surveying Engineering
Fly Levelling
Fly leveling: -Fly leveling is just like differential leveling carried
out to check the accuracy of leveling work. It is a very approximate
form of leveling in which sights are taken as large as possible. in this
method, a line of levels is run to determine approximately reduced
levels of the points carried out with more rapidly and less precision
The aim of fly Levelling: The main purpose of this type of leveling is
to check the values of the reduced levels of the bench marks already
fixed. In this method only back sight and foresight are taken. There is no need of intermediate sights. However great care has to be taken for selecting the change points (Turning Points) and for taking reading on the change points because the accuracy of leveling depends upon these
-Create Bench Marks (BM).
Bench Marks
Bench Mark is a point of known elevation, there are three Type of Bench Marks
1-Perment Bench Mark.
2-Orbitrary Bench Mark .
3-Temporary Bench Mark .
-Leveling Process Calculation.
1. Height of collimation method
2. Rise and Fall method
How do we find horizontal distance using levelling Machine.
Fly Levelling Close loop survey.
Fly and Differential leveling Using (Rise & fall) and (HI)methods.
*Checks for Errors
-Misclosure
Allowable closing error
Where:
D =Distance in km
E = Misclosure error in (mm).
C = 30 for fixed levelling process in rough ground.
C = 15 for normal leveling in flat area (Good work)
Fly Levelling example
Computation of Elevations for an open loop survey H.I method
Computation of Elevations
Differential Leveling
Computation of Elevations
-Correction For Errors in Leveling
1. Errors Due to the line of sight being not horizontal
2. Error Due to Curvature and refraction.
Errors in differential leveling: -
1) Non adjustment of the instrument: -
a) Adjustment of cross-wire ring
b) Adjustment of the bubble tube
c) Adjustment of line of sight
2-Errors in levelling
• Collimation line
• Parallax
• Change point instability
• Instrument instability
• Benchmark instability
• Staff reading errors , • Staff verticality • Level Instrument shading • Temperature on staff • Booking errors) • Earth curvature • Refraction • The Bubble not center.
3-Constant error (instrumental error):
A. Non vertically of the staff.
B. Collimation error in the instrument.
C. Staff gradation error.
4- Random error (natural error):
A. Effect of wind and temperature.
B. Soft and hard ground.
C. Change points. CP
D. Human deficiencies and neglect
Prepared by:
Asst. Prof. Salar K.Hussein
Mr. Kamal Y.Abdullah
Asst.Lecturer. Dilveen H. Omar
Erbil Polytechnic University
Technical Engineering College
Civil Engineering Department
*Introduction
*Controls For Setting Out
*Horizontal control
*Vertical control
*SETTING OUT A BUILDING
*The equipment required for the job
*Method(1):-By using a Circumscribing Rectangle
*Method(2):- By using centre-line-rectangle
* Setting out of culverts
*SETTING OUT A TUNNEL
in this presentation, we should discuss what is the need for a survey in bridge construction site and what are the needed equipment use in construction. in this presentation, you should learn about how to locate activity of bridge construction.the different method should be learning in this presentation and it more effectively. it is more helpful in your career growth.
thank you
ASWINI & SAGAR
Course Contents:
Introduction; Linear measurements; Analysis and adjustment of measurements, Survey methods: coordinate systems, bearings, horizontal control, traversing, triangulation, detail surveying; Orientation and position; Areas and volumes; Setting out; Curve ranging; Global Positioning system (GPS); Photogrammetry.
*Introduction
*Controls For Setting Out
*Horizontal control
*Vertical control
*SETTING OUT A BUILDING
*The equipment required for the job
*Method(1):-By using a Circumscribing Rectangle
*Method(2):- By using centre-line-rectangle
* Setting out of culverts
*SETTING OUT A TUNNEL
in this presentation, we should discuss what is the need for a survey in bridge construction site and what are the needed equipment use in construction. in this presentation, you should learn about how to locate activity of bridge construction.the different method should be learning in this presentation and it more effectively. it is more helpful in your career growth.
thank you
ASWINI & SAGAR
Course Contents:
Introduction; Linear measurements; Analysis and adjustment of measurements, Survey methods: coordinate systems, bearings, horizontal control, traversing, triangulation, detail surveying; Orientation and position; Areas and volumes; Setting out; Curve ranging; Global Positioning system (GPS); Photogrammetry.
