SlideShare a Scribd company logo
Environmental Impact Assessment
EIA
Thought of the Day
The Living in the
Moment Concept
Environmental Impact Assessment 2
DOMAINS OF ENVIRONMENT
Physical
• Air
• Water
• Land
Ecological
• Flora
• Fauna
Socio-economic
• Social
• Economic
• Cultural
Environmental Impact Assessment 3
Environmental Impact Assessment
EIA
WHAT IS EIA?
An important procedure for
ensuring that the likely
effects of new development
on the environment are fully
understood and taken into
account before the
development is allowed to
go ahead
Environmental Impact Assessment 4
What EIA can do?
• Modify and improve design
• Ensure efficient resource use
• Enhance social aspects
• Identify measures for monitoring and
managing impacts
• Inform decision-making
• Provide justification for a proposal
Environmental Impact Assessment 5
Origin of EIA in Pakistan
• The EIA process was strengthened under
Section 12 of Pakistan Environment Protection
Act (PEPA), 1997
• Guidelines were prepared with a thorough
consultative process with the stakeholders
• Initial Environmental Examination IEE/EIA
Regulations, 2000 notified.
Environmental Impact Assessment 6
Pakistan Environmental Protection Act
1997
• Penalties
• Upto One Million Rupees (Rs 10,00,000) with
a daily penalty of Rs 100,000
• Environmental Tribunals
• Judge
• National Environmental Quality Standards
(NEQS)
• Arrest Warrants
Environmental Impact Assessment 7
List of Projects Requiring IEE/EIA
• Agriculture, livestock and fisheries, etc.
• Energy
• Manufacturing and processing
• Mining and mineral processing
• Transport
• Water management, dams, irrigation and flood
protection
• Waste Disposal
• Urban development and tourism
• Environmentally sensitive areas
Environmental Impact Assessment 8
FINANCIAL ASPECTS OF EIA
Environmental Impact Assessment 9
Description of a Project
• Type of project
• Need for project
• Location (use maps showing general location, specific location, project boundary
and project site layout)
• Size or magnitude of operation including any associated activities required by or
for the project
• Proposed schedule for approval and implementation
• Description of the project including drawings showing project layout, components
of project, etc. This information should be of the same type and extent as is
included in feasibility reports for proposed projects, in order to give a clear picture
of the project and its operations.
Environmental Impact Assessment 10
EIA processes in sequences of
application
• Project Screening
• Scoping
• Baseline Data Collection
• Identification of
Environmental Impacts
• Impact Prediction
Comparison of Alternatives
• Comparison of Alternatives
• Mitigation Measures
• Public Consultation and
Participation
• Environmental Monitoring
• Environmental Auditing
Environmental Impact Assessment 11
Screening
• important to establish
mechanisms by
identifying projects
which requires EIA, and
this process of selection
of project is referred to
as "Screening“
Environmental Impact Assessment 12
Project Scoping
• Scoping is to determine
what should be the
coverage or scope of the
EIA study for a project
proposal as having
potentially significant
environmental impacts.
Environmental Impact Assessment 13
Baseline Data Collection
• Baseline information is
important reference point for
conducting EIA.
• The term "baseline" refers to
the collection of background
information on the
biophysical, social and
economic settings proposed
project area.
Baseline data are collected for
two main purposes:
• to provide a description of the
status and trends of
environmental factors (e.g., air
pollutant concentrations)
against which predicted
changes can be compared and
evaluated in terms of
importance, and
• to provide a means of
detecting actual change by
monitoring once a project has
been initiated
Environmental Impact Assessment 14
Identification of Environmental
Impacts
• Biological and Physio-
chemical Impacts
• Social Impact
• demographic impacts, socio-
economic impacts, institutional
impacts, gender impact
• Cultural Impacts
• Health Impact
• Economic Impact
• labor force requirements, size of
investment, likely demographic
changes
Environmental Impact Assessment 15
Impact Prediction Comparison of
Alternatives
Considerations for Impact
Prediction
• Magnitude of Impact
• Extent of Impact
• Duration of Impact
Uncertainty in Impact
Prediction
Environmental Impact Assessment 16
Comparison of Alternatives
• Qualitative approach
• Quantitative approach
• Ranking, rating or
scaling approach
• Weighting approach
• Weighting-
ranking/rating/scaling
approach
Environmental Impact Assessment 17
ANALYSIS OF ALTERNATIVES
1. No Project Option
2. Location/Alignment
Alternatives
