the frequency.
05/31/13Tempus Telcosys 54
CCCH(Common Control
Channel)
 RACH(Random Access Channel)
 Uplink only.
 Used by the MS when making its first access to
the Network.
 The reason for access could be initiation of a call
or a page response.
05/31/13Tempus Telcosys 55
CCCH(Common Control Channel)
cont’d
 AGCH(Assess Grant Channel)
 Downlink only.
 Used for acknowledgement of the access attempt
sent on RACH.
 Used by the network to assign a signaling cannel
upon successful decoding of access bursts.
05/31/13Tempus Telcosys 56
CCCH(Common Control Channel)
cont’d
 PCH(Paging Channel)
 Downlink only.
 The network will page the MS ,if there is a
incoming call or a short Message.
 It contains the MS identity number, the IMSI or
TMSI.
05/31/13Tempus Telcosys 57
DCCH(Dedicated Control
Channel)
 SDCCH (Stand-alone Dedicated Control
Channel)
 Uplink and Downlink.
 Used for call setup, authentication, ciphering
location update and SMS.
05/31/13Tempus Telcosys 58
DCCH(Dedicated Control
Channel) cont’d
 SACCH(Slow Associated Control Channel)
 Downlink and Uplink.
 Used to transfer signal while MS have ongoing
conversation on traffic or while SDCCH is being
used.
 On the forward link, the SACCH is used to send
slow but regularly changing control information to
each mobile on that ARFCN, such as power
control instructions and specific timing advance
instructions
05/31/13Tempus Telcosys 59
 SACCH(Slow Associated Control Channel)
cont’d
 The reverse SACCH carries information about
the received signal strength and quality of the
TCH, as well as BCH measurement results
from neighboring cells.
05/31/13Tempus Telcosys 60
DCCH(Dedicated Control
Channel) cont’d
 FACCH(Fast Associated Control Channel)
 Downlink and uplink.
 Associate with TCH only.
 It is used to send fast message like hand over
message.
 Work by stealing traffic bursts.
05/31/13Tempus Telcosys 61
Mapping on Physical
Channels
 The Logical channels are mapped on the
physical channels.
 The TDMA frames are grouped together into
multi-frame.
 26 TDMA multi-frame for Traffic.
 51 TDMA multi-frame for control signal.
05/31/13Tempus Telcosys 62
Channel Combination
 Combined
 All the controlling signals are in the time slot 0 of
the Multi-frame.
 Non Combined
 Dedicated controlling signals are in time slot 1 of
the Multi-frame.
05/31/13Tempus Telcosys 63
Combined
 Cell with single carrier.
 Timeslot 0 :BCCH+CCCH+SDCCH.
 Timeslot 1-7 :TCH/FACCH+SACCH.
05/31/13Tempus Telcosys 64
Non Combined
 Cell with Two carrier
 Timeslot 0 (of carrier 1) BCCH+CCCH.
 Timeslot 1 (of carrier1) SDCCH+SACCH.
 Timeslot 2-7 & 0-7(of both carriers)
TCH/FACCH+SACCH.
05/31/13Tempus Telcosys 65
BROADCAST MESSAGES
 System information 5 and 6 sent on the SACCH
immediately after Handover or whenever nothing else is
being sent.
 Downlink SACCH is used for system information
messages while uplink SACCH is used for measurement
reports.
 System Information types 7 and 8 (optional) are an
extension to type 4 and broadcast on the BCCH.
05/31/13Tempus Telcosys 66
SYSTEM INFORMATION
05/31/13Tempus Telcosys 67
SYSTEM INFORMATION 1
 When frequency hopping is used in cell MS needs to
know which frequency band to use and what frequency
within the band it should use in hopping algorithm.
 Cell channel description
Cell Allocation Number(CANO)-Informs the band
number of the frequency channels used.
00-Band 0(current GSM band)
Cell Allocation ARFCN(CA ARFCN):- ARFCN’s
used for hopping.It is coded in a bitmap of 124 bits.
05/31/13Tempus Telcosys 68
SYTEM INFORMATION 1
05/31/13Tempus Telcosys 69
124 123 122 121
024 023 022 021 020 019 018 017
016 015 014 013 012 011 010 009
008 007 006 005 004 003 002 001
SYSTEM INFORMATION 1
 RACH Control Parameters
Access Control Class(ACC) :-Bitmap with 16 bits.
All MS spread out on class 0 –9 . Priority groups use
class 11-15. A bit set to 1 barred access for that class.
Bit 10 is used to tell the MS if emergency call is allowed
or not.
0 – All MS can make emergency call.
1 - MS with class 11-15 only can
make emergency calls.
Cell barred for access(CB):-
0- Yes
1- No
05/31/13Tempus Telcosys 70
SYSTEM INFORMATION 1
 RACH Control Parameters
Re-establishment allowed(RE):-
0- Yes
1- No
Max_retransmissions(MAXRET):-Number of times
the MS attempts to access the Network [1,2,4 or 7].
Tx-integer(TX):- Number of slots to spread access
retransmissions when a MS attempts to
access the system.
Emergency call allowed:- Yes/No.
05/31/13Tempus Telcosys 71
SYSTEM INFORMATION 2
 System Information Type 2 message consists of
the Double BA list which defines the BCCH
frequencies used in the neighboring cells.
 The Double BA list provides the MS with
different frequencies on which to measure,
depending on whether the MS is in idle or active
mode.
 In active mode, the MS should measure on a
reduced number of frequencies in order to
improve the accuracy of measurements.
05/31/13Tempus Telcosys 72
SYSTEM INFORMATION 2
 In Idle mode,the MS should measure on larger
number of frequencies, so that the time required
for the MS to access the network after power on
is reduced.
 The MS is also informed which PLMN’s it may
use.
 As well as System Information Type 2,it is also
possible to have System Information Type 2 Bis
and System information Type 2 Ater, depending
on the size of the BA List.
 System Information Type 2 Bis/Ter are optional.
05/31/13Tempus Telcosys 73
SYSTEM INFORMATION 2
 Neighbor Cell Description:-
BA Indicator(BA IND):- Allows to differentiate
measurement results related to different list of BCCH
frequencies sent to MS.
BCCH Allocation number(BANO):-
Band 0 is used.
 PLMN Permitted(NCCPERM):-This the PLMN
color codes permitted and tells the MS which network
color codes(NCC) on the BCCH carriers it is allowed to
monitor when it is in this cell.
.
05/31/13Tempus Telcosys 74
SYSTEM INFORMATION 2
 RACH Control Parameters
Access Control Class(ACC) :-Bitmap with 16 bits.
All MS spread out on class 0 –9 . Priority groups
use class 11-15. A bit set to 1 barred access for
that class. Bit 10 is used to tell the MS if emergency
call is allowed or not.
0 – All MS can make emergency call.
1 - MS with class 11-15 only can
make emergency calls.
Cell barred for access(CB):-
0- Yes
1- No
05/31/13Tempus Telcosys 75
SYSTEM INFORMATION 2
Re-establishment allowed(RE):-
0- Yes
1- No
Max_retransmissions(MAXRET):-Number of times
the MS attempts to access the Network [1,2,4 or 7].
Tx-integer(TX):- Number of slots to spread access
retransmissions when a MS attempts to
access the system.
Emergency call allowed:- Yes/No.
05/31/13Tempus Telcosys 76
SYSTEM INFORMATION 2
BCCH ARFCN Number(BAIND):- ARFCN’s used for in
a Bitmap of 124 bits
05/31/13Tempus Telcosys 77
124 123 122 121
024 023 022 021 020 019 018 017
016 015 014 013 012 011 010 009
008 007 006 005 004 003 002 001
SYSTEM INFORMATION 3
 The System Information Type 3 contains information on
the identity of the current LA and cell identity, because a
change means that the MS must update the network.
 System Information 3 also as Control Channel
Description parameters used to calculate the Paging
group.
 When the MS is in idle mode it decides which cells to lock
to. Information needed by the MS for cell selection is also
broadcast in the Type 3 information.
05/31/13Tempus Telcosys 78
SYSTEM INFORMATION 3
8 7 6 5 4 3 2 1
1 1 1 1
LAC
LOCATION AREA IDENTITTY(LAI)
MCC DIG 1MCC DIG 2
MCC DIG 1
MNC DIG 1MNC DIG 2
CI
CI
CELL IDENTITY
LAC
05/31/13Tempus Telcosys 79
SYSTEM INFORMATION 3
 Control Channel Description
Attach / Detach(ATT):-
0 = Allowed
1 = Not Allowed
bs_agblk:-Number of block reserved for AGCH [0-7]
Ba_pmfrms:-Number of 51 frame multi-frames
between transmission of paging messages to MS of
the same group
T3212:- Periodic location update timer .
[1-255 deci hours].
05/31/13Tempus Telcosys 80
SYSTEM INFORMATION 3
cch_conf Physical channels combined No. of CCH
0 1 timeslot(0) No 9
1 1 timeslot(0) Yes 3
2 2 timeslot(0,2) No 18
4 3 timeslot(0,2,4) No 27
6 4 timeslot(0,2,4,6) No 36
05/31/13Tempus Telcosys 81
SYSTEM INFORMATION 3
 Cell options
DTX:-Whether Discontinuous Transmission
used or not.
PWRC:-Power control on the downlink.
0 = Not used.
1 = Used.
Radio link timeout(RLINKT):-
Radio link time-out is the time before an MS
disconnects due to failure in decoding SACCH
message. Sets the timer T100 in the MS.
05/31/13Tempus Telcosys 82
SYSTEM INFORMATION 3
 Cell Selection Parameters
Rxlev_access_min:- Minimum received signal level
at the MS for which it is permitted to access the
system.
0-63 = -100 dBm to –47 dBm.
Mx_txpwr_cch:- Maximum power the MS will use
when accessing the system.
Cell_reselect_hysteresis:- Used for cell reselection.
 RACH Control Parameters.
05/31/13Tempus Telcosys 83
SYSTEM INFORMATION 4
 Location Area Identification.
 Cell Selection Parameters
Rxlev_access_min:- Minimum received signal level
at the MS for which it is permitted to access the
system.
0-63 = -100 dBm to –47 dBm.
Mx_txpwr_cch:- Maximum power the MS will use
when accessing the system.
Cell_reselect_hysteresis:- Used for cell reselection.
05/31/13Tempus Telcosys 84
SYSTEM INFORMATION 4
 RACH Control Parameters
max_retransmissions(MAXRET)
tx_integer(TX)
Cell barred for access(CB).
Re-establishment allowed(RE)
Emergency Call Allowed
Access Control Class (ACC)
05/31/13Tempus Telcosys 85
SYSTEM INFORMATION 4
 CBCH Description(Optional) :
CHN:- This is the channel number for CBCH. It is
controlled internally in BSC.
TSC:- Training Sequence Code. Base Station Color
Code(BCC) part of BSIC is used.
CBCHNO:- Absolute RF channel number of CBCH.
MAC:- Mobile Allocation in the cell, describes the
frequencies to be used in the hopping sequence if
frequency hopping is used.
05/31/13Tempus Telcosys 86
SYSTEM INFORMATION 4
Hopping Channel(H):-Informs if CBCH Channel is
hopping or single.
ARFCN:- If H=0;
MAIO:- If H=1, informs the MS where to
start hopping.
Values [0-63].
HSN:- If H=1, informs the MS in what order
the hopping should take place. Values[0 –63].
HSN=0 Cyclic Hopping.
MA:-Indicates which RF Channels are used
for hopping. ARFCN numbers coded in
bitmap.
05/31/13Tempus Telcosys 87
SYSTEM INFORMATION 5
 Sent on the SACCH on the downlink to the MS in
dedicated mode.
 On SAACH, the MS also receives information about the
BCCH carrier in each neighboring cell. This may differ
from those sent in System information type 2.
 It is also possible to have system Information Type 5 Bis
and System Information Type 5Ter, depending on the
size of the BA list.
05/31/13Tempus Telcosys 88
SYSTEM INFORMATION 5
 Neighbor Cell Description:-
BA-IND:-Used by the Network to discriminate
measurements results related to different lists of
BCCH carriers sent by the MS(Type 2 or 5).
Values 0 or 1(different from type 2).
BCCH
Allocation number:-00-Band 0(current GSM band).
05/31/13Tempus Telcosys 89
SYSTEM INFORMATION 5
BCCH ARFCN:-Neighboring cells ARFCN’s. Sent as a
bitmap.
0-Not used
1-Used.
124 123 122 121
024 023 022 021 020 019 018 017
016 015 014 013 012 011 010 009
008 007 006 005 004 003 002 001
05/31/13Tempus Telcosys 90
SYSTEM INFORMATION 6
 Ms in dedicated mode needs to know if the LA has
changed.If so, it must perform location updating when
the call is released.
 MS may change between cells with different Radio link
timeout and DTX.
 Cell Identity.
 Location Area Identification.
 PLMN permitted.
05/31/13Tempus Telcosys 91
SYSTEM INFORMATION 6
 Cell options:
DTX
PWRC
Radio Link timeout.
05/31/13Tempus Telcosys 92
SYSTEM INFORMATION 7/8
 System Information Types 7 and 8 contain Cell
Reselect parameters. Their function is to
supplement System Information Type 4.
05/31/13Tempus Telcosys 93
GSM Interfaces
 (Um) Air interface - MS to BTS
 A bis interface - BTS to BSC
 A Interface - BSC to MSC
 B Interface - MSC to VLR
 C interface - MSC to HLR
05/31/13Tempus Telcosys 94
MSC
BSC
VLRHLR
AUC
EIR
GMSC
MS
A Interface
A bis Interface
Air Interface
B Interface
C Interface
F Interface
D Interface
H Interface
To other
Networks
05/31/13Tempus Telcosys 95
GSM Interfaces
 The interfaces between MSC and MS is called A,
Abis and Um interfaces.
 On these interfaces only three layers are
defined.They are not corresponding to the OSI
(Open System Interconnection) model.
05/31/13Tempus Telcosys 96
A Interface
 A interface between the BSC and the MSC
 The A interface provides two distinct types of
information, signalling and traffic, between the
MSC and the BSC.
 The speech is transcoded in the TRC and the SS7
(Signalling system) signalling is transparently
connected through the TRC or on a separate link
to the BSC.
05/31/13Tempus Telcosys 97
Abis Interface
 The A-bis interface responsible for transmitting traffic
and signalling information between the BSC and the
BTS.
 The transmission protocol used for sending signalling
information on the A-bis interface is Link Access
Protocol on the D Channel (LAPD)
05/31/13Tempus Telcosys 98
(Um) Air Interface
 This is the interface between the mobile station and the
Base station.
 The Air interface uses the Time Division Multiple Access
(TDMA) technique to transmit and receive traffic and
signalling information between the BTS and MS.
 The TDMA technique is used to divide each carrier into
eight time slots.These time slots are then assigned to
specific users,allowing up to eight conversations to be
handled Simultaneously by the same carrier.
05/31/13Tempus Telcosys 99
7 56 34 12 0
1 2 43 5 76
Down Link
Up Link 0
Time Slot
05/31/13Tempus Telcosys 100
• This interface is the radio interface between the
mobile station and the network and uses layer
Three messages.
• On Layer three messages we have the division
of message types into CM (communication
Management), MM (Mobility Management), and
RR (Radio Resource Management).
Connection Management
(CM)
There are three entities within CM:
 Call Control(CC) – Which handles the procedures
concerning call control. e.g. setup,Change of bearer
service.
 Supplementary Service (SS) – Which handles such as call
bearing, call waiting , call forwarding etc.
 Short Message Service (SMS) – Enables the MS to handle
short message transfer to and from the network.
05/31/13Tempus Telcosys 101
Mobility Management (MM)
 Mobility management handles functions for
authentication, location updating, identification and
others concerning the mobility of the mobile station.
05/31/13Tempus Telcosys 102
Radio Resource Management
(RR)
 It contains the functions concerning the radio link. Here
we find the capability to establish,maintain and release
the radio connection between the network and the
mobile station, which includes the handover procedure.
05/31/13Tempus Telcosys 103
B Interface
 The B interface between the MSC and the VLR uses the
MAP/TCAP protocol.
 Most MSCs are associated with a VLR, making the B
interface "internal".
