PROJECT DESCRIPTION
LOCATION across river Giri about 1.5 km upstream of
Dadahu bridge on Dadahu-Sangra motor road in
district Sirmaur of Himachal Pradesh.
longitude 770-03’12” to 77039’10” E
latitude 30036’51” to 31015’23” N
Characterstics of dam 148m high rockfill dam with centrally inclined
impervious clay core dam at
an elevation of 778 m, full reservoir level at
elevation 766 m, 63 m wide chute
spillway on the left bank with crest level
elevation 755 m &discharge7067 cumecs
Total land requirement 1532.60ha out of which
forest land 955.82 ha
private land576.78 ha
submerge land 1197.60 ha
Catchment area above dam site 2175 sq km
storage capacity 49800ha m
Power house capacity 2 X 20MW
Total cost of the project 3896.83 crores
RENUKA DAM
PROJECT.
NEED OF THE PROJECT
supply of drinking water to National Capital Region (NCR) of Delhi 1000 million
litres everyday
•powerhouse with installed capacity 2 x 20 MW in a 90% dependable year shall
generate 296.80 GWH for H.P.
PERTINENT INSTITUTIONAL INFORMATION
Name Scope and Objective
Water (Prevention and Control of
Pollution) Act, 1974, 1988
To provide for the prevention and control of water
pollution and enhancing the quality of water
Air (Prevention and Control of
Pollution) Act, 1981, 1987
To provide for the prevention and control of air
pollution
Forest (Conservation) Act, 1980,
1988
To consolidate acquisition of common property
such as forests, halt India’s rapid deforestation and
resulting environmental degradation
Wildlife (Protection) Act, 1972, 1993 To protect wildlife
Environment (Protection) Act, 1986 To provide for the protection and improvement of
environment
National Policy on R & R, 2003 Resettlement and rehabilitation of project affected
people
EIA Notification 14th September
2006
Environmental Impact Assessment
•Though the project falls under category ‘B’ but has been classified
in category ‘A’ because the project lies within 10 KM from boundary
of Renukaji Wild Life Sanctuary ( notified under the Wildlife
(Protection) Act, 1972 ).
•A comprehensive EIA is required.
TERMS OF REFERENCE (TOR)
The study comprises of the five following stages:
A. Determination of baseline conditions with respect to each of the Land Use,
Soil, Geology, Hydrology, Meteorology, Water Quality, Air and Noise Quality,
Terrestrial Ecology, Aquatic Ecology and Public Health, Demography and
Socio-Economics.
B. Identification of the different components of the project that would have an
effect on one or several aspects of the environment
C. Estimation of the quantum and character of the polluting discharges of such
components
D. Assessment of the impacts of such polluting discharges on the different
aspects of the environment and
E. Formulation and recommendation of mitigation measures necessary to
control the adverse environmental impacts to acceptable levels.
DESCRIPTION OF THE AFFECTED ENVIRONMENT & BASELINE STUDIES
The area falling within 10 km radius of the proposed Renukaji dam project has
been assessed and evaluated for the all existing environmental conditions.
CLIMATE
•The climate is sub-tropical interspersed between cold weather, hot weather
and southwest monsoon
•Winds are generally moderate throughout the season and lie in the range of 1-
19 km / hr .
• The relative humidity of the area varies from 33 to 90%.
Windrose Diagram for Monsoon Season
Windrose Diagram for Post-Monsoon
Season
SEISMICITY
the area of Renuka dam project falls within Zone IV. Therefore, suitable seismic
factor in design of structure would be kept under consideration.
SOIL CHARACTERSTICS
•slightly acidic in nature having pH values from 6.35 to 6.90.
•soil texture varies from coarse sandy loam to clay loam having predominantly
Sand.
•The soil near river terrace isgood for paddy cultivation.
•SLOPE
•The area has moderate slope(32%) and steep slope(38%) in majority.
LAND USE
the catchment area is characterized by steep hills and deep valleys, the
dominating classes are dense forest, open forest, waste land, agriculture &
settlement patches and some degraded forest.
ARCHAEOLOGICAL / RELEGIOUS / HISTORICAL MONUMENTS
No archaeological monument of national importance either lies in the project
area or in its submergence area.
Station
Code
Station
Name
Location with respect to
Site
Distance (Km)
Direction
Description
S-1 Renuka 2.5 SE Agriculture
land
S-2 Dhanoi 1.0 NE Forest land
S-3 Khalna 4.0 SW Forest land
S-4 Dabhuri 5.0 SW Agriculture
land
S-5 Trimali 4.0 SE Agriculture
land
S-6 Dhar 5.0 SE Agriculture
land
Soil sampling sites
Soil Sampling Stations
Air Quality Assessment
•The number of sampling at each station was for two consecutive days. The
baseline data of ambient air environment is generated for the mentioned
parameters as given below:
1. Suspended Particulate Matter (SPM)
