Fly Levelling
surveying Engineering
2022- 2021
1
Erbil polytechnic university
technical engineering college
civil engineering department
Prepared by
Asst. Prof. Salar Khudhur Hussein
Ass. Lecturer Mr. Kamal Yaseen
Ass. Lecturer Ms. Dilveen H. Omar
Benchmark
Fly Levelling
. Fly leveling: -Fly leveling is just like differential leveling carried
out to check the accuracy of leveling work. It is a very approximate
form of leveling in which sights are taken as large as possible. in this
method, a line of levels is run to determine approximately reduced
levels of the points carried out with more rapidly and less precision
The aim of fly Levelling: The main purpose of this type of leveling is
to check the values of the reduced levels of the bench marks already
fixed. In this method only back sight and foresight are taken. There is
no need of intermediate sights. However great care has to be taken for
selecting the change points (Turning Points) and for taking reading on
the change points because the accuracy of leveling depends upon
these. 2
Create Bench Marks (BM)
3
Bench Marks
Bench Mark is a point of known elevation, there are three Type of Bench Marks
1-Perment Bench Mark.
2-Orbitrary Bench Mark .
3-Temporary Bench Mark .
1-Permanent bench marks
• These benchmarks are written on permanent objects such as milestones, culverts,
bridges etc. their values are clearly written and their position are recorded for
future reference.
4
City Center BM
Shanadr BM
Introduction to Surveying (BPD)
LEVELLING PROCEDURES
Department of Structural Engineering Technology
College Of Technology
5
6
Bench Mark B. M
RLBM
Benchmark
Datum
7
2.Datum Surface; Datum surface is
any level surface to which the elevations
of all points may be referred. The mean
sea level(MSL) is usually adopted as
datum.
Mean Sea Level
Leveling Process Calculation
To find reduced level of points, there are two methods:
1. Height of collimation method
The following formula will serve as a guide to the reduction of level by this method;
H. I= B. S + R. L.BM
R. L (new)= H. I – staff reading(I.S or F.S)
H. I. (old) – F. S = R. L (new) at change point
R. L. (new) + B.S = H. I. (new)
2. Rise and Fall method
Rise or fall = B.S – F.S or I.S
= I.S preceding point – I.S following point = I.S – F.S
R.L of any point = R.L B.M + {Rise (+) or fall (-)}
Distance (AB) = (Upper – Lower)x 100
8
H.I
R.L
A B
Sea level-Datum
Elevation
How do we find horizontal distance using
levelling Machine
9
10
BM=100
ST1
ST2 ST3
ST4
ST5
TP1
TP2
TP3
TP4
TBM=?
Fly Levelling
Close loop survey
Fly and Differential leveling Using (Rise&fall)
and (HI)methods
11
Checks for Errors
1. Closed loop check To close the loop the survey is continued back to the
beginning. Any difference in elevation for BM1 between the initial elevation of
BM1 and the closing elevation of BM1 is error.
2. The Note check (The Computation check) The note check uses an equation:
∑B.S - ∑F.S = R.L last - R. L first
3. Allowable error (Misclosure); Is the difference between the known
benchmark and computed benchmark
misclosure =Known point- measured point =0
12
Misclosure
•The amount by which the measured height
difference (DH measure) differs from the known
height difference derived from the RLs of the
starting and finishing benchmarks (DH known