 Whenever the MSC needs access to data regarding a MS
located in its area, it interrogates the VLR using the
MAP/B protocol over the B interface.
05/31/13Tempus Telcosys 104
C Interface
 The C interface is between the HLR and a MSC.
 Each call originating outside of GSM (i.e., a MS
terminating call from the PSTN) has to go through a
Gateway to obtain the routing information required to
complete the call, and the MAP/TCAP protocol over the
C interface is used for this purpose.
 Also, the MSC may optionally forward billing information
to the HLR after call clearing.
05/31/13Tempus Telcosys 105
D Interface
 The D interface is between the VLR and HLR.
 It uses the MAP/TCAP protocol to exchange the data
related to the location of the MS and to the management
of the subscriber.
05/31/13Tempus Telcosys 106
E Interface
 The E interface interconnects two MSCs.
 The E interface exchanges data related to handover
between the anchor and relay MSCs using the
-MAP/TCAP+ISUP/TUP protocol.
05/31/13Tempus Telcosys 107
F Interface
 The F interface connects the MSC to the EIR.
 It uses the MAP/TCAP protocol to verify the status of the
IMEI that the MSC has retrieved from the MS.
05/31/13Tempus Telcosys 108
G Interface
 The G interface interconnects two VLRs of different
MSCs.
 It uses the MAP/G protocol to transfer subscriber
information, during e.g. a location update procedure.
05/31/13Tempus Telcosys 109
05/31/13Tempus Telcosys 110
Topics for discussion
 Speech Encoding
 Data Encoding
 Interleaving for Voice,Control and Data
signals
05/31/13Tempus Telcosys 111
Speech Encoding
 We shall start with a raw voice signal fed into
the microphone, travel through the various
stages involving vocoding, channel coding etc
till it reaches the final burst format on the Air
Interface.
05/31/13Tempus Telcosys 112
Speech Encoding ckt
05/31/13Tempus Telcosys 113
Voice
Encoding
Channel
coding
interleaving
RF Modulation
Raw
Voice
signal
Speech Encoding ckt
 The voice is sampled at the rate of 50 samples
per second.
 This results in 20 msec blocks of speech
 Each of this 20 msec block is passed on to the
13Kbps vocoder.
 There are 260 information bits from the
output of the vocoder for every 20 msec input
i.e.; 13Kbps *20msec = 260 bits.
05/31/13Tempus Telcosys 114
Voice Encoding ckt
05/31/13Tempus Telcosys 115
Vocoder I/p
20 msec speech
blocks
13Kbps Vocoder Vocoder O/p
260 bits
Channel coding
 Channel Coding is done to protect the logical
channels from transmission errors introduced
by the radio path.
 The coding schemes depend on the type of
the logical channels, hence the coding can
differ from speech, control and data .
05/31/13Tempus Telcosys 116
Channel Coding for speech
05/31/13Tempus Telcosys 117
Class class 1b class 2
1a
50 3 132 4 tail
Bits parity bits
Convolutional coder
½ coder, k=5
456 bits=378 bits from Convolution coder + 78 class 2 bits
260 bits
Channel coding for Speech
 The 260 bits of speech info from the vocoder is
broken down into three parts.
 Class 1a- 50 bits , these represent the filter
coefficients of the speech and are the most
important for proper detection of the speech at
the receiver and hence are given maximum
protection. 3 additional parity bits are derived
from the class 1a bits for cyclic redundancy check
(CRC).
05/31/13Tempus Telcosys 118
Channel coding for Speech
cont’d
 Class 1b - 132 bits are not parity checked but
are fed into the convolutional coder along
with 4 tail bits which are used to set the
registers in the receiver to a known state for
decoding purpose.
 Class 1b- 78 bits, these are not so important
and are not protected but are combined with
the output of the convolution coder.
05/31/13Tempus Telcosys 119
Convolutional coder CC
 The Convolutional coder is a series of shift
registers implemented using logic gates, where
for every one input bit we get 2 output bits.
Hence it is called ½ coder.
 Here k=5 is the constraint length, it means there
are 5 shift register and each bit has memory
depth of 4 , meaning it can influence the output
of up to four next successive bits. This is useful
during reception as bits can be derived even if a
few consecutive bits are lost due to errors or
corruption.
05/31/13Tempus Telcosys 120
½ Convolutional coder
05/31/13Tempus Telcosys 121
R1 R2 R3 R5R4
+
+
C0
output
C1
output
0110..
Input bits
+ EX-OR
R=register
Convolutional coder cont’d
 The output of the CC* is now 378 bits.
(50+3+132+4)*2=378
The total number of bits now is 378+78=456 bits.
*Note : The bit rate from the vocoder was 13Kbps
for the 20 msec speech block, but after CC the bit
rate increases to 22.8Kbps.
456 bits *20msecs=22.8Kbps
* CC = Convolutional Coder.
05/31/13Tempus Telcosys 122
Control Channel Coding
05/31/13Tempus Telcosys 123
184 bits
Control data
184 40 4 tail
Fire coded parity bits
½ Convolutional Coder
456 bits output
Control Channel Coding
 The control information is received in blocks of
184 bits.
 These bits are first protected with a cyclic code
called as Fire code, which is useful in correction
and detection of burst errors.
 40 Parity bits are added, along with 4 tail bits.
 These 228 bits are given to the CC whose output
is again 456 bits at a bitrate of 22.8Kbps.
 The control channels include the RACH, PCH,
AGCH etc.
05/31/13Tempus Telcosys 124
Data Channel Coding
05/31/13Tempus Telcosys 125
240 bits 4 tail
Data bits
½ Convolutional Coder
Output= 488 bits
After Puncturing
Output=456 bits
Data Channel Coding
 The data bits are received in blocks of 240 bits.
These are directly convolution coded after
adding 4 tail bits.
 The output of the CC is now 488 bits, which
actually increases the bitrate to 24.4 Kbps.
 To keep the bitrate constant on the air interface
we need to puncture the output of the CC.
Hence, we have a final bitrate of 22.8 Kbps again
.
05/31/13Tempus Telcosys 126
Channel Coding cont’d
 The above explanation was given keeping in
view a full rate Traffic, Control, or Data
channel.
 For Half rate or Lesser rates the same
principle of channel coding holds good, with
slight differences in the encoding process.
05/31/13Tempus Telcosys 127
Interleaving
 Having encoded the logical channel
information, the next step is to build its bit
stream into bursts that can be transmitted
within the TDMA frame structure. This is the
stage where the interleaving process is
carried out.
 Interleaving spreads the content of one
information block across several TDMA
timeslots or bursts.
05/31/13Tempus Telcosys 128
Interleaving cont’d
 The following interleaving depths are used :
 Speech – 8 blocks
 Control – 4 blocks
 Data – 22 blocks
 The interleaving process for a speech block is
shown wherein which a 456 bit speech block is
divided into 8 blocks of 57 bits each and each of
these odd and even 57 bit blocks are interleaved
diagonally on to alternate bursts on the TDMA
frame.
05/31/13Tempus Telcosys 129
Speech Interleaving
05/31/13Tempus Telcosys 130
8* 57 bits each = 456 bits
Of Speech block N
57
Even
Of N-1
57
Even
Of N
Speech block
N-1
57
odd
Of N-1
57
odd
Of N
The speech is spread over 8 such normal bursts
Each normal burst consists of two blocks of 57 bit speech
from different 20msec blocks (say N, N-1) along with
26 bit training sequence T and 2 flag F plus 6 start stop bits .
T+FT+FT+F
456 bit speech data
Control Data Interleaving
05/31/13Tempus Telcosys 131
114 114 114 114
456 bits control data
The control data is spread over 4 blocks using rectangular
interleaving instead of diagonal interleaving as in
speech the receiver will have to wait for at least
2 multiframes before being able to decode the control
message
TDMA
Burst blocks
Data Interleaving
05/31/13Tempus Telcosys 132
114 114 114 114
Burst 1 Burst 22Burst 2 Burst 3 Burst 4 Burst 19
First 6
bits
First 6
bits
Last 6
bits
Last 6
bits
456 bit data block
Data Interleaving cont’d
 Here the data block of 456 bits is divided into 4
blocks of 114 bits each.
 The first 6 bits from each of the 114 bit blocks is
inserted in to each frame, the second 6 bits from
each of the 114 bits into the next frame and so on
spreading each 114 block over 19 TDMA bursts
while the entire 456 bits is spread over 22 TDMA
bursts.
 Thus the data interleaving is said to have a depth
of 22 bursts.
05/31/13Tempus Telcosys 133
Data Interleaving cont’d
 The reason why data is spread over such along
period of time is that if data burst is corrupted or
lost, only a small part of it is lost which can be
reproduced at the receiver.
 This wide interleaving depth does produce a
time delay during transmission but that is
acceptable since it does not affect the data
signal quality at the receiver, unlike speech
where delay could result in bad quality of signal
to the subscriber.
 *Note – The interleaving used in data is diagonal
interleaving.
05/31/13Tempus Telcosys 134
Before Deinterleaving
3 successive bursts corrupted
After Deinterleaving
The corrupted bursts are spread over a length equal to the
interleaving depth so that the effect of the errors is
minimized.
05/31/13Tempus Telcosys 135
Interleaving Advantage
Air Interface Bitrate
 The information which is now coded and
interleaved at 22.8 Kbps now has to be
transmitted over the Air interface to the BTS.
 The information burst is not sent directly , but is
sent in ciphered form within a burst envelope.
This ciphering is done using ciphering keys and
algorithms known both by the mobile and the
BSS.
05/31/13Tempus Telcosys 136
Air Interface Bitrate
cont’d
 The Kc is the ciphering key and A5 algorithm
are applied to the information(speech or
data) which increases the bitrate to a final
rate of 33.8 Kbps from/to each mobile.
 If we assume all 8 timeslots of the cell to be
occupied then the bitrate of the Air interface
comes to 33.8 * 8= 270.4 Kbps/channel.
05/31/13Tempus Telcosys 137
Air Interface Bitrate
cont’d
05/31/13Tempus Telcosys 138
A5 Algorithm
Kc Information
Block 22.8 Kbps
Sent on Air interface
Ciphered information burst
33.8 Kbps
Air Interface Bitrate
cont’d
05/31/13Tempus Telcosys 139
1 2 3 4 5 6 7 8
Mobile
Tx’s at
33.8 Kbps
Cell rx’s 8*33.8
KBps = 270.4 Kbps
Per TDMA frame
Cell coverage area
TDMA Fn TDMA Fn+1
Decoding and Deinterleaving at
the Receiver
 At the receiver the reverse process of
Deinterleaving and decoding have to take place
respectively, so as to recover the information
from the signal.
 After Deinterleaving the signal will be decoded
which is the reverse process of the Convolutional
coding, using Viterbi decoders.
 The decoder can recover lost or corrupted data
up to 4 successive bits, because the memory
depth of the CC is 4(for k=5).
05/31/13Tempus Telcosys 140
Channelization
 Frequency band has several application
segments
 Certain blocks of the Band are reserved for
certain applications by regulating authorities
 Technologies have decided their frequency
bands
 E.g. AMPS/DAMPS: 824-894 MHz
05/31/13Tempus Telcosys 141
Channelization methods
Channelization can be done primarily by three
methods:
 FDMA (Frequency Division Multiple Access)
 TDMA (Time Division Multiple Access)
 CDMA (Code Division Multiple Access)
05/31/13Tempus Telcosys 142
FDMA
 E.g. AMPS band is divided into 30 KHz channels
(1666 Freq. channels)
 Television Channels (Star, Zee, Sony,..)
05/31/13Tempus Telcosys 143
Frequency
Time
Power
TDMA
 E.g. AMPS has 3 timeslots on each 30 KHz
channel
05/31/13Tempus Telcosys 144
Frequency
Time
Power
CDMA
 Frequency channel is divided into code
channels
 E.g. in IS-95 CDMA, 1.228 MHz channel is
divided into 64 Code Channels
 Each user has a particular code
 Codes are orthogonal to each other, do not
interfere with each other
05/31/13Tempus Telcosys 145
Duplex Access Methods
 Frequency Division Duplex (FDD)
 Transmit on one frequency and receive on
another frequency
05/31/13Tempus Telcosys 146
F1 F2 Frequency
Amplitude
Time
Tx Rx
Time Division Duplex
 Time division duplex
 Tx and Rx is on the same frequency but on
different times
05/31/13Tempus Telcosys 147
F1 Frequency
Amplitude
Time
Tx
Rx
GSM Air Interface
 Separate Bands for Uplink and Downlink
 Downlink: 935-960Mhz (EGSM: 925-960MHz)
 Uplink: 890-915 MHz (EGSM: 880-915 MHz)
05/31/13Tempus Telcosys 148
• TDMA and TDMA Multiplex
– 124 Frequency Channels (ARFCN) for
GSM900
– 1 to 124 fro current band
– 975 to 1023 for E-GSM
– 200kHz Channels
– 8 Mobiles share ARFCN by TDMA
GSM Air interface (1800)
 1800: Downlink: 1805-1880 MHz
 1800: Uplink: 1710-1785 MHx
 374 ARFCNs
 Separation of 95 MHz
 ARFCNs are numbered from 512 to 885
inclusive
05/31/13Tempus Telcosys 149
The GSM Burst
05/31/13Tempus Telcosys 150
3 357 261 571 8.25
Tail Bits
Data
Control
Bit
Midamble
Control
Bit
Data
Tail Bits
Guard
Period
Speech Coder
 RPE/LTP coder (Regular
Pulse excitation/Long term
Prediction)
 Converts 64 kbps speech
to 13 kbps
 At the end we get 13kbps
speech i.e. 260 bits in 20
ms
05/31/13Tempus Telcosys 151
20 ms blocks
Speech Coder
Bits Ordered
50 very
important
bits
132
important
bits
78 other
bits
Error Correction
05/31/13Tempus Telcosys 152
Type 1a 50 3(CRC)Type 1b 132 Type II 78
Reordering
25 66366 25 4 Type II 78
Type 1a
Type 1b Type 1b
Type 1a
Tail
Half rate convolutional code
378 Type II 78
456 bits from 20 ms of speech
Diagonal Interleaving
 Traffic channel (TCH) bursts carry two 57 bit blocks
(114)
 Each 120 ms of speech = 456*6 = 2736 bits
2736/114 = 24 bursts i.3. 24 frames
Multiframe has 26 frames in 120ms.
