Checks & Balances - Steps towards
“Environmental Clearance-Industrial Projects “
Environment Clearance- Steps
Pre-Feasibility Report & Form -1 to MOEF/SEIAA
Presentation for TOR to EAC
Baseline Study
Award of TOR
Submit EIA report to SPCB
Notice for Public Hearing
Conduct Public Hearing
MOM of Public Hearing to MOEF
Final EIA report to MOEF
Presentation to Env Assessment Committee
Grant of EC
2
Introduction
• All new or expansion projects listed in EIA -
Notifications-2006 requires environmental
clearance from Ministry of Environment &
Forest.
• Total time for grant of EC is 12 to 18 months.
• Construction work can not be started without
EC.
• Only boundary wall of project site can be
constructed before grant of EC.
3
Category of Industry
Category ‘A’ Industries (Large size)
• EC is granted by Ministry of Environment &
Forest (MOEF)
Category ‘B’ Industries (Small Size)
• EC is granted by State Environment Impact
Assessment Authority (SEIAA)
4
Classification-Category A & B
Industry Category “A” Category “B”
Mining of minerals  50 ha. of mining lease
area
<50 ha  1 ha .of mining
lease area.
Thermal Power
Plants
 500 MW < 500 MW
Cement plants  1.0 million tons/annum
capacity
<1.0 million tons/annum
capacity. ( grinding units)
Metallurgical
industries (ferrous
& non ferrous)
Primary metallurgical
industry
Secondary metallurgical
processing industry
5
EIA Consultant
• Services of EIA Consultant
(registered with MOEF) is
mandatory.
• Consultant carry out all work
from submission of application
upto grant of EC.
6
Preparation of Pre-feasibility Report & Form 1
• Report requires broad information of the
project (No Details).
• Online submission of PFR & Form 1 to MOEF
website.
• Acceptance of form1 by MOEF in 15 days
time.
• Hard copies of Form1 is submitted to MOEF.
7
TOR Presentation
• MOEF invites project proponent to make
presentation to expert appraisal committee
for TOR (Terms of Reference of EIA study).
• Committee has 10 to 15 experts on air
pollution, water pollution, meteorology,
mining, flora-fauna, CSR etc.
• Proponent presents basic information of site,
process , waste generation, impact on air,
water etc. to committee.
8
TOR & Baseline Study
After presentation committee prescribes TOR
conditions for 3 months base line data generation
and EIA study which includes:
• Number of monitoring locations for base line
ambient air, ground water, noise, soil quality etc.
• Total environmental impact & mitigation in 10 km
area of project.
• Land use, flora-fauna data of 10 km radius area.
• Impact on livelihood of land looser of project
affected area.
9
Public Hearing
• After collections of 3 months baseline data, EIA
report is prepared.
• Report is submitted to Pollution Control Board.
• PCB organizes public hearing within 45 days.
• Data of EIA study is presented to project affected
community.
• Proposals, objections, suggestions of community
is recorded (video) .
• Minutes of meeting & video is submitted to
MOEF.
10
Final EIA Report
• Final EIA report with minutes of public hearing
is submitted to MOEF.
• MOEF invites project proponent to make
presentation to expert committee.
• Committee evaluates EIA report, impacts on
environment and community.
• Committee may ask to submit more
information and after complete evaluation
grants EC or reject the proposal.
11
Efficient Planning for EC
METHODOLOGY
(1) Advance action by Project Proponent
(2) Set Target Time for allied Studies
(3) Good Communication with EIA Consultant
(4) Coordination with Statutory Authority
12
• Time of EC procedure is reduced if homework
is good.
• Advance compilation of data for Form-1, EIA
report, public hearing and presentation saves
time.
• Data/information can be submitted
immediately to the EIA consultant and
regulatory authority as and when required.
Advance action by Project Proponent
13
Accuracy of information
Accuracy of data in documents avoids submission of clarifications to
MOEF & saves time.
• Data in the mine plan, EIA & public hearing documents must match.
( Mine reserve, Waste Qty., Greenbelt etc.)
• Good communication between PP, EIA consultant & Mine plan
Consultant keeps uniformity of data. (No work in isolation)
EXAMPLES :
• Latitude-longitude of lease area - Identical in Form-1, EIA report
and lease deed.
• Name of PP - Same in the lease deed, previous EC & proposed
expansion title. (Ex: M/s X Minerals Ltd instead of M/s X Minerals
Pvt. Ltd.
• Project cost – careful assessment in the feasibility report and no
change of amount throughout the EC process.
Advance action by Project Proponent
14
Certificates from statutory authority
• Forest Department -Involvement of forest in
the project area.
• EC compliance certified by Regional Office-
MOEF.(without it –No TOR or Final
presentation)
• Project area is /not located in a sensitive zone,