Surveying Engineering
Traversing Practical part 1
Plane and Applied surveying 2
Report number(2)
• Report name :Gales Traverse Table(Horizontal angle
measurement (FL)of closed traversing
• Apparatus
• Theodolite Instrument
• Tripod
• Compass
• Pin
• Tape
• Range pole
Object
• To conducted survey work in a closed traversing and calculate
in depend coordinates and area calculation by coordinate rule.
Procedure Traverse;
Calculations Traverse .Dada Sheet and Table method work clock wise surveying
-Gales Traverse Table.
*Traverse Calculations
-Traverse Calculation.
-Coordinate conversions.
-Signs of Departures and Latitudes.
*Balancing latitude and departure
-Correction for ∆E& ∆N:
Bowditch adjustment or compass method
-The example…
-Vector components (pre-adjustment)
*The adjustment components
Prepared by:
Asst. Prof. Salar K.Hussein
Mr. Kamal Y.Abdullah
Asst.Lecturer. Dilveen H. Omar
Erbil Polytechnic University
Technical Engineering College
Civil Engineering Department
Transition curve and Super-elevation
Transition Curve
Objectives of Transition Curve
Properties Of Transition Curve
Types Of Transition Curve
Length Of Transition Curve
Superelevation
Objective of providing superelevation
Advantages of providing superelevation
Superelevation Formula
Numerical
In this lecture we will cover
Applications of levelling
Equipment and procedures
Purposes of levelling
Some definitions
Applications
Longitudinal sections and cross sections
Plotting the profile
Procedure of profile
Procedure of cross-section:
Plotting the cross-section:
Prepared by:
Asst. Prof. Salar K.Hussein
Mr. Kamal Y.Abdullah
Asst.Lecturer. Dilveen H. Omar
Erbil Polytechnic University
Technical Engineering College
Civil Engineering Department
Geometric Design of Railways in India is explained. Design of horizontal curves, speed on curves, super-elevation, cant deficiency, transition curves etc. are included
Levelling in surveying is the process of determining the height of one level relative to another. It is used to establish the elevation of a point relative to a datum, or to establish a point at a given elevation relative to a datum
Surveying Engineering
Traversing Practical part 1
Plane and Applied surveying 2
Report number(2)
• Report name :Gales Traverse Table(Horizontal angle
measurement (FL)of closed traversing
• Apparatus
• Theodolite Instrument
• Tripod
• Compass
• Pin
• Tape
• Range pole
Object
• To conducted survey work in a closed traversing and calculate
in depend coordinates and area calculation by coordinate rule.
Procedure Traverse;
Calculations Traverse .Dada Sheet and Table method work clock wise surveying
-Gales Traverse Table.
*Traverse Calculations
-Traverse Calculation.
-Coordinate conversions.
-Signs of Departures and Latitudes.