There are 2 spare frames .. 1 SACCH, 1 Idle
05/31/13Tempus Telcosys 153
456 bits from 20ms of speech 456 bits from 20ms of speech
57 57575757575757 57 57575757575757
57 57 57 5757 5757 5757 5757 5757 5757 57
Convolutional Coding and
Interleaving
 Bits to be Tx ed: HELLO
 Convolutionally encoded: HHEELLLLOO
 Interleaved: EE HH LL LL OO
 Bits Rx ed: EE HH LL LL OO
 De-Interleaved: HHEELLLLOO
 Viterbi Decoded: HELLO
05/31/13Tempus Telcosys 154
Speech Coding Process
05/31/13Tempus Telcosys 155
20 ms
Speech Coder
260 bits 13 kbps
50 1a 132 1b 78 II
Channel Coder
456 bits 22.8 kbps
Transceiver (BTS)
Transcoder Handler
260 bits
456 bits
16 kbps
TRAU frame
260 + 60 = 320 bits
Abis
13 kbps
TRAU frame
 260 bits info + 60 TRAU bits = 320 bits/20ms =
TRAU frame
 60 bits contain frame Information data which
indicates speech, data, O&M, full rate/half
rate
 60 bits = 35 synchronization + 21 control + 4
timing
05/31/13Tempus Telcosys 156
Midamble or Training Bits
 8 midamble patterns (Colour codes) of 26 bits (BSIC)
 RACH and SCH have longer 41 and 64 bit Midambles
 Equalizer estimates channel impulse response from
midamble
 Mathematically construct inverse filter
 Uses inverse to decode bits
05/31/13Tempus Telcosys 157
3 357 261 571 8.25
Tail Bits
Data
Control Bit
Midamble
Control Bit
Data
Tail Bits
Guard
Period
Downlink and Uplink
 Uplink lags downlink by 3 timeslots
 Uplink and downlink use same timeslot number
 Uplink and downlink use same channel number
(ARFCN)
 Uplink and downlink use different bands (45
MHz apart for GSM 900)
05/31/13Tempus Telcosys 158
Measurements made by MS and
BTS
05/31/13Tempus Telcosys 159
 RxQual
0 < 0.2% 1 0.2 – 0.4 %
3 0.4 – 0.8 % 4 0.8 – 0.16 %
5 1.6 – 3.2 % 6 3.2 – 6.4 %
7 6.4 – 12.8 %
Uplink RXLEV (-48 to -110 dbm)
Uplink RXQUAL (0-7)
Uplink RXLEV (-48 to -110 dbm)
Uplink RXQUAL (0-7)
Mobile Power Control
05/31/13Tempus Telcosys 160
 Mobile is commanded to change its Transmit
Power
 Change in Power is proportionate to the Path
Loss
 Change in Power is done in steps of 2 dbs
Path Loss
Power Command
Timing Advance
 TDMA approach requires signals to arrive at
BTS at the correct time
 A mobile at 30 km will be late by 100micro
seconds
 Timing advance is in the range of 0-62
 One unit is 550m
 So maximum cell size is 63*0.55 = ~35 kms
05/31/13Tempus Telcosys 161
Concepts of Channels in GSM
 A company vehicle is used for several purposes in a
day
 Similarly in GSM, the timeslots are used for different
purposes at different times
05/31/13Tempus Telcosys 162
Frames and Multiframes
05/31/13Tempus Telcosys 163
0 654321 7
3 Data 1Midamble1 Data 3 8.25 bits
156.25 bits 576.92 micro sec
4.615 ms
Time
Slot
Frame
0 50 0 25
Control Channel
Multiframe
Traffic Channel
Multiframe
GSM Operations
 Location Update
 Mobile
Originated Call
 Mobile
Terminated Call
 Handover
 Security
Procedures
 Cell Barring
 DTX
 Cell Broadcast
 Short Message
Service
 Emergency calls
 Supplementary
Services
 Roaming
05/31/13Tempus Telcosys 164
Mobile Turn On
 Mobile Searches for Broadcast
Channels (BCH)
 Synchronizes Frequency and Timing
 Decodes BCH sub-channels (BCCH)
 Checks if Network Allowed by SIM
 Location Update
 Authentication
05/31/13Tempus Telcosys 165
Location Area
05/31/13Tempus Telcosys 166
Location Area 1Location Area 1
Location
Area 2
Location
Area 2
BTS
BTS
BTS
BTS
BTS
BTS
BTS
BTS
BSC
BSC
BSC
MSC
Location Area Identity
 Location area is the area covered by one
or more BTSs where a mobile can move
freely without updating the system
 One Location area can be covered by one
or more BSCs, but ony one MSC.
05/31/13Tempus Telcosys 167
MCC LACMNC
Importance of Location Area
 Reduce Paging load
 Resource Planning
Smaller Location Areas – Location update
increases
Larger Location Areas – Paging load increases
05/31/13Tempus Telcosys 168
What is Location Update?
 MSC should know the location of the
Mobile for paging
 Mobile is continuously changing
location area
 Mobile when changes Location Area
informs the MSC about its new LA
 Process of informing MSC about new
Location area is Location Update
05/31/13Tempus Telcosys 169
Types of Location Updates
1. Normal Location
Update
2. IMSI Attach
3. Periodic Location
Update
05/31/13Tempus Telcosys 170
Hi,
I am in Location area
xxx
IMSI Attach
 Mobile turns off and sends an IMSI Detach
to MSC
 Mobile turns on again and compares LAI
 If same, sends an IMSI attach to MSC
05/31/13Tempus Telcosys 171
Is the received
LAI same as
before
If same,
Sends
IMSI
attach
Normal Location Update
 Mobile Turns on Power
 Reads the new LAI
 If different, does a Location Update
05/31/13Tempus Telcosys 172
Is the received
LAI same as
before
If different,
does
Location
Update
Periodic Location Update
 The periodic location Update time is set
from OMC/MSC
 After the periodic location update timer
expires, the mobile has to do a location
update
05/31/13Tempus Telcosys 173
What happens at Location
Update?
 Mobile changes location area
 Reads the new Location Area from
BCCH
 Sends a RACH (request for channel)
 Gets a SDCCH after AGCH
 Sends its IMSI and new and old LAI in a
Location Update request to MSC on
SDCCH
05/31/13Tempus Telcosys 174
What happens at location
update cont..
….. . .
 MSC starts Authentication
 If successful, Updates the new Location area
for the Mobile in the VLR
 Sends a confirmation to the Mobile
 Mobile leaves SDCCH, and comes to idle mode
05/31/13Tempus Telcosys 175
Mobile Originated Call
05/31/13Tempus Telcosys 176
Channel Request
Immediate Assign
Service Request
Call Proceeding
Set Up
Ciphering
Authentication
Alerting
Assignment
Connection
Mobile Terminated Call
05/31/13Tempus Telcosys 177
Paging
Channel Request
Immediate Assign
Set Up
Ciphering
Authentication
Paging Response
Assignment
Call Confirmed
Alerting
Connection
Security Features
 Authentication
 Process to verify Authenticity of SIM
 Mobile is asked to perform an operation
using identity unique to SIM
05/31/13Tempus Telcosys 178
• Ciphering
–Process of coding speech for
secrecy
–The speech bits are EXORed with
bit stream unique to MS
Security Features (TMSI
Reallocation)
05/31/13Tempus Telcosys 179
GSM
Infrastructure
Mobile
Location Update
TMSI Allocation
Call Setup
TMSI Reallocation
TMSI- Temporary Mobile Subscriber Identity
Security Features
(Identity Check)
05/31/13Tempus Telcosys 180
EIR
Sends IMEI
Identity Check
White listed /Grey Listed/ Black
Listed mobiles
Handover
05/31/13Tempus Telcosys 181
Cell 1 Cell 2
Handover is a GSM feature by which the
control/communication of a Mobile is transferred
from one cell to another if certain criteria’s are
met. It is a network initiated process.
Criteria for Handover
 Receive Quality (RXQUAL) on uplink and
downlink
 Receive Signal Strength (RXLEV) on uplink
and downlink
 Distance (Timing Advance)
 Interference Level
 Power Budget
05/31/13Tempus Telcosys 182
Handover Decision
 BSC process the measurements reported by Mobile
and the BTS
05/31/13Tempus Telcosys 183
BTS
BTS
BTS
BTS
BTS
BTS
Mobile has measurements of six neighbors
Handover Decision (cont..)
 BSS performs averaging function on these
measurements every SACCH frame (480ms)
 Handover Decision algorithm is activated after a
set number of SACCH frame periods by
comparison against thresholds
05/31/13Tempus Telcosys 184
Types of Handovers
 INTRA-CELL HANDOVERS
 INTER-CELL HANDOVERS
 INTRA-BSC HANDOVERS
 INTER-BSC HANDOVERS
 INTER-MSC HANDOVERS
05/31/13Tempus Telcosys 185
INTRA-CELL HANDOVER
05/31/13Tempus Telcosys 186
C0
C1
Handover between timeslots of same frequency
Handover between different frequencies of the same cell
(to reduce interference)
MSC is not aware about this
Inter-cell Handover
05/31/13Tempus Telcosys 187
Handover between cells of the same BTS
BTS
Cell 1 Cell 2
Inter-cell Handover (cont..)
 MSC is told about HO
 BTS -> BSC -> MSC
 Why MSC is informed?
 In case of change of LA, MSC may need LAC for
paging. As MS is busy, a link already exists. So, MSC
can send a tone in case of call waiting, and does not
need to page again.
 This is needed also for billing and call tracing
05/31/13Tempus Telcosys 188
INTRA-BSC Handover
05/31/13Tempus Telcosys 189
MSC BSC
BTS
BTS
This HO takes place if the cell to which handover
is to be done belongs to the same BSC
Inter BSC Handover
05/31/13Tempus Telcosys 190
MSC
BSC BTS
BTSBSC
The MSC is completely involved in this Handover
Inter MSC Handover
05/31/13Tempus Telcosys 191
BSC
BSC
MSC
MSC
BTS
BTS
GMSC/
PSTN/
Backbone
In this case the handover takes place through the
interconnecting element which can be GMSC or
PSTN or private Backbone between the MSCs
Cell Barring
05/31/13Tempus Telcosys 192
BTS
Cell Barring is a GSM feature by which certain
mobiles could be barred access to certain cells
Cell barring is activated/deactivated at BTS level
Cell barring is done for mobile categories and
priorities
Cell Barring
 Every mobile has an access class
 The access class is stored in the SIM
 Classes 0-9 are termed normal calsses
 Classes 11-15 are emergency classes
05/31/13Tempus Telcosys 193
• Every cell has a set parameter which
defines which access classes are
barred for the particular cell. This
parameter is broadcasted on the
BCCH
What is DTX?
 DTX (Discontinous Transmission)
 Each direction of Transmission is only 50%
 Transmitter is switched ON for useful
information frames
05/31/13Tempus Telcosys 194
Need for DTX
•To increase battery life
•To reduce the average interference
level
DTX is done by DTX handlers which
VAD (Voice Activity
Detector)
 Senses for speech in 20ms blocks
 Removes stationary noise
 VAD is an energy detector
 Compares Energy of filtered speech threshold
 It determines which 20ms blocks contain
speech and it only forwards those frames
05/31/13Tempus Telcosys 195
Evaluation of Background Noise
 Background noise is always present with
speech
 DTX cuts off this noise with speech
 Gives an uncomfortable feeling to the listener
 VAD takes care of this by inserting comfort
noise at the receiving end when speech
discontinues.
05/31/13Tempus Telcosys 196
Emergency Calls
 GSM specs define 112 as an emergency
number
 ‘112’ is accessible with or without SIM
 Without SIM it is sent on the best
channel
 Mobile on sensing ‘112’ sets the
establishment cause to emergency call in
the RACH
 Routing of this call be done to a desired
location defined in the switch
05/31/13Tempus Telcosys 197
Cell (Re)selection
 Cell reselection is done using C1 path loss
criterion.
 The purpose is to ensure that the MS is
camped on to the cell with the best
transmission quality.
 The MS will camp on to the cell with the
highest C1 value if C1 > 0.
05/31/13Tempus Telcosys 198
The following parameters are used to
calculate the C1 criterion
 The received signal at the MS side.
 Rxlev_access_min - broadcast on the BCCH -
The minimum received level at the MS
required for access to the network.
 Ms_txpwr_max_cch - the maximum power
that an MS may use when initially accessing
the network.
 The maximum power of the MS
05/31/13Tempus Telcosys 199
C1 = A - Max(B,0)
 A = Received level Average -
Rxlev_access_min.
 B = MS_txpwr_max_cch - maximum output
power of the MS
05/31/13Tempus Telcosys 200
Cell Reselect Hysteresis
 Cell reselection on the border of two location areas result
in a location update. When an MS moves on the border
of two location areas lots of location updates take place.
To avoid these location updates, the reselect hysteresis
is introduced.
 A location update is performed only if:
 The C1 value of the new location area is higher than
the C1 value in the current location area and
 The received signal strengths have at least a
difference of the reselect hysteresis.
05/31/13Tempus Telcosys 201
Cellular concept
05/31/13Tempus Telcosys 202
Why to use the cellular
concept ?
 Solves the problem of Spectral congestion
and user capacity by means of frequency
reuse.
 Offers high capacity in a limited spectrum
allocation.
 Offers system level approach, using low
power transmitters instead of a single, high
power transmitter (large cell) to cover larger
area.
05/31/13Tempus Telcosys 203
 A portion of the total channels available is
allocated to each base station.
 Neighboring base stations are assigned
different groups channels, in order to
minimize interference.
05/31/13Tempus Telcosys 204
Cell shape
05/31/13Tempus Telcosys 205
05/31/13Tempus Telcosys 206
1-Omni-directional cell-site (Omni-directional
antenna).
2-Rhombus-shaped sectors (Directive antenna).
3-Hexagonal shaped sectors (Directive
antenna).
05/31/13Tempus Telcosys 207
Cell size
Large cell : (up to 70km in diameter)
It exists where :
1-Radio waves are unobstructed.
2-Transmission power can cover the area.
3-low subscriber density.
Small cell : (up to 2km in diameter)
It exists where :
1-Radio waves are obstructed.
2-Low transmission power to decrease interference.
3-High subscriber density.
05/31/13Tempus Telcosys 208
Types of cells
1-Macro-cells 2-Micro-cells.
3-Pico-cells. 4-Umbrella-cells.
05/31/13Tempus Telcosys 209
What is a cluster ?
 A cluster is a group of
cells.
 No channels are
reused within a
cluster.
 It is the unit of
design.
05/31/13Tempus Telcosys 210
Cluster size
 Definition : It is The number of cells per
cluster
N = i^2 + ij + j^2
Where :
i = 0, 1, 2….& j = 0,1,2…. etc.
N = 1 , 3 , 4 ,7, 9 , 12 ,……
05/31/13Tempus Telcosys 211
Types of clusters
1-N=7 omni frequency plan (2-directional).
2-N=7 trapezoidal frequency plan
(1-directional).
3-N=9 omni frequency plan.
4-Tricellular plans
a) N=3 tricellular plan (3/9).
b) N=4 tricellular plan (4/12).
05/31/13Tempus Telcosys 212
Channel assignment
strategies
 Considerations :
1) Max. capacity.
2) Min interference.
3) Perfect handover.
 Types of assignment strategies :
1) Fixed :
 Each cell has permanent predetermined set of voice
channels.
 New calls served by unused channels of this cell.
 Borrowing strategy if all channels are occupied.
 High probabiltity that call is Blocked if channels are
occupied.( disadv.)
05/31/13Tempus Telcosys 213
2) Dynamic :
 Channels are not allocated to different cells
permanently.
 Each new call BTS requests new channel from
MSC.
 MSC allocate a channel, by using an algorithm
that takes into account:
1- Frequency is not already in use.
2- Min. reuse distance to avoid co-channel
interference.
05/31/13Tempus Telcosys 214
 Adv. of dynamic assignment strategy :
1) Increase channel utilization
( Increase trunking efficiency ).
2) Decrease probability of a blocked call.
05/31/13Tempus Telcosys 215
Frequency reuse
Concept
05/31/13Tempus Telcosys 216
05/31/13Tempus Telcosys 217
Reuse cluster
05/31/13Tempus Telcosys 218
Co-channel Reuse ratio
(Q) :
 R : cell radius.
 D : reuse distance.
 Q = D/R. =
sqrt(3N).
Where :
N : cluster size
05/31/13Tempus Telcosys 219
Handover
05/31/13Tempus Telcosys 220
Definition : procedure that allows MS to
change the cell or time-slot to keep as good
link as possible during all the call.
05/31/13Tempus Telcosys 221
Types of handover
 IntraCell : bet. 2 channels of same cell.
 InterCell : bet. 2 channels of 2 different cell &
same BTS.
 InterBTS (intra BSC) : 2 cells of different BTS
Same BSC.
 InterBSC : bet. 2 cells of different BSC’s & same
MSC.
05/31/13Tempus Telcosys 222
Measurements before
handover
1- Measurements from MS to BSC :
a) Strength of BTS signal.
b) Quality of BTS signal.
c) Signal strength of 6 neighbor BTS’s.
2-Measurements from BTS to BSC :
a) Strength of MS signal.
b) Quality of MS signal.
c) Distance between serving BTS & MS.
05/31/13Tempus Telcosys 223
Different causes of handover
05/31/13Tempus Telcosys 224
Better cell HOEmergency HO
Level Quality
PBGT
Traffic causes
InterferenceDistance
Different causes of
Handover
Basic handover
algorithms
a)“Min. acceptable performance” algorithm:
MS power is increased when quality deceases
till handover is the only way.
b) “Power budget “ algorithm:
Prefer direct handover when quality deceases
without increasing MS power first .
05/31/13Tempus Telcosys 225
Handover priority
1) UL quality cause (or interference).
2) DL quality cause (or interference).
3) UL level cause.
4) DL level cause.
5) Distance cause.
6) Better cell cause.