like the Aravali Hills, coastal area etc.
Advance action by Project Proponent
15
Data for the EIA report
Should be available -:
• Coal linkage agreement with supplier.
• CSR history.
• Existing/ proposed Greenbelt
• Manpower/land requirement,
• Process/flow chart, waste generation,
Advance action by Project Proponent
16
Back-up database
• On all aspects of EIA study & project should be
on hand.
• To satisfy queries during TOR and Appraisal
presentation.
• Helps to avoid submission of clarifications if not
properly addressed in the MOEF presentation.
Advance action by Project Proponent
17
To start following studies simultaneously with baseline
environmental monitoring :
• Biological study :
• Hydrogeological study
• Procurement of satellite image
• Rehabilitation & Resettlement study
• Preparation of mine Plan
It Helps in preparation of the EIA report in shortest time.
Follow-up with the EIA consultant is necessary to complete
allied studies on time.
Target Time for Allied Studies
18
Biological study
Early action of study helps in completing the
following activities:
• Authentication of map & approval of Wild life
conservation plan from Chief Wild Life
Warden.
• Approval process takes 2-3 months after
assessment by local, district and head office
level in the forest department .
Target Time for allied Studies
19
Hydro geological study
• To start study immediately on submission of
Form-1.
• Apply for Permission of abstraction & intersection
of groundwater as soon as study is complete.
• Grant of CGWA permission before the appraisal
stage has a positive impact during appraisal
meeting.
• Permission is also necessary to get consent to
establish.
Target Time for allied Studies
20
Land Use pattern
• Start procurement of Satellite imagery
from National Remote Sensing Center
(NRSC) for land use of area
• Procurement of images takes 1 or 2
months.
• To start procurement immediately after
submission of Form-1.
Target Time for allied Studies
21
Rehabilitation and Resettlement plan
• When land acquisition is involved.
• R & R issue is major point during TOR &
appraisal presentation.
• Hence R & R report & data should be
comprehensive to clarify all possible queries
of committee .
• Keep additional information if SC or ST
community is involved.
Target Time for allied Studies
22
Mine Plan
• Preparation of Mine Plan in schedule time.
• Mine plan is required for the preparation of
the EIA report.
• Project is not considered without approved
mine plan for appraisal presentation.
Target Time for allied Studies
23
Traffic Impact
• Impact of inward and outward traffic from the
proposed project on surrounding highways is
assessed.
• To collect data of traffic-carrying capacity of
surrounding highways from PWD/CPWD/
NHAI.
Target Time for allied Studies
24
• Constant follow-up with the EIA consultant is
very crucial for timely completion of each
activity.
• To submit project data to the consultant
without delays.
• May delay EC procedure if job progress of
consultant is not monitored efficiently by the
PP.
Coordination with EIA Consultant
25
Coordination with Statutory Authority
Coordination and follow-up with statutory authorities.
• Pollution control board
• MOEF
• Forest Department
• Mining Department
• IBM
• CGWA
• District Collector
Quick actions:
 Do not wait for official mail from authority.
 Provide information/ clarifications during visit to authority’s office.
 Helps to get approvals in the shortest time.
26
Validity of Environmental Clearance
EC shall be valid for a period of thirty
years for mining projects and five
years in the case of all other projects.
27
Transferability of Environmental Clearance
• May be transferred to another entitled legal
person to undertake the project.
• On application to the regulatory authority
concerned, on same terms and conditions.
• No reference to the Expert Appraisal
Committee is necessary in such cases.
28
Guidelines for Location of industry
• To avoid use of Agricultural land/forest land for
industrial site as far as possible.
• Minimum - 500 meters from highways and railway line.
• 25 km from Major Settlements (3,00,000 population) .
• 1/2 km from the high tide line as per CRZ notification.
• 200 meters from the estuary boundaries.
• 500 meters from flood plain.
• Land Size - adequate to provide green belt ,solid waste
etc.
• Plant Layout must conform to the landscape of the
surrounding area.
29
Conclusion
As we have discussed above with following actions:
Advance action by Project Proponent
Target Time for allied Studies
Communication with EIA Consultant
Coordination with Statutory Authority
 We can save time from 5 days to 15 days in each small activities.
 Total time of normal EC procedure of 84 weeks can brought to 64
weeks.
30
Thank you
31