*Balancing latitude and departure
-Correction for ∆E& ∆N:
Bowditch adjustment or compass method
-The example…
-Vector components (pre-adjustment)
*The adjustment components
Prepared by:
Asst. Prof. Salar K.Hussein
Mr. Kamal Y.Abdullah
Asst.Lecturer. Dilveen H. Omar
Erbil Polytechnic University
Technical Engineering College
Civil Engineering Department
Transition curve and Super-elevation
Transition Curve
Objectives of Transition Curve
Properties Of Transition Curve
Types Of Transition Curve
Length Of Transition Curve
Superelevation
Objective of providing superelevation
Advantages of providing superelevation
Superelevation Formula
Numerical
In this lecture we will cover
Applications of levelling
Equipment and procedures
Purposes of levelling
Some definitions
Applications
Longitudinal sections and cross sections
Plotting the profile
Procedure of profile
Procedure of cross-section:
Plotting the cross-section:
Prepared by:
Asst. Prof. Salar K.Hussein
Mr. Kamal Y.Abdullah
Asst.Lecturer. Dilveen H. Omar
Erbil Polytechnic University
Technical Engineering College
Civil Engineering Department
Geometric Design of Railways in India is explained. Design of horizontal curves, speed on curves, super-elevation, cant deficiency, transition curves etc. are included
Levelling in surveying is the process of determining the height of one level relative to another. It is used to establish the elevation of a point relative to a datum, or to establish a point at a given elevation relative to a datum
Haa bhai sahi hai bhai kal mil teri gend par out ho gaye han aur hai ki ab tak to aapane yahi suna hai ki ab tak to aapane yahi suna hai ki ab tak to aapane yahi suna hai ki ab tak to aapane yahi suna hai ki
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
الجامعة التكنولوجية
قسم هندسة البناء والإنشاءات
فرع هندسة الطرق والجسور
مختبر الأسفلت
دليل تجارب الاسفلت المختبرية
Asphalt Experiments Guide Laboratory
:أعداد
م.د. زينب ابراهيم قاسم
م شرف مختبر الاسفلت
University of Technology
Building and Construction
Engineering Department
Highways and Bridges Engineering Branch
Asphalt Laboratory
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTIONBahzad5
FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS
CONDITIONS OF CONTRACT
FOR WORKS OF CIVIL
ENGINEERING CONSTRUCTION
PART I GENERAL CONDITIONS
WITH FORMS OF TENDER AND AGREEMENT
FOURTH EDITION 1987
Reprinted 1988 with editorial amendments
Reprinted 1992 with further amendments
الشروط العامة لمقاولات اعمال الهندسة المدنيةBahzad5
الشروط العامة لمقاولات اعمال الهندسة المدنية ((بقسميها الاول والثاني)) المعدة من وزارة التخطيط مع اخر التعديلات عليها بغداد 2002
توزيع المكتبة القانونية - بغداد
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
REPUBLIC OF IRAQ
MINISTRY OF PLANNING
LEGAL DEPARTMENT
GENERAL CONDITIONS
FOR
CONTRACTS OF CIVIL ENGINEERING WORKS
PART I & II
PREPARED BY SPECIAL COMMITTEE AND
APPROVED BY THE PLANNING BOARD
JUNE 1973
Dar Al-Hurriyah
Al-Jamhurriyah Press, Baghdad
The Planning Board at its fifth meeting held on 12/6/1972 approved
these conditions vide resolution No. 2 and enforced the distribution
thereof to Ministries and Public establishments to act accordingly when
announcing tenders and adhering to the application thereof in all
contracts of civil engineering works together with the observance of
accuracy in the application of the second part for these conditions as to
harmonize with the volume and nature of each contract.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
Fly Levelling
1. Fly Levelling
surveying Engineering
2022- 2021
1
Erbil polytechnic university
technical engineering college
civil engineering department
Prepared by
Asst. Prof. Salar Khudhur Hussein
Ass. Lecturer Mr. Kamal Yaseen
Ass. Lecturer Ms. Dilveen H. Omar
Benchmark
2. Fly Levelling
. Fly leveling: -Fly leveling is just like differential leveling carried
out to check the accuracy of leveling work. It is a very approximate
form of leveling in which sights are taken as large as possible. in this
method, a line of levels is run to determine approximately reduced
levels of the points carried out with more rapidly and less precision
The aim of fly Levelling: The main purpose of this type of leveling is
to check the values of the reduced levels of the bench marks already
fixed. In this method only back sight and foresight are taken. There is
no need of intermediate sights. However great care has to be taken for
selecting the change points (Turning Points) and for taking reading on
the change points because the accuracy of leveling depends upon
these. 2
4. Bench Marks
Bench Mark is a point of known elevation, there are three Type of Bench Marks
1-Perment Bench Mark.
2-Orbitrary Bench Mark .
3-Temporary Bench Mark .
1-Permanent bench marks
• These benchmarks are written on permanent objects such as milestones, culverts,
bridges etc. their values are clearly written and their position are recorded for
future reference.
4
City Center BM
Shanadr BM
5. Introduction to Surveying (BPD)
LEVELLING PROCEDURES
Department of Structural Engineering Technology
College Of Technology
5
7. Bench Mark B. M
RLBM
Benchmark
Datum
7
2.Datum Surface; Datum surface is
any level surface to which the elevations
of all points may be referred. The mean
sea level(MSL) is usually adopted as
datum.