05/31/13Tempus Telcosys 226
Interference
05/31/13Tempus Telcosys 227
Sources of interference
include:
1) Another mobile in the same cell.
2) A call in progress in the neighboring
cell.
3) Other BTS’s operating in the same
frequency band.
05/31/13Tempus Telcosys 228
Interference effects :
 In voice channel causes crosstalk
 In control channels it leads missed and
blocked calls due to errors in the digital
signaling.
05/31/13Tempus Telcosys 229
Main types of
interference :
1) Co-channel interference.
2) Adjacent channel interference.
05/31/13Tempus Telcosys 230
1) Co-channel interference
 Source : Near cell using same frequency.
It is a function of reuse distance(D/R).
 General rule :
io = No. of co-channel interfering cells.
S = Signal power from a desired BS.
Ii = interference power caused by the ith
interfering co-channel cell BS.
05/31/13Tempus Telcosys 231
 Another form :
C/I = 10 log {(1/n)(D/R)*m}
Where :
m = propagation constant
(dep’s on nature of environment)
n = number of co-channel interferers.
Can be minimized by :
Choosing minimum reuse distance
= (2.5….3)(2R).
05/31/13Tempus Telcosys 232
2) Adjacent channel
interference
 Source : A cell using a frequency adjacent to the
one in another cell due to imperfect reciever’s
filter.
05/31/13Tempus Telcosys 233
Can be minimized by :
1-careful filtering
2-careful channel assignments
3-Directional antenna.
 General rule : ACI= -10 Log[(d1/d2)*m] – Adj ch
isolation.
Where :
d1: distance between MS & proper BTs d2:
dist. Bet MS & adj BTS causing
interference.
Adj ch isolation = Filter isolation = -
26db.
05/31/13Tempus Telcosys 234
Traffic engineering
theory
05/31/13Tempus Telcosys 235
Why do we need to
know traffic?
 The amount of traffic during peak hours allows
us to dimension our wireless system for a certain
GOS.
 GOS : probability of having a call blocked
during busy hour (block rate).
05/31/13Tempus Telcosys 236
Traffic intensity (E)
 Erlang : A unit of traffic intensity measure.
 1 Erlang = 1 circuit in use for 1 hour.
 T ( in Erlangs) = [No. of calls per hour*average
call holding time(sec.)] / [3600]
05/31/13Tempus Telcosys 237
Typical traffic profile
05/31/13Tempus Telcosys 238
Traffic tables
Erlang B
Table
Blocked calls are not
held
Erlang C
Table
Blocked calls are held in
the queue indefinitely
Poisson
Table
Blocked calls are held in
the queue for a time =
the mean holding time05/31/13Tempus Telcosys 239
Erlang – B table
 P(N;T) = [ (T^N)*exp(-T) ] / N!
N GOS
1%
GOS
2%
2 0.153 0.223
4 0.869 1.093
10 4.46 5.084
20 12.0 13.182
40 29.0 30.99705/31/13Tempus Telcosys 240
Trunking
 Sharing channel among several users.
 Trunking efficiency (nT) : Measures the number
of subscribers that each channel in every cell can
accommodate.
nT = (traffic in Erlangs / no. of channels)*100.
05/31/13Tempus Telcosys 241
Trunking efficiency
in presence of one
operator :
N = 7 , 312 one direction
voice channels
No. of channels / cell = 312 /
7 = 44 ch./cell.
From Erlang-B table @GOS
2%,this’s equivalent to 35
Erlangs
nT = 35 / 44 = 79.55.
Trunking efficiency
in presence of two
operators :
N = 7 , 312 / 2 = 156 one
direction voice channel for
each operator.
No. of channels / cell = 156 /
7 = 22 ch./cell.
From Erlang-B table
@GOS 2%,this’s
equivalent to 15 Erlangs.
nT = 15 / 22 = 68.18.
05/31/13Tempus Telcosys 242
System capacity
05/31/13Tempus Telcosys 243
 S : total duplex channels available for use = k*N
Where:
N : cluster size.
k : No. of channels / cell.
 C : total No. of duplex channels in system;
C = M*k*N.
Where :
M : No. of times the cluster is repeated.
05/31/13Tempus Telcosys 244
Improving system
capacity
 Cell splitting.
 Sectoring.
05/31/13Tempus Telcosys 245
Cell splitting
05/31/13Tempus Telcosys 246
Sectoring
 We use directional antennas instead of being
omnidirectional
05/31/13Tempus Telcosys 247
What does sectoring
mean?
 We can now assign frequency sets to sectors
and decrease the re-use distance to fulfill :
1) More freq reuse.
2) Higher system capacity.
3) Improve S/I ratio ( better signal quality ).
 How S/I ratio is improved?
-e.g. In 120 degree sectoring there’s only
2 interferers instead of 6 incase of omnidirectional N=7
cluster.
05/31/13Tempus Telcosys 248
05/31/13Tempus Telcosys 249
05/31/13Tempus Telcosys 250
Directional frequency reuse
 Here we use 7/21
pattern for frequency
allocation.
05/31/13Tempus Telcosys 251
Comparison
between various
types of clusters
05/31/13Tempus Telcosys 252
N = 7 omni frequency
plan :
 n = 6 , m = 4.
 D / R = 4.583.
 1) Co-channel
interference ratio :
C / I = 18.6 dB.
 2) Adjacent channel
interference :
ACI = -26 dB @ d1= d2.
05/31/13Tempus Telcosys 253
N = 7 trapezoidal
frequency plan
 n = 2 , m = 4.
 D / R = 6.245.
 1) Co-channel interference
ratio :
C / I = 28.8.
 2) Adjacent channel
interference : disappears
because the channels are
assigned alternatively to the
cells.
05/31/13Tempus Telcosys 254
 Trunking efficiency :
 312 one direction voice channels
N = 7
 312 / 7 = 44.57 ~ 44 ch./cell.
 From Erlang-B table @ GOS = 2%
T = 35 E.
 nT = 35 / 44 = 79.55 %.
05/31/13Tempus Telcosys 255
N = 9 omni frequency plan
 n = 4 , m = 4.
 D / R = sqrt ( 3 * 9 ) = 5.2.
 1) Co-channel
interference :
C / I = 22.6 dB.
 2) Adjacent channel
interference :
ACI = -38 dB @ d2 = 2
(d1).
05/31/13Tempus Telcosys 256
 Trunking efficiency :
 312 one direction voice channels
N = 9
 312 / 9 = 34.67 ~ 34 ch./cell.
 From Erlang-B table @ GOS = 2%
T = 25.529 E.
 nT = 25.529 / 34 = 75.085 %.
Conclusion : nT 7 > nT 9
But C/I 7 > C/I 9
ACI 7 > ACI 9
05/31/13Tempus Telcosys 257
4 / 12 cell pattern
 n = 1 , m = 4.
 D / R = sqrt (3* 4) = 3.732.
 C / I = 22.87 dB.
 Trunking efficiency :
 No. of channels/cell
= 312 / 12 = 26 ch./cell.
 From Erlang-B table @
GOS = 2 %.
 T = 18.4 E/cell.
 nT = 18.4 / 26= 70.77%.
05/31/13Tempus Telcosys 258
3 / 9 cell pattern
 n = 1 , m = 4.
 D / R = sqrt (3* 3) = 3.
 C / I = 19.1 dB.
 Trunking efficiency :
 No. of channels/cell
=312 / 9 = 34 ch./cell.
 From Erlang-B table @ GOS
= 2 %.
 T = 25.5 E/cell.
 nT = 25.5 / 24 = 75 %.
05/31/13Tempus Telcosys 259
120 degree cell sectoring
 n = 2 , m = 4.
 D / R = sqrt(3 * 7) = 4.583.
 Co-channel interference :
C / I = 23.436 + 6dB(due to
isolation) = 29.436 dB.
 Trunking efficiency :
 No. of channels/cell = 312 / 21 =
14.857.
 From Erlang-B @ GOS=2% T=
8.2003.
 nT = 8.2003 / 14.857
=56.216%.
05/31/13Tempus Telcosys 260
 References :
 Motorola CP02
 NOKIA SYSTRA
05/31/13Tempus Telcosys 261
If any Query
Contact
9903867731
TempusTelcosys@gmail.com
05/31/13Tempus Telcosys 262

GSM Introduction

  • 1.
  • 2.
    INTRODUCTION  The globalsystem for mobile communications (GSM) is a set of recommendations and specifications for a digital cellular telephone network (known as a Public Land Mobile Network, or PLMN). These recommendations ensure the compatibility of equipment from different GSM manufacturers, and interconnectivity between different administrations, including operations across international boundaries. 05/31/13Tempus Telcosys 2
  • 3.
    THE GSM NETWORK The GSM network is comprised of the following components:  Network Elements  The GSM network incorporates a number of network elements to support mobile equipment. They are listed and described in the GSM network elements section of this chapter.  GSM subsystems  In addition, the network includes subsystems that are not formally recognized as network elements but are necessary for network operation. These are described in the GSM subsystems (non-network elements) section of this chapter.  Standardized Interfaces  GSM specifies standards for interfaces between network elements, which ensure the connectivity of GSM equipment from different manufacturers. These are listed in the Standardized interfaces section of this chapter. 05/31/13Tempus Telcosys 3
  • 4.
    THE GSM NETWORK- CONTINUED  Network Protocols  For most of the network communications on these interfaces, internationally recognized communications protocols have been used  These are identified in the Network protocols section of this chapter.  GSM Frequencies  The frequency allocations for GSM 900, Extended GSM and Digital Communications Systems are identified in the GSM frequencies section of this chapter. 05/31/13Tempus Telcosys 4
  • 5.
    DIGITAL NETWORKS  GSMnetworks are digital and can cater for high system capacities. They are consistent with the world wide digitization of the telephone network, and are an extension of the Integrated Services Digital Network (ISDN), using a digital radio interface between the cellular network and the mobile subscriber equipment. 05/31/13Tempus Telcosys 5
  • 6.
    INCREASED CAPACITY  TheGSM system provides a greater subscriber capacity than analogue systems. GSM allows 25 kHz. Per user, that is, eight conversations per 200kHz. Channel pair (a pair comprising one transmit channel and one receive channel). Digital channel coding and the modulation used makes the signal resistant to interference from the cells where the same frequencies are re-used (co-channel interference); a Carrier to Interference Ratio (C/I) level of 9 dB is achieved, as opposed to the 18 dB typical with analogue cellular. This allows increased geographic reuse by permitting a reduction in the number of cells in the reuse pattern. Since this number is directly controlled by the amount of interference, the radio transmission design can deliver acceptable performance. 05/31/13Tempus Telcosys 6
  • 7.
    CGI : CELLGLOBAL IDENTITY 05/31/13Tempus Telcosys 7 MCC MNC LAC CI LAI CGI MCC = Mobile Country Code MNC = Mobile Network Code LAC = Location Area Code CI = Cell Identity
  • 8.
    MSISDN 05/31/13Tempus Telcosys 8 CCNDC SN 98 XXX 12345 CC = Country Code NDC = National Destination Code SN = Subscriber Number
  • 9.
    MSISDN  The MobileSubscriber ISDN (MSISDN) number is the telephone number of the MS. This is the number a calling party dials to reach the subscriber. It is used by the land network to route calls towards the MSC. 05/31/13Tempus Telcosys 9
  • 10.
    IMSI  IMSI (InternationalMobile Subscriber Identity) Network Identity Unique To A Sim. 05/31/13Tempus Telcosys 10 MCC MNC MSIN 404 XX 12345..10 SIM = Subscriber Identity Module MCC = Mobile Country Code MNC = Mobile Network Code MSIN = Mobile Subscriber Identity Number
  • 11.
    IMEI  IMEI :Serial number unique to each mobile 05/31/13Tempus Telcosys 11 TAC FAC SNR SP 6 2 6 1 IMEI = International Mobile Equipment Identity TAC = Type Approval Code FAC = Final Assembly Code SNR = Serial Number SP = Spare
  • 12.
    SUBSCRIBER IDENTIFICATION  InternationalMobile Subscriber Identity (IMSI)  Just the IMEI identifies the mobile equipment, other numbers are used to identify the mobile subscriber. Different subscriber identities are used in different phases of call setup. The International Mobile Subscriber Identity (IMSI) is the primary identity of the subscriber within the mobile network and is permanently assigned to that subscriber.  Temporary Mobile Subscriber Identity (TMSI)  The GSM system can also assign a Temporary Mobile Subscriber Identity (TMSI). After the subscriber’s IMSI has been initialized on the system, the TMSI can be used for sending backward and forward across the network to identify the subscriber. The system automatically changes the TMSI at regular intervals, thus protecting the subscriber from being identified by someone attempting to monitor the radio channels. The TMSI is a local number and is always transmitted with the Local numbers and is always transmitted with the Location Area Identification (LAI) to avoid ambiguities. 05/31/13Tempus Telcosys 12
  • 13.
    SUBSCRIBER IDENTIFICATION MODULE (SIM) By making a distinction between the subscriber identity and the mobile equipment identity, a GSM PLMN can route calls and perform billing based on the identity of the subscriber rather than the mobile equipment being used. This can be done using a removable Subscriber Information Module (SIM). A ”smart card” is one possible implementation of a SIM module.  IMSI. This is transmitted at initialization of the mobile equipment.  TMSI This is updated periodically by the PLMN  MSISDN This is made up of a country code, a national code and a subscriber number.  Location Area Identity (LAI) This identified the current location of the subscriber.  Subscriber Authentication Key (KI) This is used to authenticate the SIM. 05/31/13Tempus Telcosys 13
  • 14.
    EQUIPMENT IDENTITY NUMBER International Mobile station Equipment Identity (IMEI)  Each MS is identified by an International Mobile station Equipment Identity (IMEI) number which is permanently stored in the mobile equipment. On request, the MS sends this number over the signalling channel to the MSC. The IMEI can be used to identify MS,s that are reported stolen or operating incorrectly.  Equipment Identity Register ( EIR )  A listing of the allowed IMEI is maintained by the PLMN’s in the Equipment Identity Register (EIR) to validate the mobile equipment. 05/31/13Tempus Telcosys 14
  • 15.
    Frequency Bands Uplink 890– 915 MHz 25 MHz 05/31/13Tempus Telcosys 15 Downlink 935 – 960 MHz 25 MHz 100 KHz 200 KHz 100 KHz 1 43 1242 ……………. A 200 KHz carrier spacing has been chosen. Excluding 2x100 KHz edges of the band, this gives 124 possible carriers for the uplink and downlink. The use of carrier 1 and 124 are optional for operators.
  • 16.
    GSM Network Architecture 05/31/13TempusTelcosys 16 BTS BTS BTS BTS BTS BSC BSC TRAU MSC HLR AUC VLR EIR PSTN SMSC
  • 17.
    MS – MobileStation  Mobile station provides user access to GSM network for voice and data  All GSM mobiles comply to GSM standards  Subscriber data is read from a SIM card that plugs into ME 05/31/13Tempus Telcosys 17 SIM ME MS
  • 18.
    MS (cont..)  EachMS has a unique number called as IMEI number, which is stored in EIR for authentication purposes  Mobile camps on to the GSM network through the BTS serving the cell  Mobile also scans neighboring cells and reports signal strengths  Mobile transmits and receives voice at 13 kb/s over the air interface 05/31/13Tempus Telcosys 18
  • 19.
    Mobile Station OutputPower  CLASS 1 20 watts Vehicle and Portable  CLASS 2 8 watts Portable and Vehicle  CLASS 3 5 watts Hand-Held  CLASS 4 2 watts Hand-Held (GSM)  CLASS 5 0.8 watts Hand-Held (DCS 1800)  Output power determines:  Accessibility in areas of coverage  Talk Time and Standby time 05/31/13Tempus Telcosys 19
  • 20.
    Mobile Station Identities CC – Country Code  NDC – National Destination Code  SN – Serial Number 05/31/13Tempus Telcosys 20 MSISDN : Mobile Station ISDN Number It is the human identity used to call a Mobile Station CC SNNDC MSISDN 98 250 00134
  • 21.
    IMSI (International Mobile SubscriberIdentity)  MCC – Mobile Country Code  MNC – Mobile Network Code  MSIN – Mobile Subscriber Identity Number 05/31/13Tempus Telcosys 21 MCC MSINMNC IMSI 3 2 or 3 Not more than 15 NMSI
  • 22.