3. Process/Design
Alternatives
4. Demand/Activity
Alternatives
5. Scheduling
Alternatives
6. Input Alternatives
Environmental Impact Assessment 18
Lahore Sports City
Environmental Impact Assessment 19
Lahore Sports City
(Site Screening Criteria)
• Accessibility
• Land use and Land availability
• Aesthetics
• Water Availability
• Potential of Infrastructure Development
• Environmental and Social Issues
Environmental Impact Assessment 20
Site Options
Environmental Impact Assessment 21
Key elements for assessing impact
significance
• Ecological
• effects on plant and animal
habitat
• rare and endangered species
• ecosystem resilience, sensitivity,
bio-diversity and carrying
capacity
• viability of local species
populations
• Environmental
Standards
• Social and Economical
• effects on human health and
safety
• potential loss of species with
current or potential value, or
commercially available
production (farmland)
• recreational or aesthetic value
• demands on public resources
such as social service
• demands on transportation and
other infrastructures
• demographic effects
Environmental Impact Assessment 22
Mitigation Measures
• recommended actions
to reduce, avoid or
offset the potential
adverse environmental
consequences of
development activities
• maximize project
benefits
• minimize undesirable
impacts
Environmental Impact Assessment 23
Mitigation Measures
• Mitigation measures
requires funding
• Mitigation measures
should be integrated in
the project design
• Mitigation measures is
not limited to one point
in the EIA process
• Link between mitigation
and monitoring
Environmental Impact Assessment 24
Public Consultation and Participation
• Local people
• Project beneficiaries
• NGOs
• Voluntary organizations
• Private sector
• National/local
governments
• Scientist/experts
• Private sector
Environmental Impact Assessment 25
Methods for stakeholder involvement
• Public meetings
• Advisory panels
• Public information
centers
• Interviews
• Questionnaires
• Participatory Appraisal
techniques
Environmental Impact Assessment 26
Environmental Monitoring
• an activity undertaken to
provide specific information
on the characteristics and
functions of environmental
and social variables in space
and time
Environmental monitoring is
therefore one of the most
important components of an EIA
• ensuring that impacts do not
exceed the legal standards
• checking the implementation
of mitigation measures in the
manner described in the EIA
report
• providing early warning of
potential environmental
damages
Environmental Impact Assessment 27
Principles of Monitoring
• Determine the indicators to be
used in monitoring activities
• Collection of meaningful and
relevant information
• Application of
measurable criteria in relation to
chosen indicators
• Reviewing objective judgments
on the information collected
• Draw tangible conclusions based
on the processing of information
• Making rational decision based
on the conclusion drawn
• Recommendation of improved
mitigation measures to be
undertaken
Environmental Impact Assessment 28
Types of Monitoring
• Baseline Monitoring
• pre-audit study
• Impact Monitoring
• Compliance Monitoring
Environmental Impact Assessment 29
Environmental Auditing
• an audit assess the actual
environmental impact
• the accuracy of prediction
• the effectiveness of
environmental impact
mitigation
• enhancement measures
• the functioning of
monitoring mechanisms
Environmental Impact Assessment 30
Types of Audit
• Decision Point Audit
• Implementation Audit
• Performance Audit
• Project Impact Audit
• Predictive Technique
Audit
• EIA Procedures Audit
Environmental Impact Assessment 31
Environmental Auditing Plan
• condition of
natural/social/economical
resources prior to project
implementation
• mitigation measures
implemented are effective
to control adverse impact
• degraded landscape have
been restored into original
condition
• effect on the local economy
of project implementation
Environmental Impact Assessment 32
Public Hearing
Public Hearing of Environmental Impact
Assessment of 225 MW Thermal Power
RFO Fired Power Plant Near Sheikhupura
Public Hearing of Zero Point Interchange
Environmental Impact Assessment 33
Public Hearing
Public Hearing of Benazir Bhutto International
Airport
Public Consultation for Mirani Dam
Project
Environmental Impact Assessment 34
Transplantation of Trees
Environmental Impact Assessment 35
Transplantation of Trees
Environmental Impact Assessment 36
Mangla Dam Raising Project
• A population of about 50,000
persons is being affected
• About 8000 houses and other
buildings are being affected
• A total of 6,388 hectares of land
(residential, agriculture and barren)
is to be acquired
• 28 brick kilns will be abandoned