Misclosure = DH known – DH measure
13
• The third check for error is also called the allowable error.
• It is common practice for the individual contracting the work to specify the acceptable level of
error. Professional standards may also specify allowable error.
The allowable error is based on an equation:
Allowable misclosure=E =C 𝑹
Where: C=constant C=12 for Mountain area C=30 for Ground levelling
R= is total distance by Km
Correction= E/n n=Number of T.P stations
Note:
• If actual misclosure<allowable misclosure(E), therefore the survey is acceptable. Unless, you
divide the error into turning points only.
• ΣBS - ΣFS only checks CALCULATION not OBSERVATIONS
• Observations checked by closing onto known final point MISCLOSURE
• Intermediate sights NOT checked by either.
14
Table and Corrections,,, Misclosure = DH known – DH measure
point BS IS FS HI RL Corrections Corrected ,,RL DH Distance
15
Allowable closing error
Where:
D =Distance in km
E = Misclosure error in (mm).
C = 30 for fixed levelling process in rough ground.
C = 15 for normal leveling in flat area (Good work)
16
Fly Levelling example
Computation of Elevations for an open loop survey
H.I method
Elevation 100.00
BS
12.64
Point
BM1
Elevation
BS HI FS
BM1
12.64 112.64 100.00
1. BS + Elevation = HI
BM2=124.47m
17
Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
100.00
18
Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
FS
2.56
TP2
2.56
TP2 117.85
100.00
19
Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
FS
2.56
TP2
2.56
TP2 117.85
BS
9.72
9.72 127.57
100.00
20
Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
FS
2.56
TP2
2.56
TP2 117.85
BS
9.72
9.72 127.57
BM2
FS
3.10
BM2 3.10 124.47
100.00
21
Differential Leveling
Computation of Elevations
Elevation 100.00
BS
12.64
FS
3.11
Point
BM1
TP1
Elevation
BS HI FS
TP1
BM1
12.64 112.64
3.11 109.53
BS
10.88
10.88 120.41
FS
2.56
TP2
2.56
TP2 117.85
BS
9.72
9.72 127.57
BM2
FS
3.10
BM2 3.10 124.47
100.00
22
Differential Leveling
Computation of Elevations
3. Change in elevation- summation of the backsight and
the foresight then subtract
+33.24 -8.77
Change in elevation = 33.24 -8.77 =24.47
Point
BM1
TP1
Elevation
BS HI FS
12.64 112.64
3.11 109.53
10.88 120.41
2.56
TP2 117.85
9.72 127.57
BM2 3.10 124.47
100.00
23
Summation
Last RL – First RL =124.47 – 100.00 = 24.47 m
For check
Correction For Errors in Leveling
1. Errors Due to the line of sight being not horizontal
2. Error Due to Curvature and refraction.
Correct
reading
Actual
reading
Size of error depends on
sight length
24
Errors in differential leveling: -
1) Non adjustment of the instrument: -
a) Adjustment of cross-wire ring
b) Adjustment of the bubble tube
c) Adjustment of line of sight
2-Errors in levelling
• Collimation line
• Parallax
• Change point instability
• Instrument instability
• Benchmark instability
• Staff reading errors ,
• Staff verticality
• Level Instrument shading
• Temperature on staff
• Booking errors)
• Earth curvature
• Refraction
• The Bubble not centered
26
3-Constant error (instrumental error):
A. Non vertically of the staff.
B. Collimation error in the instrument.
C. Staff gradation error.
4- Random error (natural error):
A. Effect of wind and temperature.
B. Soft and hard ground.
C. Change points. CP
D. Human deficiencies and neglect .
27