    IMEI (International Mobile EquipmentIdentity)  TAC – Type Approval Code  FAC – Factory Assembly Code  SNR – Serial Number  SP – Spare digit (usually used to specify software version) 05/31/13Tempus Telcosys 22 TAC SPFAC IMEISNR 6 162 15
  • 23.
    SIM ( SubscriberIdentity Module)  Removable module inserted when the subscriber wants to use the ME  Two sizes: credit card size and stamp size  SIM features and contents are personalized by the Service Activator  ROM – 6kb to 16 kb  RAM – 128 bytes to 256 bytes  EEPROM – 3kb to 8 kb 05/31/13Tempus Telcosys 23 Space to insert SIM photo
  • 24.
    Contents of SIM Serial Number  IMSI, Subscriber Key Ki, Ciphering Key Kc  Algorithms for authentication and ciphering  Network Code  PIN, PUK  Charging Information  Abbreviated Dialling  Supplementary Features (e.g. Call barring) 05/31/13Tempus Telcosys 24
  • 25.
    SIM Security  Twolevel protection  When mobile is turned on, it will ask for user to enter PIN (Personal Id Number)  3 tries for PIN, after that PIN locked  To unblock PIN, there is PUK (Pin Unblock Key)  10 attempts of PUK allowed  After that SIM is blocked 05/31/13Tempus Telcosys 25
  • 26.
    BTS (Base TransceiverStation)  BTS has a set of Transceivers (TRXs) to communicate with mobiles in its area  One BTS covers one or more than one cell  The capacity of a cell depends on number of transceivers in the cell  BTS is connected to the BSC through Abis Interface which is 2Mbps  BTS transmits and receives voice at 13kbps over air interface to the mobiles.  BTS commands mobiles to set Tx. Power, timing advance and Handovers 05/31/13Tempus Telcosys 26
  • 27.
  • 28.
    BSC – BaseStation Controller  Several BTSs are connected to the BSC  BSC Manages channel allocation, handovers and release of channels at connected BTSs  BSC connects to the BTS via the Abis interface and to the MSC on A interface  BSC has the entire database of cell parameters associated with the BTSs.  No mobile data is stored in the BSC  Less connections for MSC as intelligence is made common to all BTSs by the BSC 05/31/13Tempus Telcosys 28
  • 29.
  • 30.
    TRAU – TranscoderRate Adaptation Unit 05/31/13Tempus Telcosys 30 BTS BSC PSTN 13 kbps 16 kbps 16 kbps 64 kbps MSC and TRAU
  • 31.
    TRAU (cont..)  TheMSC is based on ISDN switching. The Fixed Network is also ISDN based.  ISDN has speech rate of 64 kbps. Mobile communicates at 13 kbps.  TRAU converts the data rates between 13kbps GSM rate to 64kbps Standard ISDN rate  TRAU can be collocated with the BTS, BSC or MSC or it can be a separate unit. 05/31/13Tempus Telcosys 31
  • 32.
    Location of Transcoder Collocated with MSC, BSC, BTS  Separate Unit 05/31/13Tempus Telcosys 32 MSC Transco der BSC
  • 33.
    MSC – MobileSwitching Centre 05/31/13Tempus Telcosys 33 BSC BSC BSC BTSs PSTN HLR VLR
  • 34.
    MSC (cont..)  Exchangewhere calls are established, maintained and released  Database for all subscribers and their associated features.  Communicates with the BSCs on the A interface and with PSTN on fixed line.  MSC is weighted on the number of subscribers it can support. E.g. an MSC of 1 lac subscribers means one MSC is enough till subscriber base increases upto 1 lac, beyond which another MSC is required. 05/31/13Tempus Telcosys 34
  • 35.
    Multiple MSCs  Whenthere is more capacity, there are more than one MSCs.  All MSCs have to communicate with one another and to the outside world.  Very complicated to connect each MSC to each other and each MSC to PSTN  So there is a concept of GMSC (Gateway MSC) 05/31/13Tempus Telcosys 35 BSC BSC MSC MSC GMSC PSTN
  • 36.
    HLR – HomeLocation Register  MSC has all subscriber database stored in HLR  HLR has all permanent subscriber database  HLR has a database which describes the subscriber’s profile i.e. basic features and supplementary services  MSC communicates with the HLR to get data for subscribers on call 05/31/13Tempus Telcosys 36
  • 37.
    VLR – VisitingLocation Register  A subscription when activated is registered in VLR  VLR has all the subscriber numbers which are active.  VLR has a temporary database of all active subscribers (on/off, location information) 05/31/13Tempus Telcosys 37 MSC VLRVLR HLR
  • 38.
    VLR (cont..)  MSCcommunicates with HLR for subscribers coming from different MSCs. If the subscriber is found valid, then it registers the subscriber in the VLR 05/31/13Tempus Telcosys 38 MSC MSCVLRVLR HLR VLR
  • 39.
    AUC – AuthenticationCentre  Authentication is a process by which a SIM is verified  Secret data and the verification process algorithm are stored in AUC  AUC is the element which carries out the verification of the SIM  AUC is associated with the HLR 05/31/13Tempus Telcosys 39 MS MSC HLR AUC
  • 40.
    EIR (Equipment IdentityRegister)  EIR is the Mobile Equipment Database which has a series of IMEIs  MSC asks the Mobile to send its IMEI  MSC then checks the validity of IMEI with the EIR  All IMEIs are stored in EIR with relevant classifications 05/31/13Tempus Telcosys 40 EIR MSC
  • 41.
    Classification of IMEIs 05/31/13TempusTelcosys 41 White list: This contains the IMEI of type approved mobiles Black List: List of IMEIs which should be barred because either they are stolen or are not functioning properly Grey list: List of IMEIs which are to be evaluated before they are put in black list
  • 42.
    Billing Centre (BC) BC Generates the billing statement for each subscriber  BC may be directly connected to the MSC or through a mediation device  MSC sends CDRs (Call Detail Records) to the BC  According to the template of pulse rates and units set, BC creates a bill according to the destination called and the call duration 05/31/13Tempus Telcosys 42
  • 43.
    Billing Centre (BC)(cont..) 05/31/13Tempus Telcosys 43 CDRs Templates for unit costs
  • 44.
    OMC – Operationsand Maintenance Centre  Also called the NOC (Network Operations centre)  It is the central monitoring and remote maintenance centre for all network elements  OMC has links to BSCs and MSCs 05/31/13Tempus Telcosys 44
  • 45.
    OMC – Operationsand Maintenance Centre  Also called the NOC (Network Operations centre)  It is the central monitoring and remote maintenance centre for all network elements  OMC has links to BSCs and MSCs 05/31/13Tempus Telcosys 45
  • 46.
    OMC 05/31/13Tempus Telcosys 46 OMCSystem BSC BSC BSC BTSs BTSs BTSs OMC Terminals
  • 47.
  • 48.
    GSM Channels  PhysicalChannel  One time slot on one carrier is called physical channel.  Logical Channel  Information carried by physical channels is called logical Channels.  Logical channels are mapped on physical channels. 05/31/13Tempus Telcosys 48
  • 49.
    Logical Channels  Trafficchannels: Used for speech and data  Full Rate(TCH/F)  Half Rate(TCH/H)  Control channels: Used for signaling .i.e. setting up a radio connection, call or controlling an MS during conversation  BCH(Broadcast channels)  CCCH(common control channels)  DCCH(dedicated control channels) 05/31/13Tempus Telcosys 49
  • 50.
    Traffic Channels(TCH) 05/31/13Tempus Telcosys50 TCH/F (full Rate) TCH/H (half Rate) Traffic Channels(TCH)
  • 51.
    Control Channels(CCH) 05/31/13Tempus Telcosys51 CCH(Control Channel) BCH CCCH DCCH CCH RACH CBCH SDCCH ACCHSynch. Chanels SACCHFACCH PCH/ AGCHFCCHSCH
  • 52.
    BCH(Broadcast Channels)  BCCH(BroadcastControl Channels)  Downlink Only.  Broadcast information of the serving cell (System Information).  Transmitted on timeslot zero of BCCH carrier.  Reads only by idle mobile at least once every 30 secs. 05/31/13Tempus Telcosys 52
  • 53.
    BCH(Broadcast Channels) cont’d SCH(Synchronisation Channels)  Downlink Only  Carries information for frame synchronisation.  Contains frame number and BSIC(Base Station Identity Code). 05/31/13Tempus Telcosys 53
  • 54.
    BCH(Broadcast Channels) cont’d FCCH(Frequency Correction Channels)  Downlink Only.  Enable MS to synchronies to the frequency. 05/31/13Tempus Telcosys 54
  • 55.
    CCCH(Common Control Channel)  RACH(RandomAccess Channel)  Uplink only.  Used by the MS when making its first access to the Network.  The reason for access could be initiation of a call or a page response. 05/31/13Tempus Telcosys 55
  • 56.
    CCCH(Common Control Channel) cont’d AGCH(Assess Grant Channel)  Downlink only.  Used for acknowledgement of the access attempt sent on RACH.  Used by the network to assign a signaling cannel upon successful decoding of access bursts. 05/31/13Tempus Telcosys 56
  • 57.
    CCCH(Common Control Channel) cont’d PCH(Paging Channel)  Downlink only.  The network will page the MS ,if there is a incoming call or a short Message.  It contains the MS identity number, the IMSI or TMSI. 05/31/13Tempus Telcosys 57
  • 58.
    DCCH(Dedicated Control Channel)  SDCCH(Stand-alone Dedicated Control Channel)  Uplink and Downlink.  Used for call setup, authentication, ciphering location update and SMS. 05/31/13Tempus Telcosys 58
  • 59.
    DCCH(Dedicated Control Channel) cont’d SACCH(Slow Associated Control Channel)  Downlink and Uplink.  Used to transfer signal while MS have ongoing conversation on traffic or while SDCCH is being used.  On the forward link, the SACCH is used to send slow but regularly changing control information to each mobile on that ARFCN, such as power control instructions and specific timing advance instructions 05/31/13Tempus Telcosys 59
  • 60.
     SACCH(Slow AssociatedControl Channel) cont’d  The reverse SACCH carries information about the received signal strength and quality of the TCH, as well as BCH measurement results from neighboring cells. 05/31/13Tempus Telcosys 60
  • 61.
    DCCH(Dedicated Control Channel) cont’d FACCH(Fast Associated Control Channel)  Downlink and uplink.  Associate with TCH only.  It is used to send fast message like hand over message.  Work by stealing traffic bursts. 05/31/13Tempus Telcosys 61
  • 62.
    Mapping on Physical Channels The Logical channels are mapped on the physical channels.  The TDMA frames are grouped together into multi-frame.  26 TDMA multi-frame for Traffic.  51 TDMA multi-frame for control signal. 05/31/13Tempus Telcosys 62
  • 63.
    Channel Combination  Combined All the controlling signals are in the time slot 0 of the Multi-frame.  Non Combined  Dedicated controlling signals are in time slot 1 of the Multi-frame. 05/31/13Tempus Telcosys 63
  • 64.
    Combined  Cell withsingle carrier.  Timeslot 0 :BCCH+CCCH+SDCCH.  Timeslot 1-7 :TCH/FACCH+SACCH. 05/31/13Tempus Telcosys 64
  • 65.
    Non Combined  Cellwith Two carrier  Timeslot 0 (of carrier 1) BCCH+CCCH.  Timeslot 1 (of carrier1) SDCCH+SACCH.  Timeslot 2-7 & 0-7(of both carriers) TCH/FACCH+SACCH. 05/31/13Tempus Telcosys 65
  • 66.
    BROADCAST MESSAGES  Systeminformation 5 and 6 sent on the SACCH immediately after Handover or whenever nothing else is being sent.  Downlink SACCH is used for system information messages while uplink SACCH is used for measurement reports.  System Information types 7 and 8 (optional) are an extension to type 4 and broadcast on the BCCH. 05/31/13Tempus Telcosys 66
  • 67.
  • 68.
    SYSTEM INFORMATION 1 When frequency hopping is used in cell MS needs to know which frequency band to use and what frequency within the band it should use in hopping algorithm.  Cell channel description Cell Allocation Number(CANO)-Informs the band number of the frequency channels used. 00-Band 0(current GSM band) Cell Allocation ARFCN(CA ARFCN):- ARFCN’s used for hopping.It is coded in a bitmap of 124 bits. 05/31/13Tempus Telcosys 68
  • 69.
    SYTEM INFORMATION 1 05/31/13TempusTelcosys 69 124 123 122 121 024 023 022 021 020 019 018 017 016 015 014 013 012 011 010 009 008 007 006 005 004 003 002 001
  • 70.
    SYSTEM INFORMATION 1 RACH Control Parameters Access Control Class(ACC) :-Bitmap with 16 bits. All MS spread out on class 0 –9 . Priority groups use class 11-15. A bit set to 1 barred access for that class. Bit 10 is used to tell the MS if emergency call is allowed or not. 0 – All MS can make emergency call. 1 - MS with class 11-15 only can make emergency calls. Cell barred for access(CB):- 0- Yes 1- No 05/31/13Tempus Telcosys 70
  • 71.
    SYSTEM INFORMATION 1 RACH Control Parameters Re-establishment allowed(RE):- 0- Yes 1- No Max_retransmissions(MAXRET):-Number of times the MS attempts to access the Network [1,2,4 or 7]. Tx-integer(TX):- Number of slots to spread access retransmissions when a MS attempts to access the system. Emergency call allowed:- Yes/No. 05/31/13Tempus Telcosys 71
  • 72.
    SYSTEM INFORMATION 2 System Information Type 2 message consists of the Double BA list which defines the BCCH frequencies used in the neighboring cells.  The Double BA list provides the MS with different frequencies on which to measure, depending on whether the MS is in idle or active mode.  In active mode, the MS should measure on a reduced number of frequencies in order to improve the accuracy of measurements. 05/31/13Tempus Telcosys 72
  • 73.
    SYSTEM INFORMATION 2 In Idle mode,the MS should measure on larger number of frequencies, so that the time required for the MS to access the network after power on is reduced.  The MS is also informed which PLMN’s it may use.  As well as System Information Type 2,it is also possible to have System Information Type 2 Bis and System information Type 2 Ater, depending on the size of the BA List.  System Information Type 2 Bis/Ter are optional. 05/31/13Tempus Telcosys 73
  • 74.
    SYSTEM INFORMATION 2 Neighbor Cell Description:- BA Indicator(BA IND):- Allows to differentiate measurement results related to different list of BCCH frequencies sent to MS. BCCH Allocation number(BANO):- Band 0 is used.  PLMN Permitted(NCCPERM):-This the PLMN color codes permitted and tells the MS which network color codes(NCC) on the BCCH carriers it is allowed to monitor when it is in this cell. . 05/31/13Tempus Telcosys 74
  • 75.
    SYSTEM INFORMATION 2 RACH Control Parameters Access Control Class(ACC) :-Bitmap with 16 bits. All MS spread out on class 0 –9 . Priority groups use class 11-15. A bit set to 1 barred access for that class. Bit 10 is used to tell the MS if emergency call is allowed or not. 0 – All MS can make emergency call. 1 - MS with class 11-15 only can make emergency calls. Cell barred for access(CB):- 0- Yes 1- No 05/31/13Tempus Telcosys 75
  • 76.
    SYSTEM INFORMATION 2 Re-establishmentallowed(RE):- 0- Yes 1- No Max_retransmissions(MAXRET):-Number of times the MS attempts to access the Network [1,2,4 or 7]. Tx-integer(TX):- Number of slots to spread access retransmissions when a MS attempts to access the system. Emergency call allowed:- Yes/No. 05/31/13Tempus Telcosys 76
  • 77.
    SYSTEM INFORMATION 2 BCCHARFCN Number(BAIND):- ARFCN’s used for in a Bitmap of 124 bits 05/31/13Tempus Telcosys 77 124 123 122 121 024 023 022 021 020 019 018 017 016 015 014 013 012 011 010 009 008 007 006 005 004 003 002 001
  • 78.
