 Section 1. Instructions to Tenderers (ITT)
 Section 2. Tender Data Sheet (TDS)
 Section 3. General Conditions of Contract
(GCC)
 Section 4. Particular Conditions of
Contract(PCC)
 Section 5. Tender and Contract Forms
 Section 6. Bill of Quantities
 Section 7. General Specifications
 Section 8. Particular Specifications
 Section 9. Drawings
 1.CRITERIA FOR ELIGIBILITY
EXPERIENCE.
FINANCIAL
CAPACITY.
TAX PAYING
CAPABILITY.
 2.INFORMATIONS
 Information on –
# Tender preparation
# Tender submission
# Tender opening &
evaluation
# Contract of award
PREPERA-
TION
CURRENCY
AND
TENDER
SECURITY
PRICE OF
CONTRACT CONTENTS
OF
SENDER
Tender Opening
& Evaluation
TENDER
OPENING.
PRELIMIN
ARY
EXAMINA
TION.
TENDERE
R’S
CLARIFIC
ATION.
LOWEST
EVALUAT
ED
TENDER
CONTRACT
OF AWARD
CONTRACT
SIGNING
PERFORMANCE
SECURING
RIGHT TO
COMPLAIN
ISSUE OF
NOA
 GENERAL:
 THE PROCURING ENTITY: Executive
Engineer,PWD E/M,Division-V.
 TITLE OF WORK: Construction of 4 Storied
Commercial Building.
 SINGLE LOT.
 OPEN TENDER METHOD.
 Tender Document:
• Attention : Executive Engineer.
• Address : Dhaka PWD Division.
• Telephone : 9348972
• e-mail address: ictt_ce_15@gmail.com
 QUALIFICATION CRITERIA:
 A satisfactory completion of similar works of at
least Tk. 1 crore 20 lacs under single number of
contract.
 Required average annual construction turnover :
Tk. 1 crore over the last 1 year.
 Minimum amount of liquid asset : Tk 80 lacs.
 TENDER PREPERATION:
 Additional Documents-
Professional and Technical Qualification
Financial Resources
Equipment and Physical Facilities
Specific Experience
 Tender Validity Period 80 days.
 Tender Security : Taka 4 lacs.
 TENDER SUBMISSION:
Deadline : 10 am,12th November,2015
 TENDER OPENING:
Address: Office of the Executive Engineer,PWD E/M Division-V,12-
storied Govt. Office Building (11th floor), Segunbagicha, Dhaka.
Time And Date: 10 am,17th November,2015
 CONTRACT AWARD:
Performance Security : 10% of Contract
Price.
General
Time Control
Quality Control
Cost Control
Completion of Contract
Termination and Settlement of Disputes
Disputes and Arbitration
 Procuring Entity: …………….
 Project Manager: …………….
 Site location: ......................
 Job: .............................
Possession of the
Site
20th December,2015
Starting date
5 January,2016
Intended
Completion
Date
5 November,2017
Programme for
the Works
within 7 days
Defects Liability Period 12 months
Proportion of payments be retained
Liquidated Damages 0.07 percent off the
Contract price
Contract value of the works not
completed is 16%
Place for arbitration (Dhaka)
Tender Submission Letter
Tenderer Information
Bank Guarantee for Tender
Security
Tender & Contract Forms
Tender forms
Notification of award
Contract agreement
Performance security
Contract Forms
Outline of the ‘Bill of Quantities’
Main parts of ‘Bill of Quantities’
I. Item No-100: Earth Work
II. Item No-200. RCC Works
III. Item No-300: Reinforcements
IV. Item No-400: Brick soling, CC, DPC
V. Item No-500: Brickwork, Plastering & Floor finish
VI. Item No-600: Door and Window Materials
Item No.:
101
For
Example
Item Description:
Layout & Marking for
earthwork in excavation
in foundation accepted
by the Engineer
Unit:
sqm
Quantity:
310
Features of BOQ
-grouped into sections
-simple and brief
-computed net from the Drawings
-no allowance should be made for bulking,
shrinkage, or waste; quantities should be
rounded up or down
Considerations for BOQ
Earth Work:
RCC Work:
Reinforcements:
Brick soling, CC, DPC :
Brickwork, Plastering & Floor finish:
Door and Window Materials:
 First Class Bricks must be used in both BFS
and 5” Brick Wall
 60 Grade( 400MPa) Deformed Bar from any
Renowned Bangladeshi Manufacturer should
be used.
 Only Bangladeshi paints can be used for
painting works.
 The Mosaic floor finish must consist of Marble
Chips of Indian Origin. Chips from other
countries must not be used. Also, 100% white
cement must be used.
 Mahogany Wood for Door Frame and
Chapalish wood for Door Shutters must be
used.
 Window frames must be made with Aluminum
of S.S. color
 Tinted Glass(Greenish) from renowned
manufacturer should be used.
General Specifications
- Dismantling & Removal of Existing Structures
- Mobilization and Preparation of Site
-Security
-Disposal and Pollution
-Surveys and Setting Out
-Programme and Progress Reports and Return
-Health and Safety
- Quantities should be computed net from the
Drawings
-The actual Drawings, including site plans,
should be attached to this section or annexed in
a separate folder.