More Related Content

What's hot

Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
Bahzad5
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
KHUSHBU SHAH
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
kamariya keyur
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
Student
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
Mir Zafarullah
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
sharda university
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
Bahzad5
 
Introduction to Setting Out a Building
Introduction to Setting Out a BuildingIntroduction to Setting Out a Building
Introduction to Setting Out a Building
Steve Jarvis
 
Three.hinged.arch
Three.hinged.archThree.hinged.arch
Three.hinged.arch
engr jafar
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
Kai Yun Pang
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
Muhammad Zubair
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
Vijai Krishnan V
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
Sarchia Khursheed
 
Setting Out Works in Surveying
Setting Out Works in SurveyingSetting Out Works in Surveying
Setting Out Works in Surveying
ATUL DONGRE
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
SAI KIRAN
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volumekmasz kamal
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
Naufil Sayyad
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
kmasz kamal
 
Tutor l1 setting out
Tutor l1 setting outTutor l1 setting out
Tutor l1 setting out
Luke D'Arcy
 

What's hot (20)

Traversing Practical part 1
Traversing Practical part 1Traversing Practical part 1
Traversing Practical part 1
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
Vertical Curves (Part 1)
Vertical Curves (Part 1)Vertical Curves (Part 1)
Vertical Curves (Part 1)
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Introduction to Setting Out a Building
Introduction to Setting Out a BuildingIntroduction to Setting Out a Building
Introduction to Setting Out a Building
 
Three.hinged.arch
Three.hinged.archThree.hinged.arch
Three.hinged.arch
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Setting Out Works in Surveying
Setting Out Works in SurveyingSetting Out Works in Surveying
Setting Out Works in Surveying
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Topic 2 area & volume
Topic 2   area & volumeTopic 2   area & volume
Topic 2 area & volume
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Topic 3 mass haul diagram
Topic 3   mass haul diagramTopic 3   mass haul diagram
Topic 3 mass haul diagram
 
Tutor l1 setting out
Tutor l1 setting outTutor l1 setting out
Tutor l1 setting out
 

Similar to Fly Levelling

Ss report 1
Ss report 1Ss report 1
Ss report 1
Hasif Alias
 
LEVELING.pdf
LEVELING.pdfLEVELING.pdf
LEVELING.pdf
pradeep madhuranga
 
Leveling
Leveling Leveling
Leveling
AlwandBarzani
 
levelling survey
levelling surveylevelling survey
levelling survey
prashantsingham
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
Doreen Yeo
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
chloeesim
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
Darren Lee
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
RAHUL SINHA
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
MELVIN tan
 
Levelling_1.pptx
Levelling_1.pptxLevelling_1.pptx
Levelling_1.pptx
Kvsghgd
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
YASMINE HASLAN
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
ashleyyeap
 
Levelling
LevellingLevelling
Levelling
Arissa Loh
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
Est
 
Levelling
LevellingLevelling
Levelling
Diana Dian
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
LeulDamtew
 
Surveying
SurveyingSurveying
Surveying
redaasd
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
Phurba Tamang
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 

Similar to Fly Levelling (20)

Ss report 1
Ss report 1Ss report 1
Ss report 1
 
LEVELING.pdf
LEVELING.pdfLEVELING.pdf
LEVELING.pdf
 
Leveling
Leveling Leveling
Leveling
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Levelling_1.pptx
Levelling_1.pptxLevelling_1.pptx
Levelling_1.pptx
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Levelling
LevellingLevelling
Levelling
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Levelling
LevellingLevelling
Levelling
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
Surveying
SurveyingSurveying
Surveying
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 

More from Bahzad5

دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
Bahzad5
 
2013 (Total Station & Civil 3D) فێرکاری
2013  (Total Station & Civil 3D) فێرکاری2013  (Total Station & Civil 3D) فێرکاری
2013 (Total Station & Civil 3D) فێرکاری
Bahzad5
 
Engineering field knowledge -زانیاری بواری ئەندازیاری
Engineering field knowledge -زانیاری بواری ئەندازیاریEngineering field knowledge -زانیاری بواری ئەندازیاری
Engineering field knowledge -زانیاری بواری ئەندازیاری
Bahzad5
 
(atmosphere correction) زانیاری دەربارەی
(atmosphere correction) زانیاری دەربارەی(atmosphere correction) زانیاری دەربارەی
(atmosphere correction) زانیاری دەربارەی
Bahzad5
 
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
Bahzad5
 
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی (Municipal guidelines)
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی  (Municipal guidelines)المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی  (Municipal guidelines)
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی (Municipal guidelines)
Bahzad5
 
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTIONCONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
Bahzad5
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
Bahzad5
 
الشروط العامة لمقاولات اعمال الهندسة المدنية
الشروط العامة لمقاولات اعمال الهندسة المدنيةالشروط العامة لمقاولات اعمال الهندسة المدنية
الشروط العامة لمقاولات اعمال الهندسة المدنية
Bahzad5
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
Bahzad5
 