• An unprecedented and very
attractive compensation package
for the affectees has been provided
• Pakistan Resettlement Policy is
being followed for the resettlement
and compensation process
Environmental Impact Assessment 37
EIA Flow Chart
Environmental Impact Assessment 38
Strategic Environment Assessment
SEA
Strategic Environmental Assessment
SEA
• Social Impact
Assessment (SIA)
• Cumulative Impact
Assessment (CIA)
• Environmental and
Social Impact
Assessment (ESIA)
Environmental Impact Assessment 40
EIA SEA
Applied to specific and relatively short-term (life-
cycle) projects and their specifications
Applied to policies, plans and programs with broad,
long-term strategic perspective
Takes place at early stage of project planning once
parameters are set
Ideally, takes place at an early stage in strategic
planning
Considers limited range of project alternatives Considers a broad range of alternative scenarios
Usually prepared and/or funded by the project
proponents
Conducted independently of any specific project
proponent
Focus on obtaining project permission, and rarely
with feedback
to policy, plan or program consideration
Focus on decision on policy, plan and program
implications
for future lower-level decisions
Well-defined, linear process with clear beginning and
end
Multi-stage, iterative process with feedback loops
Preparation of an EIA document with prescribed
format and contents
is usually mandatory. This document provides a
baseline reference
for monitoring
May not be formally documented
Limited review of cumulative impacts, often limited
to phases of a specific project. Does not cover
regional-scale developments
or multiple projects
Inherently incorporates consideration of cumulative
impacts
Environmental Impact Assessment 41
Tools for predicting environmental and
socio-economic effects
• Modeling or forecasting
of direct environmental
effects
• Matrices and network
analysis
• Participatory or
consultative techniques
• Geographical information
systems as a tool to
analyze, organize and
present information
Environmental Impact Assessment 42
Tools for analyzing and comparing
options
• Scenario analysis and
multi-criteria analysis
• Risk analysis or
assessment
• Cost benefit analysis
• Opinion surveys to
identify priorities
Environmental Impact Assessment 43
A continuum of SEA application
Environmental Impact Assessment 44
SEA benefits at a glance
1. Supporting the integration of
environment and
development
2. Providing environmental-
based evidence to support
informed decisions
3. Improving the identification
of new opportunities
4. Preventing costly mistakes
5. Building public engagement
in decision making for
improved governance
6. Facilitating transboundary
co-operation
Environmental Impact Assessment 45
Thermal Power Generation Policy, Pakistan: an
early SEA would have helped
• In the mid 1990s, rapidly expanding industrial
activity, increasing population
• Pakistan’s Government decided to stimulate
increased power generation
• Independent Power Plants Policy (IPPs) provided
incentives for investments in thermal power
generation
• No SEA was made; instead investors had to submit
an EIA without considering potential cumulative
effects
• Investors given freedom to choose the
site, technology and the fuel
• plants were installed with little or no pollution
control devices
• Leading energy experts and the WAPDA raised
objections to the policy but were ignored
• EIA used down-stream decision making approach
• individual projects, especially after deciding the
site, technology and fuel
• thermal power stations using high-sulphur furnace
oil became clustered in one city and added to the
already polluted air
• Alternatively, they were developed in a scattered
way in remote places, which made it difficult to
connect them with the national grid system
Key costs
• Increased pollution
• Relocation of plants –
following public
pressure and lobbying –
at considerable cost
• Delayed delivery of
energy
Environmental Impact Assessment 46
The Circular Debt of Pakistan
• According to USAID report on the
Causes and Impacts of Power Sector
Circular Debt in Pakistan
• in 2008, the circular debt was Rs
161.21 billion
• increased to Rs 235.65 billion in 2009
• circular debt in 2010 increased to Rs
365.66 billion
• in 2011, this amount swelled to Rs
537.53 billion
• During the current fiscal year circular
debt increased to Rs 872.41 billion
Environmental Impact Assessment 47
Policy SEA Process Steps
Environmental Impact Assessment 48
Conceptual Model of SEA
Environmental Impact Assessment 49
Reducing Emissions from
Deforestation and Degradation
(REDD+)
Environmental Impact Assessment 50
Thank You
Environmental Impact Assessment 51