Thank you
for your kind attention

TENDER DOCUMENT

  • 2.
     Section 1.Instructions to Tenderers (ITT)  Section 2. Tender Data Sheet (TDS)  Section 3. General Conditions of Contract (GCC)  Section 4. Particular Conditions of Contract(PCC)  Section 5. Tender and Contract Forms  Section 6. Bill of Quantities  Section 7. General Specifications  Section 8. Particular Specifications  Section 9. Drawings
  • 5.
     1.CRITERIA FORELIGIBILITY EXPERIENCE. FINANCIAL CAPACITY. TAX PAYING CAPABILITY.
  • 6.
     2.INFORMATIONS  Informationon – # Tender preparation # Tender submission # Tender opening & evaluation # Contract of award
  • 7.
    PREPERA- TION CURRENCY AND TENDER SECURITY PRICE OF CONTRACT CONTENTS OF SENDER TenderOpening & Evaluation TENDER OPENING. PRELIMIN ARY EXAMINA TION. TENDERE R’S CLARIFIC ATION. LOWEST EVALUAT ED TENDER CONTRACT OF AWARD CONTRACT SIGNING PERFORMANCE SECURING RIGHT TO COMPLAIN ISSUE OF NOA
  • 9.
     GENERAL:  THEPROCURING ENTITY: Executive Engineer,PWD E/M,Division-V.  TITLE OF WORK: Construction of 4 Storied Commercial Building.  SINGLE LOT.  OPEN TENDER METHOD.
  • 10.
     Tender Document: •Attention : Executive Engineer. • Address : Dhaka PWD Division. • Telephone : 9348972 • e-mail address: ictt_ce_15@gmail.com
  • 11.
     QUALIFICATION CRITERIA: A satisfactory completion of similar works of at least Tk. 1 crore 20 lacs under single number of contract.  Required average annual construction turnover : Tk. 1 crore over the last 1 year.  Minimum amount of liquid asset : Tk 80 lacs.
  • 12.
     TENDER PREPERATION: Additional Documents- Professional and Technical Qualification Financial Resources Equipment and Physical Facilities Specific Experience  Tender Validity Period 80 days.  Tender Security : Taka 4 lacs.
  • 13.
     TENDER SUBMISSION: Deadline: 10 am,12th November,2015  TENDER OPENING: Address: Office of the Executive Engineer,PWD E/M Division-V,12- storied Govt. Office Building (11th floor), Segunbagicha, Dhaka. Time And Date: 10 am,17th November,2015  CONTRACT AWARD: Performance Security : 10% of Contract Price.
  • 15.
    General Time Control Quality Control CostControl Completion of Contract Termination and Settlement of Disputes Disputes and Arbitration
  • 17.
     Procuring Entity:…………….  Project Manager: …………….  Site location: ......................  Job: .............................
  • 18.
    Possession of the Site 20thDecember,2015 Starting date 5 January,2016 Intended Completion Date 5 November,2017 Programme for the Works within 7 days
  • 19.
    Defects Liability Period12 months Proportion of payments be retained Liquidated Damages 0.07 percent off the Contract price Contract value of the works not completed is 16% Place for arbitration (Dhaka)
  • 21.
    Tender Submission Letter TendererInformation Bank Guarantee for Tender Security Tender & Contract Forms Tender forms
  • 22.
    Notification of award Contractagreement Performance security Contract Forms
  • 24.
    Outline of the‘Bill of Quantities’ Main parts of ‘Bill of Quantities’ I. Item No-100: Earth Work II. Item No-200. RCC Works III. Item No-300: Reinforcements IV. Item No-400: Brick soling, CC, DPC V. Item No-500: Brickwork, Plastering & Floor finish VI. Item No-600: Door and Window Materials
  • 25.
    Item No.: 101 For Example Item Description: Layout& Marking for earthwork in excavation in foundation accepted by the Engineer Unit: sqm Quantity: 310
  • 26.
    Features of BOQ -groupedinto sections -simple and brief -computed net from the Drawings -no allowance should be made for bulking, shrinkage, or waste; quantities should be rounded up or down
  • 27.
    Considerations for BOQ EarthWork: RCC Work: Reinforcements: Brick soling, CC, DPC : Brickwork, Plastering & Floor finish: Door and Window Materials:
  • 28.
     First ClassBricks must be used in both BFS and 5” Brick Wall  60 Grade( 400MPa) Deformed Bar from any Renowned Bangladeshi Manufacturer should be used.  Only Bangladeshi paints can be used for painting works.  The Mosaic floor finish must consist of Marble Chips of Indian Origin. Chips from other countries must not be used. Also, 100% white cement must be used.
  • 29.
     Mahogany Woodfor Door Frame and Chapalish wood for Door Shutters must be used.  Window frames must be made with Aluminum of S.S. color  Tinted Glass(Greenish) from renowned manufacturer should be used.
  • 31.
    General Specifications - Dismantling& Removal of Existing Structures - Mobilization and Preparation of Site -Security -Disposal and Pollution -Surveys and Setting Out -Programme and Progress Reports and Return -Health and Safety
  • 36.
    - Quantities shouldbe computed net from the Drawings -The actual Drawings, including site plans, should be attached to this section or annexed in a separate folder.
  • 37.