More Related Content

What's hot

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
School of planning and architecture
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
Deepika Verma
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearanceMohit Singh
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental clearance from moef
Environmental clearance from moefEnvironmental clearance from moef
Environmental clearance from moef
Property Document Verification
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Kashmeera N.A.
 
EIA 2020
EIA 2020EIA 2020
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020
AnthonyNimelyCheaJr1
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
Nabin Lamichhane
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
SonikaPawar
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
B. BHASKAR
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
GAURAV. H .TANDON
 
Water protection act 1974
Water protection act 1974Water protection act 1974
Water protection act 1974
Dashiya Foundation
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
Pramoda Raj
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Sayyid Ina
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
Kushal Patel
 
Ministry of Environment & Forests Notification 2006
Ministry of Environment & Forests Notification 2006Ministry of Environment & Forests Notification 2006
Ministry of Environment & Forests Notification 2006
kopila
 
Eia screening
Eia screeningEia screening
Eia screening
Iqbál Ãzàm
 

What's hot (20)

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearance
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental clearance from moef
Environmental clearance from moefEnvironmental clearance from moef
Environmental clearance from moef
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA 2020
EIA 2020EIA 2020
EIA 2020
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Water protection act 1974
Water protection act 1974Water protection act 1974
Water protection act 1974
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Ministry of Environment & Forests Notification 2006
Ministry of Environment & Forests Notification 2006Ministry of Environment & Forests Notification 2006
Ministry of Environment & Forests Notification 2006
 
Eia screening
Eia screeningEia screening
Eia screening
 

Viewers also liked

Environmental policy in india aabid
Environmental policy in india aabidEnvironmental policy in india aabid
Environmental policy in india aabid
Aabid Hussain Mir
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIA
Ar Naveen Naveen
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Ecotist
 
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian EffortsBiodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
ClearIAS
 
Env policy ppt 2
Env policy ppt 2Env policy ppt 2
Env policy ppt 2arvindprem
 
Coastal regulation zone
Coastal regulation zoneCoastal regulation zone
Coastal regulation zone
Vaishnavi Bargotra
 

Viewers also liked (7)

Environmental policy in india aabid
Environmental policy in india aabidEnvironmental policy in india aabid
Environmental policy in india aabid
 
Coastal regulation zone
Coastal regulation   zoneCoastal regulation   zone
Coastal regulation zone
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIA
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
 
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian EffortsBiodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
 
Env policy ppt 2
Env policy ppt 2Env policy ppt 2
Env policy ppt 2
 
Coastal regulation zone
Coastal regulation zoneCoastal regulation zone
Coastal regulation zone
 

Similar to Environment Clearance Procedure-India

Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
B. BHASKAR
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
Abhishek Kumar Sinha
 
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptxA CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
DarpanChaudhary7
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
Sandeep Kumar
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016
Anaerobic Digestion & Biogas Association
 
Law presentation
Law presentationLaw presentation
Law presentation
AKHIL GEORGE
 
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
Sadique Khan
 
Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
IES / IAQM
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
Palash Mehar
 
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Aaron Organ
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue WestPublic Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
Crosstown TO
 
2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin 2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin
SevernEstuary
 
Eia 2020 kulvendra patel
Eia 2020  kulvendra patelEia 2020  kulvendra patel
Eia 2020 kulvendra patel
Kulvendra Patel
 
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
 -Project professionals: Ready for the future? Climate change, Leigh Woodcock -Project professionals: Ready for the future? Climate change, Leigh Woodcock
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
APMDonotuse
 
Environmental Assessment Presentation Kitselas Aug 15, 2014
Environmental Assessment Presentation Kitselas Aug 15, 2014Environmental Assessment Presentation Kitselas Aug 15, 2014
Environmental Assessment Presentation Kitselas Aug 15, 2014sarahartis
 