More Related Content

What's hot

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
onkar solshe
 
Socio economic study in eia
Socio economic study in eiaSocio economic study in eia
Socio economic study in eia
Arif Shaikh
 
mix design m30
mix design m30mix design m30
mix design m30
Er.BASAVARAJ Pachhapure
 
Effects of Climate Change on the Glaciers of Pakistan
Effects of Climate Change on the Glaciers of PakistanEffects of Climate Change on the Glaciers of Pakistan
Effects of Climate Change on the Glaciers of Pakistan
Atif Nauman
 
EIA M9 highway
EIA M9 highwayEIA M9 highway
EIA M9 highway
zubeditufail
 
Eia and its process
Eia and its processEia and its process
Eia and its process
ManojSharma968
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
Maham Basharat
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
Kezar Ali. Shah
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
KANTHARAJAN GANESAN
 
Building Resilience for Adaptation to Climate Change in Agriculture
Building Resilience for Adaptation to Climate Change in AgricultureBuilding Resilience for Adaptation to Climate Change in Agriculture
Building Resilience for Adaptation to Climate Change in Agriculture
FAO
 
Environmental Governance in Pakistan
Environmental Governance in PakistanEnvironmental Governance in Pakistan
Environmental Governance in Pakistan
Ayesha Akhtar
 
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
 ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
Azharnawaz22
 
Flood Management in Bangladesh
Flood Management in Bangladesh Flood Management in Bangladesh
EIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOREIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOR
Mohd Ahmed Naim Shaikh
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxMd. Mahmudor Rahman
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
Kinza Irshad
 
EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
Saurabh Gupta
 
Natural resources and Carrying Capacity
Natural resources and Carrying CapacityNatural resources and Carrying Capacity
Natural resources and Carrying Capacity
dmyen
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
Shashi Shekar
 

What's hot (20)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
 
Socio economic study in eia
Socio economic study in eiaSocio economic study in eia
Socio economic study in eia
 
mix design m30
mix design m30mix design m30
mix design m30
 
Effects of Climate Change on the Glaciers of Pakistan
Effects of Climate Change on the Glaciers of PakistanEffects of Climate Change on the Glaciers of Pakistan
Effects of Climate Change on the Glaciers of Pakistan
 
EIA M9 highway
EIA M9 highwayEIA M9 highway
EIA M9 highway
 
Eia and its process
Eia and its processEia and its process
Eia and its process
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
Building Resilience for Adaptation to Climate Change in Agriculture
Building Resilience for Adaptation to Climate Change in AgricultureBuilding Resilience for Adaptation to Climate Change in Agriculture
Building Resilience for Adaptation to Climate Change in Agriculture
 
Environmental Governance in Pakistan
Environmental Governance in PakistanEnvironmental Governance in Pakistan
Environmental Governance in Pakistan
 
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
 ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
 
Flood Management in Bangladesh
Flood Management in Bangladesh Flood Management in Bangladesh
Flood Management in Bangladesh
 
EIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOREIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOR
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
 
EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
 
Eia pakistan perspective
Eia   pakistan perspectiveEia   pakistan perspective
Eia pakistan perspective
 
Natural resources and Carrying Capacity
Natural resources and Carrying CapacityNatural resources and Carrying Capacity
Natural resources and Carrying Capacity
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
 

Similar to Environmental Impact Assessment

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
School of planning and architecture
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
Hemant Thakur
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
Istiak Asif
 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
HNaliniNirala
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
Adilah Anuar
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Vinod Burdak
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON
 
Eia sem 40_02
Eia sem 40_02Eia sem 40_02
Eia sem 40_02
prashant vadaliya
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Nanyang Technological University, Singapore
 
environmentimpactassessment-120810134826-phpapp02.pptx
environmentimpactassessment-120810134826-phpapp02.pptxenvironmentimpactassessment-120810134826-phpapp02.pptx
environmentimpactassessment-120810134826-phpapp02.pptx
Deep Gondane
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
Ekonnect Knowledge Foundation
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Mr.Allah Dad Khan
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
areebakhan678
 
PEISS
PEISSPEISS
PEISS
Mk Blanco
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Kashmeera N.A.
 
