Environmental impact assessment
• Environmental impact assessment is the formal process used to predict the
environmental consequences (positive or negative) of a plan, policy, program, or
project prior to the decision to move forward with the proposed action. Formal
impact assessments may be governed by rules of administrative
procedure regarding public participation and documentation of decisionmaking,
and may be subject to judicial review. An impact assessment may propose
measures to adjust impacts to acceptable levels or to investigate new
technological solutions.
• The purpose of the assessment is to ensure that decision makers consider the
environmental impacts when deciding whether or not to proceed with a project.
The International Association for Impact Assessment (IAIA) defines an
environmental impact assessment as "the process of identifying, predicting,
evaluating and mitigating the biophysical, social, and other relevant effects of
development proposals prior to major decisions being taken and commitments
made."[1] EIAs are unique in that they do not require adherence to a
predetermined environmental outcome, but rather they require decision makers
to account for environmental values in their decisions and to justify those
decisions in light of detailed environmental studies and public comments on the
potential environmental impacts.[2]
Environmental Impact Statement (EIS)
• A document, prepared after careful studies, describing a proposed
development or activity, and disclosing the possible, probable, or certain
effects of that proposal on the environment.
• An EIS should be comprehensive in its treatment of the subject matter,
objective in its approach, and sufficiently specific for a reasonably
intelligent and informed mind to examine the potential environmental
consequences of the carrying out or not carrying out of that proposal.
• An EIS should meet the requirement that it alerts the decision-maker,
members of the public, and the government to the consequences to the
community; it should also explore possible alternatives to the project that
might maximize the benefits while minimizing the disbenefits.
• The purpose of an EIS is to assist the decision-maker in arriving at a better
informed decision than would otherwise have been the case...(Gilpin
1990, p. 72).
• The Environmental Impact Statement (EIS) is not a decision-making end in
itself but a means to a decision-making end.
Finding of No Significant Impact
• A Finding of No Significant Impact (FONSI) presents the reasons why
an action will not have a significant effect on the human
environment. It must include the Environment Assessment(EA) or
summary of the EA that supports the FONSI determination.
• A FONSI is issued when environmental analysis and interagency
review during the EA process find a project to have no significant
impacts on the quality of the environment. The FONSI document is
the EA modified to reflect all applicable comments and responses. If
it was not done in the EA, the FONSI must include the project
sponsor's recommendation or selected alternative. No formal
public circulation of the FONSI is required, but the state
clearinghouse must be notified of the availability of the FONSI.
FINDING OF NO SIGNIFICANT IMPACT
(FONSI)
• The FONSI is a document that explains the reasons why an action
will not have a significant effect on the human environment and,
why, therefore, an EIS will not be required (40 CFR 1508.13). This
FONSI is a stand-alone document but is attached to the
Environmental Assessment (EA) and incorporates the EA by
reference.
• The FONSI does not constitute the authorizing document: the
decision record is the authorizing document. “Significance” as used
in NEPA requires considerations of both context and intensity. In
relation to context, I find that the project’s affected region is
localized and the effects of implementation are relevant to people
recreating and living in the area. There would be no societal or
regional impacts and no impacts on potentially affected interests.
• The affected area is comprised of the proposed twelve 250 KW wind turbines sites
and the surrounding area from which they can be seen. Intensity refers to the
severity of effects. The BLM will conduct the actions described using the BMPs
referenced in the EA and limiting severity of the effects to the immediate vicinity
of the proposed twelve wind turbines as described in the Affected Environment
section of the EA.
• While any land management activity invariably and by definition entails
environmental effects, I have determined, based upon the analysis of
environmental impacts contained in the referenced EA (OR-035-08-01), that the
potential impacts raised by the proposed action (which is to issue Joseph
Millworks Inc. a right-of-way grant authorizing the right to install, operate, and
maintain a wind development project on public lands and to also issue a right-of-
way grant to Idaho Power Company authorizing the right to build, operate and
maintain an overhead utility corridor from their existing line on private property
across BLM lands to the Lime Wind Project) will not be significant and that,
therefore, preparation of an environmental impact statement is not required.
• I have evaluated the effects of the proposed action, together with the proposed
mitigating measures, against the tests of significance found at 40 CFR 1508.27. I
have determined that:
• 1. The proposed action would cause no significant impacts, either beneficial or
adverse; all impact would be minimal; most would be of short duration.
• 2. The proposed action would have no effect on public health or safety.
• 3. The proposed action would not affect unique characteristics of the geographic
area.
• 4. The proposed action would have no highly controversial effects.
• 5. The proposed action would have no uncertain effects and would not involve
unique or unknown risks.
• 6. The proposed action is a routine and common project and does not establish a
precedent for future actions.
• 7. The proposed action is not related to any other action being considered by BLM.
• 8. The proposed action would have no adverse effect to any property listed on or
potentially eligible for listing on the National Register of Historic Places.
• 9. The proposed action would not significantly adversely affect an endangered or
threatened species, or any habitat critical to an endangered or threatened species.
• 10. The proposed action does not violate any law or requirement imposed for the
protection of the environment. Nancy Lull Date Field Manager Baker Field Office,
Vale District BLM