Mean Sea Level
8. Leveling Process Calculation
To find reduced level of points, there are two methods:
1. Height of collimation method
The following formula will serve as a guide to the reduction of level by this method;
H. I= B. S + R. L.BM
R. L (new)= H. I – staff reading(I.S or F.S)
H. I. (old) – F. S = R. L (new) at change point
R. L. (new) + B.S = H. I. (new)
2. Rise and Fall method
Rise or fall = B.S – F.S or I.S
= I.S preceding point – I.S following point = I.S – F.S
R.L of any point = R.L B.M + {Rise (+) or fall (-)}
Distance (AB) = (Upper – Lower)x 100
8
H.I
R.L
A B
Sea level-Datum
Elevation
9. How do we find horizontal distance using
levelling Machine
9
12. Checks for Errors
1. Closed loop check To close the loop the survey is continued back to the
beginning. Any difference in elevation for BM1 between the initial elevation of
BM1 and the closing elevation of BM1 is error.
2. The Note check (The Computation check) The note check uses an equation:
∑B.S - ∑F.S = R.L last - R. L first
3. Allowable error (Misclosure); Is the difference between the known
benchmark and computed benchmark
misclosure =Known point- measured point =0
12
13. Misclosure
•The amount by which the measured height
difference (DH measure) differs from the known
height difference derived from the RLs of the
starting and finishing benchmarks (DH known
Misclosure = DH known – DH measure
13
14. • The third check for error is also called the allowable error.
• It is common practice for the individual contracting the work to specify the acceptable level of
error. Professional standards may also specify allowable error.
The allowable error is based on an equation:
Allowable misclosure=E =C 𝑹
Where: C=constant C=12 for Mountain area C=30 for Ground levelling
R= is total distance by Km
Correction= E/n n=Number of T.P stations
Note:
• If actual misclosure<allowable misclosure(E), therefore the survey is acceptable. Unless, you
divide the error into turning points only.
• ΣBS - ΣFS only checks CALCULATION not OBSERVATIONS
• Observations checked by closing onto known final point MISCLOSURE
• Intermediate sights NOT checked by either.
14
15. Table and Corrections,,, Misclosure = DH known – DH measure
point BS IS FS HI RL Corrections Corrected ,,RL DH Distance
15
16. Allowable closing error
Where:
D =Distance in km
E = Misclosure error in (mm).
C = 30 for fixed levelling process in rough ground.
C = 15 for normal leveling in flat area (Good work)
16
17. Fly Levelling example
Computation of Elevations for an open loop survey
H.I method
Elevation 100.00
BS
12.64
Point
BM1
Elevation
BS HI FS
BM1
12.64 112.64 100.00
1. BS + Elevation = HI
BM2=124.47m
17
18. Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
100.00
18
23. Differential Leveling
Computation of Elevations
3. Change in elevation- summation of the backsight and
the foresight then subtract
+33.24 -8.77
Change in elevation = 33.24 -8.77 =24.47
Point
BM1
TP1
Elevation
BS HI FS
12.64 112.64
3.11 109.53
10.88 120.41
2.56
TP2 117.85
9.72 127.57
BM2 3.10 124.47
100.00
23
Summation
Last RL – First RL =124.47 – 100.00 = 24.47 m
For check
24. Correction For Errors in Leveling
1. Errors Due to the line of sight being not horizontal
2. Error Due to Curvature and refraction.
Correct
reading
Actual
reading
Size of error depends on
sight length
24
25. Errors in differential leveling: -
1) Non adjustment of the instrument: -
a) Adjustment of cross-wire ring
b) Adjustment of the bubble tube
c) Adjustment of line of sight
2-Errors in levelling
• Collimation line
• Parallax
• Change point instability
• Instrument instability
• Benchmark instability
26. • Staff reading errors ,
• Staff verticality
• Level Instrument shading
• Temperature on staff
• Booking errors)
• Earth curvature
• Refraction
• The Bubble not centered
26
27. 3-Constant error (instrumental error):
A. Non vertically of the staff.
B. Collimation error in the instrument.
C. Staff gradation error.
4- Random error (natural error):
A. Effect of wind and temperature.
B. Soft and hard ground.
C. Change points. CP
D. Human deficiencies and neglect .
27