Eia procedure-and-requirements-in-malaysia
Eia procedure-and-requirements-in-malaysiaEia procedure-and-requirements-in-malaysia
Eia procedure-and-requirements-in-malaysia
Franz Klyne
 
Sustainable Tourism :Eia procedure-and-requirements-in-malaysia
Sustainable Tourism :Eia procedure-and-requirements-in-malaysiaSustainable Tourism :Eia procedure-and-requirements-in-malaysia
Sustainable Tourism :Eia procedure-and-requirements-in-malaysia
NURUL HAZWANI HUSNA RAZLAN
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
Southern New England American Planning Association
 

Similar to Environment Clearance Procedure-India (20)

Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptxA CASE STUDY ON MINING PROJECT EIA PLAN.pptx
A CASE STUDY ON MINING PROJECT EIA PLAN.pptx
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016
 
Law presentation
Law presentationLaw presentation
Law presentation
 
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
 
Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue WestPublic Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
Public Open House - MSF (Maintenance and Storage Facility) on Finch Avenue West
 
2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin 2009 06 Department of Energy and Climate Change - Juliet Austin
2009 06 Department of Energy and Climate Change - Juliet Austin
 
Eia 2020 kulvendra patel
Eia 2020  kulvendra patelEia 2020  kulvendra patel
Eia 2020 kulvendra patel
 
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
 -Project professionals: Ready for the future? Climate change, Leigh Woodcock -Project professionals: Ready for the future? Climate change, Leigh Woodcock
-Project professionals: Ready for the future? Climate change, Leigh Woodcock
 
Environmental Assessment Presentation Kitselas Aug 15, 2014
Environmental Assessment Presentation Kitselas Aug 15, 2014Environmental Assessment Presentation Kitselas Aug 15, 2014
Environmental Assessment Presentation Kitselas Aug 15, 2014
 
Eia procedure-and-requirements-in-malaysia
Eia procedure-and-requirements-in-malaysiaEia procedure-and-requirements-in-malaysia
Eia procedure-and-requirements-in-malaysia
 
Sustainable Tourism :Eia procedure-and-requirements-in-malaysia
Sustainable Tourism :Eia procedure-and-requirements-in-malaysiaSustainable Tourism :Eia procedure-and-requirements-in-malaysia
Sustainable Tourism :Eia procedure-and-requirements-in-malaysia
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 

More from Kezar Ali. Shah

Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfill
Kezar Ali. Shah
 
Transportation of Concrete - Notes for Civil engineering Students
Transportation of Concrete  - Notes for Civil engineering StudentsTransportation of Concrete  - Notes for Civil engineering Students
Transportation of Concrete - Notes for Civil engineering Students
Kezar Ali. Shah
 
Form Work
Form Work Form Work
Form Work
Kezar Ali. Shah
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
Kezar Ali. Shah
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
Kezar Ali. Shah
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
Kezar Ali. Shah
 
Road Safety Awareness (india)
Road Safety Awareness (india)Road Safety Awareness (india)
Road Safety Awareness (india)
Kezar Ali. Shah
 

More from Kezar Ali. Shah (7)

Design & construction of secure waste landfill
Design & construction of secure waste landfillDesign & construction of secure waste landfill
Design & construction of secure waste landfill
 
Transportation of Concrete - Notes for Civil engineering Students
Transportation of Concrete  - Notes for Civil engineering StudentsTransportation of Concrete  - Notes for Civil engineering Students
Transportation of Concrete - Notes for Civil engineering Students
 
Form Work
Form Work Form Work
Form Work
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
 
Road Safety Awareness (india)
Road Safety Awareness (india)Road Safety Awareness (india)
Road Safety Awareness (india)
 

Recently uploaded

UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 

Recently uploaded (20)

UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 

Environment Clearance Procedure-India

  • 1. Kezar A.Shah BE(Civil) NIT-Rourkela, MS(Environment) Leeds University,UK GM(Environment & CSR) Wonder Cement Limited, Chittorgarh -Rajasthan 1 Checks & Balances - Steps towards “Environmental Clearance-Industrial Projects “
  • 2. Environment Clearance- Steps Pre-Feasibility Report & Form -1 to MOEF/SEIAA Presentation for TOR to EAC Baseline Study Award of TOR Submit EIA report to SPCB Notice for Public Hearing Conduct Public Hearing MOM of Public Hearing to MOEF Final EIA report to MOEF Presentation to Env Assessment Committee Grant of EC 2
  • 3. Introduction • All new or expansion projects listed in EIA - Notifications-2006 requires environmental clearance from Ministry of Environment & Forest. • Total time for grant of EC is 12 to 18 months. • Construction work can not be started without EC. • Only boundary wall of project site can be constructed before grant of EC. 3
  • 4. Category of Industry Category ‘A’ Industries (Large size) • EC is granted by Ministry of Environment & Forest (MOEF) Category ‘B’ Industries (Small Size) • EC is granted by State Environment Impact Assessment Authority (SEIAA) 4
  • 5. Classification-Category A & B Industry Category “A” Category “B” Mining of minerals  50 ha. of mining lease area <50 ha  1 ha .of mining lease area. Thermal Power Plants  500 MW < 500 MW Cement plants  1.0 million tons/annum capacity <1.0 million tons/annum capacity. ( grinding units) Metallurgical industries (ferrous & non ferrous) Primary metallurgical industry Secondary metallurgical processing industry 5
  • 6. EIA Consultant • Services of EIA Consultant (registered with MOEF) is mandatory. • Consultant carry out all work from submission of application upto grant of EC. 6
  • 7. Preparation of Pre-feasibility Report & Form 1 • Report requires broad information of the project (No Details). • Online submission of PFR & Form 1 to MOEF website. • Acceptance of form1 by MOEF in 15 days time. • Hard copies of Form1 is submitted to MOEF. 7
  • 8. TOR Presentation • MOEF invites project proponent to make presentation to expert appraisal committee for TOR (Terms of Reference of EIA study). • Committee has 10 to 15 experts on air pollution, water pollution, meteorology, mining, flora-fauna, CSR etc. • Proponent presents basic information of site, process , waste generation, impact on air, water etc. to committee. 8
  • 9. TOR & Baseline Study After presentation committee prescribes TOR conditions for 3 months base line data generation and EIA study which includes: • Number of monitoring locations for base line ambient air, ground water, noise, soil quality etc. • Total environmental impact & mitigation in 10 km area of project. • Land use, flora-fauna data of 10 km radius area. • Impact on livelihood of land looser of project affected area. 9
  • 10. Public Hearing • After collections of 3 months baseline data, EIA report is prepared. • Report is submitted to Pollution Control Board. • PCB organizes public hearing within 45 days. • Data of EIA study is presented to project affected community. • Proposals, objections, suggestions of community is recorded (video) . • Minutes of meeting & video is submitted to MOEF. 10
  • 11. Final EIA Report • Final EIA report with minutes of public hearing is submitted to MOEF. • MOEF invites project proponent to make presentation to expert committee. • Committee evaluates EIA report, impacts on environment and community. • Committee may ask to submit more information and after complete evaluation grants EC or reject the proposal. 11
  • 12. Efficient Planning for EC METHODOLOGY (1) Advance action by Project Proponent (2) Set Target Time for allied Studies (3) Good Communication with EIA Consultant (4) Coordination with Statutory Authority 12
  • 13. • Time of EC procedure is reduced if homework is good. • Advance compilation of data for Form-1, EIA report, public hearing and presentation saves time. • Data/information can be submitted immediately to the EIA consultant and regulatory authority as and when required. Advance action by Project Proponent 13
  • 14. Accuracy of information Accuracy of data in documents avoids submission of clarifications to MOEF & saves time. • Data in the mine plan, EIA & public hearing documents must match. ( Mine reserve, Waste Qty., Greenbelt etc.) • Good communication between PP, EIA consultant & Mine plan Consultant keeps uniformity of data. (No work in isolation) EXAMPLES : • Latitude-longitude of lease area - Identical in Form-1, EIA report and lease deed. • Name of PP - Same in the lease deed, previous EC & proposed expansion title. (Ex: M/s X Minerals Ltd instead of M/s X Minerals Pvt. Ltd. • Project cost – careful assessment in the feasibility report and no change of amount throughout the EC process. Advance action by Project Proponent 14