2. Respirable Suspended Particulate Matter (RSPM)
3. Sulphur dioxide (SO2)
4 Nitrogen oxides (NOx)
•The major sources of air pollutants in the project area are vehicular traffic,
blasting (during road construction at present), dust arising from local and
village road, forest fire and domestic fuel burning.
•“Respirable Dust Sampler Envirotech Model APM 460 BL” was used for air
monitoring.
OBSERVATIONS
•Ambient Air Quality Status with respect to RSPM ,SPM ,SO2 NOX were within the
National Ambient Air Quality Standards for 24 hrs monitoring.
• However,the air quality will be affected during construction period.
• The concentration obnoxious gases and dust emission, will be cleared on daily
basis as the area is located in a valley and the gush of strong winds during
morning and evening hours is a common phenomenon.
Sound Level Measurement
•The sound level was measured by using sound level meter (RS 232 digital
Instrument) at 6 different locations.
•Maximum and minimum level of sound was recorded for the particular site and
then average was calculated which gave the final readings.
•The noise levels in the study area were well within the permissible standards.
Water Quality
•Over a stretch of 35 km length on river Giri and its tributaries nine sites were
selected for water sampling.
•The sampling was carried out for about a year time keeping the frequency of
observation once in 30 days time
OBSERVATIONS
The water quality results shows that all the parameters are within the
permissible limit of Drinking Water Standards (IS: 10500), except the
bacteriological parameters. The discharge in the river is more in monsoon
season and the water quality is also better as compare to post monsoon season.
Parameters Instrumentation
Ambient temperature Digital thermometer
Transparency Seehi dise method
Water velocity EMCON digital current meter
Turbidity Nephelometer
Total Dissolved Solids Titration method
pH Digital pH meter (HANNA)
Alkalinity, Acidity, Chlorides,
Silicates, DO, Free CO2, Zn, Si, Fe,
Nutrients (Phosphorus, Sulphates) Aquamerck / Aquaquant kits
Total Ca and Mg Hardness – EDTA Titrametric methods
Inorganic phosphates Colorimetric Methods
BOD Titration
E-Coli and Total Coliform Macconkey broth
AQUATIC ENVIRONMENT
Data on existing aquatic environmental conditions includes
• Biological characteristics of river water
• Estimation of coliform organisms
• Present status of fish fauna: Identification of fish species
• Their migratory pattern, feeding and breeding grounds
OBSERVATIONS
the proposed dam will have major impact on the endemic fishes,
which play a major role in maintaining the aquatic ecosystem and contribute to
the livelihood opportunities for the local inhabitants.
BIOLOGICAL ENVIRONMENT
Floral Study
•The study area in the Giri river Valley was divided into submergence and
influence zones.
•The plant species were identified with the help of Botany Division, FRI,
Dehradun & local inhabitants.
Floral studies were carried out
1. To make an inventory/checklist of plants found in the study area.
2. To analyze the existing vegetation under submergence and influence zones
of the project.
3. To know the density (trees/unit area) of each of the woody species under
submergence and influence zones of the project.
Faunal Study
Terrestrial fauna
The terrestrial fauna of important animal groups such as butterflies (insects),
birds, mammals and reptiles was evaluated during a week long post monsoon
survey (Ocotber’2007) in 5 km radius of the impact zone. Terrestrial fauna was
evaluated
1. To prepare an inventory of the terrestrial fauna present in the study area.
2. To assess present status of the terrestrial fauna present in the study area
3. To assess the impacts of the proposed dam on the terrestrial fauna.
OBSERVATIONS
Renuka Sanctuary and Kashoga Reserve forest support high species richness
and diversity of birds. Thus, these sites are most crucial for the conserving the
bird diversity of the area and should be protected during the course of dam
construction and thereafter.
Aquatic Fauna
•Evaluation of Phytobenthos and Plankton
•Evaluation of Benthic Macro-Invertebrates
•Evaluation of Fish Fauna
•OBSERVATIONS
•decline of migratory species. The dam prevents migration between
feeding and breeding zones.
•Loss of habitat
•Change in Water temperature and water quality changes and discharge
fluctuations
Site I
Site II
Site III
Site IV
Map showing the terrestrial fauna study sites in the Impact zone of dam
SOCIOECONOMIC STUDY
The data were collected in two stages-
• The first stage involved a rapid assessment of the study area in order to obtain
an overall perspective of the villages of District Sirmaur that were located in the
submergence zone.
•The second stage of data collection was done in the villages, which are going