Presentation (1)
Presentation (1)Presentation (1)
Presentation (1)
Kinza Irshad
 

Similar to Environmental Impact Assessment (20)

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Eia sem 40_02
Eia sem 40_02Eia sem 40_02
Eia sem 40_02
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
environmentimpactassessment-120810134826-phpapp02.pptx
environmentimpactassessment-120810134826-phpapp02.pptxenvironmentimpactassessment-120810134826-phpapp02.pptx
environmentimpactassessment-120810134826-phpapp02.pptx
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
 
PEISS
PEISSPEISS
PEISS
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Presentation (1)
Presentation (1)Presentation (1)
Presentation (1)
 

Recently uploaded

The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
Globus
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
Jen Stirrup
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 

Recently uploaded (20)

The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 

Environmental Impact Assessment

  • 2. Thought of the Day The Living in the Moment Concept Environmental Impact Assessment 2
  • 3. DOMAINS OF ENVIRONMENT Physical • Air • Water • Land Ecological • Flora • Fauna Socio-economic • Social • Economic • Cultural Environmental Impact Assessment 3
  • 4. Environmental Impact Assessment EIA WHAT IS EIA? An important procedure for ensuring that the likely effects of new development on the environment are fully understood and taken into account before the development is allowed to go ahead Environmental Impact Assessment 4
  • 5. What EIA can do? • Modify and improve design • Ensure efficient resource use • Enhance social aspects • Identify measures for monitoring and managing impacts • Inform decision-making • Provide justification for a proposal Environmental Impact Assessment 5
  • 6. Origin of EIA in Pakistan • The EIA process was strengthened under Section 12 of Pakistan Environment Protection Act (PEPA), 1997 • Guidelines were prepared with a thorough consultative process with the stakeholders • Initial Environmental Examination IEE/EIA Regulations, 2000 notified. Environmental Impact Assessment 6
  • 7. Pakistan Environmental Protection Act 1997 • Penalties • Upto One Million Rupees (Rs 10,00,000) with a daily penalty of Rs 100,000 • Environmental Tribunals • Judge • National Environmental Quality Standards (NEQS) • Arrest Warrants Environmental Impact Assessment 7
  • 8. List of Projects Requiring IEE/EIA • Agriculture, livestock and fisheries, etc. • Energy • Manufacturing and processing • Mining and mineral processing • Transport • Water management, dams, irrigation and flood protection • Waste Disposal • Urban development and tourism • Environmentally sensitive areas Environmental Impact Assessment 8
  • 9. FINANCIAL ASPECTS OF EIA Environmental Impact Assessment 9
  • 10. Description of a Project • Type of project • Need for project • Location (use maps showing general location, specific location, project boundary and project site layout) • Size or magnitude of operation including any associated activities required by or for the project • Proposed schedule for approval and implementation • Description of the project including drawings showing project layout, components of project, etc. This information should be of the same type and extent as is included in feasibility reports for proposed projects, in order to give a clear picture of the project and its operations. Environmental Impact Assessment 10
  • 11. EIA processes in sequences of application • Project Screening • Scoping • Baseline Data Collection • Identification of Environmental Impacts • Impact Prediction Comparison of Alternatives • Comparison of Alternatives • Mitigation Measures • Public Consultation and Participation • Environmental Monitoring • Environmental Auditing Environmental Impact Assessment 11
  • 12. Screening • important to establish mechanisms by identifying projects which requires EIA, and this process of selection of project is referred to as "Screening“ Environmental Impact Assessment 12
  • 13. Project Scoping • Scoping is to determine what should be the coverage or scope of the EIA study for a project proposal as having potentially significant environmental impacts. Environmental Impact Assessment 13
  • 14. Baseline Data Collection • Baseline information is important reference point for conducting EIA. • The term "baseline" refers to the collection of background information on the biophysical, social and economic settings proposed project area. Baseline data are collected for two main purposes: • to provide a description of the status and trends of environmental factors (e.g., air pollutant concentrations) against which predicted changes can be compared and evaluated in terms of importance, and • to provide a means of detecting actual change by monitoring once a project has been initiated Environmental Impact Assessment 14