2 سەرەتاکانی دیزاین
2 سەرەتاکانی دیزاین2 سەرەتاکانی دیزاین
2 سەرەتاکانی دیزاین
Bahzad5
 
Soil Mechanics (Problems & solutions)
Soil Mechanics (Problems & solutions)Soil Mechanics (Problems & solutions)
Soil Mechanics (Problems & solutions)
Bahzad5
 
ڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکانڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکان
Bahzad5
 
سەرەتاکانی دیزاین
سەرەتاکانی دیزاینسەرەتاکانی دیزاین
سەرەتاکانی دیزاین
Bahzad5
 
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیەڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
Bahzad5
 
پرۆژەی ناساندنی ئەندازیاری
پرۆژەی ناساندنی ئەندازیاریپرۆژەی ناساندنی ئەندازیاری
پرۆژەی ناساندنی ئەندازیاری
Bahzad5
 
بناغە و بنەپایە Footing and Foundation
بناغە و بنەپایە Footing and Foundationبناغە و بنەپایە Footing and Foundation
بناغە و بنەپایە Footing and Foundation
Bahzad5
 
slump test سڵەمپ تێست
slump test سڵەمپ تێستslump test سڵەمپ تێست
slump test سڵەمپ تێست
Bahzad5
 
Design of Storm Sewer System
Design of Storm Sewer SystemDesign of Storm Sewer System
Design of Storm Sewer System
Bahzad5
 
ڕۆنی بزوێنەر
ڕۆنی بزوێنەرڕۆنی بزوێنەر
ڕۆنی بزوێنەر
Bahzad5
 

More from Bahzad5 (20)

دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
2013 (Total Station & Civil 3D) فێرکاری
2013  (Total Station & Civil 3D) فێرکاری2013  (Total Station & Civil 3D) فێرکاری
2013 (Total Station & Civil 3D) فێرکاری
 
Engineering field knowledge -زانیاری بواری ئەندازیاری
Engineering field knowledge -زانیاری بواری ئەندازیاریEngineering field knowledge -زانیاری بواری ئەندازیاری
Engineering field knowledge -زانیاری بواری ئەندازیاری
 
(atmosphere correction) زانیاری دەربارەی
(atmosphere correction) زانیاری دەربارەی(atmosphere correction) زانیاری دەربارەی
(atmosphere correction) زانیاری دەربارەی
 
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
(Building Permit Guidelines ) ڕێنماییەکانی مۆڵەتی بینا
 
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی (Municipal guidelines)
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی  (Municipal guidelines)المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی  (Municipal guidelines)
المبادئ التوجيهية البلدية - ڕێنامەی شارەوانی (Municipal guidelines)
 
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTIONCONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
الشروط العامة لمقاولات اعمال الهندسة المدنية
الشروط العامة لمقاولات اعمال الهندسة المدنيةالشروط العامة لمقاولات اعمال الهندسة المدنية
الشروط العامة لمقاولات اعمال الهندسة المدنية
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
2 سەرەتاکانی دیزاین
2 سەرەتاکانی دیزاین2 سەرەتاکانی دیزاین
2 سەرەتاکانی دیزاین
 
Soil Mechanics (Problems & solutions)
Soil Mechanics (Problems & solutions)Soil Mechanics (Problems & solutions)
Soil Mechanics (Problems & solutions)
 
ڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکانڕێبەری بەشە ئەندازیارییەکان
ڕێبەری بەشە ئەندازیارییەکان
 
سەرەتاکانی دیزاین
سەرەتاکانی دیزاینسەرەتاکانی دیزاین
سەرەتاکانی دیزاین
 
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیەڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
ڕێبەری بەشەئەندازیارییەكانی زانكۆی كۆیە
 
پرۆژەی ناساندنی ئەندازیاری
پرۆژەی ناساندنی ئەندازیاریپرۆژەی ناساندنی ئەندازیاری
پرۆژەی ناساندنی ئەندازیاری
 