to be directly affected by acquisition of land
Secondary information was collected from different government and
nongovernment offices.
In order to gather information on public perception of the proposed project
the attitude survey was carried, which depicts the prevailing awareness and
acceptance about the project
OBSERVATIONS
•Agriculture was the main occupation of the project affected people
Attitude of affected families of Renuka Dam Project
Questions Yes (%) No (%)
Do you know about the Project to be constructed in
the area?
100.00 00.00
Are you in favour of Project? 4.38 95.62
S. No. Reasons to be in against Views of PAP (%)
1 Loss of Fertile Agriculture
Land
95.62
2 Deprived of fuel and
fodder
91.34
3 Losing their ancestral
place
67.13
4 No problem 4.38
Views of PAP (%) of Renuka Dam Project
S.No. Reason for supporting
Renuka DamProject
Views of PAP (%)
1 Underdevelopment 91.04 91.04
2 Employment
opportunities 18.32
18.32
3 Others 7.64 7.64
IDENTIFICATION, PREDICTION AND EVALUATION OF IMPACTS
IMPACTS ON LAND ENVIRONMENT
• Change in land-use due to submergence and construction of the project.
• Alteration of terrain due to construction of approach and access roads.
•Localized increase in erosion due to excavation of tunnel, powerhouse and
other appurtenant components.
• Generation of solid waste due to construction and deployment of construction
workforce.
Impacts on the Microclimate of the Area
• Localized fall off temperature in and around reservoir.
• Localized increase in humidity and evapo-transpiration.
• Localized decrease in aridity around reservoir.
Change in Land use / Land cover
Construction Phase
•The change in land use will be from riverine environment to lacustrine
environment and the change in land cover will also be from agriculture/forest
land cover to reservoir area.(permanent change)
•The unutilized muck may bring change in landscape of the dumping yard.
Operational Phase
no significant change on land use is expected.
Mitigation measures
the land cover will improve, due to implementation of landscape restoration and
catchment area treatment works.
Soil Erosion and Siltation
Construction Phase
• Soil erosion due to excavation for different components of the project,
construction of roads and dumping of muck into disposal yards will accelerate
soil erosion during the construction period.
Operational Phase
No significant impact
Mitigation measures
landscape restoration work& reservoir rim treatment would be implemented that
will restore erosion.
IMPACTS ON AIR AND NOISE ENVIRONMENT
Construction Phase
• Temporary changes in air quality and noise levels during construction phase
are expected
Operation Phase
• The ambient air quality during the operation phase is not expected to
deteriorate.
• Noise level in power house is also not expected to increase as the powerhouse
is underground.
Mitigation measures
During construction phase, monitoring of parameters required to be carried out
IMPACTS ON WATER ENVIRONMENT
•water quality downstream of dam shall improve.
Construction Phase
•The sewage generated at the labour camps and other residential areas may
also bring considerable pollutants to river sections
•The muck disposal yards, quarry areas would be the areas of concerns for
leaching of sediments during rains.
Operation Phase
the water environment in general will not deteriorate as the reservoir of the
project will be continuously operated or used for power generation.
IMPACTS ON FLORA AND FAUNA OF PROJECT AREA
Impact on Flora (Plant Biodiversity)
1. Degradation/destruction of Northern Tropical Dry deciduous Forests
2. Impacts in the submergible area-there will be a sudden shift in the
population density of the species, which certainly will have some impact on
the ecology of the region.
3. Loss of threatened/ economically important species
4. Invasion of the habitat by exotic and Invasive species
Impacts on Fauna
1. more loss to aquatic environment than the terrestrial one.
2. Terrestrial wildlife change in their route in search of their food etc.
aquatic communities present in the submergence areas are going to vanish.
Mitigation measures
• The area downward from dam site, the backwater formed from its
tributaries is going to support the present aquatic fauna to some extent.
•Provision of fish ladder
IMPACTS ON THE SOCIOECONOMICS
1. About 1281 ha land of 32 villages will either be submerged or acquired for
project construction. Out of the 32 villages, the people from 24 villages will
lose their individual land.
2. Most of PAFs are going to be displaced so they should be placed in the
area nearer to their existing location with development of proper facilities,
training and financial assistance to earn their living.
EIA REPORT :Renuka dam project