  • 15. Identification of Environmental Impacts • Biological and Physio- chemical Impacts • Social Impact • demographic impacts, socio- economic impacts, institutional impacts, gender impact • Cultural Impacts • Health Impact • Economic Impact • labor force requirements, size of investment, likely demographic changes Environmental Impact Assessment 15
  • 16. Impact Prediction Comparison of Alternatives Considerations for Impact Prediction • Magnitude of Impact • Extent of Impact • Duration of Impact Uncertainty in Impact Prediction Environmental Impact Assessment 16
  • 17. Comparison of Alternatives • Qualitative approach • Quantitative approach • Ranking, rating or scaling approach • Weighting approach • Weighting- ranking/rating/scaling approach Environmental Impact Assessment 17
  • 18. ANALYSIS OF ALTERNATIVES 1. No Project Option 2. Location/Alignment Alternatives 3. Process/Design Alternatives 4. Demand/Activity Alternatives 5. Scheduling Alternatives 6. Input Alternatives Environmental Impact Assessment 18
  • 19. Lahore Sports City Environmental Impact Assessment 19
  • 20. Lahore Sports City (Site Screening Criteria) • Accessibility • Land use and Land availability • Aesthetics • Water Availability • Potential of Infrastructure Development • Environmental and Social Issues Environmental Impact Assessment 20
  • 22. Key elements for assessing impact significance • Ecological • effects on plant and animal habitat • rare and endangered species • ecosystem resilience, sensitivity, bio-diversity and carrying capacity • viability of local species populations • Environmental Standards • Social and Economical • effects on human health and safety • potential loss of species with current or potential value, or commercially available production (farmland) • recreational or aesthetic value • demands on public resources such as social service • demands on transportation and other infrastructures • demographic effects Environmental Impact Assessment 22
  • 23. Mitigation Measures • recommended actions to reduce, avoid or offset the potential adverse environmental consequences of development activities • maximize project benefits • minimize undesirable impacts Environmental Impact Assessment 23
  • 24. Mitigation Measures • Mitigation measures requires funding • Mitigation measures should be integrated in the project design • Mitigation measures is not limited to one point in the EIA process • Link between mitigation and monitoring Environmental Impact Assessment 24
  • 25. Public Consultation and Participation • Local people • Project beneficiaries • NGOs • Voluntary organizations • Private sector • National/local governments • Scientist/experts • Private sector Environmental Impact Assessment 25
  • 26. Methods for stakeholder involvement • Public meetings • Advisory panels • Public information centers • Interviews • Questionnaires • Participatory Appraisal techniques Environmental Impact Assessment 26
  • 27. Environmental Monitoring • an activity undertaken to provide specific information on the characteristics and functions of environmental and social variables in space and time Environmental monitoring is therefore one of the most important components of an EIA • ensuring that impacts do not exceed the legal standards • checking the implementation of mitigation measures in the manner described in the EIA report • providing early warning of potential environmental damages Environmental Impact Assessment 27
  • 28. Principles of Monitoring • Determine the indicators to be used in monitoring activities • Collection of meaningful and relevant information • Application of measurable criteria in relation to chosen indicators • Reviewing objective judgments on the information collected • Draw tangible conclusions based on the processing of information • Making rational decision based on the conclusion drawn • Recommendation of improved mitigation measures to be undertaken Environmental Impact Assessment 28
  • 29. Types of Monitoring • Baseline Monitoring • pre-audit study • Impact Monitoring • Compliance Monitoring Environmental Impact Assessment 29
  • 30. Environmental Auditing • an audit assess the actual environmental impact • the accuracy of prediction • the effectiveness of environmental impact mitigation • enhancement measures • the functioning of monitoring mechanisms Environmental Impact Assessment 30
  • 31. Types of Audit • Decision Point Audit • Implementation Audit • Performance Audit • Project Impact Audit • Predictive Technique Audit • EIA Procedures Audit Environmental Impact Assessment 31
  • 32. Environmental Auditing Plan • condition of natural/social/economical resources prior to project implementation • mitigation measures implemented are effective to control adverse impact • degraded landscape have been restored into original condition • effect on the local economy of project implementation Environmental Impact Assessment 32
  • 33. Public Hearing Public Hearing of Environmental Impact Assessment of 225 MW Thermal Power RFO Fired Power Plant Near Sheikhupura Public Hearing of Zero Point Interchange Environmental Impact Assessment 33