بناغە و بنەپایە Footing and Foundation
بناغە و بنەپایە Footing and Foundationبناغە و بنەپایە Footing and Foundation
بناغە و بنەپایە Footing and Foundation
 
slump test سڵەمپ تێست
slump test سڵەمپ تێستslump test سڵەمپ تێست
slump test سڵەمپ تێست
 
Design of Storm Sewer System
Design of Storm Sewer SystemDesign of Storm Sewer System
Design of Storm Sewer System
 
ڕۆنی بزوێنەر
ڕۆنی بزوێنەرڕۆنی بزوێنەر
ڕۆنی بزوێنەر
 

Recently uploaded

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

Fly Levelling

  • 1. Fly Levelling surveying Engineering 2022- 2021 1 Erbil polytechnic university technical engineering college civil engineering department Prepared by Asst. Prof. Salar Khudhur Hussein Ass. Lecturer Mr. Kamal Yaseen Ass. Lecturer Ms. Dilveen H. Omar Benchmark
  • 2. Fly Levelling . Fly leveling: -Fly leveling is just like differential leveling carried out to check the accuracy of leveling work. It is a very approximate form of leveling in which sights are taken as large as possible. in this method, a line of levels is run to determine approximately reduced levels of the points carried out with more rapidly and less precision The aim of fly Levelling: The main purpose of this type of leveling is to check the values of the reduced levels of the bench marks already fixed. In this method only back sight and foresight are taken. There is no need of intermediate sights. However great care has to be taken for selecting the change points (Turning Points) and for taking reading on the change points because the accuracy of leveling depends upon these. 2
  • 4. Bench Marks Bench Mark is a point of known elevation, there are three Type of Bench Marks 1-Perment Bench Mark. 2-Orbitrary Bench Mark . 3-Temporary Bench Mark . 1-Permanent bench marks • These benchmarks are written on permanent objects such as milestones, culverts, bridges etc. their values are clearly written and their position are recorded for future reference. 4 City Center BM Shanadr BM
  • 5. Introduction to Surveying (BPD) LEVELLING PROCEDURES Department of Structural Engineering Technology College Of Technology 5
  • 6. 6
  • 7. Bench Mark B. M RLBM Benchmark Datum 7 2.Datum Surface; Datum surface is any level surface to which the elevations of all points may be referred. The mean sea level(MSL) is usually adopted as datum. Mean Sea Level
  • 8. Leveling Process Calculation To find reduced level of points, there are two methods: 1. Height of collimation method The following formula will serve as a guide to the reduction of level by this method; H. I= B. S + R. L.BM R. L (new)= H. I – staff reading(I.S or F.S) H. I. (old) – F. S = R. L (new) at change point R. L. (new) + B.S = H. I. (new) 2. Rise and Fall method Rise or fall = B.S – F.S or I.S = I.S preceding point – I.S following point = I.S – F.S R.L of any point = R.L B.M + {Rise (+) or fall (-)} Distance (AB) = (Upper – Lower)x 100 8 H.I R.L A B Sea level-Datum Elevation
  • 9. How do we find horizontal distance using levelling Machine 9
  • 11. Fly and Differential leveling Using (Rise&fall) and (HI)methods 11
  • 12. Checks for Errors 1. Closed loop check To close the loop the survey is continued back to the beginning. Any difference in elevation for BM1 between the initial elevation of BM1 and the closing elevation of BM1 is error. 2. The Note check (The Computation check) The note check uses an equation: ∑B.S - ∑F.S = R.L last - R. L first 3. Allowable error (Misclosure); Is the difference between the known benchmark and computed benchmark misclosure =Known point- measured point =0 12
  • 13. Misclosure •The amount by which the measured height difference (DH measure) differs from the known height difference derived from the RLs of the starting and finishing benchmarks (DH known Misclosure = DH known – DH measure 13
