This document discusses problems that can arise during and after construction of flyover bridges and their solutions. It outlines objectives to identify common issues and provide fundamental knowledge on construction and maintenance. Key problems discussed include earthworks not being properly leveled and compacted, substandard materials used in concrete and steel works, bearing failures from issues like misalignment, corrosion and contamination, and general corrosion of reinforcement from water and chloride ingress. Solutions proposed are reducing excessive loads, using higher quality materials, preventing contamination, diverting corrosive fluids, ensuring proper alignment, and increasing bond strength between steel and concrete. Literature on related topics is also reviewed.