More Related Content

What's hot

Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
Ethical Sector
 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower project
Tanveer Abbas
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
Anchal Garg
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
Abid Hussainy
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
Mizanur R. Shohel
 
Environment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote SensingEnvironment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote Sensing
shubham shama
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
Kushal Patel
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
Deepika Verma
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
Sandeep Kumar
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Jini Rajendran
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
National Institute of Technology Hamirpur
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
Shehab Sajeeb
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
Arvind Kumar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
SonikaPawar
 
EIA Methods
EIA MethodsEIA Methods
Final lake ppt
Final lake pptFinal lake ppt
Final lake ppt
Janak Shah
 

What's hot (20)

Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower project
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
EIA training for Environmental Management Plan
EIA training for Environmental Management PlanEIA training for Environmental Management Plan
EIA training for Environmental Management Plan
 
Landfill gas management
Landfill gas managementLandfill gas management
Landfill gas management
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
Environment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote SensingEnvironment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote Sensing
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Final lake ppt
Final lake pptFinal lake ppt
Final lake ppt
 

Viewers also liked

EIA REPORT
EIA REPORTEIA REPORT
EIA REPORT
saadullah19
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
Arvind Kumar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
Environmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated ResortEnvironmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated Resort
November Tan
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Probir Bidhan
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
Vinod Burdak
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
zubeditufail
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - PresentationEmma Syrat
 
2014 06-21 050711-polavaram_thr
2014 06-21 050711-polavaram_thr2014 06-21 050711-polavaram_thr
2014 06-21 050711-polavaram_thrPruthvi Azad
 
EIA Report
EIA ReportEIA Report
EIA Report
Priyanka Singh
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
zubeditufail
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
Deshan Arachchige
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
consumeractiongroup
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
apndesai
 
EIA M9 highway
EIA M9 highwayEIA M9 highway
EIA M9 highway
zubeditufail
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
Pabasara Gunawardane
 

Viewers also liked (20)

EIA REPORT
EIA REPORTEIA REPORT
EIA REPORT
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated ResortEnvironmental Impact Assessment of Sentosa Integrated Resort
Environmental Impact Assessment of Sentosa Integrated Resort
 
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA Project - Presentation
EIA Project - PresentationEIA Project - Presentation
EIA Project - Presentation
 
2014 06-21 050711-polavaram_thr
2014 06-21 050711-polavaram_thr2014 06-21 050711-polavaram_thr
2014 06-21 050711-polavaram_thr
 
EIA Report
EIA ReportEIA Report
EIA Report
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
 
Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project Field visit report of Moragahakanda reservoir project
Field visit report of Moragahakanda reservoir project
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013Gis hydrology river_in_summary of river link project_with images_05.08.2013
Gis hydrology river_in_summary of river link project_with images_05.08.2013
 
EIA M9 highway
EIA M9 highwayEIA M9 highway
EIA M9 highway
 
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri LankaAn Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
An Evaluation of EIA report of Norochcholai Coal Power Plant Sri Lanka
 
Dams
DamsDams
Dams
 

Similar to EIA REPORT :Renuka dam project

Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
Udip Das
 
Groundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
Groundwater Salinity and Zoning in the Southwestern Coastal Region of BangladeshGroundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
Groundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
International Water Management Institute (IWMI)
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
RaghuGhu1
 
Geospatial modelling for wetlands
Geospatial modelling for wetlandsGeospatial modelling for wetlands
Geospatial modelling for wetlands
Rajashree Naik
 
04 tm origin of sandstone tanzania session-8
04 tm origin of sandstone tanzania session-804 tm origin of sandstone tanzania session-8
04 tm origin of sandstone tanzania session-8Monatom Mgl
 
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
Ethical Sector
 
REMOTE SENSING IN GROUNDWATER.pptx
REMOTE SENSING IN GROUNDWATER.pptxREMOTE SENSING IN GROUNDWATER.pptx
REMOTE SENSING IN GROUNDWATER.pptx
Imposter7
 
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...Kavya Prabhakar
 
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
IRJET Journal
 
Healthy Landscape - Healthy People
Healthy Landscape - Healthy PeopleHealthy Landscape - Healthy People
Healthy Landscape - Healthy People
Dr. P.B.Dharmasena
 
Lesson 9 sri lankan environment
Lesson 9   sri lankan environmentLesson 9   sri lankan environment
Lesson 9 sri lankan environment
Dr. P.B.Dharmasena
 
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
ICEM - International Centre for Environmental Management
 