More Related Content

What's hot

Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)Sumeet Khirade
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projectsAnchal Garg
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilutionAnkit Gola
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management PlanShehab Sajeeb
 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIAbishal sapkota
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006Tej Kiran
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
 
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’sConstruction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’sDevelopment Alternatives
 

What's hot (20)

Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)Gaussian model (kabani & sumeet)
Gaussian model (kabani & sumeet)
 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
Concept of cetp
Concept of cetpConcept of cetp
Concept of cetp
 
Eia screening
Eia screeningEia screening
Eia screening
 
AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
desposal by dilution
desposal by dilutiondesposal by dilution
desposal by dilution
 
cetp
cetpcetp
cetp
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
L 8 equalization and proportioning
L  8 equalization and proportioningL  8 equalization and proportioning
L 8 equalization and proportioning
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’sConstruction and Demolition Waste Management Rules, 2016  -  Impacts on ULB’s
Construction and Demolition Waste Management Rules, 2016 - Impacts on ULB’s
 

Similar to Eia eis fonsi

Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAikinsOsei1
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxMarskyUbia
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentPramoda Raj
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfJagriti Agarwal
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptxKalaimani
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptxthanga2
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsIgiegie Oghenegueke
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...MdHaque78
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 

Similar to Eia eis fonsi (20)

Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
Eia sem 40_02
Eia sem 40_02Eia sem 40_02
Eia sem 40_02
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdf
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Facts about-environmental-impact-assessments
Facts about-environmental-impact-assessmentsFacts about-environmental-impact-assessments
Facts about-environmental-impact-assessments
 
Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...Environmental impact assessment and importance of effective application in ba...
Environmental impact assessment and importance of effective application in ba...
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptx
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 

Recently uploaded

VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-Kawther MEKNI
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...Amil baba
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 

Recently uploaded (20)

VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Environmental Management System - ISO 14001:2015-
Environmental Management System      - ISO 14001:2015-Environmental Management System      - ISO 14001:2015-
Environmental Management System - ISO 14001:2015-
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
NO1 Famous Kala Jadu specialist Expert in Pakistan kala ilam specialist Exper...
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 