    SYSTEM INFORMATION 3 The System Information Type 3 contains information on the identity of the current LA and cell identity, because a change means that the MS must update the network.  System Information 3 also as Control Channel Description parameters used to calculate the Paging group.  When the MS is in idle mode it decides which cells to lock to. Information needed by the MS for cell selection is also broadcast in the Type 3 information. 05/31/13Tempus Telcosys 78
  • 79.
    SYSTEM INFORMATION 3 87 6 5 4 3 2 1 1 1 1 1 LAC LOCATION AREA IDENTITTY(LAI) MCC DIG 1MCC DIG 2 MCC DIG 1 MNC DIG 1MNC DIG 2 CI CI CELL IDENTITY LAC 05/31/13Tempus Telcosys 79
  • 80.
    SYSTEM INFORMATION 3 Control Channel Description Attach / Detach(ATT):- 0 = Allowed 1 = Not Allowed bs_agblk:-Number of block reserved for AGCH [0-7] Ba_pmfrms:-Number of 51 frame multi-frames between transmission of paging messages to MS of the same group T3212:- Periodic location update timer . [1-255 deci hours]. 05/31/13Tempus Telcosys 80
  • 81.
    SYSTEM INFORMATION 3 cch_confPhysical channels combined No. of CCH 0 1 timeslot(0) No 9 1 1 timeslot(0) Yes 3 2 2 timeslot(0,2) No 18 4 3 timeslot(0,2,4) No 27 6 4 timeslot(0,2,4,6) No 36 05/31/13Tempus Telcosys 81
  • 82.
    SYSTEM INFORMATION 3 Cell options DTX:-Whether Discontinuous Transmission used or not. PWRC:-Power control on the downlink. 0 = Not used. 1 = Used. Radio link timeout(RLINKT):- Radio link time-out is the time before an MS disconnects due to failure in decoding SACCH message. Sets the timer T100 in the MS. 05/31/13Tempus Telcosys 82
  • 83.
    SYSTEM INFORMATION 3 Cell Selection Parameters Rxlev_access_min:- Minimum received signal level at the MS for which it is permitted to access the system. 0-63 = -100 dBm to –47 dBm. Mx_txpwr_cch:- Maximum power the MS will use when accessing the system. Cell_reselect_hysteresis:- Used for cell reselection.  RACH Control Parameters. 05/31/13Tempus Telcosys 83
  • 84.
    SYSTEM INFORMATION 4 Location Area Identification.  Cell Selection Parameters Rxlev_access_min:- Minimum received signal level at the MS for which it is permitted to access the system. 0-63 = -100 dBm to –47 dBm. Mx_txpwr_cch:- Maximum power the MS will use when accessing the system. Cell_reselect_hysteresis:- Used for cell reselection. 05/31/13Tempus Telcosys 84
  • 85.
    SYSTEM INFORMATION 4 RACH Control Parameters max_retransmissions(MAXRET) tx_integer(TX) Cell barred for access(CB). Re-establishment allowed(RE) Emergency Call Allowed Access Control Class (ACC) 05/31/13Tempus Telcosys 85
  • 86.
    SYSTEM INFORMATION 4 CBCH Description(Optional) : CHN:- This is the channel number for CBCH. It is controlled internally in BSC. TSC:- Training Sequence Code. Base Station Color Code(BCC) part of BSIC is used. CBCHNO:- Absolute RF channel number of CBCH. MAC:- Mobile Allocation in the cell, describes the frequencies to be used in the hopping sequence if frequency hopping is used. 05/31/13Tempus Telcosys 86
  • 87.
    SYSTEM INFORMATION 4 HoppingChannel(H):-Informs if CBCH Channel is hopping or single. ARFCN:- If H=0; MAIO:- If H=1, informs the MS where to start hopping. Values [0-63]. HSN:- If H=1, informs the MS in what order the hopping should take place. Values[0 –63]. HSN=0 Cyclic Hopping. MA:-Indicates which RF Channels are used for hopping. ARFCN numbers coded in bitmap. 05/31/13Tempus Telcosys 87
  • 88.
    SYSTEM INFORMATION 5 Sent on the SACCH on the downlink to the MS in dedicated mode.  On SAACH, the MS also receives information about the BCCH carrier in each neighboring cell. This may differ from those sent in System information type 2.  It is also possible to have system Information Type 5 Bis and System Information Type 5Ter, depending on the size of the BA list. 05/31/13Tempus Telcosys 88
  • 89.
    SYSTEM INFORMATION 5 Neighbor Cell Description:- BA-IND:-Used by the Network to discriminate measurements results related to different lists of BCCH carriers sent by the MS(Type 2 or 5). Values 0 or 1(different from type 2). BCCH Allocation number:-00-Band 0(current GSM band). 05/31/13Tempus Telcosys 89
  • 90.
    SYSTEM INFORMATION 5 BCCHARFCN:-Neighboring cells ARFCN’s. Sent as a bitmap. 0-Not used 1-Used. 124 123 122 121 024 023 022 021 020 019 018 017 016 015 014 013 012 011 010 009 008 007 006 005 004 003 002 001 05/31/13Tempus Telcosys 90
  • 91.
    SYSTEM INFORMATION 6 Ms in dedicated mode needs to know if the LA has changed.If so, it must perform location updating when the call is released.  MS may change between cells with different Radio link timeout and DTX.  Cell Identity.  Location Area Identification.  PLMN permitted. 05/31/13Tempus Telcosys 91
  • 92.
    SYSTEM INFORMATION 6 Cell options: DTX PWRC Radio Link timeout. 05/31/13Tempus Telcosys 92
  • 93.
    SYSTEM INFORMATION 7/8 System Information Types 7 and 8 contain Cell Reselect parameters. Their function is to supplement System Information Type 4. 05/31/13Tempus Telcosys 93
  • 94.
    GSM Interfaces  (Um)Air interface - MS to BTS  A bis interface - BTS to BSC  A Interface - BSC to MSC  B Interface - MSC to VLR  C interface - MSC to HLR 05/31/13Tempus Telcosys 94
  • 95.
    MSC BSC VLRHLR AUC EIR GMSC MS A Interface A bisInterface Air Interface B Interface C Interface F Interface D Interface H Interface To other Networks 05/31/13Tempus Telcosys 95
  • 96.
    GSM Interfaces  Theinterfaces between MSC and MS is called A, Abis and Um interfaces.  On these interfaces only three layers are defined.They are not corresponding to the OSI (Open System Interconnection) model. 05/31/13Tempus Telcosys 96
  • 97.
    A Interface  Ainterface between the BSC and the MSC  The A interface provides two distinct types of information, signalling and traffic, between the MSC and the BSC.  The speech is transcoded in the TRC and the SS7 (Signalling system) signalling is transparently connected through the TRC or on a separate link to the BSC. 05/31/13Tempus Telcosys 97
  • 98.
    Abis Interface  TheA-bis interface responsible for transmitting traffic and signalling information between the BSC and the BTS.  The transmission protocol used for sending signalling information on the A-bis interface is Link Access Protocol on the D Channel (LAPD) 05/31/13Tempus Telcosys 98
  • 99.
    (Um) Air Interface This is the interface between the mobile station and the Base station.  The Air interface uses the Time Division Multiple Access (TDMA) technique to transmit and receive traffic and signalling information between the BTS and MS.  The TDMA technique is used to divide each carrier into eight time slots.These time slots are then assigned to specific users,allowing up to eight conversations to be handled Simultaneously by the same carrier. 05/31/13Tempus Telcosys 99
  • 100.
    7 56 3412 0 1 2 43 5 76 Down Link Up Link 0 Time Slot 05/31/13Tempus Telcosys 100 • This interface is the radio interface between the mobile station and the network and uses layer Three messages. • On Layer three messages we have the division of message types into CM (communication Management), MM (Mobility Management), and RR (Radio Resource Management).
  • 101.
    Connection Management (CM) There arethree entities within CM:  Call Control(CC) – Which handles the procedures concerning call control. e.g. setup,Change of bearer service.  Supplementary Service (SS) – Which handles such as call bearing, call waiting , call forwarding etc.  Short Message Service (SMS) – Enables the MS to handle short message transfer to and from the network. 05/31/13Tempus Telcosys 101
  • 102.
    Mobility Management (MM) Mobility management handles functions for authentication, location updating, identification and others concerning the mobility of the mobile station. 05/31/13Tempus Telcosys 102
  • 103.
    Radio Resource Management (RR) It contains the functions concerning the radio link. Here we find the capability to establish,maintain and release the radio connection between the network and the mobile station, which includes the handover procedure. 05/31/13Tempus Telcosys 103
  • 104.
    B Interface  TheB interface between the MSC and the VLR uses the MAP/TCAP protocol.  Most MSCs are associated with a VLR, making the B interface "internal".  Whenever the MSC needs access to data regarding a MS located in its area, it interrogates the VLR using the MAP/B protocol over the B interface. 05/31/13Tempus Telcosys 104
  • 105.
    C Interface  TheC interface is between the HLR and a MSC.  Each call originating outside of GSM (i.e., a MS terminating call from the PSTN) has to go through a Gateway to obtain the routing information required to complete the call, and the MAP/TCAP protocol over the C interface is used for this purpose.  Also, the MSC may optionally forward billing information to the HLR after call clearing. 05/31/13Tempus Telcosys 105
  • 106.
    D Interface  TheD interface is between the VLR and HLR.  It uses the MAP/TCAP protocol to exchange the data related to the location of the MS and to the management of the subscriber. 05/31/13Tempus Telcosys 106
  • 107.
    E Interface  TheE interface interconnects two MSCs.  The E interface exchanges data related to handover between the anchor and relay MSCs using the -MAP/TCAP+ISUP/TUP protocol. 05/31/13Tempus Telcosys 107
  • 108.
    F Interface  TheF interface connects the MSC to the EIR.  It uses the MAP/TCAP protocol to verify the status of the IMEI that the MSC has retrieved from the MS. 05/31/13Tempus Telcosys 108
  • 109.
    G Interface  TheG interface interconnects two VLRs of different MSCs.  It uses the MAP/G protocol to transfer subscriber information, during e.g. a location update procedure. 05/31/13Tempus Telcosys 109
  • 110.
  • 111.
    Topics for discussion Speech Encoding  Data Encoding  Interleaving for Voice,Control and Data signals 05/31/13Tempus Telcosys 111
  • 112.
    Speech Encoding  Weshall start with a raw voice signal fed into the microphone, travel through the various stages involving vocoding, channel coding etc till it reaches the final burst format on the Air Interface. 05/31/13Tempus Telcosys 112
  • 113.
    Speech Encoding ckt 05/31/13TempusTelcosys 113 Voice Encoding Channel coding interleaving RF Modulation Raw Voice signal
  • 114.
    Speech Encoding ckt The voice is sampled at the rate of 50 samples per second.  This results in 20 msec blocks of speech  Each of this 20 msec block is passed on to the 13Kbps vocoder.  There are 260 information bits from the output of the vocoder for every 20 msec input i.e.; 13Kbps *20msec = 260 bits. 05/31/13Tempus Telcosys 114
  • 115.
    Voice Encoding ckt 05/31/13TempusTelcosys 115 Vocoder I/p 20 msec speech blocks 13Kbps Vocoder Vocoder O/p 260 bits
  • 116.
    Channel coding  ChannelCoding is done to protect the logical channels from transmission errors introduced by the radio path.  The coding schemes depend on the type of the logical channels, hence the coding can differ from speech, control and data . 05/31/13Tempus Telcosys 116
  • 117.
    Channel Coding forspeech 05/31/13Tempus Telcosys 117 Class class 1b class 2 1a 50 3 132 4 tail Bits parity bits Convolutional coder ½ coder, k=5 456 bits=378 bits from Convolution coder + 78 class 2 bits 260 bits
  • 118.
    Channel coding forSpeech  The 260 bits of speech info from the vocoder is broken down into three parts.  Class 1a- 50 bits , these represent the filter coefficients of the speech and are the most important for proper detection of the speech at the receiver and hence are given maximum protection. 3 additional parity bits are derived from the class 1a bits for cyclic redundancy check (CRC). 05/31/13Tempus Telcosys 118
  • 119.
    Channel coding forSpeech cont’d  Class 1b - 132 bits are not parity checked but are fed into the convolutional coder along with 4 tail bits which are used to set the registers in the receiver to a known state for decoding purpose.  Class 1b- 78 bits, these are not so important and are not protected but are combined with the output of the convolution coder. 05/31/13Tempus Telcosys 119
  • 120.
    Convolutional coder CC The Convolutional coder is a series of shift registers implemented using logic gates, where for every one input bit we get 2 output bits. Hence it is called ½ coder.  Here k=5 is the constraint length, it means there are 5 shift register and each bit has memory depth of 4 , meaning it can influence the output of up to four next successive bits. This is useful during reception as bits can be derived even if a few consecutive bits are lost due to errors or corruption. 05/31/13Tempus Telcosys 120
  • 121.
    ½ Convolutional coder 05/31/13TempusTelcosys 121 R1 R2 R3 R5R4 + + C0 output C1 output 0110.. Input bits + EX-OR R=register
  • 122.
    Convolutional coder cont’d The output of the CC* is now 378 bits. (50+3+132+4)*2=378 The total number of bits now is 378+78=456 bits. *Note : The bit rate from the vocoder was 13Kbps for the 20 msec speech block, but after CC the bit rate increases to 22.8Kbps. 456 bits *20msecs=22.8Kbps * CC = Convolutional Coder. 05/31/13Tempus Telcosys 122
  • 123.
    Control Channel Coding 05/31/13TempusTelcosys 123 184 bits Control data 184 40 4 tail Fire coded parity bits ½ Convolutional Coder 456 bits output
  • 124.
    Control Channel Coding The control information is received in blocks of 184 bits.  These bits are first protected with a cyclic code called as Fire code, which is useful in correction and detection of burst errors.  40 Parity bits are added, along with 4 tail bits.  These 228 bits are given to the CC whose output is again 456 bits at a bitrate of 22.8Kbps.  The control channels include the RACH, PCH, AGCH etc. 05/31/13Tempus Telcosys 124
  • 125.
    Data Channel Coding 05/31/13TempusTelcosys 125 240 bits 4 tail Data bits ½ Convolutional Coder Output= 488 bits After Puncturing Output=456 bits
  • 126.
    Data Channel Coding The data bits are received in blocks of 240 bits. These are directly convolution coded after adding 4 tail bits.  The output of the CC is now 488 bits, which actually increases the bitrate to 24.4 Kbps.  To keep the bitrate constant on the air interface we need to puncture the output of the CC. Hence, we have a final bitrate of 22.8 Kbps again . 05/31/13Tempus Telcosys 126
  • 127.
    Channel Coding cont’d The above explanation was given keeping in view a full rate Traffic, Control, or Data channel.  For Half rate or Lesser rates the same principle of channel coding holds good, with slight differences in the encoding process. 05/31/13Tempus Telcosys 127
  • 128.
    Interleaving  Having encodedthe logical channel information, the next step is to build its bit stream into bursts that can be transmitted within the TDMA frame structure. This is the stage where the interleaving process is carried out.  Interleaving spreads the content of one information block across several TDMA timeslots or bursts. 05/31/13Tempus Telcosys 128
  • 129.
    Interleaving cont’d  Thefollowing interleaving depths are used :  Speech – 8 blocks  Control – 4 blocks  Data – 22 blocks  The interleaving process for a speech block is shown wherein which a 456 bit speech block is divided into 8 blocks of 57 bits each and each of these odd and even 57 bit blocks are interleaved diagonally on to alternate bursts on the TDMA frame. 05/31/13Tempus Telcosys 129
  • 130.
    Speech Interleaving 05/31/13Tempus Telcosys130 8* 57 bits each = 456 bits Of Speech block N 57 Even Of N-1 57 Even Of N Speech block N-1 57 odd Of N-1 57 odd Of N The speech is spread over 8 such normal bursts Each normal burst consists of two blocks of 57 bit speech from different 20msec blocks (say N, N-1) along with 26 bit training sequence T and 2 flag F plus 6 start stop bits . T+FT+FT+F 456 bit speech data
  • 131.
    Control Data Interleaving 05/31/13TempusTelcosys 131 114 114 114 114 456 bits control data The control data is spread over 4 blocks using rectangular interleaving instead of diagonal interleaving as in speech the receiver will have to wait for at least 2 multiframes before being able to decode the control message TDMA Burst blocks
  • 132.