Ppt of wazid dissertation 2019 aug
Ppt of wazid dissertation 2019 augPpt of wazid dissertation 2019 aug
Ppt of wazid dissertation 2019 aug
Warish Khan
 
Med partnership bouareg_rev
Med partnership bouareg_revMed partnership bouareg_rev
Med partnership bouareg_rev
groundwatercop
 
Base line study in eia
Base line study in eiaBase line study in eia
Base line study in eia
Raheela Shabbir
 
Physio-chemical parameters of a canal
Physio-chemical parameters of a canalPhysio-chemical parameters of a canal
Physio-chemical parameters of a canal
Adil Masood
 
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
IJERA Editor
 
IRJET- Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
IRJET-  	  Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...IRJET-  	  Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
IRJET- Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
IRJET Journal
 

Similar to EIA REPORT :Renuka dam project (20)

Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
 
Groundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
Groundwater Salinity and Zoning in the Southwestern Coastal Region of BangladeshGroundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
Groundwater Salinity and Zoning in the Southwestern Coastal Region of Bangladesh
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
 
Geospatial modelling for wetlands
Geospatial modelling for wetlandsGeospatial modelling for wetlands
Geospatial modelling for wetlands
 
04 tm origin of sandstone tanzania session-8
04 tm origin of sandstone tanzania session-804 tm origin of sandstone tanzania session-8
04 tm origin of sandstone tanzania session-8
 
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
8. E&S Hydro Advisory Program: Advancing sustainability in the hydropower sector
 
REMOTE SENSING IN GROUNDWATER.pptx
REMOTE SENSING IN GROUNDWATER.pptxREMOTE SENSING IN GROUNDWATER.pptx
REMOTE SENSING IN GROUNDWATER.pptx
 
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...
Geospatial and Statistical Assessment of Groundwater Contamination Due to Lan...
 
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
 
Healthy Landscape - Healthy People
Healthy Landscape - Healthy PeopleHealthy Landscape - Healthy People
Healthy Landscape - Healthy People
 
IJG_2016042716323074
IJG_2016042716323074IJG_2016042716323074
IJG_2016042716323074
 
Lesson 9 sri lankan environment
Lesson 9   sri lankan environmentLesson 9   sri lankan environment
Lesson 9 sri lankan environment
 
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
Lancang-Mekong Development Plan Environmental Study - Findings and Conclusions
 
Ppt of wazid dissertation 2019 aug
Ppt of wazid dissertation 2019 augPpt of wazid dissertation 2019 aug
Ppt of wazid dissertation 2019 aug
 
Med partnership bouareg_rev
Med partnership bouareg_revMed partnership bouareg_rev
Med partnership bouareg_rev
 
Base line study in eia
Base line study in eiaBase line study in eia
Base line study in eia
 
Physio-chemical parameters of a canal
Physio-chemical parameters of a canalPhysio-chemical parameters of a canal
Physio-chemical parameters of a canal
 
Mp ground water
Mp ground waterMp ground water
Mp ground water
 
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
Seasonal Variation of Groundwater Quality in Parts of Y.S.R and Anantapur Dis...
 
IRJET- Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
IRJET-  	  Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...IRJET-  	  Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
IRJET- Adsorption Kinetics of Heavy Metal in the catchment soils of Swarn...
 

Recently uploaded

"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Open Access Research Paper
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
ipcc-media
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
upasana742003
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 

Recently uploaded (20)

"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
Micro RNA genes and their likely influence in rice (Oryza sativa L.) dynamic ...
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
IPCC Vice Chair Ladislaus Change Central Asia Climate Change Conference 27 Ma...
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Bhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of deathBhopal Gas Leak Tragedy - A Night of death
Bhopal Gas Leak Tragedy - A Night of death
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 