Eia eis fonsi

  • 1. EIA, EIS and FONSI
  • 2.
  • 3.
  • 4. Environmental impact assessment • Environmental impact assessment is the formal process used to predict the environmental consequences (positive or negative) of a plan, policy, program, or project prior to the decision to move forward with the proposed action. Formal impact assessments may be governed by rules of administrative procedure regarding public participation and documentation of decisionmaking, and may be subject to judicial review. An impact assessment may propose measures to adjust impacts to acceptable levels or to investigate new technological solutions. • The purpose of the assessment is to ensure that decision makers consider the environmental impacts when deciding whether or not to proceed with a project. The International Association for Impact Assessment (IAIA) defines an environmental impact assessment as "the process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made."[1] EIAs are unique in that they do not require adherence to a predetermined environmental outcome, but rather they require decision makers to account for environmental values in their decisions and to justify those decisions in light of detailed environmental studies and public comments on the potential environmental impacts.[2]
  • 5. Environmental Impact Statement (EIS) • A document, prepared after careful studies, describing a proposed development or activity, and disclosing the possible, probable, or certain effects of that proposal on the environment. • An EIS should be comprehensive in its treatment of the subject matter, objective in its approach, and sufficiently specific for a reasonably intelligent and informed mind to examine the potential environmental consequences of the carrying out or not carrying out of that proposal. • An EIS should meet the requirement that it alerts the decision-maker, members of the public, and the government to the consequences to the community; it should also explore possible alternatives to the project that might maximize the benefits while minimizing the disbenefits. • The purpose of an EIS is to assist the decision-maker in arriving at a better informed decision than would otherwise have been the case...(Gilpin 1990, p. 72). • The Environmental Impact Statement (EIS) is not a decision-making end in itself but a means to a decision-making end.
  • 6. Finding of No Significant Impact • A Finding of No Significant Impact (FONSI) presents the reasons why an action will not have a significant effect on the human environment. It must include the Environment Assessment(EA) or summary of the EA that supports the FONSI determination. • A FONSI is issued when environmental analysis and interagency review during the EA process find a project to have no significant impacts on the quality of the environment. The FONSI document is the EA modified to reflect all applicable comments and responses. If it was not done in the EA, the FONSI must include the project sponsor's recommendation or selected alternative. No formal public circulation of the FONSI is required, but the state clearinghouse must be notified of the availability of the FONSI.
  • 7. FINDING OF NO SIGNIFICANT IMPACT (FONSI) • The FONSI is a document that explains the reasons why an action will not have a significant effect on the human environment and, why, therefore, an EIS will not be required (40 CFR 1508.13). This FONSI is a stand-alone document but is attached to the Environmental Assessment (EA) and incorporates the EA by reference. • The FONSI does not constitute the authorizing document: the decision record is the authorizing document. “Significance” as used in NEPA requires considerations of both context and intensity. In relation to context, I find that the project’s affected region is localized and the effects of implementation are relevant to people recreating and living in the area. There would be no societal or regional impacts and no impacts on potentially affected interests.
  • 8. • The affected area is comprised of the proposed twelve 250 KW wind turbines sites and the surrounding area from which they can be seen. Intensity refers to the severity of effects. The BLM will conduct the actions described using the BMPs referenced in the EA and limiting severity of the effects to the immediate vicinity of the proposed twelve wind turbines as described in the Affected Environment section of the EA. • While any land management activity invariably and by definition entails environmental effects, I have determined, based upon the analysis of environmental impacts contained in the referenced EA (OR-035-08-01), that the potential impacts raised by the proposed action (which is to issue Joseph Millworks Inc. a right-of-way grant authorizing the right to install, operate, and maintain a wind development project on public lands and to also issue a right-of- way grant to Idaho Power Company authorizing the right to build, operate and maintain an overhead utility corridor from their existing line on private property across BLM lands to the Lime Wind Project) will not be significant and that, therefore, preparation of an environmental impact statement is not required.
  • 9. • I have evaluated the effects of the proposed action, together with the proposed mitigating measures, against the tests of significance found at 40 CFR 1508.27. I have determined that: • 1. The proposed action would cause no significant impacts, either beneficial or adverse; all impact would be minimal; most would be of short duration. • 2. The proposed action would have no effect on public health or safety. • 3. The proposed action would not affect unique characteristics of the geographic area. • 4. The proposed action would have no highly controversial effects. • 5. The proposed action would have no uncertain effects and would not involve unique or unknown risks. • 6. The proposed action is a routine and common project and does not establish a precedent for future actions. • 7. The proposed action is not related to any other action being considered by BLM. • 8. The proposed action would have no adverse effect to any property listed on or potentially eligible for listing on the National Register of Historic Places. • 9. The proposed action would not significantly adversely affect an endangered or threatened species, or any habitat critical to an endangered or threatened species. • 10. The proposed action does not violate any law or requirement imposed for the protection of the environment. Nancy Lull Date Field Manager Baker Field Office, Vale District BLM