    Data Interleaving 05/31/13Tempus Telcosys132 114 114 114 114 Burst 1 Burst 22Burst 2 Burst 3 Burst 4 Burst 19 First 6 bits First 6 bits Last 6 bits Last 6 bits 456 bit data block
  • 133.
    Data Interleaving cont’d Here the data block of 456 bits is divided into 4 blocks of 114 bits each.  The first 6 bits from each of the 114 bit blocks is inserted in to each frame, the second 6 bits from each of the 114 bits into the next frame and so on spreading each 114 block over 19 TDMA bursts while the entire 456 bits is spread over 22 TDMA bursts.  Thus the data interleaving is said to have a depth of 22 bursts. 05/31/13Tempus Telcosys 133
  • 134.
    Data Interleaving cont’d The reason why data is spread over such along period of time is that if data burst is corrupted or lost, only a small part of it is lost which can be reproduced at the receiver.  This wide interleaving depth does produce a time delay during transmission but that is acceptable since it does not affect the data signal quality at the receiver, unlike speech where delay could result in bad quality of signal to the subscriber.  *Note – The interleaving used in data is diagonal interleaving. 05/31/13Tempus Telcosys 134
  • 135.
    Before Deinterleaving 3 successivebursts corrupted After Deinterleaving The corrupted bursts are spread over a length equal to the interleaving depth so that the effect of the errors is minimized. 05/31/13Tempus Telcosys 135 Interleaving Advantage
  • 136.
    Air Interface Bitrate The information which is now coded and interleaved at 22.8 Kbps now has to be transmitted over the Air interface to the BTS.  The information burst is not sent directly , but is sent in ciphered form within a burst envelope. This ciphering is done using ciphering keys and algorithms known both by the mobile and the BSS. 05/31/13Tempus Telcosys 136
  • 137.
    Air Interface Bitrate cont’d The Kc is the ciphering key and A5 algorithm are applied to the information(speech or data) which increases the bitrate to a final rate of 33.8 Kbps from/to each mobile.  If we assume all 8 timeslots of the cell to be occupied then the bitrate of the Air interface comes to 33.8 * 8= 270.4 Kbps/channel. 05/31/13Tempus Telcosys 137
  • 138.
    Air Interface Bitrate cont’d 05/31/13TempusTelcosys 138 A5 Algorithm Kc Information Block 22.8 Kbps Sent on Air interface Ciphered information burst 33.8 Kbps
  • 139.
    Air Interface Bitrate cont’d 05/31/13TempusTelcosys 139 1 2 3 4 5 6 7 8 Mobile Tx’s at 33.8 Kbps Cell rx’s 8*33.8 KBps = 270.4 Kbps Per TDMA frame Cell coverage area TDMA Fn TDMA Fn+1
  • 140.
    Decoding and Deinterleavingat the Receiver  At the receiver the reverse process of Deinterleaving and decoding have to take place respectively, so as to recover the information from the signal.  After Deinterleaving the signal will be decoded which is the reverse process of the Convolutional coding, using Viterbi decoders.  The decoder can recover lost or corrupted data up to 4 successive bits, because the memory depth of the CC is 4(for k=5). 05/31/13Tempus Telcosys 140
  • 141.
    Channelization  Frequency bandhas several application segments  Certain blocks of the Band are reserved for certain applications by regulating authorities  Technologies have decided their frequency bands  E.g. AMPS/DAMPS: 824-894 MHz 05/31/13Tempus Telcosys 141
  • 142.
    Channelization methods Channelization canbe done primarily by three methods:  FDMA (Frequency Division Multiple Access)  TDMA (Time Division Multiple Access)  CDMA (Code Division Multiple Access) 05/31/13Tempus Telcosys 142
  • 143.
    FDMA  E.g. AMPSband is divided into 30 KHz channels (1666 Freq. channels)  Television Channels (Star, Zee, Sony,..) 05/31/13Tempus Telcosys 143 Frequency Time Power
  • 144.
    TDMA  E.g. AMPShas 3 timeslots on each 30 KHz channel 05/31/13Tempus Telcosys 144 Frequency Time Power
  • 145.
    CDMA  Frequency channelis divided into code channels  E.g. in IS-95 CDMA, 1.228 MHz channel is divided into 64 Code Channels  Each user has a particular code  Codes are orthogonal to each other, do not interfere with each other 05/31/13Tempus Telcosys 145
  • 146.
    Duplex Access Methods Frequency Division Duplex (FDD)  Transmit on one frequency and receive on another frequency 05/31/13Tempus Telcosys 146 F1 F2 Frequency Amplitude Time Tx Rx
  • 147.
    Time Division Duplex Time division duplex  Tx and Rx is on the same frequency but on different times 05/31/13Tempus Telcosys 147 F1 Frequency Amplitude Time Tx Rx
  • 148.
    GSM Air Interface Separate Bands for Uplink and Downlink  Downlink: 935-960Mhz (EGSM: 925-960MHz)  Uplink: 890-915 MHz (EGSM: 880-915 MHz) 05/31/13Tempus Telcosys 148 • TDMA and TDMA Multiplex – 124 Frequency Channels (ARFCN) for GSM900 – 1 to 124 fro current band – 975 to 1023 for E-GSM – 200kHz Channels – 8 Mobiles share ARFCN by TDMA
  • 149.
    GSM Air interface(1800)  1800: Downlink: 1805-1880 MHz  1800: Uplink: 1710-1785 MHx  374 ARFCNs  Separation of 95 MHz  ARFCNs are numbered from 512 to 885 inclusive 05/31/13Tempus Telcosys 149
  • 150.
    The GSM Burst 05/31/13TempusTelcosys 150 3 357 261 571 8.25 Tail Bits Data Control Bit Midamble Control Bit Data Tail Bits Guard Period
  • 151.
    Speech Coder  RPE/LTPcoder (Regular Pulse excitation/Long term Prediction)  Converts 64 kbps speech to 13 kbps  At the end we get 13kbps speech i.e. 260 bits in 20 ms 05/31/13Tempus Telcosys 151 20 ms blocks Speech Coder Bits Ordered 50 very important bits 132 important bits 78 other bits
  • 152.
    Error Correction 05/31/13Tempus Telcosys152 Type 1a 50 3(CRC)Type 1b 132 Type II 78 Reordering 25 66366 25 4 Type II 78 Type 1a Type 1b Type 1b Type 1a Tail Half rate convolutional code 378 Type II 78 456 bits from 20 ms of speech
  • 153.
    Diagonal Interleaving  Trafficchannel (TCH) bursts carry two 57 bit blocks (114)  Each 120 ms of speech = 456*6 = 2736 bits 2736/114 = 24 bursts i.3. 24 frames Multiframe has 26 frames in 120ms. There are 2 spare frames .. 1 SACCH, 1 Idle 05/31/13Tempus Telcosys 153 456 bits from 20ms of speech 456 bits from 20ms of speech 57 57575757575757 57 57575757575757 57 57 57 5757 5757 5757 5757 5757 5757 57
  • 154.
    Convolutional Coding and Interleaving Bits to be Tx ed: HELLO  Convolutionally encoded: HHEELLLLOO  Interleaved: EE HH LL LL OO  Bits Rx ed: EE HH LL LL OO  De-Interleaved: HHEELLLLOO  Viterbi Decoded: HELLO 05/31/13Tempus Telcosys 154
  • 155.
    Speech Coding Process 05/31/13TempusTelcosys 155 20 ms Speech Coder 260 bits 13 kbps 50 1a 132 1b 78 II Channel Coder 456 bits 22.8 kbps Transceiver (BTS) Transcoder Handler 260 bits 456 bits 16 kbps TRAU frame 260 + 60 = 320 bits Abis 13 kbps
  • 156.
    TRAU frame  260bits info + 60 TRAU bits = 320 bits/20ms = TRAU frame  60 bits contain frame Information data which indicates speech, data, O&M, full rate/half rate  60 bits = 35 synchronization + 21 control + 4 timing 05/31/13Tempus Telcosys 156
  • 157.
    Midamble or TrainingBits  8 midamble patterns (Colour codes) of 26 bits (BSIC)  RACH and SCH have longer 41 and 64 bit Midambles  Equalizer estimates channel impulse response from midamble  Mathematically construct inverse filter  Uses inverse to decode bits 05/31/13Tempus Telcosys 157 3 357 261 571 8.25 Tail Bits Data Control Bit Midamble Control Bit Data Tail Bits Guard Period
  • 158.
    Downlink and Uplink Uplink lags downlink by 3 timeslots  Uplink and downlink use same timeslot number  Uplink and downlink use same channel number (ARFCN)  Uplink and downlink use different bands (45 MHz apart for GSM 900) 05/31/13Tempus Telcosys 158
  • 159.
    Measurements made byMS and BTS 05/31/13Tempus Telcosys 159  RxQual 0 < 0.2% 1 0.2 – 0.4 % 3 0.4 – 0.8 % 4 0.8 – 0.16 % 5 1.6 – 3.2 % 6 3.2 – 6.4 % 7 6.4 – 12.8 % Uplink RXLEV (-48 to -110 dbm) Uplink RXQUAL (0-7) Uplink RXLEV (-48 to -110 dbm) Uplink RXQUAL (0-7)
  • 160.
    Mobile Power Control 05/31/13TempusTelcosys 160  Mobile is commanded to change its Transmit Power  Change in Power is proportionate to the Path Loss  Change in Power is done in steps of 2 dbs Path Loss Power Command
  • 161.
    Timing Advance  TDMAapproach requires signals to arrive at BTS at the correct time  A mobile at 30 km will be late by 100micro seconds  Timing advance is in the range of 0-62  One unit is 550m  So maximum cell size is 63*0.55 = ~35 kms 05/31/13Tempus Telcosys 161
  • 162.
    Concepts of Channelsin GSM  A company vehicle is used for several purposes in a day  Similarly in GSM, the timeslots are used for different purposes at different times 05/31/13Tempus Telcosys 162
  • 163.
    Frames and Multiframes 05/31/13TempusTelcosys 163 0 654321 7 3 Data 1Midamble1 Data 3 8.25 bits 156.25 bits 576.92 micro sec 4.615 ms Time Slot Frame 0 50 0 25 Control Channel Multiframe Traffic Channel Multiframe
  • 164.
    GSM Operations  LocationUpdate  Mobile Originated Call  Mobile Terminated Call  Handover  Security Procedures  Cell Barring  DTX  Cell Broadcast  Short Message Service  Emergency calls  Supplementary Services  Roaming 05/31/13Tempus Telcosys 164
  • 165.
    Mobile Turn On Mobile Searches for Broadcast Channels (BCH)  Synchronizes Frequency and Timing  Decodes BCH sub-channels (BCCH)  Checks if Network Allowed by SIM  Location Update  Authentication 05/31/13Tempus Telcosys 165
  • 166.
    Location Area 05/31/13Tempus Telcosys166 Location Area 1Location Area 1 Location Area 2 Location Area 2 BTS BTS BTS BTS BTS BTS BTS BTS BSC BSC BSC MSC
  • 167.
    Location Area Identity Location area is the area covered by one or more BTSs where a mobile can move freely without updating the system  One Location area can be covered by one or more BSCs, but ony one MSC. 05/31/13Tempus Telcosys 167 MCC LACMNC
  • 168.
    Importance of LocationArea  Reduce Paging load  Resource Planning Smaller Location Areas – Location update increases Larger Location Areas – Paging load increases 05/31/13Tempus Telcosys 168
  • 169.
    What is LocationUpdate?  MSC should know the location of the Mobile for paging  Mobile is continuously changing location area  Mobile when changes Location Area informs the MSC about its new LA  Process of informing MSC about new Location area is Location Update 05/31/13Tempus Telcosys 169
  • 170.
    Types of LocationUpdates 1. Normal Location Update 2. IMSI Attach 3. Periodic Location Update 05/31/13Tempus Telcosys 170 Hi, I am in Location area xxx
  • 171.
    IMSI Attach  Mobileturns off and sends an IMSI Detach to MSC  Mobile turns on again and compares LAI  If same, sends an IMSI attach to MSC 05/31/13Tempus Telcosys 171 Is the received LAI same as before If same, Sends IMSI attach
  • 172.
    Normal Location Update Mobile Turns on Power  Reads the new LAI  If different, does a Location Update 05/31/13Tempus Telcosys 172 Is the received LAI same as before If different, does Location Update
  • 173.
    Periodic Location Update The periodic location Update time is set from OMC/MSC  After the periodic location update timer expires, the mobile has to do a location update 05/31/13Tempus Telcosys 173
  • 174.
    What happens atLocation Update?  Mobile changes location area  Reads the new Location Area from BCCH  Sends a RACH (request for channel)  Gets a SDCCH after AGCH  Sends its IMSI and new and old LAI in a Location Update request to MSC on SDCCH 05/31/13Tempus Telcosys 174
  • 175.
    What happens atlocation update cont.. ….. . .  MSC starts Authentication  If successful, Updates the new Location area for the Mobile in the VLR  Sends a confirmation to the Mobile  Mobile leaves SDCCH, and comes to idle mode 05/31/13Tempus Telcosys 175
  • 176.
    Mobile Originated Call 05/31/13TempusTelcosys 176 Channel Request Immediate Assign Service Request Call Proceeding Set Up Ciphering Authentication Alerting Assignment Connection
  • 177.
    Mobile Terminated Call 05/31/13TempusTelcosys 177 Paging Channel Request Immediate Assign Set Up Ciphering Authentication Paging Response Assignment Call Confirmed Alerting Connection
  • 178.
    Security Features  Authentication Process to verify Authenticity of SIM  Mobile is asked to perform an operation using identity unique to SIM 05/31/13Tempus Telcosys 178 • Ciphering –Process of coding speech for secrecy –The speech bits are EXORed with bit stream unique to MS
  • 179.
    Security Features (TMSI Reallocation) 05/31/13TempusTelcosys 179 GSM Infrastructure Mobile Location Update TMSI Allocation Call Setup TMSI Reallocation TMSI- Temporary Mobile Subscriber Identity
  • 180.
    Security Features (Identity Check) 05/31/13TempusTelcosys 180 EIR Sends IMEI Identity Check White listed /Grey Listed/ Black Listed mobiles
  • 181.
    Handover 05/31/13Tempus Telcosys 181 Cell1 Cell 2 Handover is a GSM feature by which the control/communication of a Mobile is transferred from one cell to another if certain criteria’s are met. It is a network initiated process.
  • 182.
    Criteria for Handover Receive Quality (RXQUAL) on uplink and downlink  Receive Signal Strength (RXLEV) on uplink and downlink  Distance (Timing Advance)  Interference Level  Power Budget 05/31/13Tempus Telcosys 182
  • 183.
    Handover Decision  BSCprocess the measurements reported by Mobile and the BTS 05/31/13Tempus Telcosys 183 BTS BTS BTS BTS BTS BTS Mobile has measurements of six neighbors
  • 184.
    Handover Decision (cont..) BSS performs averaging function on these measurements every SACCH frame (480ms)  Handover Decision algorithm is activated after a set number of SACCH frame periods by comparison against thresholds 05/31/13Tempus Telcosys 184
  • 185.
    Types of Handovers INTRA-CELL HANDOVERS  INTER-CELL HANDOVERS  INTRA-BSC HANDOVERS  INTER-BSC HANDOVERS  INTER-MSC HANDOVERS 05/31/13Tempus Telcosys 185
  • 186.
    INTRA-CELL HANDOVER 05/31/13Tempus Telcosys186 C0 C1 Handover between timeslots of same frequency Handover between different frequencies of the same cell (to reduce interference) MSC is not aware about this
  • 187.
    Inter-cell Handover 05/31/13Tempus Telcosys187 Handover between cells of the same BTS BTS Cell 1 Cell 2
  • 188.
    Inter-cell Handover (cont..) MSC is told about HO  BTS -> BSC -> MSC  Why MSC is informed?  In case of change of LA, MSC may need LAC for paging. As MS is busy, a link already exists. So, MSC can send a tone in case of call waiting, and does not need to page again.  This is needed also for billing and call tracing 05/31/13Tempus Telcosys 188
  • 189.