EIA REPORT :Renuka dam project

  • 1.
  • 2. PROJECT DESCRIPTION LOCATION across river Giri about 1.5 km upstream of Dadahu bridge on Dadahu-Sangra motor road in district Sirmaur of Himachal Pradesh. longitude 770-03’12” to 77039’10” E latitude 30036’51” to 31015’23” N Characterstics of dam 148m high rockfill dam with centrally inclined impervious clay core dam at an elevation of 778 m, full reservoir level at elevation 766 m, 63 m wide chute spillway on the left bank with crest level elevation 755 m &discharge7067 cumecs Total land requirement 1532.60ha out of which forest land 955.82 ha private land576.78 ha submerge land 1197.60 ha Catchment area above dam site 2175 sq km storage capacity 49800ha m Power house capacity 2 X 20MW Total cost of the project 3896.83 crores
  • 4. NEED OF THE PROJECT supply of drinking water to National Capital Region (NCR) of Delhi 1000 million litres everyday •powerhouse with installed capacity 2 x 20 MW in a 90% dependable year shall generate 296.80 GWH for H.P.
  • 5. PERTINENT INSTITUTIONAL INFORMATION Name Scope and Objective Water (Prevention and Control of Pollution) Act, 1974, 1988 To provide for the prevention and control of water pollution and enhancing the quality of water Air (Prevention and Control of Pollution) Act, 1981, 1987 To provide for the prevention and control of air pollution Forest (Conservation) Act, 1980, 1988 To consolidate acquisition of common property such as forests, halt India’s rapid deforestation and resulting environmental degradation Wildlife (Protection) Act, 1972, 1993 To protect wildlife Environment (Protection) Act, 1986 To provide for the protection and improvement of environment National Policy on R & R, 2003 Resettlement and rehabilitation of project affected people EIA Notification 14th September 2006 Environmental Impact Assessment
  • 6. •Though the project falls under category ‘B’ but has been classified in category ‘A’ because the project lies within 10 KM from boundary of Renukaji Wild Life Sanctuary ( notified under the Wildlife (Protection) Act, 1972 ). •A comprehensive EIA is required.
  • 7. TERMS OF REFERENCE (TOR) The study comprises of the five following stages: A. Determination of baseline conditions with respect to each of the Land Use, Soil, Geology, Hydrology, Meteorology, Water Quality, Air and Noise Quality, Terrestrial Ecology, Aquatic Ecology and Public Health, Demography and Socio-Economics. B. Identification of the different components of the project that would have an effect on one or several aspects of the environment C. Estimation of the quantum and character of the polluting discharges of such components D. Assessment of the impacts of such polluting discharges on the different aspects of the environment and E. Formulation and recommendation of mitigation measures necessary to control the adverse environmental impacts to acceptable levels.
  • 8. DESCRIPTION OF THE AFFECTED ENVIRONMENT & BASELINE STUDIES The area falling within 10 km radius of the proposed Renukaji dam project has been assessed and evaluated for the all existing environmental conditions. CLIMATE •The climate is sub-tropical interspersed between cold weather, hot weather and southwest monsoon •Winds are generally moderate throughout the season and lie in the range of 1- 19 km / hr . • The relative humidity of the area varies from 33 to 90%.
  • 9. Windrose Diagram for Monsoon Season
  • 10. Windrose Diagram for Post-Monsoon Season
  • 11. SEISMICITY the area of Renuka dam project falls within Zone IV. Therefore, suitable seismic factor in design of structure would be kept under consideration. SOIL CHARACTERSTICS •slightly acidic in nature having pH values from 6.35 to 6.90. •soil texture varies from coarse sandy loam to clay loam having predominantly Sand. •The soil near river terrace isgood for paddy cultivation. •SLOPE •The area has moderate slope(32%) and steep slope(38%) in majority. LAND USE the catchment area is characterized by steep hills and deep valleys, the dominating classes are dense forest, open forest, waste land, agriculture & settlement patches and some degraded forest. ARCHAEOLOGICAL / RELEGIOUS / HISTORICAL MONUMENTS No archaeological monument of national importance either lies in the project area or in its submergence area.
  • 12. Station Code Station Name Location with respect to Site Distance (Km) Direction Description S-1 Renuka 2.5 SE Agriculture land S-2 Dhanoi 1.0 NE Forest land S-3 Khalna 4.0 SW Forest land S-4 Dabhuri 5.0 SW Agriculture land S-5 Trimali 4.0 SE Agriculture land S-6 Dhar 5.0 SE Agriculture land Soil sampling sites
  • 14. Air Quality Assessment •The number of sampling at each station was for two consecutive days. The baseline data of ambient air environment is generated for the mentioned parameters as given below: 1. Suspended Particulate Matter (SPM) 2. Respirable Suspended Particulate Matter (RSPM) 3. Sulphur dioxide (SO2) 4 Nitrogen oxides (NOx) •The major sources of air pollutants in the project area are vehicular traffic, blasting (during road construction at present), dust arising from local and village road, forest fire and domestic fuel burning. •“Respirable Dust Sampler Envirotech Model APM 460 BL” was used for air monitoring. OBSERVATIONS •Ambient Air Quality Status with respect to RSPM ,SPM ,SO2 NOX were within the National Ambient Air Quality Standards for 24 hrs monitoring. • However,the air quality will be affected during construction period. • The concentration obnoxious gases and dust emission, will be cleared on daily basis as the area is located in a valley and the gush of strong winds during morning and evening hours is a common phenomenon.
  • 15. Sound Level Measurement •The sound level was measured by using sound level meter (RS 232 digital Instrument) at 6 different locations. •Maximum and minimum level of sound was recorded for the particular site and then average was calculated which gave the final readings. •The noise levels in the study area were well within the permissible standards. Water Quality •Over a stretch of 35 km length on river Giri and its tributaries nine sites were selected for water sampling. •The sampling was carried out for about a year time keeping the frequency of observation once in 30 days time OBSERVATIONS The water quality results shows that all the parameters are within the permissible limit of Drinking Water Standards (IS: 10500), except the bacteriological parameters. The discharge in the river is more in monsoon season and the water quality is also better as compare to post monsoon season.
  • 16. Parameters Instrumentation Ambient temperature Digital thermometer Transparency Seehi dise method Water velocity EMCON digital current meter Turbidity Nephelometer Total Dissolved Solids Titration method pH Digital pH meter (HANNA) Alkalinity, Acidity, Chlorides, Silicates, DO, Free CO2, Zn, Si, Fe, Nutrients (Phosphorus, Sulphates) Aquamerck / Aquaquant kits Total Ca and Mg Hardness – EDTA Titrametric methods Inorganic phosphates Colorimetric Methods BOD Titration E-Coli and Total Coliform Macconkey broth