  • 15. Certificates from statutory authority • Forest Department -Involvement of forest in the project area. • EC compliance certified by Regional Office- MOEF.(without it –No TOR or Final presentation) • Project area is /not located in a sensitive zone, like the Aravali Hills, coastal area etc. Advance action by Project Proponent 15
  • 16. Data for the EIA report Should be available -: • Coal linkage agreement with supplier. • CSR history. • Existing/ proposed Greenbelt • Manpower/land requirement, • Process/flow chart, waste generation, Advance action by Project Proponent 16
  • 17. Back-up database • On all aspects of EIA study & project should be on hand. • To satisfy queries during TOR and Appraisal presentation. • Helps to avoid submission of clarifications if not properly addressed in the MOEF presentation. Advance action by Project Proponent 17
  • 18. To start following studies simultaneously with baseline environmental monitoring : • Biological study : • Hydrogeological study • Procurement of satellite image • Rehabilitation & Resettlement study • Preparation of mine Plan It Helps in preparation of the EIA report in shortest time. Follow-up with the EIA consultant is necessary to complete allied studies on time. Target Time for Allied Studies 18
  • 19. Biological study Early action of study helps in completing the following activities: • Authentication of map & approval of Wild life conservation plan from Chief Wild Life Warden. • Approval process takes 2-3 months after assessment by local, district and head office level in the forest department . Target Time for allied Studies 19
  • 20. Hydro geological study • To start study immediately on submission of Form-1. • Apply for Permission of abstraction & intersection of groundwater as soon as study is complete. • Grant of CGWA permission before the appraisal stage has a positive impact during appraisal meeting. • Permission is also necessary to get consent to establish. Target Time for allied Studies 20
  • 21. Land Use pattern • Start procurement of Satellite imagery from National Remote Sensing Center (NRSC) for land use of area • Procurement of images takes 1 or 2 months. • To start procurement immediately after submission of Form-1. Target Time for allied Studies 21
  • 22. Rehabilitation and Resettlement plan • When land acquisition is involved. • R & R issue is major point during TOR & appraisal presentation. • Hence R & R report & data should be comprehensive to clarify all possible queries of committee . • Keep additional information if SC or ST community is involved. Target Time for allied Studies 22
  • 23. Mine Plan • Preparation of Mine Plan in schedule time. • Mine plan is required for the preparation of the EIA report. • Project is not considered without approved mine plan for appraisal presentation. Target Time for allied Studies 23
  • 24. Traffic Impact • Impact of inward and outward traffic from the proposed project on surrounding highways is assessed. • To collect data of traffic-carrying capacity of surrounding highways from PWD/CPWD/ NHAI. Target Time for allied Studies 24
  • 25. • Constant follow-up with the EIA consultant is very crucial for timely completion of each activity. • To submit project data to the consultant without delays. • May delay EC procedure if job progress of consultant is not monitored efficiently by the PP. Coordination with EIA Consultant 25
  • 26. Coordination with Statutory Authority Coordination and follow-up with statutory authorities. • Pollution control board • MOEF • Forest Department • Mining Department • IBM • CGWA • District Collector Quick actions:  Do not wait for official mail from authority.  Provide information/ clarifications during visit to authority’s office.  Helps to get approvals in the shortest time. 26
  • 27. Validity of Environmental Clearance EC shall be valid for a period of thirty years for mining projects and five years in the case of all other projects. 27
  • 28. Transferability of Environmental Clearance • May be transferred to another entitled legal person to undertake the project. • On application to the regulatory authority concerned, on same terms and conditions. • No reference to the Expert Appraisal Committee is necessary in such cases. 28
  • 29. Guidelines for Location of industry • To avoid use of Agricultural land/forest land for industrial site as far as possible. • Minimum - 500 meters from highways and railway line. • 25 km from Major Settlements (3,00,000 population) . • 1/2 km from the high tide line as per CRZ notification. • 200 meters from the estuary boundaries. • 500 meters from flood plain. • Land Size - adequate to provide green belt ,solid waste etc. • Plant Layout must conform to the landscape of the surrounding area. 29
  • 30. Conclusion As we have discussed above with following actions: Advance action by Project Proponent Target Time for allied Studies Communication with EIA Consultant Coordination with Statutory Authority  We can save time from 5 days to 15 days in each small activities.  Total time of normal EC procedure of 84 weeks can brought to 64 weeks. 30