    INTRA-BSC Handover 05/31/13Tempus Telcosys189 MSC BSC BTS BTS This HO takes place if the cell to which handover is to be done belongs to the same BSC
  • 190.
    Inter BSC Handover 05/31/13TempusTelcosys 190 MSC BSC BTS BTSBSC The MSC is completely involved in this Handover
  • 191.
    Inter MSC Handover 05/31/13TempusTelcosys 191 BSC BSC MSC MSC BTS BTS GMSC/ PSTN/ Backbone In this case the handover takes place through the interconnecting element which can be GMSC or PSTN or private Backbone between the MSCs
  • 192.
    Cell Barring 05/31/13Tempus Telcosys192 BTS Cell Barring is a GSM feature by which certain mobiles could be barred access to certain cells Cell barring is activated/deactivated at BTS level Cell barring is done for mobile categories and priorities
  • 193.
    Cell Barring  Everymobile has an access class  The access class is stored in the SIM  Classes 0-9 are termed normal calsses  Classes 11-15 are emergency classes 05/31/13Tempus Telcosys 193 • Every cell has a set parameter which defines which access classes are barred for the particular cell. This parameter is broadcasted on the BCCH
  • 194.
    What is DTX? DTX (Discontinous Transmission)  Each direction of Transmission is only 50%  Transmitter is switched ON for useful information frames 05/31/13Tempus Telcosys 194 Need for DTX •To increase battery life •To reduce the average interference level DTX is done by DTX handlers which
  • 195.
    VAD (Voice Activity Detector) Senses for speech in 20ms blocks  Removes stationary noise  VAD is an energy detector  Compares Energy of filtered speech threshold  It determines which 20ms blocks contain speech and it only forwards those frames 05/31/13Tempus Telcosys 195
  • 196.
    Evaluation of BackgroundNoise  Background noise is always present with speech  DTX cuts off this noise with speech  Gives an uncomfortable feeling to the listener  VAD takes care of this by inserting comfort noise at the receiving end when speech discontinues. 05/31/13Tempus Telcosys 196
  • 197.
    Emergency Calls  GSMspecs define 112 as an emergency number  ‘112’ is accessible with or without SIM  Without SIM it is sent on the best channel  Mobile on sensing ‘112’ sets the establishment cause to emergency call in the RACH  Routing of this call be done to a desired location defined in the switch 05/31/13Tempus Telcosys 197
  • 198.
    Cell (Re)selection  Cellreselection is done using C1 path loss criterion.  The purpose is to ensure that the MS is camped on to the cell with the best transmission quality.  The MS will camp on to the cell with the highest C1 value if C1 > 0. 05/31/13Tempus Telcosys 198
  • 199.
    The following parametersare used to calculate the C1 criterion  The received signal at the MS side.  Rxlev_access_min - broadcast on the BCCH - The minimum received level at the MS required for access to the network.  Ms_txpwr_max_cch - the maximum power that an MS may use when initially accessing the network.  The maximum power of the MS 05/31/13Tempus Telcosys 199
  • 200.
    C1 = A- Max(B,0)  A = Received level Average - Rxlev_access_min.  B = MS_txpwr_max_cch - maximum output power of the MS 05/31/13Tempus Telcosys 200
  • 201.
    Cell Reselect Hysteresis Cell reselection on the border of two location areas result in a location update. When an MS moves on the border of two location areas lots of location updates take place. To avoid these location updates, the reselect hysteresis is introduced.  A location update is performed only if:  The C1 value of the new location area is higher than the C1 value in the current location area and  The received signal strengths have at least a difference of the reselect hysteresis. 05/31/13Tempus Telcosys 201
  • 202.
  • 203.
    Why to usethe cellular concept ?  Solves the problem of Spectral congestion and user capacity by means of frequency reuse.  Offers high capacity in a limited spectrum allocation.  Offers system level approach, using low power transmitters instead of a single, high power transmitter (large cell) to cover larger area. 05/31/13Tempus Telcosys 203
  • 204.
     A portionof the total channels available is allocated to each base station.  Neighboring base stations are assigned different groups channels, in order to minimize interference. 05/31/13Tempus Telcosys 204
  • 205.
  • 206.
  • 207.
    1-Omni-directional cell-site (Omni-directional antenna). 2-Rhombus-shapedsectors (Directive antenna). 3-Hexagonal shaped sectors (Directive antenna). 05/31/13Tempus Telcosys 207
  • 208.
    Cell size Large cell: (up to 70km in diameter) It exists where : 1-Radio waves are unobstructed. 2-Transmission power can cover the area. 3-low subscriber density. Small cell : (up to 2km in diameter) It exists where : 1-Radio waves are obstructed. 2-Low transmission power to decrease interference. 3-High subscriber density. 05/31/13Tempus Telcosys 208
  • 209.
    Types of cells 1-Macro-cells2-Micro-cells. 3-Pico-cells. 4-Umbrella-cells. 05/31/13Tempus Telcosys 209
  • 210.
    What is acluster ?  A cluster is a group of cells.  No channels are reused within a cluster.  It is the unit of design. 05/31/13Tempus Telcosys 210
  • 211.
    Cluster size  Definition: It is The number of cells per cluster N = i^2 + ij + j^2 Where : i = 0, 1, 2….& j = 0,1,2…. etc. N = 1 , 3 , 4 ,7, 9 , 12 ,…… 05/31/13Tempus Telcosys 211
  • 212.
    Types of clusters 1-N=7omni frequency plan (2-directional). 2-N=7 trapezoidal frequency plan (1-directional). 3-N=9 omni frequency plan. 4-Tricellular plans a) N=3 tricellular plan (3/9). b) N=4 tricellular plan (4/12). 05/31/13Tempus Telcosys 212
  • 213.
    Channel assignment strategies  Considerations: 1) Max. capacity. 2) Min interference. 3) Perfect handover.  Types of assignment strategies : 1) Fixed :  Each cell has permanent predetermined set of voice channels.  New calls served by unused channels of this cell.  Borrowing strategy if all channels are occupied.  High probabiltity that call is Blocked if channels are occupied.( disadv.) 05/31/13Tempus Telcosys 213
  • 214.
    2) Dynamic : Channels are not allocated to different cells permanently.  Each new call BTS requests new channel from MSC.  MSC allocate a channel, by using an algorithm that takes into account: 1- Frequency is not already in use. 2- Min. reuse distance to avoid co-channel interference. 05/31/13Tempus Telcosys 214
  • 215.
     Adv. ofdynamic assignment strategy : 1) Increase channel utilization ( Increase trunking efficiency ). 2) Decrease probability of a blocked call. 05/31/13Tempus Telcosys 215
  • 216.
  • 217.
  • 218.
  • 219.
    Co-channel Reuse ratio (Q):  R : cell radius.  D : reuse distance.  Q = D/R. = sqrt(3N). Where : N : cluster size 05/31/13Tempus Telcosys 219
  • 220.
  • 221.
    Definition : procedurethat allows MS to change the cell or time-slot to keep as good link as possible during all the call. 05/31/13Tempus Telcosys 221
  • 222.
    Types of handover IntraCell : bet. 2 channels of same cell.  InterCell : bet. 2 channels of 2 different cell & same BTS.  InterBTS (intra BSC) : 2 cells of different BTS Same BSC.  InterBSC : bet. 2 cells of different BSC’s & same MSC. 05/31/13Tempus Telcosys 222
  • 223.
    Measurements before handover 1- Measurementsfrom MS to BSC : a) Strength of BTS signal. b) Quality of BTS signal. c) Signal strength of 6 neighbor BTS’s. 2-Measurements from BTS to BSC : a) Strength of MS signal. b) Quality of MS signal. c) Distance between serving BTS & MS. 05/31/13Tempus Telcosys 223
  • 224.
    Different causes ofhandover 05/31/13Tempus Telcosys 224 Better cell HOEmergency HO Level Quality PBGT Traffic causes InterferenceDistance Different causes of Handover
  • 225.
    Basic handover algorithms a)“Min. acceptableperformance” algorithm: MS power is increased when quality deceases till handover is the only way. b) “Power budget “ algorithm: Prefer direct handover when quality deceases without increasing MS power first . 05/31/13Tempus Telcosys 225
  • 226.
    Handover priority 1) ULquality cause (or interference). 2) DL quality cause (or interference). 3) UL level cause. 4) DL level cause. 5) Distance cause. 6) Better cell cause. 05/31/13Tempus Telcosys 226
  • 227.
  • 228.
    Sources of interference include: 1)Another mobile in the same cell. 2) A call in progress in the neighboring cell. 3) Other BTS’s operating in the same frequency band. 05/31/13Tempus Telcosys 228
  • 229.
    Interference effects : In voice channel causes crosstalk  In control channels it leads missed and blocked calls due to errors in the digital signaling. 05/31/13Tempus Telcosys 229
  • 230.
    Main types of interference: 1) Co-channel interference. 2) Adjacent channel interference. 05/31/13Tempus Telcosys 230
  • 231.
    1) Co-channel interference Source : Near cell using same frequency. It is a function of reuse distance(D/R).  General rule : io = No. of co-channel interfering cells. S = Signal power from a desired BS. Ii = interference power caused by the ith interfering co-channel cell BS. 05/31/13Tempus Telcosys 231
  • 232.
     Another form: C/I = 10 log {(1/n)(D/R)*m} Where : m = propagation constant (dep’s on nature of environment) n = number of co-channel interferers. Can be minimized by : Choosing minimum reuse distance = (2.5….3)(2R). 05/31/13Tempus Telcosys 232
  • 233.
    2) Adjacent channel interference Source : A cell using a frequency adjacent to the one in another cell due to imperfect reciever’s filter. 05/31/13Tempus Telcosys 233
  • 234.
    Can be minimizedby : 1-careful filtering 2-careful channel assignments 3-Directional antenna.  General rule : ACI= -10 Log[(d1/d2)*m] – Adj ch isolation. Where : d1: distance between MS & proper BTs d2: dist. Bet MS & adj BTS causing interference. Adj ch isolation = Filter isolation = - 26db. 05/31/13Tempus Telcosys 234
  • 235.
  • 236.
    Why do weneed to know traffic?  The amount of traffic during peak hours allows us to dimension our wireless system for a certain GOS.  GOS : probability of having a call blocked during busy hour (block rate). 05/31/13Tempus Telcosys 236
  • 237.
    Traffic intensity (E) Erlang : A unit of traffic intensity measure.  1 Erlang = 1 circuit in use for 1 hour.  T ( in Erlangs) = [No. of calls per hour*average call holding time(sec.)] / [3600] 05/31/13Tempus Telcosys 237
  • 238.
  • 239.
    Traffic tables Erlang B Table Blockedcalls are not held Erlang C Table Blocked calls are held in the queue indefinitely Poisson Table Blocked calls are held in the queue for a time = the mean holding time05/31/13Tempus Telcosys 239
  • 240.
    Erlang – Btable  P(N;T) = [ (T^N)*exp(-T) ] / N! N GOS 1% GOS 2% 2 0.153 0.223 4 0.869 1.093 10 4.46 5.084 20 12.0 13.182 40 29.0 30.99705/31/13Tempus Telcosys 240
  • 241.
    Trunking  Sharing channelamong several users.  Trunking efficiency (nT) : Measures the number of subscribers that each channel in every cell can accommodate. nT = (traffic in Erlangs / no. of channels)*100. 05/31/13Tempus Telcosys 241
  • 242.
    Trunking efficiency in presenceof one operator : N = 7 , 312 one direction voice channels No. of channels / cell = 312 / 7 = 44 ch./cell. From Erlang-B table @GOS 2%,this’s equivalent to 35 Erlangs nT = 35 / 44 = 79.55. Trunking efficiency in presence of two operators : N = 7 , 312 / 2 = 156 one direction voice channel for each operator. No. of channels / cell = 156 / 7 = 22 ch./cell. From Erlang-B table @GOS 2%,this’s equivalent to 15 Erlangs. nT = 15 / 22 = 68.18. 05/31/13Tempus Telcosys 242
  • 243.
  • 244.
     S :total duplex channels available for use = k*N Where: N : cluster size. k : No. of channels / cell.  C : total No. of duplex channels in system; C = M*k*N. Where : M : No. of times the cluster is repeated. 05/31/13Tempus Telcosys 244
  • 245.
    Improving system capacity  Cellsplitting.  Sectoring. 05/31/13Tempus Telcosys 245
  • 246.
  • 247.
    Sectoring  We usedirectional antennas instead of being omnidirectional 05/31/13Tempus Telcosys 247
  • 248.
    What does sectoring mean? We can now assign frequency sets to sectors and decrease the re-use distance to fulfill : 1) More freq reuse. 2) Higher system capacity. 3) Improve S/I ratio ( better signal quality ).  How S/I ratio is improved? -e.g. In 120 degree sectoring there’s only 2 interferers instead of 6 incase of omnidirectional N=7 cluster. 05/31/13Tempus Telcosys 248
  • 249.
  • 250.
  • 251.
    Directional frequency reuse Here we use 7/21 pattern for frequency allocation. 05/31/13Tempus Telcosys 251
  • 252.
    Comparison between various types ofclusters 05/31/13Tempus Telcosys 252
  • 253.
    N = 7omni frequency plan :  n = 6 , m = 4.  D / R = 4.583.  1) Co-channel interference ratio : C / I = 18.6 dB.  2) Adjacent channel interference : ACI = -26 dB @ d1= d2. 05/31/13Tempus Telcosys 253
  • 254.
    N = 7trapezoidal frequency plan  n = 2 , m = 4.  D / R = 6.245.  1) Co-channel interference ratio : C / I = 28.8.  2) Adjacent channel interference : disappears because the channels are assigned alternatively to the cells. 05/31/13Tempus Telcosys 254
  • 255.
     Trunking efficiency:  312 one direction voice channels N = 7  312 / 7 = 44.57 ~ 44 ch./cell.  From Erlang-B table @ GOS = 2% T = 35 E.  nT = 35 / 44 = 79.55 %. 05/31/13Tempus Telcosys 255
  • 256.
    N = 9omni frequency plan  n = 4 , m = 4.  D / R = sqrt ( 3 * 9 ) = 5.2.  1) Co-channel interference : C / I = 22.6 dB.  2) Adjacent channel interference : ACI = -38 dB @ d2 = 2 (d1). 05/31/13Tempus Telcosys 256
  • 257.
     Trunking efficiency:  312 one direction voice channels N = 9  312 / 9 = 34.67 ~ 34 ch./cell.  From Erlang-B table @ GOS = 2% T = 25.529 E.  nT = 25.529 / 34 = 75.085 %. Conclusion : nT 7 > nT 9 But C/I 7 > C/I 9 ACI 7 > ACI 9 05/31/13Tempus Telcosys 257
  • 258.
    4 / 12cell pattern  n = 1 , m = 4.  D / R = sqrt (3* 4) = 3.732.  C / I = 22.87 dB.  Trunking efficiency :  No. of channels/cell = 312 / 12 = 26 ch./cell.  From Erlang-B table @ GOS = 2 %.  T = 18.4 E/cell.  nT = 18.4 / 26= 70.77%. 05/31/13Tempus Telcosys 258
  • 259.
    3 / 9cell pattern  n = 1 , m = 4.  D / R = sqrt (3* 3) = 3.  C / I = 19.1 dB.  Trunking efficiency :  No. of channels/cell =312 / 9 = 34 ch./cell.  From Erlang-B table @ GOS = 2 %.  T = 25.5 E/cell.  nT = 25.5 / 24 = 75 %. 05/31/13Tempus Telcosys 259
  • 260.
    120 degree cellsectoring  n = 2 , m = 4.  D / R = sqrt(3 * 7) = 4.583.  Co-channel interference : C / I = 23.436 + 6dB(due to isolation) = 29.436 dB.  Trunking efficiency :  No. of channels/cell = 312 / 21 = 14.857.  From Erlang-B @ GOS=2% T= 8.2003.  nT = 8.2003 / 14.857 =56.216%. 05/31/13Tempus Telcosys 260
  • 261.
     References : Motorola CP02  NOKIA SYSTRA 05/31/13Tempus Telcosys 261
  • 262.

Editor's Notes