  • 17. AQUATIC ENVIRONMENT Data on existing aquatic environmental conditions includes • Biological characteristics of river water • Estimation of coliform organisms • Present status of fish fauna: Identification of fish species • Their migratory pattern, feeding and breeding grounds OBSERVATIONS the proposed dam will have major impact on the endemic fishes, which play a major role in maintaining the aquatic ecosystem and contribute to the livelihood opportunities for the local inhabitants. BIOLOGICAL ENVIRONMENT Floral Study •The study area in the Giri river Valley was divided into submergence and influence zones. •The plant species were identified with the help of Botany Division, FRI, Dehradun & local inhabitants. Floral studies were carried out 1. To make an inventory/checklist of plants found in the study area. 2. To analyze the existing vegetation under submergence and influence zones of the project. 3. To know the density (trees/unit area) of each of the woody species under submergence and influence zones of the project.
  • 18. Faunal Study Terrestrial fauna The terrestrial fauna of important animal groups such as butterflies (insects), birds, mammals and reptiles was evaluated during a week long post monsoon survey (Ocotber’2007) in 5 km radius of the impact zone. Terrestrial fauna was evaluated 1. To prepare an inventory of the terrestrial fauna present in the study area. 2. To assess present status of the terrestrial fauna present in the study area 3. To assess the impacts of the proposed dam on the terrestrial fauna. OBSERVATIONS Renuka Sanctuary and Kashoga Reserve forest support high species richness and diversity of birds. Thus, these sites are most crucial for the conserving the bird diversity of the area and should be protected during the course of dam construction and thereafter. Aquatic Fauna •Evaluation of Phytobenthos and Plankton •Evaluation of Benthic Macro-Invertebrates •Evaluation of Fish Fauna •OBSERVATIONS •decline of migratory species. The dam prevents migration between feeding and breeding zones. •Loss of habitat •Change in Water temperature and water quality changes and discharge fluctuations
  • 19. Site I Site II Site III Site IV Map showing the terrestrial fauna study sites in the Impact zone of dam
  • 20. SOCIOECONOMIC STUDY The data were collected in two stages- • The first stage involved a rapid assessment of the study area in order to obtain an overall perspective of the villages of District Sirmaur that were located in the submergence zone. •The second stage of data collection was done in the villages, which are going to be directly affected by acquisition of land Secondary information was collected from different government and nongovernment offices. In order to gather information on public perception of the proposed project the attitude survey was carried, which depicts the prevailing awareness and acceptance about the project
  • 21. OBSERVATIONS •Agriculture was the main occupation of the project affected people Attitude of affected families of Renuka Dam Project Questions Yes (%) No (%) Do you know about the Project to be constructed in the area? 100.00 00.00 Are you in favour of Project? 4.38 95.62 S. No. Reasons to be in against Views of PAP (%) 1 Loss of Fertile Agriculture Land 95.62 2 Deprived of fuel and fodder 91.34 3 Losing their ancestral place 67.13 4 No problem 4.38 Views of PAP (%) of Renuka Dam Project
  • 22. S.No. Reason for supporting Renuka DamProject Views of PAP (%) 1 Underdevelopment 91.04 91.04 2 Employment opportunities 18.32 18.32 3 Others 7.64 7.64
  • 23. IDENTIFICATION, PREDICTION AND EVALUATION OF IMPACTS IMPACTS ON LAND ENVIRONMENT • Change in land-use due to submergence and construction of the project. • Alteration of terrain due to construction of approach and access roads. •Localized increase in erosion due to excavation of tunnel, powerhouse and other appurtenant components. • Generation of solid waste due to construction and deployment of construction workforce. Impacts on the Microclimate of the Area • Localized fall off temperature in and around reservoir. • Localized increase in humidity and evapo-transpiration. • Localized decrease in aridity around reservoir.
  • 24. Change in Land use / Land cover Construction Phase •The change in land use will be from riverine environment to lacustrine environment and the change in land cover will also be from agriculture/forest land cover to reservoir area.(permanent change) •The unutilized muck may bring change in landscape of the dumping yard. Operational Phase no significant change on land use is expected. Mitigation measures the land cover will improve, due to implementation of landscape restoration and catchment area treatment works. Soil Erosion and Siltation Construction Phase • Soil erosion due to excavation for different components of the project, construction of roads and dumping of muck into disposal yards will accelerate soil erosion during the construction period. Operational Phase No significant impact Mitigation measures landscape restoration work& reservoir rim treatment would be implemented that will restore erosion.
  • 25. IMPACTS ON AIR AND NOISE ENVIRONMENT Construction Phase • Temporary changes in air quality and noise levels during construction phase are expected Operation Phase • The ambient air quality during the operation phase is not expected to deteriorate. • Noise level in power house is also not expected to increase as the powerhouse is underground. Mitigation measures During construction phase, monitoring of parameters required to be carried out IMPACTS ON WATER ENVIRONMENT •water quality downstream of dam shall improve. Construction Phase •The sewage generated at the labour camps and other residential areas may also bring considerable pollutants to river sections •The muck disposal yards, quarry areas would be the areas of concerns for leaching of sediments during rains. Operation Phase the water environment in general will not deteriorate as the reservoir of the project will be continuously operated or used for power generation.
  • 26. IMPACTS ON FLORA AND FAUNA OF PROJECT AREA Impact on Flora (Plant Biodiversity) 1. Degradation/destruction of Northern Tropical Dry deciduous Forests 2. Impacts in the submergible area-there will be a sudden shift in the population density of the species, which certainly will have some impact on the ecology of the region. 3. Loss of threatened/ economically important species 4. Invasion of the habitat by exotic and Invasive species Impacts on Fauna 1. more loss to aquatic environment than the terrestrial one. 2. Terrestrial wildlife change in their route in search of their food etc. aquatic communities present in the submergence areas are going to vanish. Mitigation measures • The area downward from dam site, the backwater formed from its tributaries is going to support the present aquatic fauna to some extent. •Provision of fish ladder IMPACTS ON THE SOCIOECONOMICS 1. About 1281 ha land of 32 villages will either be submerged or acquired for project construction. Out of the 32 villages, the people from 24 villages will lose their individual land. 2. Most of PAFs are going to be displaced so they should be placed in the area nearer to their existing location with development of proper facilities, training and financial assistance to earn their living.