  • 14. • The third check for error is also called the allowable error. • It is common practice for the individual contracting the work to specify the acceptable level of error. Professional standards may also specify allowable error. The allowable error is based on an equation: Allowable misclosure=E =C 𝑹 Where: C=constant C=12 for Mountain area C=30 for Ground levelling R= is total distance by Km Correction= E/n n=Number of T.P stations Note: • If actual misclosure<allowable misclosure(E), therefore the survey is acceptable. Unless, you divide the error into turning points only. • ΣBS - ΣFS only checks CALCULATION not OBSERVATIONS • Observations checked by closing onto known final point MISCLOSURE • Intermediate sights NOT checked by either. 14
  • 15. Table and Corrections,,, Misclosure = DH known – DH measure point BS IS FS HI RL Corrections Corrected ,,RL DH Distance 15
  • 16. Allowable closing error Where: D =Distance in km E = Misclosure error in (mm). C = 30 for fixed levelling process in rough ground. C = 15 for normal leveling in flat area (Good work) 16
  • 17. Fly Levelling example Computation of Elevations for an open loop survey H.I method Elevation 100.00 BS 12.64 Point BM1 Elevation BS HI FS BM1 12.64 112.64 100.00 1. BS + Elevation = HI BM2=124.47m 17
  • 18. Computation of Elevations Elevation 100.00 BS 12.64 FS 3.11 Point BM1 TP1 Elevation BS HI FS TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 100.00 18
  • 19. Computation of Elevations Elevation 100.00 BS 12.64 FS 3.11 Point BM1 TP1 Elevation BS HI FS TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 FS 2.56 TP2 2.56 TP2 117.85 100.00 19
  • 20. Computation of Elevations Elevation 100.00 BS 12.64 FS 3.11 Point BM1 TP1 Elevation BS HI FS TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 FS 2.56 TP2 2.56 TP2 117.85 BS 9.72 9.72 127.57 100.00 20
  • 21. Computation of Elevations Elevation 100.00 BS 12.64 FS 3.11 Point BM1 TP1 Elevation BS HI FS TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 FS 2.56 TP2 2.56 TP2 117.85 BS 9.72 9.72 127.57 BM2 FS 3.10 BM2 3.10 124.47 100.00 21
  • 22. Differential Leveling Computation of Elevations Elevation 100.00 BS 12.64 FS 3.11 Point BM1 TP1 Elevation BS HI FS TP1 BM1 12.64 112.64 3.11 109.53 BS 10.88 10.88 120.41 FS 2.56 TP2 2.56 TP2 117.85 BS 9.72 9.72 127.57 BM2 FS 3.10 BM2 3.10 124.47 100.00 22
  • 23. Differential Leveling Computation of Elevations 3. Change in elevation- summation of the backsight and the foresight then subtract +33.24 -8.77 Change in elevation = 33.24 -8.77 =24.47 Point BM1 TP1 Elevation BS HI FS 12.64 112.64 3.11 109.53 10.88 120.41 2.56 TP2 117.85 9.72 127.57 BM2 3.10 124.47 100.00 23 Summation Last RL – First RL =124.47 – 100.00 = 24.47 m For check
  • 24. Correction For Errors in Leveling 1. Errors Due to the line of sight being not horizontal 2. Error Due to Curvature and refraction. Correct reading Actual reading Size of error depends on sight length 24
  • 25. Errors in differential leveling: - 1) Non adjustment of the instrument: - a) Adjustment of cross-wire ring b) Adjustment of the bubble tube c) Adjustment of line of sight 2-Errors in levelling • Collimation line • Parallax • Change point instability • Instrument instability • Benchmark instability
  • 26. • Staff reading errors , • Staff verticality • Level Instrument shading • Temperature on staff • Booking errors) • Earth curvature • Refraction • The Bubble not centered 26
  • 27. 3-Constant error (instrumental error): A. Non vertically of the staff. B. Collimation error in the instrument. C. Staff gradation error. 4- Random error (natural error): A. Effect of wind and temperature. B. Soft and hard ground. C. Change points. CP D. Human deficiencies and neglect . 27