  • 34. Public Hearing Public Hearing of Benazir Bhutto International Airport Public Consultation for Mirani Dam Project Environmental Impact Assessment 34
  • 37. Mangla Dam Raising Project • A population of about 50,000 persons is being affected • About 8000 houses and other buildings are being affected • A total of 6,388 hectares of land (residential, agriculture and barren) is to be acquired • 28 brick kilns will be abandoned • An unprecedented and very attractive compensation package for the affectees has been provided • Pakistan Resettlement Policy is being followed for the resettlement and compensation process Environmental Impact Assessment 37
  • 38. EIA Flow Chart Environmental Impact Assessment 38
  • 40. Strategic Environmental Assessment SEA • Social Impact Assessment (SIA) • Cumulative Impact Assessment (CIA) • Environmental and Social Impact Assessment (ESIA) Environmental Impact Assessment 40
  • 41. EIA SEA Applied to specific and relatively short-term (life- cycle) projects and their specifications Applied to policies, plans and programs with broad, long-term strategic perspective Takes place at early stage of project planning once parameters are set Ideally, takes place at an early stage in strategic planning Considers limited range of project alternatives Considers a broad range of alternative scenarios Usually prepared and/or funded by the project proponents Conducted independently of any specific project proponent Focus on obtaining project permission, and rarely with feedback to policy, plan or program consideration Focus on decision on policy, plan and program implications for future lower-level decisions Well-defined, linear process with clear beginning and end Multi-stage, iterative process with feedback loops Preparation of an EIA document with prescribed format and contents is usually mandatory. This document provides a baseline reference for monitoring May not be formally documented Limited review of cumulative impacts, often limited to phases of a specific project. Does not cover regional-scale developments or multiple projects Inherently incorporates consideration of cumulative impacts Environmental Impact Assessment 41
  • 42. Tools for predicting environmental and socio-economic effects • Modeling or forecasting of direct environmental effects • Matrices and network analysis • Participatory or consultative techniques • Geographical information systems as a tool to analyze, organize and present information Environmental Impact Assessment 42
  • 43. Tools for analyzing and comparing options • Scenario analysis and multi-criteria analysis • Risk analysis or assessment • Cost benefit analysis • Opinion surveys to identify priorities Environmental Impact Assessment 43
  • 44. A continuum of SEA application Environmental Impact Assessment 44
  • 45. SEA benefits at a glance 1. Supporting the integration of environment and development 2. Providing environmental- based evidence to support informed decisions 3. Improving the identification of new opportunities 4. Preventing costly mistakes 5. Building public engagement in decision making for improved governance 6. Facilitating transboundary co-operation Environmental Impact Assessment 45
  • 46. Thermal Power Generation Policy, Pakistan: an early SEA would have helped • In the mid 1990s, rapidly expanding industrial activity, increasing population • Pakistan’s Government decided to stimulate increased power generation • Independent Power Plants Policy (IPPs) provided incentives for investments in thermal power generation • No SEA was made; instead investors had to submit an EIA without considering potential cumulative effects • Investors given freedom to choose the site, technology and the fuel • plants were installed with little or no pollution control devices • Leading energy experts and the WAPDA raised objections to the policy but were ignored • EIA used down-stream decision making approach • individual projects, especially after deciding the site, technology and fuel • thermal power stations using high-sulphur furnace oil became clustered in one city and added to the already polluted air • Alternatively, they were developed in a scattered way in remote places, which made it difficult to connect them with the national grid system Key costs • Increased pollution • Relocation of plants – following public pressure and lobbying – at considerable cost • Delayed delivery of energy Environmental Impact Assessment 46
  • 47. The Circular Debt of Pakistan • According to USAID report on the Causes and Impacts of Power Sector Circular Debt in Pakistan • in 2008, the circular debt was Rs 161.21 billion • increased to Rs 235.65 billion in 2009 • circular debt in 2010 increased to Rs 365.66 billion • in 2011, this amount swelled to Rs 537.53 billion • During the current fiscal year circular debt increased to Rs 872.41 billion Environmental Impact Assessment 47
  • 48. Policy SEA Process Steps Environmental Impact Assessment 48
  • 49. Conceptual Model of SEA Environmental Impact Assessment 49
  • 50. Reducing Emissions from Deforestation and Degradation (REDD+) Environmental Impact Assessment 50