Editor's Notes

  1. “Renuka Dam Project ” is proposed to be constructed across River Giri about 1.50 km upstream of Dadahu bridge and 375 m downstream of confluence of Jogar ka khala with river Giri covering 35 km North of Nahan.
  2. Key Environmental Legislations
  3. SW SE S
  4. SE S
  5. slope plays major role in controlling the sediment / soil movement with water and the soil retention. Overall land requirement of the project is 1532.60 ha out of which 955.82 ha is forest land and 576.78 ha is private land. The project shall submerge 1197.60 ha of land comprising of 761.60 ha of forest land and 436.00 ha of private land
  6. The upward migration will not be possible in Giri river due to the proposed storage dam, because the dam will act not only as barrier for fish migration but also contribute to change in the fish habitat due to submergence in water.
  7. Underdevelopment Employment opportunities Loss of Fertile Agriculture Land 2 Deprived of fuel and fodder 3 Losing their ancestral place
  8. The base line data of the existing environment, in the absence of the proposed activity, provides the status of natural environment and with the proposed activity it further provides a mechanism for prediction of the changes that likely to occur. In the present study, evaluation of land, water, air, noise, flora, fauna and socioeconomics was undertaken to understand the baseline environmental status of the area and estimation were made as how this will change with the commencement of the proposed activities.